CN207435304U - A kind of discharging structure of 3D hot-bending machines - Google Patents

A kind of discharging structure of 3D hot-bending machines Download PDF

Info

Publication number
CN207435304U
CN207435304U CN201721393066.7U CN201721393066U CN207435304U CN 207435304 U CN207435304 U CN 207435304U CN 201721393066 U CN201721393066 U CN 201721393066U CN 207435304 U CN207435304 U CN 207435304U
Authority
CN
China
Prior art keywords
cooling
cooling station
chamber
sealed chamber
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721393066.7U
Other languages
Chinese (zh)
Inventor
左洪波
杨鑫宏
李铁
郑海涛
李洪霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Aurora Optoelectronics Technology Co Ltd
Original Assignee
Harbin Aurora Optoelectronics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Aurora Optoelectronics Technology Co Ltd filed Critical Harbin Aurora Optoelectronics Technology Co Ltd
Priority to CN201721393066.7U priority Critical patent/CN207435304U/en
Application granted granted Critical
Publication of CN207435304U publication Critical patent/CN207435304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/50Glass production, e.g. reusing waste heat during processing or shaping
    • Y02P40/57Improving the yield, e-g- reduction of reject rates

Landscapes

  • Tunnel Furnaces (AREA)

Abstract

This application involves a kind of discharging structures of 3D hot-bending machines, it is characterized in that it includes sealed chamber, open chamber, takes off material structure, 2 pushing structures and cooling structure, cooling structure includes 5 cooling stations, sealed chamber is connected to hot-bending machine furnace chamber slow cooling station exit, contain 3 cooling stations, open chamber is connected to operating platform, contain 2 cooling stations, open chamber is the open cooling station structure of four columns support, it takes off material structure movement to be arranged in sealed chamber, pushing structure passes through the movable setting of sealed chamber.Mechanical structure is simple, having stable behavior, greatly reduces failure and frequency of maintenance, improves production efficiency.

