CN207436059U - A kind of construction site stake fixing device - Google Patents

A kind of construction site stake fixing device Download PDF

Info

Publication number
CN207436059U
CN207436059U CN201721277493.9U CN201721277493U CN207436059U CN 207436059 U CN207436059 U CN 207436059U CN 201721277493 U CN201721277493 U CN 201721277493U CN 207436059 U CN207436059 U CN 207436059U
Authority
CN
China
Prior art keywords
fixed frame
fixing device
pile body
retainer ring
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721277493.9U
Other languages
Chinese (zh)
Inventor
李建
洪宗玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Edm Science And Technology Development Co Ltd
Original Assignee
Beijing Edm Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Edm Science And Technology Development Co Ltd filed Critical Beijing Edm Science And Technology Development Co Ltd
Priority to CN201721277493.9U priority Critical patent/CN207436059U/en
Application granted granted Critical
Publication of CN207436059U publication Critical patent/CN207436059U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of construction site stake fixing devices, including pile body and drill bit, the bottom of the pile body is equipped with drill bit, fixing device is socketed on the outer wall of the pile body, the fixing device includes the first fixed frame, U-shaped folder is installed on the left of the inner cavity of first fixed frame, the right side rear and front end surface of the U-shaped folder is equipped with jack.Construction site stake fixing device, rotating clockwise laborsaving bar can drive screw rod to rotate to the left, when screw rod touches connecting plate, it is connected by connecting plate with the cooperation of concave slide plate, screw rod can be made to promote connecting plate, and Slideslip promotes retainer ring to the left on concave slide plate, it is connected by inserted link with jack cooperation, it can make retainer ring that inserted link be driven to be slided in jack, retainer ring can be contacted with pile body, /V is carried out to pile body by U-shaped folder and retainer ring, the fixed demand of different thicknesses degree timber can be met simultaneously, limitation is smaller when in use, it can meet using needs.

