CN207432169U - Project cost budget tool box - Google Patents

Project cost budget tool box Download PDF

Info

Publication number
CN207432169U
CN207432169U CN201721340460.4U CN201721340460U CN207432169U CN 207432169 U CN207432169 U CN 207432169U CN 201721340460 U CN201721340460 U CN 201721340460U CN 207432169 U CN207432169 U CN 207432169U
Authority
CN
China
Prior art keywords
tool box
sleeve
project cost
sliding slot
cost budget
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721340460.4U
Other languages
Chinese (zh)
Inventor
陶蓉
晏江
但伟
吴章勇
李肖平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tongfang Construction Consulting Co Ltd
Original Assignee
Sichuan Tongfang Construction Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tongfang Construction Consulting Co Ltd filed Critical Sichuan Tongfang Construction Consulting Co Ltd
Priority to CN201721340460.4U priority Critical patent/CN207432169U/en
Application granted granted Critical
Publication of CN207432169U publication Critical patent/CN207432169U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purses, Travelling Bags, Baskets, Or Suitcases (AREA)

Abstract

The utility model discloses a kind of project cost budget tool boxes, solve the problem of cost personnel is mainly realized movement by embracing it when travel engineering account valuation tool box, more bothered, its key points of the technical solution are that:Including tool box body, it further includes two pairs of side walls for being symmetrically disposed on tool box body and is connected to the support arm of tool box body and between two symmetrically arranged support arms and both ends are respectively fixedly connected with the gripping arm in two support arms, a kind of project cost budget tool box of the utility model, facilitates movement of the cost personnel to project cost budget tool box.

Description

Project cost budget tool box
Technical field
The utility model is related to a kind of project cost equipment, more particularly to a kind of project cost budget tool box.
Background technology
Project cost refers to the complete equipment investment cost of construction purpose engineering anticipated expenditure or actual expenditure, preceding Phase budget, semi annual settlement, when settlement of accounts for the latter half period, can all need the instrument aided in, cost person need to go deep into engineering construction scene carry out it is real The verification on ground, therefore in use, these instruments are easily lost, rearrange it is also very bothersome during instrument, so at present These instruments are mainly housed by project cost budget tool box.
Although current project cost budget tool box can effectively accommodate surveying and mapping tool, cost personnel is in movement Mainly movement is realized by embracing it, more troublesome, there is room for improvement when project cost budget tool box.
Utility model content
The purpose of this utility model is to provide a kind of project cost budget tool box, facilitates cost personnel to project cost The movement in budget tool box.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of project cost budget tool box including tool box body, further includes and is symmetrically disposed on the two of tool box body To side wall and it is connected to the support arm of tool box body and between two symmetrically arranged support arms and both ends are fixed respectively It is connected to the gripping arm of two support arms.
Using the above program, cost personnel can uniformly be distributed in lifting work by two symmetrically arranged support arm settings The stressing conditions of both sides when having case body, keep stress equalization, and hold being provided with for arm and lift work indirectly beneficial to user Has case body.
Preferably, further include the Anti-slip cover for being arranged and being fixedly connected on and holding on wall.
Using the above program, avoided when user is in one's hands and holds gripping arm and had skidded now by the setting of Anti-slip cover As having preferable antiskid effect.
Preferably, it is provided with antiskid groove on the Anti-slip cover.
Using the above program, it is not in beat to further ensure user when holding by the setting of antiskid groove Sliding phenomenon.
Preferably, the tool box body is opened in the one side of close two support arms along with the same length direction of support arm It equipped with sliding slot, is slidably connected in the sliding slot and is useful for the sleeve for being sheathed on support arm, further include for abutment sleeve position Positioner.
Using the above program, it can effectively be sheathed on support arm and support by the sleeve slided in sliding slot Arm is fixedly connected on the reason for holding arm in itself, effectively prevents holding the opposite shifting of wall spatially opposite tool case body generation It is dynamic.
Preferably, the positioner includes being arranged at away from sliding slot slot bottom one side and is fixedly connected on the outside of sleeve Face and positioning plate beyond sliding slot opening, be arranged at tool box body close to positioning plate one side positioning sleeve, be threadedly connected to it is fixed It the bolt of position set and is opened on positioning plate so that bolt thread connects to position the threaded hole of positioning plate;
When the support arm is connected to tool box body, the bolt thread, which is connected to, to be arranged on positioning plate Threaded hole.
Using the above program, by positioning sleeve and the setting of bolt is threadedly connected to, the positioning of bolt can be being facilitated And movement, and be arranged at the threaded hole on positioning plate and be provided with and positioning plate is determined by moving into threaded hole beneficial to bolt Position, and by being positioned to positioning plate, and due to the reason that positioning plate and sleeve are fixedly installed, can indirectly realize to sleeve Positioning.
Preferably, the bolt is wing bolt.
Using the above program, by by bolt be arranged to wing bolt be conducive to cost personnel can when adjusting bolt To be used under conditions of no instrument, facilitated much compared to instrument is used to carry out positioning side.
It is vertically installed in preferably, further including between sliding slot slot bottom and sleeve bottom and both ends are respectively fixedly connected in cunning Slot trench bottom and sleeve bottom are so that the elastic component that sleeve is moved to sliding slot trench bottom.
Using the above program, can be realized by the setting of elastic component is needing to prop up support arm and sleeve separation to dismantle Sleeve can be quickly returned to initial position when brace and gripping arm, the two is accelerated compared to elastic component is not provided with Removal efficiency.
Preferably, the outer edge of the positioning plate is with arc transition.
Using the above program, since the outer edge of positioning plate is with arc transition, user is effectively prevented when holding Encounter sharp end and injured.
In conclusion the utility model has the advantages that:It can be realized by the sleeve setting slided in sliding slot Positioning to support arm, and after positioner is combined, it can realize the positioning to sleeve, in addition being provided with by elastic component Sleeve can timely be recycled beneficial to when need not position.
Description of the drawings
Fig. 1 is the structure diagram in project cost budget tool box;
Fig. 2 is the enlarged diagram in A portions in Fig. 1;
Fig. 3 is the sectional view in project cost budget tool box;
Fig. 4 is the enlarged diagram in B portions in Fig. 3.
In figure:1st, tool box body;2nd, support arm;3rd, arm is held;4th, Anti-slip cover;5th, antiskid groove;6th, sliding slot;7th, cover Cylinder;8th, positioner;9th, positioning plate;10th, positioning sleeve;11st, bolt;12nd, threaded hole;13rd, elastic component.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
As shown in Figure 1, a kind of project cost budget tool box disclosed in the present embodiment, including tool box body 1, in instrument Support arm 2 is respectively connected on two symmetrical sides of case body 1, is provided with and is respectively fixedly connected in two between two support arms 2 The gripping arm 3 of brace 2, and support arm 2 and gripping arm 3 are situated so as to holding for cost personnel in its outer edge in circular arc It holds, is also arranged in gripping arm of being in one's hands in addition 3 and is fixedly connected with Anti-slip cover 4, and several antiskid grooves are additionally provided on Anti-slip cover 4 5, effectively avoid cost personnel that slipping phenomenon occurs when holding and using.
Operating process:
Staff only needs to grip the Anti-slip cover 4 held on arm 3 during normal use, at this time due to Anti-slip cover 4 effect can avoid user from having skidded phenomenon when holding.
As shown in figure 4, and be avoid when occur support arm 2 and hold arm 3 damage when can timely into Row is replaced, and the tool box body 1 offers cunning in the one side of close two support arms 2 along with 2 same length direction of support arm Slot 6, the rounded setting in section of the sliding slot 6 are slidably connected in the sliding slot 6 and are useful for the sleeve 7 for being sheathed on support arm 2 with right Support arm 2 carries out /V, further includes for the positioner 8 of 7 position of abutment sleeve.
As shown in figure 3, positioner 8 includes being arranged at away from 6 slot bottom one side of sliding slot and is fixedly connected on the outside of sleeve 7 Face and be open beyond sliding slot 6 positioning plate 9, be arranged at tool box body 1 and connect close to the one side positioning sleeve 10 of positioning plate 9, screw thread It is connected to the bolt 11 of positioning sleeve 10 and is opened in the screw thread for being threadedly coupled to position positioning plate 9 for bolt 11 on positioning plate 9 Hole 12, the outer edge of the positioning plate 9 is with arc transition;It is described when the support arm 2 is connected to tool box body 1 Bolt 11 is threadedly connected to the threaded hole 12 being arranged on positioning plate 9, and bolt 11 is preferably wing bolt 11 in order to cost people Member can realize can be also adjusted without using instrument that in use positioning sleeve 10 is in one end away from tool box body 1 With arc transition, in being fixedly connected on one end of tool box body 1 in horizontally disposed.
Furthermore for ease of timely recycling sleeve 7 when without using sleeve 7, project cost budget tool box is also Including being vertically installed between 7 bottom of 6 slot bottom of sliding slot and sleeve and both ends are respectively fixedly connected in 6 trench bottom of sliding slot and sleeve 7 So that the elastic component 13 that sleeve 7 is moved to 6 trench bottom of sliding slot, elastic component 13 herein is preferably spring for bottom.
Specific installation and disassembly process are set forth below respectively:
Installation process:
S1, support arm 2 is positioned over close to the position of sliding slot 6.
S2, the movement by pulling 9 indirect belt moving sleeve 7 of positioning plate, make support arm 2 be contained in sleeve 7.
S3, rotating bolt 11 makes bolt 11 be moved on positioning sleeve 10 at this time, and positioning sleeve 10 is made to be threadedly connected to positioning plate 9, /V is carried out to sleeve 7 indirectly, and then realizes the positioning to support arm 2 indirectly.
Disassembly process:
S1, first rotating bolt 11 make bolt 11 be moved on positioning sleeve 10, positioning sleeve 10 are made to depart from positioning plate 9, at this time Bolt 11 no longer carries out /V to positioning plate 9.
S2, at this time elastic component 13 will be such that sleeve 7 is moved to the slot bottom direction of sliding slot 6, realize and reset.
S3, at this time cost personnel only need to hold the separation that support arm 2 and tool box body 1 can be realized in arm 3, real Both existing dismounting.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model be subject to Patent Law.

Claims (7)

1. a kind of project cost budget tool box, including tool box body (1), it is characterized in that:Further include the instrument of being symmetrically disposed on Two pairs of side walls of case body (1) and it is connected to the support arm (2) of tool box body (1) and positioned at two symmetrically arranged supports Between arm (2) and both ends are respectively fixedly connected with the gripping arm (3) in two support arms (2), and the tool box body (1) is in close to two The one side of support arm (2) offers sliding slot (6) along with support arm (2) same length direction, is slidably connected in the sliding slot (6) It is useful for being sheathed on the sleeve (7) of support arm (2), further includes for the positioner (8) of abutment sleeve (7) position.
2. project cost budget tool box according to claim 1, it is characterized in that:It further includes to be arranged and is fixedly connected on gripping Anti-slip cover (4) on wall.
3. project cost budget tool box according to claim 2, it is characterized in that:It is provided on the Anti-slip cover (4) anti- Sliding groove (5).
4. project cost budget tool box according to claim 3, it is characterized in that:The positioner (8) includes setting In away from sliding slot (6) slot bottom one side and be fixedly connected on the lateral surface of sleeve (7) and beyond sliding slot (6) opening positioning plate (9), It is arranged at the one side positioning sleeve (10) of the close positioning plate (9) of tool box body (1), is threadedly connected to the bolt of positioning sleeve (10) (11) and it is opened on positioning plate (9) so that bolt (11) is threadedly coupled to position the threaded holes (12) of positioning plate (9);
When the support arm (2) is connected to tool box body (1), the bolt (11), which is threadedly connected to, is arranged at positioning Threaded hole (12) on plate (9).
5. project cost budget tool box according to claim 4, it is characterized in that:The bolt (11) is wing bolt.
6. project cost budget tool box according to claim 5, it is characterized in that:It further includes and is vertically installed in sliding slot (6) Between slot bottom and sleeve (7) bottom and both ends are respectively fixedly connected in sliding slot (6) trench bottom and sleeve (7) bottom so that sleeve (7) elastic component (13) moved to sliding slot (6) trench bottom.
7. project cost budget tool box according to claim 6, it is characterized in that:The outer edge of the positioning plate (9) with Arc transition.
CN201721340460.4U 2017-10-17 2017-10-17 Project cost budget tool box Expired - Fee Related CN207432169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721340460.4U CN207432169U (en) 2017-10-17 2017-10-17 Project cost budget tool box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721340460.4U CN207432169U (en) 2017-10-17 2017-10-17 Project cost budget tool box

Publications (1)

Publication Number Publication Date
CN207432169U true CN207432169U (en) 2018-06-01

Family

ID=62293469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721340460.4U Expired - Fee Related CN207432169U (en) 2017-10-17 2017-10-17 Project cost budget tool box

Country Status (1)

Country Link
CN (1) CN207432169U (en)

Similar Documents

Publication Publication Date Title
CN207432169U (en) Project cost budget tool box
CN206326582U (en) A kind of communications network service special-purpose multifunctional wiring tool case
CN206544191U (en) A kind of Simple manipulator for being used to impart knowledge to students
CN207669197U (en) One kind being used for hexagon socket head cap screw pair anti-rotation device
CN204053839U (en) A kind of pincers of the maintenance for power plant's regular maintenance
CN204053977U (en) Multifunctional hammer
CN203284835U (en) Labor-saving type fire hydrant water valve operation rod with well lid drag hook
CN205660643U (en) Mounting tool is assisted to electricity -saving lamp
CN205343009U (en) A safe iron hammer for civil engineering
CN205367635U (en) Simple structure just has crow bar device of fulcrum
CN207223897U (en) A kind of architectural engineering multi-functional hammer
CN208744657U (en) A kind of fastening type oil pipe spanner of ship
CN205386784U (en) Box spanner of nut acts on
CN206051486U (en) Cable Well cover unlatching tool
CN206016199U (en) A kind of adjustable trowel
CN219834829U (en) Novel agricultural shovel
CN203250253U (en) Portable mainframe box
CN204645641U (en) Construction formwork is to drawing device
CN209785298U (en) Electric comprehensive training equipment
CN203808901U (en) Oil field underground fisher equipped with grab bucket
CN204546462U (en) A kind of position fixing handle assembly of electric hammer
CN203156650U (en) Torque wrench for valve handwheel
CN204339676U (en) Multi-functional special key
CN207296418U (en) The machine straightening device of pvc pipe
CN205154077U (en) Quick extractor of oil -field flooding pump dise root

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20191017