CN207447738U - Hot-air stove shell positioner - Google Patents

Hot-air stove shell positioner Download PDF

Info

Publication number
CN207447738U
CN207447738U CN201721590117.5U CN201721590117U CN207447738U CN 207447738 U CN207447738 U CN 207447738U CN 201721590117 U CN201721590117 U CN 201721590117U CN 207447738 U CN207447738 U CN 207447738U
Authority
CN
China
Prior art keywords
positioning column
column
hot
air stove
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721590117.5U
Other languages
Chinese (zh)
Inventor
王超
盛丽萍
傅大伟
郑希增
陈静
张晓�
郑孝红
孙伟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Iron and Steel Group Co Ltd
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN201721590117.5U priority Critical patent/CN207447738U/en
Application granted granted Critical
Publication of CN207447738U publication Critical patent/CN207447738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses a kind of hot-air stove shell positioner, including bottom plate and the first clamp assembly and the second clamp assembly that are respectively used to clamp two neighboring furnace shell plate.First clamp assembly includes the first positioning column and the first adjustment column positioned opposite with the first positioning column, being threaded on the first adjustment column can move to close to the first positioning column direction, and the first screw adjustments for compressing furnace shell plate, the first positioning column and the first adjustment column are fixedly connected with bottom plate.Second clamp assembly includes the second positioning column and the second adjustment column positioned opposite with the second positioning column, being threaded on second adjustment column can move to close to the second positioning column direction, and the second screw adjustments for compressing furnace shell plate, the second positioning column and second adjustment column are fixedly connected with bottom plate.The hot-air stove shell positioner that the application provides is effectively improved the installation quality of hot-air stove shell.

