CN207424920U - Job site personnel information management system based on internet - Google Patents

Job site personnel information management system based on internet Download PDF

Info

Publication number
CN207424920U
CN207424920U CN201721308825.5U CN201721308825U CN207424920U CN 207424920 U CN207424920 U CN 207424920U CN 201721308825 U CN201721308825 U CN 201721308825U CN 207424920 U CN207424920 U CN 207424920U
Authority
CN
China
Prior art keywords
internet
fence
management system
storage device
job site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721308825.5U
Other languages
Chinese (zh)
Inventor
王恩来
谢潇野
韩宇
周继伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201721308825.5U priority Critical patent/CN207424920U/en
Application granted granted Critical
Publication of CN207424920U publication Critical patent/CN207424920U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of job site personnel information management system based on internet, which includes:Electronic tag, data storage device, control device, the first fence and the first label information reader;Wherein, each construction personnel is each equipped with the electronic tag of storage personal information;First label information reader is arranged at the entrance of construction site, and entrance is provided with the first fence;The data storage device of personal information of the first label information reader with being previously stored with each construction personnel is connected, and data storage device and the first fence are connected with control device.In the utility model, first label information reader can be with the personal information in electronic tag, when the information of reading can match with the personal information of some in data storage device, control device then controls the first fence to open, the construction personnel to be allowed to enter construction site, in order to the management of Field Force, reduce security risk.

