CN207437988U - The Quick Connect Kit of oxygen lance before metallurgical furnace - Google Patents
The Quick Connect Kit of oxygen lance before metallurgical furnace Download PDFInfo
- Publication number
- CN207437988U CN207437988U CN201721242907.4U CN201721242907U CN207437988U CN 207437988 U CN207437988 U CN 207437988U CN 201721242907 U CN201721242907 U CN 201721242907U CN 207437988 U CN207437988 U CN 207437988U
- Authority
- CN
- China
- Prior art keywords
- oxygen lance
- coupling
- screw thread
- blowpipe
- pipe fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Carbon Steel Or Casting Steel Manufacturing (AREA)
Abstract
The utility model discloses a kind of Quick Connect Kits of oxygen lance before metallurgical furnace, the hose of source of the gas connection is connected with the casing coupling head of the pipe fitting of casing coupling thread connection, the other end of casing coupling thread connection pipe fitting is connected through a screw thread both ends and has female coupling tunnel, the first pre-load nut is installed on casing coupling thread connection pipe fitting, cooperation is installed with the first inner tube successively in coupling tunnel, first rubber sleeve, second inner tube and the second rubber sleeve, the other end of coupling tunnel is connected through a screw thread blowpipe connector, the second pre-load nut is connected through a screw thread on blowpipe connector, intubation jackscrew is installed in the tube wall screw hole of blowpipe connector on the outside of the second pre-load nut, the steel oxygen lance and first being inserted into coupling tunnel, second inner tube clearance fit, with first, the sealing cooperation of second rubber sleeve, steel oxygen lance is positioned by being intubated jackscrew.The utility model is rational in infrastructure, solves the safely and fast articulation issues of source of the gas and steel oxygen lance, being capable of quick-replaceable steel oxygen lance.
Description
Technical field
The utility model belongs to oxygen blast before the auxiliary device of oxygen lance before ironmaking metallurgical furnace, particularly a kind of metallurgical furnace
The Quick Connect Kit of pipe.
Background technology
Blast furnace and Ou Yelu are when burning iron mouth or other slag irons, it is necessary to introduce oxygen into oxygen blown steel pipe front end, then
Steel pipe, burn through iron mouth or slag iron are lighted, since oxygen is dangerous combustion-supporting energy medium, while position is needed replacing in operation
It puts, moves back and forth, this just needs source of the gas reliably to carry out flexible connected with steel oxygen lance, and easily by source of the gas to behaviour
At work, due to burning of the steel oxygen lance when burning operation quickly, burn after use, size is shortened quickly, it is necessary to more
The oxygen blown steel tubulation renewed, replacement finish carry out continued access burning operation that must be quickly, therefore for convenience efficiently by source of the gas
Factory leads to operation area, it is necessary to solve the safely and fast articulation issues of source of the gas and steel oxygen lance, while must also quick-replaceable steel
Oxygen lance processed, this burns the technical barrier that oxygen operates before becoming metallurgical furnace.
Utility model content
The purpose of this utility model is to provide a kind of Quick Connect Kit of oxygen lance before metallurgical furnace, structure is closed
Reason, can solve the safely and fast articulation issues of source of the gas and steel oxygen lance, being capable of quick-replaceable steel oxygen lance.
What the purpose of this utility model was realized in:The Quick Connect Kit of oxygen lance, source of the gas before a kind of metallurgical furnace
The hose of connection is connected with the casing coupling head of the pipe fitting of casing coupling thread connection, and the other end of casing coupling thread connection pipe fitting passes through screw thread
It is connected to both ends and has female coupling tunnel, the first pre-load nut is installed on casing coupling thread connection pipe fitting, in coupling tunnel
Inside cooperation is installed with the first inner tube, the first rubber sleeve, the second inner tube and the second rubber sleeve successively, and the other end of coupling tunnel passes through spiral shell
Line is connected to blowpipe connector, and the second pre-load nut is connected through a screw thread on blowpipe connector, on the outside of the second pre-load nut
Intubation jackscrew in the tube wall screw hole of blowpipe connector is installed, is inserted between the steel oxygen lance in coupling tunnel and first, second inner tube
Gap coordinates, and seals and coordinates with first, second rubber sleeve, is positioned steel oxygen lance by being intubated jackscrew.
The utility model is rational in infrastructure, solves the safely and fast articulation issues of source of the gas and steel oxygen lance, realizes fast
Speed replaces steel oxygen lance.
Description of the drawings
The utility model is further described below in conjunction with attached drawing, Fig. 1 illustrates for the utility model front view structure
Figure.
Specific embodiment
The Quick Connect Kit of oxygen lance before a kind of metallurgical furnace, as shown in Figure 1, the hose 1 of source of the gas connection and casing coupling spiral shell
The casing coupling first 2 of the pipe fitting of line connection is connected, and the other end of casing coupling thread connection pipe fitting 3 is connected through a screw thread both ends with interior
The coupling tunnel 5 of screw thread is installed with the first pre-load nut 4 on casing coupling thread connection pipe fitting 3, and cooperation is pacified successively in coupling tunnel 5
The first inner tube 6, the first rubber sleeve 7, the second inner tube 8 and the second rubber sleeve 9, the other end of coupling tunnel 5 is filled with to be connected through a screw thread
Blowpipe connector 10, the second pre-load nut 13 is connected through a screw thread on blowpipe connector 10, outside the second pre-load nut 13
Intubation jackscrew 11 in the tube wall screw hole of side-blown pipe fitting 10 is installed, is inserted into steel oxygen lance 12 and first in coupling tunnel 5, the
Two inner tubes 6,8 clearance fits are sealed with first, second rubber sleeve 7,9 and coordinated, determined steel oxygen lance 12 by being intubated jackscrew 11
Position.One end of coupling tunnel 5 sets internal thread, and the other end sets undergauge screw hole.Connect in casing coupling thread connection pipe fitting casing coupling first 2
Hose fixture 14 is installed on the hose 1 connect.
