CN207451329U - A kind of road construction cable reel installation - Google Patents

A kind of road construction cable reel installation Download PDF

Info

Publication number
CN207451329U
CN207451329U CN201721032451.9U CN201721032451U CN207451329U CN 207451329 U CN207451329 U CN 207451329U CN 201721032451 U CN201721032451 U CN 201721032451U CN 207451329 U CN207451329 U CN 207451329U
Authority
CN
China
Prior art keywords
folding
lantern ring
unfolding chamber
cable
road construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721032451.9U
Other languages
Chinese (zh)
Inventor
薛庆鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721032451.9U priority Critical patent/CN207451329U/en
Application granted granted Critical
Publication of CN207451329U publication Critical patent/CN207451329U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of road construction cable reel installations, including folding and unfolding chamber, the one side of the folding and unfolding chamber interior wall bottom is fixedly connected with motor by link block, the outer surface of the motor output shaft is arranged with first bevel gear, the bottom of the folding and unfolding chamber interior wall and rotation axis is rotatably connected to by bearing block positioned at the one side of motor, the outer surface of the rotation axis is arranged with second bevel gear, it is engaged with the one side of first bevel gear the one side of second bevel gear, the bottom of folding and unfolding chamber interior wall and transmission shaft is rotatably connected to by supporting rack positioned at the one side of rotation axis, the utility model is related to road construction facility technical fields.The road construction cable reel installation, greatly strengthen the folding and unfolding efficiency of cable, save substantial amounts of manpower, construction personnel's substantial amounts of working time need not be spent, alleviate the work load of construction personnel, the work efficiency of cable laying is improved, realize not only quick but also folding and unfolding easily is carried out to cable.