Description

Hot-air stove shell positioner
Technical field
The utility model is related to steel member assembling device technical field, more particularly to a kind of hot-air stove shell positioner.
Background technology
There is the furnace shell that substantial amounts of steel plate makes to form a team to welding in blast funnace hot blast stove site operation, current Construction method of installation be hot-blast stove plate furnace shell is carried out assembling on processing platform it is presetting, after reaching precision, by steel plate with Adjacent furnace shell plate connecting welding is fixed, soldering furnace coverboard longitudinal seam after the completion of fixing, again will be fixed with steel plate gas after being soldered It cuts off.
It is however, preceding, it is necessary to fixing steel plate be welded on furnace shell plate, in two neighboring furnace shell due to carrying out the welding of furnace shell steel plate After the longitudinal seam welding of two neighboring furnace shell plate, it is also necessary to steel plate is cut off, and during gas cutting steel plate, it is easy to furnace shell is caused Damage thereby reduces the installation quality of hot-air stove shell.
Therefore, the installation quality of hot-air stove shell how is improved, is the technical issues of those skilled in the art are urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of hot-air stove shell positioner, to improve the installation matter of hot-air stove shell Amount.
To achieve the above object, the utility model provides a kind of hot-air stove shell positioner, uses including bottom plate and respectively In the first clamp assembly and the second clamp assembly that clamp two neighboring furnace shell plate;
First clamp assembly includes the first positioning column and the first adjustment column positioned opposite with first positioning column, Being threaded on the first adjustment column can move to close to the first positioning column direction, and for compressing furnace shell plate First screw adjustments, first positioning column and the first adjustment column are fixedly connected with the bottom plate;
Second clamp assembly includes the second positioning column and the second adjustment column positioned opposite with second positioning column, Being threaded on the second adjustment column can move to close to the second positioning column direction, and for compressing furnace shell plate Second screw adjustments, second positioning column and the second adjustment column are fixedly connected with the bottom plate.
Preferably, first screw adjustments is multiple, and multiple first screw adjustments are along the first adjustment Column vertical direction equidistantly distributed successively.
Preferably, side opposite with first screw adjustments on first positioning column is plane.
Preferably, the first adjustment column is detachably connected with the bottom plate.
Preferably, second screw adjustments is multiple, and multiple second screw adjustments are along the second adjustment Column vertical direction equidistantly distributed successively.
Preferably, side opposite with second screw adjustments on second positioning column is plane.
Preferably, the second adjustment column is detachably connected with the bottom plate.
Preferably, the furnace shell board clamping face of first positioning column and the furnace shell board clamping face of second positioning column are put down Row.
Preferably, first positioning column and second positioning column are multiple, and are prolonged along the furnace shell plate side The face of stretching is sequentially arranged.
Preferably, the bottom plate is steel plate, and the thickness of the bottom plate is 30mm-50mm.
In the above-mentioned technical solutions, hot-air stove shell positioner provided by the utility model includes bottom plate and is respectively used to Clamp the first clamp assembly and the second clamp assembly of two neighboring furnace shell plate.First clamp assembly include the first positioning column and with First positioning column the first adjustment column positioned opposite, being threaded on the first adjustment column can be to close to the first positioning column direction It is mobile, and the first screw adjustments for compressing furnace shell plate, the first positioning column and the first adjustment column are fixedly connected with bottom plate.The Two clamp assemblies include the second positioning column and the second adjustment column positioned opposite with the second positioning column, and screw thread connects on second adjustment column Being connected to can move to close to the second positioning column direction, and the second screw adjustments for compressing furnace shell plate, the second positioning column It is fixedly connected with second adjustment column with bottom plate.When needing to assemble hot-air stove shell, a furnace shell plate is placed on the first positioning Between column and second adjustment column, another furnace shell plate is placed between the second positioning column and second adjustment column, by two furnace shell plates Position is adjusted to predeterminated position, by turning the first screw adjustments to the first positioning column direction so that the first threaded adjusting Part and the first positioning column lock a furnace shell plate.By turning the second screw adjustments to the second positioning column direction so that second Screw adjustments and the second positioning column lock another furnace shell plate, then weld two neighboring furnace shell plate, after the completion of welding, instead To the first screw adjustments and the second screw adjustments are turned, most hot-air stove shell positioner is separated with furnace shell at last.
By foregoing description, in the hot-air stove shell positioner provided in the application, by adjusting the first screw thread Two neighboring furnace shell by realizing the locking of two neighboring furnace shell Board position, is treated in the position of regulating part and the second screw adjustments After the completion of plate welding, reversely turn the first screw adjustments and the second screw adjustments realize hot-air stove shell positioner and stove Coverboard separates, easy to operate, with respect to the background art in need the situation of gas cutting steel plate, efficiently reduce to hot-air stove shell Damage, therefore, the hot-air stove shell positioner that the application provides are effectively improved the installation quality of hot-air stove shell.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiment of the utility model, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
The structure diagram for the wind furnace furnace shell positioner that Fig. 1 is provided by the utility model embodiment;
Fig. 2 is the right view of wind furnace furnace shell positioner shown in Fig. 1.
In wherein Fig. 1-2:Furnace shell plate, 3- the first adjustments column, 4- second adjustments column, 5- first after the first positioning columns of 1-, 2- Screw adjustments, 6- bottom plates, 7- forehearths coverboard, the second screw adjustments of 8-.
Specific embodiment
The core of the utility model is to provide a kind of hot-air stove shell positioner, to improve the installation matter of hot-air stove shell Amount.
It is below in conjunction with the accompanying drawings and real in order to which those skilled in the art is made to more fully understand the technical solution of the utility model Applying mode, the utility model is described in further detail.
It please refers to Fig.1 and Fig. 2, in a kind of specific embodiment, hot-blast stove that the utility model specific embodiment provides Furnace shell positioner includes bottom plate 6 and is respectively used to clamp the first clamp assembly and the second clamping group of two neighboring furnace shell plate Part.Specifically, the bottom plate 6 is rectangle structure, bottom plate 6 is specifically as follows plastic plate, in order to extend hot-air stove shell positioning dress The service life put and improve safety in utilization, it is preferable that bottom plate 6 is steel plate, and the thickness of bottom plate 6 is 30mm-50mm, specifically can be with For 35mm, 40mm etc..
First clamp assembly include the first positioning column 1 and the first adjustment column 3 positioned opposite with the first positioning column 1, first Being threaded in adjustment column 3 can move to close to 1 direction of the first positioning column, and the first screw thread tune for compressing furnace shell plate Part 5 being saved, specifically, in order to reduce the difficulty of processing of hot-air stove shell positioner, it is preferable that the first screw adjustments 5 are bolt, Staff can directly be commercially available.First positioning column 1 and the first adjustment column 3 are fixedly connected with bottom plate 6, specifically, the On one positioning column 1 and the welding of the first adjustment column 3 and bottom plate 6.
Second clamp assembly includes the second positioning column and the second adjustment column 4 positioned opposite with the second positioning column, and second adjusts Being threaded on whole column 4 can move to close to the second positioning column direction, and the second threaded adjusting for compressing furnace shell plate Part 8, specifically, in order to reduce the difficulty of processing of hot-air stove shell positioner, it is preferable that the second screw adjustments 8 be bolt, work Making personnel can directly be commercially available.Second positioning column and second adjustment column 4 are fixedly connected with bottom plate 6, specifically, second is fixed On position column and the welding of second adjustment column 4 and bottom plate 6.Specifically, the first positioning column 1, the first adjustment column 3, the second positioning column and Two adjustment columns 4 can be rectangular column.It is preferred that preceding adjustment column and rear adjustment column are symmetrically set along 6 center line of bottom plate in front and rear It puts.
When needing to assemble hot-air stove shell, by a furnace shell plate be placed on the first positioning column 1 and second adjustment column 4 it Between, another furnace shell plate is placed between the second positioning column and second adjustment column 4, specifically, two furnace shell plates can specifically divide Not Wei forehearth coverboard 7 and rear furnace shell plate 2, forehearth coverboard 7 and rear 2 position gap of furnace shell plate are adjusted to predeterminated position, passed through The first screw adjustments 5 are turned to 1 direction of the first positioning column so that the first screw adjustments 5 and the first positioning column 1 lock one Furnace shell plate.By turning the second screw adjustments 8 to the second positioning column direction so that the second screw adjustments 8 and the second positioning Column locks another furnace shell plate, then welds forehearth coverboard 7 and rear furnace shell plate 2, after the completion of welding, reversely turns the first screw thread 5 and second screw adjustments 8 of regulating part, most hot-air stove shell positioner is separated with furnace shell at last.
By foregoing description, in the hot-air stove shell positioner provided in the application specific embodiment, pass through The position of the first screw adjustments 5 and the second screw adjustments 8 is adjusted, by realizing the locking of two neighboring furnace shell Board position, After the completion for the treatment of two neighboring furnace shell plate welding, reversely turn the first screw adjustments 5 and the second screw adjustments 8 realize hot-blast stove Furnace shell positioner is separated with furnace shell plate, easy to operate, with respect to the background art in need the situation of gas cutting steel plate, effectively subtract Few damage to hot-air stove shell, therefore, the hot-air stove shell positioner that the application provides are effectively improved hot-blast stove stove The installation quality of shell.
In order to improve the positioning intensity of furnace shell plate, it is preferable that the first screw adjustments 5 are multiple, multiple first threaded adjustings Part 5 is along 3 vertical direction of the first adjustment column successively equidistantly distributed, specifically, the first screw adjustments 5 can be three.
Further, side opposite with the first screw adjustments 5 on the first positioning column 1 is plane.Pass through setting and furnace shell The plane that plate abuts is effectively improved the position stability of furnace shell plate.
It is dismounted for the ease of hot-air stove shell positioner and furnace shell plate, it is preferable that the first adjustment column 3 detachably connects with bottom plate It connects, specifically, the first adjustment column 3 can be connected by buckle or threaded fastener with bottom plate.
In order to further improve the positioning intensity of furnace shell plate, it is preferable that the second screw adjustments 8 are multiple, multiple second spiral shells Line regulating part 8 is along second adjustment column vertical direction successively equidistantly distributed.It is preferred that the first screw adjustments 5 and the second screw thread tune Part 8 is saved in the one-to-one horizontal relative level arrangement of vertical direction.
Further, side opposite with the second screw adjustments 8 on the second positioning column is plane.By setting and furnace shell plate The plane of abutting is effectively improved the position stability of furnace shell plate.
It is dismounted for the ease of hot-air stove shell positioner and furnace shell plate, it is preferable that second adjustment column 4 and the bottom plate are removable Unload connection.Specifically, second adjustment column 4 can be connected by buckle or threaded fastener with bottom plate.
In order to improve the positioning accuracy for the furnace shell plate being mutually parallel, it is preferable that the furnace shell board clamping face of the first positioning column 1 and The furnace shell board clamping face of two positioning columns is parallel.
On the basis of above-mentioned each scheme, it is preferable that the first positioning column 1 and the second positioning column are multiple, and along furnace shell Plate side extended surface is sequentially arranged.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or new using this practicality Type.A variety of modifications of these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (10)

