CN207436665U - A kind of interim splicing safety guard for water conservancy construction - Google Patents

A kind of interim splicing safety guard for water conservancy construction Download PDF

Info

Publication number
CN207436665U
CN207436665U CN201721506096.4U CN201721506096U CN207436665U CN 207436665 U CN207436665 U CN 207436665U CN 201721506096 U CN201721506096 U CN 201721506096U CN 207436665 U CN207436665 U CN 207436665U
Authority
CN
China
Prior art keywords
safety guard
crossbeam
splice tray
vertical beam
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721506096.4U
Other languages
Chinese (zh)
Inventor
李搏洋
李业辉
张彦美
姚亚栋
白志超
孟欣
吴昊
高凤霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721506096.4U priority Critical patent/CN207436665U/en
Application granted granted Critical
Publication of CN207436665U publication Critical patent/CN207436665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of interim splicing safety guards for water conservancy construction, including safety guard main body, vertical beam and first crossbeam, the left side and right side of safety guard main body are symmetrically fixedly connected with vertical beam, the front of vertical beam is connected with fixing piece in both sides up and down, the surface of fixing piece is fixedly connected with boost bar, the intermediate hollow out position of safety guard main body is through there is first crossbeam, and through there is second cross beam, the middle part of second cross beam is nested with splice tray for the bottom of first crossbeam.It is provided with splice tray, splice tray can rotate 180 degree by leaf of hinge, and crossbeam is clamped, and be spliced crossbeam different in size, it turns and tightens nut, make in clamping screw insertion locking screw holes, splice tray is locked, so as to be fixed to crossbeam, operator is made not have to splice safety guard main body by means of instrument, the convenience of safety guard main body is effectively raised, suitable for the use of water conservancy construction, there is extensive prospect of the application in future.

Description

A kind of interim splicing safety guard for water conservancy construction
Technical field
The utility model is related to safety guide rail technical fields, are specially a kind of interim splicing safety for water conservancy construction Column.
Background technology
Hydraulic engineering is for controlling and allocating the surface water and groundwater of nature, reaches and removes the evil emerging sharp purpose and build Engineering.Also referred to as Hydraulic Projects.Water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously Not in full conformity with the needs of the mankind.Hydraulic engineering is only built, current could be controlled, flood is prevented, and carries out water It adjusts and distributes, to meet the needs of people's lives and production to water resource.Hydraulic engineering needs to build dam, dike, spillway, water Lock, water inlet, cross the different types of hydraulic structure such as mortise, log chute, fish pass at channel, to realize its target.
Existing safety guard device flexibility is not high, and disassembly and assembly is required for by instrument, when construction location changes It, it is necessary to be dismantled during change, is reinstalled after adjusting position, this operation expends substantial amounts of manpower, has aggravated the work of construction personnel It bears.
So how to design a kind of interim splicing safety guard for water conservancy construction, become that we currently to be solved asks Topic.
Utility model content
The purpose of this utility model is to provide a kind of interim splicing safety guard for water conservancy construction, to solve the above-mentioned back of the body It is proposed in scape technology installing and dismounting is inconvenient the problem of.
To achieve the above object, the utility model provides following technical solution:A kind of interim splicing for water conservancy construction Safety guard, including safety guard main body, vertical beam and first crossbeam, the left side and right side of the safety guard main body are symmetrically fixedly connected with Vertical beam, the front of the vertical beam are connected with fixing piece in both sides up and down, and the surface of the fixing piece is fixedly connected with power-assisted Handle is welded with fixing nut behind the fixing piece, and the bottom of the vertical beam is nested with fixed seat, and the fixed seat is just Through there is snib, the bottom of the fixed seat is welded with pedestal, the intermediate hollow-out parts of the safety guard main body for front middle part Position is through there is first crossbeam, and through there is second cross beam, the middle part of the second cross beam is nested for the bottom of the first crossbeam There is splice tray, the front bottom left of the splice tray and right side, which are symmetrically arranged with, tightens nut, and the nut of tightening is with spelling Box flexible connection, the top left side of the splice tray and right side are connect through there is clamping screw, the middle part of the splice tray is lived Dynamic to be connected with leaf of hinge, the bottom left of the splice tray and right side are embedded with locking screw holes, and the top of the locking screw holes is embedding Enter to have crossbeam slot, the surface of the crossbeam slot fits closely matcoveredn.
Preferably, the shape of the splice tray is made of two rectangles, and the centre of splice tray is through there are one circular holes.
Preferably, it by top is one a diameter of eight centimetres that the fixing piece, which is, and thickness is one centimetre of round pie, bottom It is a diameter of 1 point 5 centimetre of a cylinder composition.
Preferably, the protective layer is made of rubber material.
Preferably, the fixed seat using heavier-weight, hardness is higher and the alloy material of the preferable steel of rustless property and iron Material is made.
Preferably, there are two the vertical beam is total to, vertical beam is made of the alloy material of the preferable steel of rustless property and iron.
Compared with prior art, the beneficial effects of the utility model are:This kind is safe for the interim splicing of water conservancy construction Column is provided with splice tray, and the shape of splice tray is made of two rectangles, and the centre of splice tray is run through there are one circular holes, spells 180 degree can be rotated by leaf of hinge by connecing box, and crossbeam is clamped, and spliced crossbeam different in size, turned and tighten Nut makes in clamping screw insertion locking screw holes, splice tray is locked, so as to being fixed to crossbeam, make operator do not have to by means of Instrument can splice safety guard main body, effectively raise the convenience of safety guard main body.Fixing piece is provided with, Gu It by top is one a diameter of eight centimetres to determine part to be, thickness is one centimetre of round pie, and bottom is one a diameter of 1 point 5 li The cylinder composition of rice, holds boost bar and is rotated, make the inside precession of fixing nut, so as to which crossbeam is fixed on vertical beam On, effectively raise the stability of safety guard main body.Matcoveredn is set, and protective layer is made of rubber material, splice tray Crossbeam is clamped, crossbeam is spliced, is fixed, protective layer can protect crossbeam, avoid because firmly excessive spelling It connects box to damage beam surface, crossbeam is made to meet scale erosion, substantially increase the service life of crossbeam.Fixed seat is provided with, it is fixed Seat is using heavier-weight, hardness is higher and the alloy material of the preferable steel of rustless property and iron is made, and vertical beam is inserted into fixed seat It is interior, it is fixed, vertical beam is locked in fixed seat by snib, and fixed seat is closely welded with pedestal, avoids rocking for vertical beam, effectively The stability column for improving safety guard main body.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the mount body structure diagram of the utility model;
Fig. 3 is that agent structure schematic diagram is unfolded in the splice tray of the utility model;
In figure:1st, safety guard main body, 2, vertical beam, 3, fixed seat, 4, first crossbeam, 5, second cross beam, 6, snib, 7, fixed Part, 701, boost bar, 702, fixing bolt, 8, splice tray, 801, clamping screw, 802, leaf of hinge, 803, locking screw holes, 804th, crossbeam slot, 805, protective layer, 9, tighten nut, 10, pedestal.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 3, the utility model provides a kind of technical solution:A kind of interim splicing peace for water conservancy construction Full column, including safety guard main body 1, vertical beam 2, fixed seat 3, first crossbeam 4, second cross beam 5, snib 6, fixing piece 7, boost bar 701st, fixing bolt 702, splice tray 8, clamping screw 801, leaf of hinge 802, locking screw holes 803, crossbeam slot 804, protective layer 805th, tighten nut 9 and pedestal 10, the left side and right side of safety guard main body 1 are symmetrically fixedly connected with vertical beam 2, vertical beam 2 just before Side is connected with fixing piece 7 in both sides up and down, and it by top is one a diameter of eight centimetres that fixing piece 7, which is, and thickness is one centimetre Round pie, bottom are a diameter of 1 point 5 centimetre of a cylinder compositions, hold boost bar 701 and are rotated, make fixation 702 inside precession of nut so as to which crossbeam is fixed on vertical beam 2, effectively raises the stability of safety guard main body 1, fixed The surface of part 7 is fixedly connected with boost bar 701, and fixing nut 702 is welded with behind fixing piece 7, and the bottom of vertical beam 2 is nested There is fixed seat 3, fixed seat 3 is using heavier-weight, hardness is higher and the alloy material of the preferable steel of rustless property and iron is made, will Vertical beam 2 is inserted into fixed seat 3, is fixed, and vertical beam 2 is locked in fixed seat 3 by snib 6, and fixed seat 3 is closely welded with pedestal 10 It connects, avoids rocking for vertical beam 2, effectively raise the stability column of safety guard main body 1, the front middle part of fixed seat 3 is passed through Snib 6 is installed with, the bottom of fixed seat 3 is welded with pedestal 10, and the intermediate hollow out position of safety guard main body 1, which is run through, first crossbeam 4, Through there is second cross beam 5, the middle part of second cross beam 5 is nested with splice tray 8, the shape of splice tray 8 for the bottom of first crossbeam 4 It is made of two rectangles, the centre of splice tray 8 is run through there are one circular holes, and splice tray 8 can rotate one by leaf of hinge 802 180 degree, crossbeam is clamped, spliced crossbeam different in size, turned and tighten nut 9, be inserted into clamping screw 801 In locking screw holes 803, splice tray 8 is locked, so as to be fixed to crossbeam, not having to operator can be to safety by means of instrument Column main body 1 is spliced, and effectively raises the convenience of safety guard main body 1, the front bottom left of splice tray 8 and right side It is symmetrically arranged with and tightens nut 9, tighten nut 9 and be flexibly connected with splice tray 8, the top left side of splice tray 8 and right side are through having Clamping screw 801, the middle part of splice tray 8 are connected with leaf of hinge 802, the bottom left of splice tray 8 and right side insertion There are locking screw holes 803, the top of locking screw holes 803 is embedded with crossbeam slot 804, and the surface of crossbeam slot 804 is closely fitted with protection Layer 805, protective layer 805 is made of rubber material, and splice tray 8 clamps crossbeam, and crossbeam is spliced, is fixed, protective layer 805 can protect crossbeam, avoid because firmly excessive splice tray 8 damages beam surface, and crossbeam is made to meet scale erosion, Substantially increase the service life of crossbeam.
Operation principle:Vertical beam 2 will be inserted into fixed seat 3 by builder first, and then vertical beam 2 is fixed, and snib 6 will Vertical beam 2 is locked in fixed seat 3, and fixed seat 3 is closely welded with pedestal 10, is avoided rocking for vertical beam 2, is effectively raised safety First crossbeam 4 and second cross beam 5 are then run through vertical beam 2, hold boost bar 701 and rotated by the stability column of column main body 1, Make 702 inside precession of fixing nut, so as to which crossbeam is fixed on vertical beam 2, effectively raise the stabilization of safety guard main body 1 Property, and then splice tray 8 can rotate 180 degree by leaf of hinge 802, and crossbeam is clamped, make crossbeam different in size into Row splicing, turns and tightens nut 9, and clamping screw 801 is made to be inserted into locking screw holes 803, splice tray 8 is locked, so as to crossbeam It is fixed, operator is made not have to splice safety guard main body 1 by means of instrument, effectively raises safety guard main body 1 convenience, last protective layer 805 can protect crossbeam, avoid because firmly excessive splice tray 8 is to beam surface Damage makes crossbeam meet scale erosion, substantially increases the service life of crossbeam, and here it is the interim splicings that this kind is used for water conservancy construction The operation principle of safety guard.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of interim splicing safety guard for water conservancy construction, including safety guard main body(1), vertical beam(2)And first crossbeam (4), it is characterised in that:The safety guard main body(1)Left side and right side be symmetrically fixedly connected with vertical beam(2), the vertical beam(2) Front up and down both sides be connected with fixing piece(7), the fixing piece(7)Surface be fixedly connected with boost bar (701), the fixing piece(7)Behind be welded with fixing nut(702), the vertical beam(2)Bottom be nested with fixed seat (3), the fixed seat(3)Front middle part through there is snib(6), the fixed seat(3)Bottom be welded with pedestal (10), the safety guard main body(1)Intermediate hollow out position through there is first crossbeam(4), the first crossbeam(4)Bottom pass through It is installed with second cross beam(5), the second cross beam(5)Middle part be nested with splice tray(8), the splice tray(8)Just before Square bottom left and right side, which are symmetrically arranged with, tightens nut(9), it is described to tighten nut(9)With splice tray(8)Flexible connection, it is described Splice tray(8)Top left side and right side through there is clamping screw(801), the splice tray(8)Middle part flexible connection There is leaf of hinge(802), the splice tray(8)Bottom left and right side be embedded with locking screw holes(803), the locking screw holes (803)Top be embedded with crossbeam slot(804), the crossbeam slot(804)Surface fit closely matcoveredn(805).
2. a kind of interim splicing safety guard for water conservancy construction according to claim 1, it is characterised in that:The splicing Box(8)Shape be made of two rectangles, splice tray(8)Centre run through there are one circular holes.
3. a kind of interim splicing safety guard for water conservancy construction according to claim 1, it is characterised in that:The fixation Part(7)It by top is one a diameter of eight centimetres to be, thickness is one centimetre of round pie, and bottom is one a diameter of 1 point 5 li The cylinder composition of rice.
4. a kind of interim splicing safety guard for water conservancy construction according to claim 1, it is characterised in that:The protection Layer(805)It is made of rubber material.
5. a kind of interim splicing safety guard for water conservancy construction according to claim 1, it is characterised in that:The fixation Seat(3)It is made using the alloy material of steel and iron.
6. a kind of interim splicing safety guard for water conservancy construction according to claim 1, it is characterised in that:The vertical beam (2)There are two altogether, vertical beam(2)It is made of the alloy material of steel and iron.
CN201721506096.4U 2017-11-13 2017-11-13 A kind of interim splicing safety guard for water conservancy construction Expired - Fee Related CN207436665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721506096.4U CN207436665U (en) 2017-11-13 2017-11-13 A kind of interim splicing safety guard for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721506096.4U CN207436665U (en) 2017-11-13 2017-11-13 A kind of interim splicing safety guard for water conservancy construction

Publications (1)

Publication Number Publication Date
CN207436665U true CN207436665U (en) 2018-06-01

Family

ID=62289089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721506096.4U Expired - Fee Related CN207436665U (en) 2017-11-13 2017-11-13 A kind of interim splicing safety guard for water conservancy construction

Country Status (1)

Country Link
CN (1) CN207436665U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824956A (en) * 2018-06-17 2018-11-16 安徽绿泉生态农业股份有限公司 A kind of flower planting protection guardrail

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824956A (en) * 2018-06-17 2018-11-16 安徽绿泉生态农业股份有限公司 A kind of flower planting protection guardrail

Similar Documents

Publication Publication Date Title
CN207436665U (en) A kind of interim splicing safety guard for water conservancy construction
CN205472980U (en) Aeration equipment is administered in river lake
CN109898465A (en) A kind of construction of hydro project baffle device for water
CN209375531U (en) A kind of roof photovoltaic bracket component
CN208917778U (en) A kind of protection slope protective reinforcing device
CN208158032U (en) One kind being used for hydraulic and hydroelectric engineering cable fixing protector
CN208015658U (en) A kind of double glass photovoltaic systems of large span flexible support
CN103215915A (en) Stand pole and floating bridge adjusting structure, and floating dock applying stand pole and floating bridge adjusting structure
CN208869993U (en) A kind of hydraulic engineering protective net reinforcing rock-steady structure
CN211312542U (en) Steel sheet pile foundation pit supporting structure
CN107575646A (en) New suspension and support for large-scale pipeline
CN211821307U (en) Pipeline joint protector for hydraulic engineering
CN207315003U (en) A kind of construction baffle arrangement for civil engineering
CN104005410A (en) Tensioning and anchoring device based on unbonded prestress reinforced soil technology
CN210797834U (en) Outdoor circulating water pond
CN207776412U (en) It is a kind of to prevent sagging assembly braced frame pedestal for building
CN206712715U (en) A kind of mounting bracket of fishing light complementation photovoltaic plant
CN208884460U (en) A kind of anti-template that rises of hydraulic engineering
CN206420530U (en) A kind of liquid level sensor for being easily installed maintenance
CN108400756A (en) A kind of double glass photovoltaic systems of large span flexible support
CN205529859U (en) Anticollision pouring jacket
CN214836440U (en) Supporting device for preventing tunnel settlement deformation
CN215829283U (en) Water conservancy aqueduct reinforcing apparatus
CN210985986U (en) Photovoltaic module convenient to installation
CN207879018U (en) A kind of high strength concrete pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20181113

CF01 Termination of patent right due to non-payment of annual fee