Description

A kind of road construction cable reel installation
Technical field
The utility model is related to road construction facility technical fields, are specially a kind of road construction cable reel installation.
Background technology
By several or the cable of similar rope that several groups of wire strandings form, mutually insulated between every group of conducting wire, and often enclose It is twisted into around a center, entire outside is surrounded by the coating of high-insulation, and cable has interior energization, the feature of external insulation, electricity Electric power or information can be transferred to another place by cable at one, cable have power cable, control cable, compensating cable, shielded cable, High-temperature cable, computer cable, signal cable, coaxial cable, fire-resisting cable, cable for ship, mine cable and aluminium alloy cable Deng during road construction, the laying of cable is an engineering more important in work progress.
It is manually to remove the cable on coiling cylinder by construction personnel mostly at present during cable laying It is received and dispatched, however, such cable transmitting-receiving mode folding and unfolding efficiency is low, and needs to expend more manpower, carry out cable every time It is required for spending construction personnel's substantial amounts of working time during folding and unfolding, adds the work load of construction personnel, reduce cable paving If work efficiency, it is impossible to it is not only quick but also folding and unfolding easily is carried out to cable, so as to bring pole to entire road construction work Big inconvenience.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of road construction cable reel installation, solves electricity The folding and unfolding efficiency of cable is low, and needs to expend more manpower, it is impossible to not only quick but also the problem of conveniently carry out folding and unfolding to cable.
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of road construction cable is received Device is put, including folding and unfolding chamber, the one side of the folding and unfolding chamber interior wall bottom is fixedly connected with motor by link block, and the motor is defeated The outer surface of shaft is arranged with first bevel gear, the bottom of the folding and unfolding chamber interior wall and passes through bearing block positioned at the one side of motor and turns Dynamic to be connected with rotation axis, the outer surface of the rotation axis is arranged with second bevel gear, and the one side of second bevel gear and the first cone The one side engagement of gear, the bottom of the folding and unfolding chamber interior wall and is rotatably connected to transmission positioned at the one side of rotation axis by supporting rack Axis, the outer surface of described transmission shaft one end are arranged with third hand tap gear, and the one side of third hand tap gear and second bevel gear is another One side is engaged, and the other end of the transmission shaft is rotatablely connected by the one side of bearing and folding and unfolding chamber interior wall, outside the transmission shaft Surface is arranged with driving drum, and the outer surface of driving drum offers arc driving groove, and the inner wall of arc driving groove slides It is connected with T-shaped drive link, the one side of the folding and unfolding chamber interior wall and is fixedly connected with installing plate, the T at the top of transmission shaft The top of type drive link is through installing plate and extends to the top of installing plate, and the T-shaped drive link is extended at the top of installing plate One end is fixedly connected with movable plate.
Preferably, the top of the movable plate is fixedly connected with lower half circle lantern ring, and lower half circle lantern ring top by connecting rod The one side in portion is connected with matched upper semi-circle lantern ring by pin rotation.
Preferably, the inner wall of the lower half circle lantern ring and the inner wall of upper semi-circle lantern ring are fixedly connected with by buffer spring Line lantern ring is wiped, the one side of the lower half circle lantern ring and the one side of upper semi-circle lantern ring have been fixedly connected with fixed block.
Preferably, the top of the rotation axis is fixedly connected with splined shaft, and the appearance surface cover of splined shaft by support plate Outer surface equipped with coiling cylinder, and coiling cylinder is wound with the cable being adapted with wiping line lantern ring.
Preferably, the one end of the cable away from coiling cylinder, which sequentially passes through, wipes line lantern ring and folding and unfolding chamber and extends to receipts The one side of case is put, the top movable of the folding and unfolding chamber is connected with case lid.
Preferably, the one side of the folding and unfolding chamber is fixedly connected with hand push handle, and the fixed peace in the both sides of folding and unfolding chamber bottom Equipped with universal wheel, control switch is fixedly connected at the top of the folding and unfolding chamber one side.
Advantageous effect
The utility model provides a kind of road construction cable reel installation.Possesses following advantageous effect:
(1), the road construction cable reel installation is connected by being fixed in the one side of folding and unfolding chamber interior wall bottom by link block Motor, then being equipped with by first bevel gear, second bevel gear, rotation axis, splined shaft and coiling cylinder respectively are connected to, it can Realize that the folding and unfolding to cable carries out Electronic control, manually twisted and released of the cable works instead of construction personnel well, so significantly The folding and unfolding efficiency of cable is enhanced, saves substantial amounts of manpower, without spending construction personnel's substantial amounts of working time, is alleviated The work load of construction personnel improves the work efficiency of cable laying, realizes not only quick but also easily cable is received It puts, so as to greatly facilitate the work of road construction personnel.