1. a kind of hot-air stove shell positioner, which is characterized in that including bottom plate (6) and be respectively used to clamp two neighboring furnace shell The first clamp assembly and the second clamp assembly of plate;
First clamp assembly includes the first positioning column (1) and the first adjustment positioned opposite with first positioning column (1) Column (3), being threaded on the first adjustment column (3) can move to close to the first positioning column (1) direction, and be used for Compress the first screw adjustments (5) of furnace shell plate, first positioning column (1) and the first adjustment column (3) and the bottom plate (6) it is fixedly connected;
Second clamp assembly includes the second positioning column and the second adjustment column (4) positioned opposite with second positioning column, Being threaded on the second adjustment column (4) can move to close to the second positioning column direction, and for compressing furnace shell The second screw adjustments (8) of plate, second positioning column and the second adjustment column (4) are fixedly connected with the bottom plate (6).
2. hot-air stove shell positioner according to claim 1, which is characterized in that first screw adjustments (5) To be multiple, multiple first screw adjustments (5) are along the first adjustment column (3) vertical direction successively equidistantly distributed.
3. hot-air stove shell positioner according to claim 1, which is characterized in that on first positioning column (1) with The opposite side of first screw adjustments (5) is plane.
4. hot-air stove shell positioner according to claim 1, which is characterized in that the first adjustment column (3) and institute Bottom plate (6) is stated to be detachably connected.
5. hot-air stove shell positioner according to claim 1, which is characterized in that second screw adjustments (8) To be multiple, multiple second screw adjustments (8) are along second adjustment column (4) vertical direction successively equidistantly distributed.
6. hot-air stove shell positioner according to claim 1, which is characterized in that on second positioning column with it is described The opposite side of second screw adjustments (8) is plane.
7. hot-air stove shell positioner according to claim 1, which is characterized in that the second adjustment column (4) and institute Bottom plate (6) is stated to be detachably connected.
8. hot-air stove shell positioner according to claim 1, which is characterized in that the stove of first positioning column (1) It is parallel with the furnace shell board clamping face of second positioning column that coverboard clamps face.
9. hot-air stove shell positioner according to claim 8, which is characterized in that first positioning column (1) and institute It is multiple to state the second positioning column, and is sequentially arranged along the furnace shell plate side extended surface.
10. the hot-air stove shell positioner according to any one of claim 1-9, which is characterized in that the bottom plate (6) For steel plate, and the thickness of the bottom plate (6) is 30mm-50mm.
CN201721590117.5U 2017-11-24 2017-11-24 Hot-air stove shell positioner Expired - Fee Related CN207447738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721590117.5U CN207447738U (en) 2017-11-24 2017-11-24 Hot-air stove shell positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721590117.5U CN207447738U (en) 2017-11-24 2017-11-24 Hot-air stove shell positioner