Claims (3)
1. the Quick Connect Kit of oxygen lance before a kind of metallurgical furnace, it is characterized in that:The hose (1) of source of the gas connection and casing coupling screw thread
The casing coupling head (2) of the pipe fitting of connection is connected, and the other end of casing coupling thread connection pipe fitting (3), which is connected through a screw thread both ends, to be had
The coupling tunnel (5) of internal thread, is installed with the first pre-load nut (4) on casing coupling thread connection pipe fitting (3), in coupling tunnel (5)
Cooperation is installed with the first inner tube (6), the first rubber sleeve (7), the second inner tube (8) and the second rubber sleeve (9), coupling tunnel (5) successively
The other end be connected through a screw thread blowpipe connector (10), be connected through a screw thread the second pre-load nut on blowpipe connector (10)
(13), positioned at intubation jackscrew (11) is installed on the outside of the second pre-load nut (13) in the tube wall screw hole of blowpipe connector (10), it is inserted into
Steel oxygen lance (12) in coupling tunnel (5) and first, second inner tube (6,8) clearance fit, with first, second rubber sleeve (7,
9) sealing cooperation is positioned steel oxygen lance (12) by being intubated jackscrew (11).
2. the Quick Connect Kit of oxygen lance before metallurgical furnace according to claim 1, it is characterized in that:Coupling tunnel (5)
One end sets internal thread, and the other end sets undergauge screw hole.
3. the Quick Connect Kit of oxygen lance before metallurgical furnace according to claim 1, it is characterized in that:Join in casing coupling screw thread
Hose fixture (14) is installed on the hose (1) of jointed tubular workpieces casing coupling head (2) connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721242907.4U CN207437988U (en) | 2017-09-26 | 2017-09-26 | The Quick Connect Kit of oxygen lance before metallurgical furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721242907.4U CN207437988U (en) | 2017-09-26 | 2017-09-26 | The Quick Connect Kit of oxygen lance before metallurgical furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207437988U true CN207437988U (en) | 2018-06-01 |
Family
ID=62295051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721242907.4U Expired - Fee Related CN207437988U (en) | 2017-09-26 | 2017-09-26 | The Quick Connect Kit of oxygen lance before metallurgical furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207437988U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110332395A (en) * | 2019-06-27 | 2019-10-15 | 唐山钢铁集团有限责任公司 | A kind of oxygen lance safe connection equipment |
-
2017
- 2017-09-26 CN CN201721242907.4U patent/CN207437988U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110332395A (en) * | 2019-06-27 | 2019-10-15 | 唐山钢铁集团有限责任公司 | A kind of oxygen lance safe connection equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207437988U (en) | The Quick Connect Kit of oxygen lance before metallurgical furnace | |
CN101225914B (en) | Automatic abutting joint for gas pipe | |
CN208545450U (en) | A kind of iron mouth oxygen rifle | |
CN201187648Y (en) | Fast joint of oxygen blowing pipe | |
CN208804368U (en) | A kind of connecting device of oxygen lance | |
CN204603546U (en) | Pipeline welding inside filled argon protection device | |
CN203413268U (en) | Oxygen lance joint | |
CN201575254U (en) | Tube quick joint | |
CN207906683U (en) | A kind of telescopic H-type pipe fitting | |
CN208684997U (en) | A kind of novel oxygen lance fast replacing device | |
CN202032216U (en) | Anti-backfire oxygen-combustion quick joint for metallurgy | |
CN215668067U (en) | Oxygen blowing lance | |
CN202066342U (en) | Connecting joint of roller hearth furnace | |
CN210030759U (en) | Portable oxygen burning connector for blast furnace | |
CN220099083U (en) | Blast furnace iron notch oxygen gun with video monitoring | |
CN203348791U (en) | Plastic-coated composite steel pipe connecting structure | |
CN203855597U (en) | Iron notch burning oxygen gun device in front of blast furnace | |
CN104295829A (en) | Connecting structure of plastic-coated composite steel pipe and connecting method thereof | |
CN220012678U (en) | Blast furnace iron notch oxygen lance with temperature measuring device | |
CN218762730U (en) | Improved oxygen interface device | |
CN214032560U (en) | Be used for clear stifled equipment of blast furnace taphole mediation | |
CN219712308U (en) | Air tightness detection plug | |
CN201739689U (en) | Expansion type corrugated nipple union | |
CN206666578U (en) | Steep-taper quick change oxygen rifle is used in one kind steel-making | |
CN216201440U (en) | Quick connecting device of pipeline for oxygen burning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180716 Address after: 830022 No. 1 Bayi Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region Patentee after: XINJIANG BAYI IRON & STEEL Co.,Ltd. Address before: 830022 No. 1 Xingang Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region. Patentee before: BAOSTEEL GROUP XINJIANG BAYI IRON & STEEL Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180601 Termination date: 20210926 |
|
CF01 | Termination of patent right due to non-payment of annual fee |