(2), road construction cable reel installation, by leading in the bottom of folding and unfolding chamber interior wall and positioned at the one side of rotation axis Cross supporting rack and be rotatably connected to transmission shaft, then respectively by third hand tap gear, driving drum, T-shaped drive link, arc driving groove, Installing plate, movable plate and being equipped with, it can be achieved that in taking up and laying cable conductors of line lantern ring is wiped, to the dirt and water on cable surface Divide and wiped, so as to ensure that the enough clean and dryings in cable surface, so as to extend the use of cable well Service life.
(3), the road construction cable reel installation by being fixedly connected with hand push handle in the one side of folding and unfolding chamber, then leads to It crosses and is installed with universal wheel in the both sides of folding and unfolding chamber bottom, personnel can be facilitated to move entire cable reel installation, work as construction When personnel need mobile draw off gear, construction personnel only need to pull hand push handle that can move entire draw off gear, so that applying Worker person uses more convenient.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structure diagram of the utility model lower half circle lantern ring and upper semi-circle lantern ring;
Fig. 3 is the structure diagram of the utility model splined shaft.
In figure:1 folding and unfolding chamber, 2 motors, 3 first bevel gears, 4 rotation axis, 5 second bevel gears, 6 transmission shafts, 7 triconodonts Wheel, 8 driving drums, 9 arc driving grooves, 10 T-shaped drive links, 11 installing plates, 12 movable plates, 13 lower half circle lantern rings, 14 upper semi-circles Line lantern ring, 16 fixed blocks, 17 splined shafts, 18 coiling cylinders, 19 cables, 20 case lids, 21 hand push handles, 220,000 are wiped in lantern ring, 15 To wheel, 23 control switches.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of road construction cable reel installation, including Folding and unfolding chamber 1, the one side of folding and unfolding chamber 1 are fixedly connected with hand push handle 21, and the both sides of 1 bottom of folding and unfolding chamber be installed with it is universal 22 are taken turns, control switch 23 is fixedly connected at the top of 1 one side of folding and unfolding chamber, the one side of 1 inner wall bottom of folding and unfolding chamber is consolidated by link block Surely it is connected with motor 2, the outer surface of 2 output shaft of motor is arranged with first bevel gear 3, the bottom of 1 inner wall of folding and unfolding chamber and positioned at electricity The one side of machine 2 is rotatably connected to rotation axis 4 by bearing block, and the outer surface of rotation axis 4 is arranged with second bevel gear 5, and second The one side of bevel gear 5 is engaged with the one side of first bevel gear 3, the bottom of 1 inner wall of folding and unfolding chamber and is passed through positioned at the one side of rotation axis 4 Supporting rack is rotatably connected to transmission shaft 6, and the outer surface of 6 one end of transmission shaft is arranged with third hand tap gear 7, and third hand tap gear 7 One side is engaged with the opposite side of second bevel gear 5, and the other end of transmission shaft 6 is rotated by the one side of bearing and 1 inner wall of folding and unfolding chamber Connection, the outer surface of transmission shaft 6 is arranged with driving drum 8, and the outer surface of driving drum 8 offers arc driving groove 9, and arc The inner wall of shape driving groove 9 slidably connects T-shaped drive link 10, the one side of 1 inner wall of folding and unfolding chamber and is fixed positioned at the top of transmission shaft 6 Installing plate 11 is connected with, the top of T-shaped drive link 10 through installing plate 11 and extends to the top of installing plate 11, T-shaped drive link 10 one end for extending to 11 top of installing plate are fixedly connected with movable plate 12, and the top of movable plate 12 is fixedly connected by connecting rod There is lower half circle lantern ring 13, and the one side at 13 top of lower half circle lantern ring is connected with matched upper semi-circle set by pin rotation Ring 14, the inner wall of lower half circle lantern ring 13 and the inner wall of upper semi-circle lantern ring 14 are fixedly connected with by buffer spring and wipe line lantern ring 15, the inner wall for wiping line lantern ring 15 is provided with hairbrush, it is therefore an objective to which the convenient cleaning to cable 19, the top of rotation axis 4 passes through branch Fagging is fixedly connected with splined shaft 17, and the outer surface of splined shaft 17 is arranged with coiling cylinder 18, and the appearance of coiling cylinder 18 Face is wound with the cable 19 being adapted with wiping line lantern ring 15, and the one side of lower half circle lantern ring 13 and the one side of upper semi-circle lantern ring 14 are equal Fixed block 16 is fixedly connected with, the threaded hole being mutually adapted is offered on two fixed blocks 16, cable 19 is justified away from coiling One end of cylinder 18, which sequentially passes through, wipes line lantern ring 15 and folding and unfolding chamber 1 and the one side for extending to folding and unfolding chamber 1, the top movable of folding and unfolding chamber 1 It is connected with case lid 20.