Publications (1)

Publication Number Publication Date
CN207447738U true CN207447738U (en) 2018-06-05

Family

ID=62278399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721590117.5U Expired - Fee Related CN207447738U (en) 2017-11-24 2017-11-24 Hot-air stove shell positioner

Country Status (1)

Country Link
CN (1) CN207447738U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111829181A (en) * 2020-07-31 2020-10-27 中国十七冶集团有限公司 Device and method for adjusting eccentric centers of furnace shells of group-pair hot blast furnaces

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111829181A (en) * 2020-07-31 2020-10-27 中国十七冶集团有限公司 Device and method for adjusting eccentric centers of furnace shells of group-pair hot blast furnaces

Similar Documents

Publication Publication Date Title
CN207447738U (en) Hot-air stove shell positioner
CN104400283A (en) Welding device for titanium alloy skin structural member for framework
CN102350563A (en) Sheet welding method
CN209384476U (en) A kind of curtain skeleton frame
CN108465958A (en) A kind of tooling for welding formula plate laser welding for titanium system half
CN201824055U (en) General arc striking location clamping device for vacuum electron beam welding
CN209190127U (en) A kind of welding tooling controlling reversible deformation
CN102862016A (en) Adjustable welding mechanism for tail cover
CN205817085U (en) A kind of new pattern laser welding fixture
CN107999984A (en) A kind of welding method for discharging thermal energy Reducing distortion
CN202984963U (en) Adjustable tail-hood welding mechanism
CN206952436U (en) Power distribution cabinet component positioning welding fixture
CN207881826U (en) A kind of more split weighing platform framves
CN206316972U (en) Quick positioning tool for petrol engine RCV valves
CN209494664U (en) One kind protecting support construction for wind-power tower
CN206598049U (en) One kind assembling positioning adjustment device
CN105904110B (en) welding method and system
CN205386674U (en) A fixture device for light alloy laser welding
CN205325034U (en) Impeller blade welding position anchor clamps
CN103600148B (en) A kind of semi-automatic diffusion welding method of steam turbine generator soft connection board
CN209289093U (en) A kind of cigarette machine belt wheel maintenance frock
CN207681827U (en) Crossbeam and flange welding device
CN103192168A (en) Vertical symmetrical welding method for wide and thick plates
CN208271687U (en) A kind of transformer rack
CN111992939B (en) Welding expansion core, limiting installation mechanism of welding expansion core and stripping mechanism of welding expansion core

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180605

Termination date: 20211124