Description

Job site personnel information management system based on internet
Technical field
The utility model is related to construction management technical field, in particular to a kind of construction site based on internet Personnel information management system.
Background technology
The construction personnel of construction site is more, and management is got up relatively cumbersome.Usual construction site is open state, non-construction Personnel can also enter construction site, this has resulted in the phenomenon that job site personnel is chaotic, meanwhile, it is hidden to also increase safety Suffer from.In addition, the embodiment of personnel's situation at the construction field (site) is largely also rested at this stage shown with simple LED screen it is on the scene The information such as personnel amount, information content is few, lacks the data interactive of personnel and environment, practical value unobvious.
China Patent Publication No.:203179084 U of CN disclose a kind of for power transmission project construction field safety management Information system, it is described including electronic tag, label information reader, web camera and control centre's server group Electronic tag is configured in personnel and equipment at the construction field (site), and the label information reader and web camera are arranged on and apply Each entrance at work scene, control centre's server group connect label information reader and web camera respectively.
In above-mentioned technical proposal, using label information reader to the electricity on the personnel and equipment of the discrepancy of record construction site The information of subtab is uploaded to label information management server;Meanwhile web camera carries out image collection, and be uploaded to and regard Frequency server;Label information management server and video server according to electronic labeling information and the timestamp of image data, into Row is synchronous corresponding so that the discrepancy data of electronic tag are corresponding with its image data.But above-mentioned technical proposal can not control people The disengaging of member, i.e., non-construction personnel also can arbitrarily pass in and out construction site;Simultaneously as non-construction personnel does not have electronic tag, that Label information reader can not just record its information, therefore also can not just control the feelings that non-construction personnel enters construction site Condition, there are some potential safety problemss.
Utility model content
In consideration of it, the utility model proposes a kind of job site personnel information management systems based on internet, it is intended to It solves the problems, such as to be unable to control non-construction personnel at present to pass in and out caused by construction site there are security risk and can not in real time exist Line grasps the problem of construction site construction personnel's information.
The utility model proposes a kind of job site personnel information management system based on internet, which includes: Electronic tag, data storage device, control device, the first fence and the first label information reader;Wherein, each construction Personnel are each equipped with the electronic tag of storage personal information;First label information reader is arranged at the entrance of construction site, enters Mouth is provided with the first fence;The data of personal information of the first label information reader with being previously stored with each construction personnel Storage device connects, and data storage device and the first fence are connected with control device.
Further, in the above-mentioned job site personnel information management system based on internet, further include:Display device, It is connected with data storage device, to show access into the personal information of the construction personnel of construction site.
Further, in the above-mentioned job site personnel information management system based on internet, further include:Internet data Harvester is connected with display device, to show that the publicity bulletin of internet data harvester acquisition, weather, environment are gentle As disaster information.
Further, in the above-mentioned job site personnel information management system based on internet, further include:Warning device, It is connected with control device.
Further, in the above-mentioned job site personnel information management system based on internet, the first fence is lock Ji Huo roads bar.
Further, in the above-mentioned job site personnel information management system based on internet, system further includes:Second electricity Sub- fence and the second label information reader;Wherein, the second label information reader is arranged at the outlet of construction site, and outlet is set The second fence is equipped with, the second fence is connected with control device;Second label information reader and data storage device Connection.
Further, in the above-mentioned job site personnel information management system based on internet, the second fence is lock Ji Huo roads bar.
Further, in the above-mentioned job site personnel information management system based on internet, display device is liquid crystal Display screen.
Further, in the above-mentioned job site personnel information management system based on internet, the read-write of the first label information Device and the second label information reader are connected by wireless network or cable network with data storage device.
Further, in the above-mentioned job site personnel information management system based on internet, data storage device passes through Wireless network or cable network are connected with control device.
Further, in the above-mentioned job site personnel information management system based on internet, the first fence and Two fences are connected by wireless network or cable network with control device.
In the utility model, institute in the electronic tag of construction personnel's configuration can be read by the first label information reader The personal information of storage, when the information of reading can match with some personal information stored in data storage device, Data storage device then sends the successful signal of information matches to control device, and control device then controls the first fence to open It opens, the construction personnel to be allowed to enter construction site, while non-construction personnel can also be avoided to enter construction site, in order to existing The management of field personnel, reduces security risk.In addition, data storage device is also connected with display device, it can by display device To carry out real-time display to construction personnel's information at the construction field (site), convenient for understanding the situation of the construction personnel of construction site.And And display device and control device realize the interconnection of data centered on data storage device, and then can realize with When the control to Field Force's information everywhere.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field Technical staff will be apparent understanding.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to this practicality New limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the structure for the job site personnel information management system based on internet that the utility model embodiment provides Schematic diagram;
Fig. 2 is provided for the utility model embodiment in the job site personnel information management system based on internet, electronics The production process figure of label.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the case where there is no conflict, the implementation in the utility model Feature in example and embodiment can be mutually combined.It is below with reference to the accompanying drawings and in conjunction with the embodiments new this practicality is described in detail Type.
Referring to Fig. 1, the job site personnel information management system provided in this embodiment based on internet is shown in figure Preferred structure.As shown in the figure, the system includes:Electronic tag 1, data storage device 2, control device 3, the first fence 4 and the first label information reader 5.