In use, first it is moved to what is specified respectively by hand push handle 21 and universal wheel 22 by entire cable reel installation Position, then case lid 20 is opened, then the coiling cylinder 18 for being tied with cable 19 is set on splined shaft 17, construction personnel can First operation-control switch 23 makes motor 2 suitably rotate, and the end of a thread of cable 19 pulls out to certain length, then by upper semi-circle set Ring 14 is opened, and the end of a thread of cable 19 is each passed through lower half circle lantern ring 13 and folding and unfolding chamber 1, and moves the outside of folding and unfolding chamber 1 to, it Upper semi-circle lantern ring 14 is closed again afterwards, and passes through trip bolt and two fixed blocks 16 is fixed, fixes rear cover upper box lid 20, construction personnel can be operated rotating and reverse for 23 control motor 2 of control switch, and motor 2 can pass through first bevel gear respectively 3rd, second bevel gear 5 and rotation axis 4 drive coiling cylinder 18 to be rotated, the folding and unfolding of cable 19 to be controlled to work, while electricity Machine 2 drives movable plate 12 on installing plate 11 by third hand tap gear 7, transmission shaft 6, driving drum 8 and T-shaped drive link 10 respectively Move back and forth, movable plate 12 moves back and forth wiping line lantern ring 15 by connecting rod again, to complete to 19 surface of cable Wiping work, this completes the whole work process of the road construction cable reel installation.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.In the absence of more restrictions.By sentence " element limited including one ..., it is not excluded that Also there are other identical elements in the process, method, article or apparatus that includes the element ".
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of road construction cable reel installation, including folding and unfolding chamber (1), it is characterised in that:Folding and unfolding chamber (1) the inner wall bottom One side motor (2) is fixedly connected with by link block, the outer surface of motor (2) output shaft is arranged with first bevel gear (3), the bottom of folding and unfolding chamber (1) inner wall and rotation axis (4) is rotatably connected to by bearing block positioned at the one side of motor (2), The outer surface of the rotation axis (4) is arranged with second bevel gear (5), and the one side of second bevel gear (5) and first bevel gear (3) One side engagement, the bottom of folding and unfolding chamber (1) inner wall and biography is rotatably connected to by supporting rack positioned at the one side of rotation axis (4) Moving axis (6), the outer surface of described transmission shaft (6) one end are arranged with third hand tap gear (7), and the one side of third hand tap gear (7) with The opposite side engagement of second bevel gear (5), the other end of the transmission shaft (6) pass through the one side of bearing and folding and unfolding chamber (1) inner wall Rotation connection, the outer surface of the transmission shaft (6) is arranged with driving drum (8), and the outer surface of driving drum (8) offers arc Shape driving groove (9), and the inner wall of arc driving groove (9) slidably connects T-shaped drive link (10), folding and unfolding chamber (1) inner wall One side and installing plate (11) is fixedly connected at the top of the transmission shaft (6), the top of the T-shaped drive link (10) is through installation Plate (11) simultaneously extends to the top of installing plate (11), and one end that the T-shaped drive link (10) is extended at the top of installing plate (11) is consolidated Surely it is connected with movable plate (12).
2. a kind of road construction cable reel installation according to claim 1, it is characterised in that:The movable plate (12) Top is fixedly connected with lower half circle lantern ring (13) by connecting rod, and the one side at the top of lower half circle lantern ring (13) passes through pin rotation It is connected with matched upper semi-circle lantern ring (14).
3. a kind of road construction cable reel installation according to claim 2, it is characterised in that:The lower half circle lantern ring (13) inner wall and the inner wall of upper semi-circle lantern ring (14) is fixedly connected with by buffer spring and wipes line lantern ring (15), the lower half The one side of circle lantern ring (13) and the one side of upper semi-circle lantern ring (14) have been fixedly connected with fixed block (16).
4. a kind of road construction cable reel installation according to claim 1, it is characterised in that:The rotation axis (4) Top is fixedly connected with splined shaft (17) by support plate, and the outer surface of splined shaft (17) is arranged with coiling cylinder (18), and The outer surface of coiling cylinder (18) is wound with the cable (19) being adapted with wiping line lantern ring (15).
5. a kind of road construction cable reel installation according to claim 4, it is characterised in that:The cable (19) is remote One end from coiling cylinder (18), which sequentially passes through, wipes line lantern ring (15) and folding and unfolding chamber (1) and extends to the one side of folding and unfolding chamber (1), institute The top movable for stating folding and unfolding chamber (1) is connected with case lid (20).
6. a kind of road construction cable reel installation according to claim 1, it is characterised in that:The folding and unfolding chamber (1) One side is fixedly connected with hand push handle (21), and the both sides of folding and unfolding chamber (1) bottom are installed with universal wheel (22), the receipts It puts and control switch (23) is fixedly connected at the top of case (1) one side.
CN201721032451.9U 2017-08-17 2017-08-17 A kind of road construction cable reel installation Expired - Fee Related CN207451329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721032451.9U CN207451329U (en) 2017-08-17 2017-08-17 A kind of road construction cable reel installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721032451.9U CN207451329U (en) 2017-08-17 2017-08-17 A kind of road construction cable reel installation

Publications (1)

Publication Number Publication Date
CN207451329U true CN207451329U (en) 2018-06-05

Family

ID=62248181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721032451.9U Expired - Fee Related CN207451329U (en) 2017-08-17 2017-08-17 A kind of road construction cable reel installation

Country Status (1)

Country Link
CN (1) CN207451329U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399407A (en) * 2018-11-30 2019-03-01 北京海风智能科技有限责任公司 It is a kind of can winding signal line control cabinet
CN110371798A (en) * 2019-07-25 2019-10-25 新乡医学院第一附属医院(河南省结核病医院) Intensive Care Therapy equipment conducting wire quickly retracting device
CN111439641A (en) * 2020-04-14 2020-07-24 张明庆 Can save physical power's wiring arrangement for construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399407A (en) * 2018-11-30 2019-03-01 北京海风智能科技有限责任公司 It is a kind of can winding signal line control cabinet
CN110371798A (en) * 2019-07-25 2019-10-25 新乡医学院第一附属医院(河南省结核病医院) Intensive Care Therapy equipment conducting wire quickly retracting device
CN110371798B (en) * 2019-07-25 2020-09-18 新乡医学院第一附属医院(河南省结核病医院) Intensive care therapy equipment wire quick winding and unwinding devices
CN111439641A (en) * 2020-04-14 2020-07-24 张明庆 Can save physical power's wiring arrangement for construction
CN111439641B (en) * 2020-04-14 2021-08-20 华仁建设集团有限公司 Can save physical power's wiring arrangement for construction

Similar Documents

Publication Publication Date Title
CN207451329U (en) A kind of road construction cable reel installation
CN201874531U (en) DC (direct current) electric paraffin cleaning hoist
CN108023306B (en) A kind of power scheduling power grid construction stretching machine
CN203545356U (en) Rapid cable take-up and pay-off reel
CN202575570U (en) Manual multi-connected rapid take-up/pay-off wire spool
CN112421490A (en) Transmission line double-conductor pulley
CN110328195A (en) A kind of vertical unipole antenna with long service life for 5G communication
CN201217589Y (en) Automatic winding and expanding machine for electric power cable
CN202848917U (en) Explosion-proof fixed column type slewing crane for low-temperature environment
CN201183724Y (en) Motorized double grinding barrel grinder
CN201390574Y (en) Slip-ring type internal motor cable winch
CN103311848A (en) Lift for outdoor substation bus operation
CN211377377U (en) Cable erecting device for building electromechanical installation
CN107017575B (en) The replacing options of power transmission and transformation system maintenance cart and breaker casing
CN215797677U (en) Steel wire rope reel
CN212366652U (en) Be applied to draw gear of cable laying
CN211239083U (en) Large-tonnage linear labor-saving wire hanging device
CN111268519B (en) Wire and cable pay-off device
CN210286348U (en) Cable installation auxiliary assembly for general aircraft
CN204064106U (en) A kind of wiping big gun machine
CN204559010U (en) Wire support pay off rack
CN212033525U (en) Integrated high-voltage switch cabinet
CN219469258U (en) Processing device for fireproof cable
CN214527323U (en) No welding cable reel
CN208135603U (en) A kind of electronic actinobacillus device of air-cylinder type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180605

Termination date: 20180817

CF01 Termination of patent right due to non-payment of annual fee