Description

A kind of construction site stake fixing device
Technical field
The utility model is related to Architectural Equipment technical fields, are specially a kind of construction site stake fixing device.
Background technology
In construction site, it is often necessary to earthward follow closely stake, tradition, which determines stake work, to be completed by two worker's cooperations, a work People holds timber, another worker swings hammer, and this mode requires very high, the work of holding stake first for the cooperation of two workers Human hand is steady, and swing hammer worker's hand will standard, the two requirements are there are one being not achieved, and gently then stake is fixed askew, heavy then hammer occurs The accident of hand, such as the utility model of Application No. 201420746620.5 are pounded, including fixed disk, is arranged at fixed disk surrounding Support leg, support leg are to include left end and right end, left end using universal axis connection, fixed disk between stretching structure, with fixed disk The fixed block of different size gap is fitted with right end, although ensureing that the position of stake is fixed, so as to avoid stake by surely askew, Prevent hammer from pounding the accident of hand simultaneously, but there are some defects for current timber fixing device, it is impossible to while meet different thick The fixed demand of thin degree timber, limitation is larger when in use, it is impossible to meet and use needs.
Utility model content
The purpose of this utility model is to provide a kind of construction site stake fixing device, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical solution:A kind of construction site stake fixing device, bag Pile body and drill bit are included, the bottom of the pile body is equipped with drill bit, fixing device, the fixation are socketed on the outer wall of the pile body Device includes the first fixed frame, is equipped with U-shaped folder on the left of the inner cavity of first fixed frame, two before and after the right side of the U-shaped folder End surfaces are equipped with jack, and the right side front of first fixed frame is equipped with the second fixed frame by shaft, and described first is solid Determine bolt is installed on the right side of the front side of frame, the bolt is connected with the first fixed frame and the second fixed frame screw thread, and described second is solid The inner cavity front and rear sides for determining frame are mounted on concave slide plate, and connecting plate, the connecting plate are equipped on the inside of the concave slide plate It is connected with the cooperation of concave slide plate, retainer ring on the left of the connecting plate is installed, spiral shell is installed on the right side of second fixed frame Bar, the screw rod are connected with the second fixed frame screw thread, and pushing block and laborsaving bar, institute are respectively welded at left and right sides of the screw rod The front and rear sides for stating retainer ring are mounted on connecting rod, and inserted link is equipped on the left of the connecting rod, and the inserted link is matched somebody with somebody with jack It closes and is connected, the outer lower end of first fixed frame and the second fixed frame is equipped with stent, and the bottom of the stent is equipped with cone Shape block.
Preferably, the outer lower end of the stent is equipped with support base, and the top of the support base is equipped with inserting column, described Inserting column runs through support base, and the top of the inserting column is welded with baffle.
Preferably, the inside of the U-shaped folder and retainer ring has pressed wearing layer.
Preferably, the front and rear sides of the U-shaped folder are mounted on reinforcing bar, the left side of the reinforcing bar and the first fixed frame It is connected.
Preferably, connecting rod is installed on the inside of the stent.
Compared with prior art, the beneficial effects of the utility model are:Construction site stake fixing device, during installation, First fixed frame and the second fixed frame are separated, U-shaped folder is stuck on pile body, the first fixed frame and the second fixed frame are closed Together, it is connected by bolt with the first fixed frame and the second fixed frame screw thread, the first fixed frame and the second fixed frame can be consolidated It is scheduled on together, is connected by screw rod with the second fixed frame screw thread, rotating clockwise laborsaving bar can drive screw rod to rotate to the left, When screw rod touches connecting plate, it is connected by connecting plate with the cooperation of concave slide plate, screw rod can be made to promote connecting plate in concave Slideslip promotes retainer ring to the left on slide plate, is connected by inserted link with jack cooperation, retainer ring can be made to drive inserted link in jack Interior slip can contact retainer ring with pile body, carries out /V to pile body by U-shaped folder and retainer ring, can meet simultaneously The fixed demand of different thicknesses degree timber, limitation is smaller when in use, can meet using needs.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the fixing device overlooking the structure diagram of the utility model.
In figure:1st, pile body, 2, fixing device, the 201, first fixed frame, 202, shaft, 203, connecting plate, 204, screw rod, 205th, laborsaving bar, 206, pushing block, the 207, second fixed frame, 208, concave slide plate, 209, bolt, 210, jack, 211, U-shaped Folder, 212, wearing layer, 213, reinforcing bar, 214, inserted link, 215, retainer ring, 216, connecting rod, 3, stent, 4, baffle, 5, inserting column, 6th, support base, 7, drill bit, 8, circular cone, 9, connecting rod.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction site stake fixing device, including Pile body 1 and drill bit 7, the bottom of pile body 1 are equipped with drill bit 7, fixing device 2 are socketed on the outer wall of pile body 1, and fixing device 2 is wrapped The first fixed frame 201 is included, U-shaped folder 211 is installed on the left of the inner cavity of the first fixed frame 201, the front and rear sides of U-shaped folder 211 are pacified Equipped with reinforcing bar 213, the left side of reinforcing bar 213 is connected with the first fixed frame 201, can strengthen U-shaped folder by reinforcing bar 213 211 and first fixed frame 201 connection, the right side rear and front end surface of U-shaped folder 211 is equipped with jack 210, the first fixed frame 201 right side front is equipped with the second fixed frame 207 by shaft 202, and bolt is equipped on the right side of the front side of the first fixed frame 201 209, bolt 209 is connected with the first fixed frame 201 and 207 screw thread of the second fixed frame, passes through 209 and first fixed frame 201 of bolt It is connected with 207 screw thread of the second fixed frame, the first fixed frame 201 and the second fixed frame 207 can be fixed together, loose bolts 209 can separate the first fixed frame 201 and the second fixed frame 20, and the inner cavity front and rear sides of the second fixed frame 207 are respectively mounted There is concave slide plate 208, the inside of concave slide plate 208 is equipped with connecting plate 203, and connecting plate 203 coordinates phase with concave slide plate 208 Even, when screw rod 204 touches connecting plate 203, it is connected by connecting plate 203 with the cooperation of concave slide plate 208, screw rod can be made 204 promote connecting plate 203, and Slideslip promotes retainer ring 215 to the left on concave slide plate 208, and the left side of connecting plate 203 is equipped with The inside of retainer ring 215, U-shaped folder 211 and retainer ring 215 has pressed wearing layer 212, can be prevented by wearing layer 212 U-shaped Folder 211 and the abrasion of the inner surface of retainer ring 215, the right side of the second fixed frame 207 is equipped with screw rod 204, screw rod 204 and second 207 screw thread of fixed frame is connected, and is connected by screw rod 204 with 207 screw thread of the second fixed frame, and rotating clockwise laborsaving bar 205 can be with Screw rod 204 is driven to rotate to the left, the left and right sides of screw rod 204 is respectively welded pushing block 206 and laborsaving bar 205, retainer ring 215 front and rear sides are mounted on connecting rod 216, and the left side of connecting rod 216 is equipped with inserted link 214, inserted link 214 and jack 210 Cooperation is connected, and is connected by inserted link 214 with the cooperation of jack 210, retainer ring 215 can be made to drive inserted link 214 sliding in jack 210 It is dynamic, retainer ring 215 with pile body 1 can be contacted, /V carries out pile body by U-shaped folder 211 and retainer ring 215, first is solid The outer lower end for determining 201 and second fixed frame 207 of frame is equipped with stent 3, and the inside of stent 3 is equipped with connecting rod 9, passes through connecting rod 9 Can circular cone 8 be equipped with the stability of reinforced support 3, the bottom of stent 3, when can be supported by circular cone 8 with reinforced support 3 Stability, the outer lower end of stent 3 is equipped with support base 6, and the top of support base 6 is equipped with inserting column 5, and inserting column 5 is through support Seat 6, the top of inserting column 5 is welded with baffle 4, and beaing baffle 5 using instrument can drive in the running insertion downwards of inserting column 5 ground, Strengthen the stability of stent 3.
First fixed frame 201 and the second fixed frame 207 are separated, U-shaped folder 211 is stuck on pile body 1, first is fixed 201 and second fixed frame 207 of frame is combined, and passes through bolt 209 and 207 screw thread phase of the first fixed frame 201 and the second fixed frame Even, the first fixed frame 201 and the second fixed frame 207 can be fixed together, stent 3 is contacted with ground, turned clockwise Moving laborsaving bar 205 can drive screw rod 204 to rotate to the left, when screw rod 204 touches connecting plate 203, can make screw rod 204 Promoting connecting plate 203, Slideslip promotes retainer ring 215 to the left on concave slide plate 208, and retainer ring 215 can be made to drive inserted link 214 slide in jack 210, can contact retainer ring 215 with pile body 1, by U-shaped folder 211 and retainer ring 215 to pile body /V is carried out, the fixed demand of different thicknesses degree timber can be met simultaneously, it is easy to assembly, securely and reliably.
In the description of the utility model, it is to be understood that term " coaxial ", " bottom ", " one end ", " top ", " middle part ", " other end ", " on ", " one side ", " top ", " interior ", " forepart ", " center ", the orientation or position of the instructions such as " both ends " It is based on orientation shown in the drawings or position relationship to put relation, is for only for ease of description the utility model and simplifies description, and It is not instruction or implies signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore It is not intended that the limitation to the utility model.
In addition, term " first ", " second ", " the 3rd ", " the 4th " are only used for description purpose, and it is not intended that instruction Or imply relative importance or the implicit quantity for indicating indicated technical characteristic, define as a result, " first ", " second ", At least one this feature can be expressed or be implicitly included to " the 3rd ", the feature of " the 4th ".
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu It is fixed ", the terms such as " being screwed on " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral; Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, it can be with It is the interaction relationship of connection inside two elements or two elements, unless otherwise restricted clearly, for this field For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction site stake fixing device, including pile body(1)And drill bit(7), the pile body(1)Bottom brill is installed Head(7), it is characterised in that:The pile body(1)Outer wall on be socketed with fixing device(2), the fixing device(2)Including first Fixed frame(201), first fixed frame(201)Inner cavity on the left of U-shaped folder is installed(211), the U-shaped folder(211)The right side Side rear and front end surface is equipped with jack(210), first fixed frame(201)Right side front pass through shaft(202)Installation There is the second fixed frame(207), first fixed frame(201)Front side on the right side of bolt is installed(209), the bolt(209) With the first fixed frame(201)With the second fixed frame(207)Screw thread is connected, second fixed frame(207)Inner cavity front and rear sides It is mounted on concave slide plate(208), the concave slide plate(208)Inside connecting plate is installed(203), the connecting plate (203)With concave slide plate(208)Cooperation is connected, the connecting plate(203)Left side retainer ring is installed(215), described second Fixed frame(207)Right side screw rod is installed(204), the screw rod(204)With the second fixed frame(207)Screw thread is connected, described Screw rod(204)The left and right sides be respectively welded pushing block(206)With laborsaving bar(205), the retainer ring(215)Front and rear two Side is mounted on connecting rod(216), the connecting rod(216)Left side inserted link is installed(214), the inserted link(214)With inserting Hole(210)Cooperation is connected, first fixed frame(201)With the second fixed frame(207)Outer lower end stent is installed(3), The stent(3)Bottom circular cone is installed(8).
2. a kind of construction site stake fixing device according to claim 1, it is characterised in that:The stent(3)It is outer Side bottom is equipped with support base(6), the support base(6)Top inserting column is installed(5), the inserting column(5)Through support base (6), the inserting column(5)Top be welded with baffle(4).
3. a kind of construction site stake fixing device according to claim 1, it is characterised in that:The U-shaped folder(211)With Retainer ring(215)Inside pressed wearing layer(212).
4. a kind of construction site stake fixing device according to claim 1, it is characterised in that:The U-shaped folder(211)'s Front and rear sides are mounted on reinforcing bar(213), the reinforcing bar(213)Left side and the first fixed frame(201)It is connected.
5. a kind of construction site stake fixing device according to claim 1, it is characterised in that:The stent(3)It is interior Side is equipped with connecting rod(9).
CN201721277493.9U 2017-09-30 2017-09-30 A kind of construction site stake fixing device Expired - Fee Related CN207436059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721277493.9U CN207436059U (en) 2017-09-30 2017-09-30 A kind of construction site stake fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721277493.9U CN207436059U (en) 2017-09-30 2017-09-30 A kind of construction site stake fixing device

Publications (1)

Publication Number Publication Date
CN207436059U true CN207436059U (en) 2018-06-01

Family

ID=62295154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721277493.9U Expired - Fee Related CN207436059U (en) 2017-09-30 2017-09-30 A kind of construction site stake fixing device

Country Status (1)

Country Link
CN (1) CN207436059U (en)

Similar Documents

Publication Publication Date Title
CN207406597U (en) A kind of connection structure of construction Machines
CN207436059U (en) A kind of construction site stake fixing device
CN206722449U (en) A kind of building iron support frame
CN206359130U (en) A kind of fixing device of straddle truck base
CN206278206U (en) Balance car wheel securing structure and balance car
CN209555959U (en) A kind of civil engineering Combined concrete ground pilum
CN207451458U (en) A kind of connection fixing device of wind-proof pull rod rod piece lower end
CN107601288B (en) The wind-proof pull rod of crane
CN110359757A (en) A kind of mechanical upender of cement electric power bar
CN206971893U (en) A kind of antiwind assembling flagpole
CN211027864U (en) Force rod device for bending single limb hoop in composite stirrup by 135 degrees
CN215167900U (en) Support supporting device attached to support
CN106013186A (en) Slope strengthening device for building municipal engineering
CN208236010U (en) Diagonal brace drawing device for in-situ concrete wall shuttering supporting
CN208961527U (en) A kind of construction steel structure processing mechanical clamping structure of flip horizontal
CN207875628U (en) A kind of sky iron car body connection hanging piece
CN209891235U (en) Integral pre-buried structure of steel structure column lower margin bolt
CN208793933U (en) A kind of quartz mine winning apparatus operating platform
CN207155144U (en) One kind support formed steel construction
CN209566073U (en) Three-claw pull-horse for the adjustable brachium for ejecting bearing inner ring
CN209211518U (en) A kind of length-adjustable spade of road construction
CN207073277U (en) A kind of construction scaffold safety connector
CN207296423U (en) A kind of hopper for building
CN206360667U (en) A kind of adjustable inclination angle letdown tank
CN105863248B (en) A kind of connection component and scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20210930