Wherein, each construction personnel is each equipped with electronic tag 1, is stored with corresponding construction personnel's in electronic tag 1 Personal information.First label information reader 5 is arranged at the entrance of construction site, and can be stored with reading electronic labels 1 The personal information of construction personnel.First label information reader 5 is connected with data storage device 2, and the data storage device 2 is advance It is stored with the personal information of each construction personnel.The entrance of construction site is provided with the first fence 4, the first fence 4 It is connected with data storage device 2 with control device 3.When it is implemented, the first label information reader 5 can be multiple.Tool When body is implemented, the first label information reader 5 can be connected by wireless network or cable network with data storage device 2.The One fence 4 and data storage device 2 also can be connected by wireless network or cable network with control device 3.
When construction personnel is needed into construction site, electricity that the first label information reader 5 configures construction personnel Personal information in subtab 1 is read out, and by the information conveyance read to data storage device 2.If the letter read Breath can match with some personal information stored in data storage device 2, and data storage device 2 is then to control device 3 The successful signal of information matches is sent, control device 3 then controls the first fence 4 to open, the construction personnel to be allowed to enter Construction site.
Referring to Fig. 2, the manufacturing process of electronic tag 1 is:Original electron label is taken first, i.e., does not store construction personnel individual The electronic tag of information registers the information of the original electron label;Secondly, it is original to this by label information reader The information of electronic tag is read out, during this period, can will be in the personal information logging data storage device 2 of construction personnel; Again, by the information conveyance of the original electron label to data storage device 2, and by the information and date of the original electron label The personal information of the construction personnel of 2 memory storage of storage device is combined;Again, printing has the information of original electron label and applies The electronic tag 1 of the personal information of worker person;Finally, electronic tag 1 is issued to corresponding construction personnel.
In the present embodiment, institute in the electronic tag 1 of construction personnel's configuration can be read by the first label information reader 5 The personal information of storage, when the information of reading can match with some personal information stored in data storage device 2, Data storage device 2 then sends the successful signal of information matches to control device 3, and control device 3 then controls the first fence 4 It opens, the construction personnel to be allowed to enter construction site, while non-construction personnel can also be avoided to enter construction site, in order to The management of Field Force, reduces security risk.
In above-described embodiment, it can also include:Display device 6.Display device 6 can be connected with data storage device 2, number The personal information of the construction personnel of successful match can be delivered to display device 6 according to storage device 2, and then display can be filled The personal information that 6 real-time displays enter the construction personnel of construction site is put, it is achieved thereby that personnel dynamically upgrade in time.Specifically During implementation, display device 6 can be high-definition liquid crystal display screen.When it is implemented, display device 6 can by wireless network with Data storage device 2 connects.
In the present embodiment, real-time display can be carried out to construction personnel's information at the construction field (site) by display device 6, just In the situation for the construction personnel for understanding construction site.Also, during display device 6 and control device 3 are with data storage device 2 The heart realizes the interconnection of data, and then can realize the control to Field Force's information whenever and wherever possible.
In above-described embodiment, it can also include:Internet data harvester 7.Internet data harvester 7 can be with Display device 6 connects, and publicity bulletin, weather, environment and meteorological disaster information, display can be managed by network collector Device 6 can then show personal management publicity bulletin, weather, environment and the meteorological disaster information collected, so as to apply Worker person is more convenient, understands information in time.
In above-described embodiment, it can also include:Warning device 8.Warning device 8 can be connected with control device 3, if the One label information reader, 5 read information cannot match with some personal information stored in data storage device 2, Data storage device 2 then sends the signal of information matches failure to control device 3, and control device 3 then controls warning device 8 to carry out Alarm, with the unmatched situation of timely prompting message.
In above-described embodiment, it can also include:Second fence 9 and the second label information reader 10.Wherein, second Label information reader 10 can be arranged at the outlet of construction site, and the outlet of construction site can then be provided with the second electronics and enclose Column 9.Second fence 9 can be connected with control device 3, and the second label information reader 10 can be with data storage device 2 Connection.When construction personnel needs to leave construction site, electronics that the second label information reader 10 configures construction personnel Personal information in label 1 is read out, and by the information conveyance read to data storage device 2.If the information read It can match with some personal information stored in data storage device 2, data storage device 2 is then sent out to control device 3 The signal for breath successful match of delivering letters, control device 3 then control the second fence 9 to open, are applied so that the construction personnel is allowed to leave Work scene.Meanwhile display device 6 no longer shows the personal information for the construction personnel for leaving construction site, further to realize people Member dynamically upgrades in time.If information does not match that, information matches failure is sent to control device 3 if data storage device 2 Signal, control device 3 then controls warning device 8 to alarm.
When it is implemented, the second label information reader 10 can be multiple.First fence 4 and the second fence 9 all can be gate or road bar.Second label information reader 10 can be stored by wireless network or cable network with data Device 2 connects.Second fence 9 can also be connected by wireless network or cable network with control device 3.
The system is divided into preparation, implementation, operation and safeguards three phases.
Preparation stage:According to scale of the project, greatly face arrangement, determine data storage device 2, first the 4, second electricity of fence Position and the model of sub- fence 9 and display device 6;
Implementation phase:According to early-stage preparations installation and debugging data storage device 2, typing construction personnel's personal information, printing Electronic tag 1 installs related soft and hardware equipment etc.;
Operation and maintenance phase:Relevant device operating condition is inspected periodically, the personal information that upgrades in time, publicity bulletin etc..
To sum up, in the present embodiment, the electronic tag of construction personnel's configuration can be read by the first label information reader Middle stored personal information, when the information of reading can match with some personal information stored in data storage device When, data storage device then sends the successful signal of information matches to control device, and control device then controls the first fence It opens, the construction personnel to be allowed to enter construction site, while non-construction personnel can also be avoided to enter construction site, in order to The management of Field Force, reduces security risk.In addition, data storage device is also connected with display device, pass through display device Real-time display can be carried out to construction personnel's information at the construction field (site), convenient for understanding the situation of the construction personnel of construction site. Also, display device and control device are realized the interconnection of data, and then can be realized centered on data storage device Whenever and wherever possible to the control of Field Force's information.
Obviously, those skilled in the art can carry out the utility model various modification and variations without departing from this practicality New spirit and scope.If in this way, these modifications and variations of the utility model belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these modification and variations.