Description

A kind of discharging structure of 3D hot-bending machines
Technical field
The utility model discloses a kind of discharging structure, and in particular to a kind of discharging structure of new 3D hot-bending machines.
Background technology
Heat-bending glass be plate glass in a mold by thermal softening, brake forming under a certain pressure, then annealed be made Bend glass.With the progress of industrial technology level and the raising of people's aesthetic requirement, 3D bend glasses are in building, civilian etc. The application in field is more and more.For example, more and more smart mobile phones have selected 3D Curved screens, and receive numerous consumers' It pursues.
With being continuously increased for 3D glass demands, the development of entire industrial chain is driven, the core as production 3D glass Process equipment, 3D hot-bending machines demand will also welcome explosive growth.And traditional hot-bending machine discharging structure complexity, action are unstable, The problems such as cooling velocity is slow considerably increases productive temp and frequency of maintenance, reduces production efficiency.Therefore to discharging structure It studies most important.
The content of the invention
The problems such as the utility model is complicated mainly for traditional hot-bending machine discharging structure, and action is unstable, and cooling velocity is slow, Provide a kind of discharging structure of 3D hot-bending machines.
What the purpose of this utility model was realized in:A kind of discharging structure of 3D hot-bending machines, it is characterised in that it includes Sealed chamber, open chamber take off material structure, 2 pushing structures and cooling structure, and cooling structure includes 5 cooling stations, sealing Chamber is connected to hot-bending machine furnace chamber slow cooling station exit, and containing 3 cooling stations, open chamber is connected to operating platform, contains Have 2 cooling stations, open chamber is the open cooling station structure of four columns support, take off material structure movement be arranged on it is close It seals in chamber, pushing structure passes through the movable setting of sealed chamber.
The utility model also has so some features:1st, described material structure of taking off is using Back Word mount structure, connection cylinder 2, The sealed chamber uses encapsulation process, and sealed chamber side plate at the second cooling station is provided with folding observation window.
3rd, the right side junction of the sealed chamber and furnace chamber is provided with the first discharge door, and 3 cool down in sealed chamber Station is followed successively by the first cooling station, the second cooling station and the 3rd cooling station, and it is the first cooling station to take off material superstructure, Right side sets the first pusher, takes off top on the left of material structure and is followed successively by the second cooling station and the 3rd cooling station, the 3rd is cold But station back side panel is equipped with the second pusher, the second discharge door is provided on front side of the 3rd cooling station, front is open chamber, interior Portion is followed successively by the 4th cooling station and the 5th cooling station.
The beneficial effects of the utility model have:
1. taking off material part using the Back Word mount structure suitable for die size, mechanical structure is simple, and having stable behavior subtracts significantly Lack failure and frequency of maintenance, improve production efficiency.
2. sealed chamber side plate at the second cooling station is provided with folding observation window, emergency can be handled.
3. sealed chamber uses encapsulation process, it is ensured that mold tapping temperature is not oxidized when excessively high, improves mold Service life.
4. opening the open cooling station structure that chamber is four columns support, observation mold can be facilitated by sealed chamber Go out the situation of chamber, handled convenient for subsequent operation.
5. cooling structure includes 5 cooling stations, it can be achieved that the fast cooling of mold, improves production efficiency.
Description of the drawings
Fig. 1 is the utility model discharging structure top view.
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings.
With reference to Fig. 1, the present embodiment is integrally located at the right side of furnace chamber, and 1 front side connection furnace chamber of the first discharge door, rear side is by gas The Back Word mount structure that cylinder 4 controls takes off material structure 2, and it is the first cooling station 5 to take off material structure 2 top, takes off 2 right side of material structure as the One pusher 3 takes off 2 left side top of material structure and is followed successively by the second cooling station 6, the 3rd cooling station 9, and sealed chamber second is cold But side plate is provided with folding observation window 7 at station, and the 3rd cooling station back side panel is equipped with the second pusher 8, the 3rd cooling station Front side is provided with the second discharge door 13, and front is open chamber, is followed successively by the 4th cooling station 10, the 5th cooling station 11, by Four columns 12 support.
Mold after furnace chamber is molded slow cooling, open by discharge door, and Back Word frame takes off material structure action, and mold is taken off to the first cooling It is cooled down below station, after finishing, mold is pushed into cool down below the second cooling station by the first pusher, is then returned Word frame takes off material structure and next mold is taken off to the first cooling station by furnace chamber cools down, after the completion of cooling, the first pusher This block mold is pushed into below the second cooling station by structure, this block mold will carry out at upper mold top to the 3rd cooling station at this time Cooling even pushes away situation by observation window observable mold.When the 3rd cooling station after the mold is cooled, the second discharge door open, second Mold is pushed into below the 4th cooling station of open chamber by pusher.During next action beat, next mold is cold by the 4th But mold is pushed into below the 5th cooling station below station, completes last cooling procedure.So far mold entirely discharges cooling procedure It completes.This process is continuously walking mold, it can be achieved that the fast cooling and mould unloading of mold, improve production efficiency.
The above content is the further descriptions done to the utility model, it is impossible to assert the specific reality of the utility model It applies and is only limited to these explanations.For the personnel with the utility model fields rudimentary knowledge, it can be easy to this Utility model is changed and changed, these change and modification should all be considered as belonging to the claim that the utility model is submitted The scope of patent protection that book determines.

Claims (3)

1. a kind of discharging structure of 3D hot-bending machines, it is characterised in that it include sealed chamber, open chamber, take off material structure, 2 push away Expect structure and cooling structure, cooling structure includes 5 cooling stations, and sealed chamber is connected to the outlet of hot-bending machine furnace chamber slow cooling station Place, containing 3 cooling stations, open chamber is connected to operating platform, and containing 2 cooling stations, open chamber is four columns The open cooling station structure of support takes off material structure setting in sealed chamber, and pushing structure is arranged on the outside of sealed chamber,
Described takes off material structure using Back Word mount structure, connects cylinder.
2. the discharging structure of a kind of 3D hot-bending machines according to claim 1, it is characterised in that the sealed chamber uses Encapsulation process, and sealed chamber side plate at the second cooling station is provided with folding observation window.
3. a kind of discharging structure of 3D hot-bending machines according to claim 1 or 2, it is characterised in that the sealed chamber with The right side junction of furnace chamber is provided with the first discharge door, and 3 cooling stations are followed successively by the first cooling station, second in sealed chamber Cooling station and the 3rd cooling station, it is the first cooling station to take off material superstructure, and right side sets the first pusher, takes off material knot Top is followed successively by the second cooling station and the 3rd cooling station on the left of structure, and the 3rd cooling station back side panel is equipped with the second pusher Structure, the 3rd cooling station front side are provided with the second discharge door, and front is open chamber, and inside is followed successively by the 4th cooling station and the 5th Cooling station.
CN201721393066.7U 2017-10-25 2017-10-25 A kind of discharging structure of 3D hot-bending machines Active CN207435304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721393066.7U CN207435304U (en) 2017-10-25 2017-10-25 A kind of discharging structure of 3D hot-bending machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721393066.7U CN207435304U (en) 2017-10-25 2017-10-25 A kind of discharging structure of 3D hot-bending machines

Publications (1)

Publication Number Publication Date
CN207435304U true CN207435304U (en) 2018-06-01

Family

ID=62294034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721393066.7U Active CN207435304U (en) 2017-10-25 2017-10-25 A kind of discharging structure of 3D hot-bending machines

Country Status (1)

Country Link
CN (1) CN207435304U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110054397A (en) * 2019-04-23 2019-07-26 哈尔滨理工大学 Cooling device and cooling means for 3D hot-bending machine discharging structure
CN111423102A (en) * 2020-03-24 2020-07-17 哈尔滨奥瑞德光电技术有限公司 Transmission discharge structure of 3D hot bender

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110054397A (en) * 2019-04-23 2019-07-26 哈尔滨理工大学 Cooling device and cooling means for 3D hot-bending machine discharging structure
CN111423102A (en) * 2020-03-24 2020-07-17 哈尔滨奥瑞德光电技术有限公司 Transmission discharge structure of 3D hot bender

Similar Documents

Publication Publication Date Title
CN207435304U (en) A kind of discharging structure of 3D hot-bending machines
TW202023974A (en) Multi-mold hot-bending forming apparatus
CN103862661A (en) Novel plastic hollow product cooling shaping technology and shaping die device
CN107445460A (en) Glass bending former
CN108439774A (en) A kind of bend molding apparatus and bending and molding method of cover-plate glass
CN110054397A (en) Cooling device and cooling means for 3D hot-bending machine discharging structure
CN107021609A (en) A kind of Curred glass forming machine mould cooling discharging device
CN207525133U (en) Glass bending former
US3309190A (en) Fluid impinging glass forming apparatus
CN212357015U (en) Transmission discharge structure of 3D hot bender
CN204035325U (en) A kind of silver bar, gold bar rapidform machine
CN206997719U (en) One kind production tin slab cooling device
CN207861429U (en) Apply the transmission mechanism on non-spherical glass lens moulding press
CN106430198A (en) Calcium carbide cooling preforming mechanism
CN209974605U (en) Rotary integrated molding equipment
CN104108716B (en) Calcium carbide cooling forming equipment
CN209583971U (en) A kind of mould for glass bottle discharge type is silently
CN207308738U (en) A kind of more specification header deflector die sets of integrated form
CN206089056U (en) Carbide cools off forming mechanism in advance
CN209098503U (en) Molding die molding machine and multi-mould hot bending shape equipment
CN206014686U (en) Strip shaped glass rounding device
CN211307226U (en) Rapid forming die for rigging
CN207435300U (en) A kind of furnace chamber improved structure of hot-bending machine
CN206607157U (en) 3D bend glass hot-press equipments
CN219786517U (en) Solar aluminum alloy frame die casting die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ejection of compact structure of hot bender of 3D

Effective date of registration: 20180929

Granted publication date: 20180601

Pledgee: Longjiang bank Limited by Share Ltd Harbin Development Zone sub branch

Pledgor: HARBIN AURORA OPTOELECTRONICS TECHNOLOGY CO., LTD.

Registration number: 2018990000856

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200509

Granted publication date: 20180601

Pledgee: Longjiang bank Limited by Share Ltd Harbin Development Zone sub branch

Pledgor: HARBIN AURORA OPTOELECTRONICS TECHNOLOGY Co.,Ltd.

Registration number: 2018990000856

PC01 Cancellation of the registration of the contract for pledge of patent right