Claims (11)

1. a kind of job site personnel information management system based on internet, which is characterized in that including:Electronic tag (1), number According to storage device (2), control device (3), the first fence (4) and the first label information reader (5);Wherein,
Each construction personnel is each equipped with the electronic tag (1) of storage personal information;
The first label information reader (5) is arranged at the entrance of construction site, and the entrance is provided with first electronics Fence (4);
The data of personal information of the first label information reader (5) with being previously stored with each construction personnel are deposited Storage device (2) connects, and the data storage device (2) and first fence (4) connect with the control device (3) It connects.
2. the job site personnel information management system according to claim 1 based on internet, which is characterized in that also wrap It includes:
Display device (6) is connected with the data storage device (2), to show access into the construction personnel's of the construction site Personal information.
3. the job site personnel information management system according to claim 2 based on internet, which is characterized in that also wrap It includes:
Internet data harvester (7) is connected with the display device (6), to show the internet data harvester (7) the publicity bulletin of acquisition, weather, environment and meteorological disaster information.
4. the job site personnel information management system according to claim 1 based on internet, which is characterized in that also wrap It includes:
Warning device (8) is connected with the control device (3).
5. the job site personnel information management system according to claim 1 based on internet, which is characterized in that
First fence (4) is gate or road bar.
6. the job site personnel information management system according to claim 1 based on internet, which is characterized in that described System further includes:Second fence (9) and the second label information reader (10);Wherein,
The second label information reader (10) is arranged at the outlet of the construction site, and the outlet is provided with described second Fence (9), second fence (9) are connected with the control device (3);
The second label information reader (10) is connected with the data storage device (2).
7. the job site personnel information management system according to claim 6 based on internet, which is characterized in that
Second fence (9) is gate or road bar.
8. the job site personnel information management system according to claim 2 based on internet, which is characterized in that
The display device (6) is liquid crystal display.
9. the job site personnel information management system according to claim 6 based on internet, which is characterized in that
The first label information reader (5) and the second label information reader (10) pass through wireless network or wired Network is connected with the data storage device (2).
10. the job site personnel information management system according to claim 1 based on internet, which is characterized in that
The data storage device (2) is connected by wireless network or cable network with the control device (3).
11. the job site personnel information management system according to claim 6 based on internet, which is characterized in that
First fence (4) and second fence (9) pass through wireless network or cable network and the control Device (3) connection processed.
CN201721308825.5U 2017-10-11 2017-10-11 Job site personnel information management system based on internet Active CN207424920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721308825.5U CN207424920U (en) 2017-10-11 2017-10-11 Job site personnel information management system based on internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721308825.5U CN207424920U (en) 2017-10-11 2017-10-11 Job site personnel information management system based on internet

Publications (1)

Publication Number Publication Date
CN207424920U true CN207424920U (en) 2018-05-29

Family

ID=62311014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721308825.5U Active CN207424920U (en) 2017-10-11 2017-10-11 Job site personnel information management system based on internet

Country Status (1)

Country Link
CN (1) CN207424920U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978101A (en) * 2019-04-09 2019-07-05 北京理工大学珠海学院 A kind of construction of transformer substation Field Device Management System and method based on Internet of Things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978101A (en) * 2019-04-09 2019-07-05 北京理工大学珠海学院 A kind of construction of transformer substation Field Device Management System and method based on Internet of Things
CN109978101B (en) * 2019-04-09 2020-04-21 北京理工大学珠海学院 Transformer substation construction field equipment management system and method based on Internet of things

Similar Documents

Publication Publication Date Title
DE69933402T2 (en) Automatic multimedia data delivery system
CA2199757C (en) Information display system
CN110276530A (en) A kind of intelligent engineering operation and maintenance supervising method
DE3943311C2 (en) Portable data entry device
CN104715524B (en) For supervising the method and data handling system of the vehicle parking facilities set shared by multiple tenants
CN203968152U (en) A kind of automatic vending machine supervisory systems based on cloud computing
CN102800038A (en) Intelligence education E-card system platform based on internet of things and cloud computation
CN107748959A (en) A kind of construction management information service system
CN103559751A (en) Auxiliary device and method for confirming cheating attendance behavior
CN107331285A (en) A kind of smart machine and method of sales promotion information displaying and data acquisition
CN207424920U (en) Job site personnel information management system based on internet
CN110415137A (en) A kind of management and running information based on mobile Internet is quickly transmitted and sharing method
CN107888665A (en) A kind of job site personnel information and safety management system
CN202472770U (en) Visitor monitoring system
KR100767756B1 (en) Electric notice board management system and method for multi user
US20100095318A1 (en) System and Method for Monitoring Audience Response
DE102012209941A1 (en) The goods label
CN101150591B (en) Airport flight information display system
CN106845876A (en) Cultural relic management system and museum management system
DE202007018985U1 (en) Electronic advertising pillar goods fair with one or more screen (LCD plasma OLEDs or the like) for advertising of all kinds worldwide in public places with virtual advisor and integrated biometric detection camera and in addition with biological weapons o.d. similar early detection system, solar energy
CN206115477U (en) Urban public utilities maintenance management platform
CN101360223A (en) RFID object dynamic image monitoring system
CN106384020A (en) Intelligent pharmacy of traditional Chinese medicine based on electronic paper
EP2312432A1 (en) Goods label
CN109885295A (en) A kind of graphical representation method and system of Gradle configuration file

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant