cabinet
power
input
generator
frequency converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721629710.6U
Other languages
Chinese (zh)
Inventor
彭冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU FEIYA AIRBORNE EQUIPMENT APPLICATION RESEARCH Co Ltd
Original Assignee
CHENGDU FEIYA AIRBORNE EQUIPMENT APPLICATION RESEARCH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU FEIYA AIRBORNE EQUIPMENT APPLICATION RESEARCH Co Ltd filed Critical CHENGDU FEIYA AIRBORNE EQUIPMENT APPLICATION RESEARCH Co Ltd
Priority to CN201721629710.6U priority Critical patent/CN207424225U/en
Application granted granted Critical
Publication of CN207424225U publication Critical patent/CN207424225U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The utility model discloses a kind of power of alterating and direct current multi-function test stands, including power distribution equipment, operate switch board, programmable power supply cabinet, frequency converter control cabinet, generator drags platform and load box, power distribution equipment output terminal is connected with programmable power supply cabinet input terminal, programmable power supply cabinet output terminal is connected with frequency converter control cabinet energization input, frequency converter control cabinet output terminal is connected with generator dragging platform energization input, generator drags platform output terminal and is connected with operation switch board, operate switch board by bus respectively with programmable power supply cabinet, the control signal input of frequency converter control cabinet is connected, operation switch board is connected with load box input terminal.The utility model manages whole process using computer integration control technology, excellent human-computer interaction interface is provided according to test assignment, dynamic performance index can be measured and analyzed, system capital equipment and component have convertibility, and equipped with complete internal detection interface, convenient for searching failure cause rapidly.

Description

A kind of power of alterating and direct current multi-function test stand
Technical field
The utility model is related to a kind of power of alterating and direct current multi-function test stands.
Background technology
Aircraft operation has strict requirements to each component, it is necessary to periodically be overhauled, removed a hidden danger, just can guarantee its safety Operation, is typically detected aircraft with testing stand, there is different testing stands for different components.Have much in aircraft Side uses attachment of double current generator, starter and generator etc., is both needed to often be detected it.
Traditional electro-mechanical formula airplane power source testing stand, it is simple in structure, failure rate is relatively low, it can be only done power-supply system and its part Department enclosure is tested, and function is single, and mechanical speed governors formula dragging platform rotational speed regulation precision is low, speed governing is slow, high noise, and console is using complete Manual operation, is susceptible to malfunction, higher to testing crew Capability Requirement, it is impossible to complete dynamic performance index analysis;Frequency conversion Drawing type airplane power source testing stand needs the cold lubricating system of lubricating oil of mating complexity, increases equipment due to the use of gear speeder Volume and weight, and increase the difficulty of maintaining, still can not achieve the automation pipe of power of alterating and direct current multi-function test stand Reason and dynamic performance index analysis;Component-level computer measurement and control formula airplane power source testing stand is set for important be tested such as generator Standby, still using traditional operation display pattern, operating process is complicated, tests process not manageability.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of power of alterating and direct current multi-function test stand.
The purpose of this utility model is achieved through the following technical solutions:A kind of power of alterating and direct current multi-function test stand, It is described to match somebody with somebody including power distribution equipment, operation switch board, programmable power supply cabinet, frequency converter control cabinet, generator dragging platform and load box Electric installation output terminal is connected with the programmable power supply cabinet input terminal, the programmable power supply cabinet output terminal and the frequency converter control cabinet Energization input is connected, and frequency converter control cabinet output terminal is connected with generator dragging platform energization input, and generator dragging platform is defeated Outlet is connected with operation switch board, and operation switch board is believed by bus with the control of programmable power supply cabinet, frequency converter control cabinet respectively Number input terminal is connected, and operation switch board is connected with load box input terminal.
The power distribution equipment includes power distribution cabinet and distribution box, and general supply controller, the distribution are equipped in the power distribution cabinet Case exports three-phase alternating current to general supply controller, and alternating current is distributed to corresponding electrical equipment by the general supply controller.
Several voltage output controllers, the alternating current warp of the general supply controller distribution are additionally provided in the power distribution cabinet Voltage output controller is input to corresponding electrical equipment.
Phase sequence relay is additionally provided in the power distribution cabinet, the three-phase alternating current that distribution box is input to power distribution cabinet is first input into Phase sequence relay, then general supply controller is input to by phase sequence relay.
The friendship that connection is matched there are three overcurrent relay and respectively with three overcurrent relays is set in the distribution box Current transformer, each phase of three-phase alternating current concatenates an overcurrent relay respectively, by the three-phase alternating current of overcurrent relay It is input in power distribution cabinet.
The power distribution equipment further includes several one-way safety isolating transformers, the single-phase electricity of the general supply controller distribution Respectively through one-way safety isolating transformer, voltage output controller distribute to the operation switch board, programmable power supply cabinet and Load box.
The load box includes the movement circuit of housing and setting inside housings, and the bottom of housing is provided with cold air Entrance, the top of housing are equipped with hot air outlet, are equipped with filter screen at the cool air inlet, enclosure interior is additionally provided with radiation air Machine.
The movement circuit includes Switching Power Supply, load output protection circuit, temperature survey protection circuit, cooling fan connection Lock control circuit, control detection circuit and RLC load arrays, the current output terminal of Switching Power Supply is respectively by controlling detection electricity Road, relay contacts device assembly are connected with the energization input of temperature survey protection circuit, load output protection circuit;Temperature is surveyed Amount protection circuit signal output part respectively with cooling fan interlock control circuit, load output protection circuit signal input part It is connected, the control signal output of cooling fan interlock control circuit protects circuit, load output protection with temperature survey respectively The control signal input of circuit is connected, load the signal output part of output protection circuit respectively with temperature survey protection circuit, Cooling fan interlock control circuit is connected with the signal input part of RLC load arrays.
The generator dragging platform includes pedestal and the frequency converter and high-speed induction motor that are arranged on pedestal, the frequency conversion Device realizes that signal is connected with high-speed induction motor, and the high-speed induction motor is realized by shaft coupling and tested generator and linked, Electromagnetic brake is also equipped on the high-speed induction motor;
The generator dragging platform further includes the first air blower and the second air blower, the supply input of first air blower End is connected with the frequency converter control cabinet, first air blower by air passage to high-speed induction motor ventilation and heat, described the Two air blowers radiate to tested hydro-generator ventilation by air passage.
The generator dragging platform further includes signal detection controller and several temperature being arranged on high-speed induction motor Detector, the detection signal output part of temperature monitor are connected with the detection signal input part of signal detection controller, signal inspection The control signal output for surveying controller is connected with the control signal input of the first air blower.
The generator dragging platform further includes the first wind pressure flow detector, and the first wind pressure flow detector is arranged on In air passage between first air blower and high-speed induction motor, the detection signal output part and signal of the first wind pressure flow detector The detection signal input part of detection controller is connected, the control signal output of signal detection controller and the control of the first air blower Signal input part processed is connected.
The generator dragging platform further includes the second wind pressure flow detector, and the second wind pressure flow detector is arranged on In air passage between second air blower and tested generator, detection signal output part and the signal of the second wind pressure flow detector are examined The detection signal input part for surveying controller is connected, the control signal output of signal detection controller and the control of the second air blower Signal input part is connected.
A kind of power of alterating and direct current multi-function test stand further includes radiator, described radiator one end and frequency converter Switch board energization input is connected, and the other end is connected with the operation switch board control signal input, the radiator pair The operation switch board ventilation and heat.
The beneficial effects of the utility model are:
1)Using test and repair integrative solution, system is tested using computer generalization, by airplane power source equipment Performance test and actual repair work demand Combined design, realize test with repair it is effective is connected, formed unified test and Maintenance work pattern, the airplane power source power of alterating and direct current multi-function test stand synthesization that proposes of creativeness is built for the first time inside and outside army Thought.
2)Using computer integration control technology, motor drag, load control and experimental implementation process etc. are integrated The control management of change can provide excellent human-computer interaction interface according to specific test assignment, simplify procedures, improve simultaneously The security of test.
3)Using gearless type high speed three-phase alternating current Frequency converting driving technology, cancel the large sizes such as fuel tank, oil pump, gear speeder Equipment simplifies system structure, reduces equipment volume and weight, reduces the difficulty of maintaining, improves dragging system Functional reliability.
4)Three overcurrent relays are introduced in the three-phase alternating current of power supply, system is worked as to realize by D.C mutual-inductor When any one phase current in circuit is more than setting electric current, function that just disconnection system input power is protected.
5)For simulating aircraft electrical equipment, the utilization of power load box that aircraft generator is sent carries out load box used Consumption can effectively verify the working characteristics of generator, and electrical parameter performance test and dimension are carried out to aircraft electrical equipment convenient for the later stage Shield.
6)Complete machine uses modularized design, easy to operate, easy to maintain;It can be according to customer requirement test voltage, electric current etc. Parameter provides the detection means of science for high-power ac power equipment.
7)Generator dragging platform used can simulate the rotating speed of aircraft engine, for realization device miniaturization and convenient for army Using operation, design directly drives the scheme of high-speed induction motor to realize the stepless time adjustment of motor, frequency conversion using frequency converter Power of motor is 150kW, and the range of speeds can meet the test request of a variety of generators in 0~8500 rpm.
Description of the drawings
Fig. 1 is the utility model principle block diagram;
Fig. 2 is the utility model power distribution equipment functional block diagram;
Fig. 3 is the utility model load box structure diagram;
Fig. 4 is the utility model load box functional block diagram;
Fig. 5 drags platform structure diagram for the utility model generator;
Fig. 6 drags platform functional block diagram for the utility model generator;
In figure, 1- housings, 2- cool air inlets, 3- filter screens, 4- cooling fans, 5- hot air outlets, 6- pedestals, 7- high Fast variable-frequency motor, 8- shaft couplings.
Specific embodiment
Below in conjunction with embodiment, the technical solution of the utility model is clearly and completely described, it is clear that retouched The embodiment stated is only the utility model part of the embodiment, instead of all the embodiments.Based in the utility model Embodiment, those skilled in the art's all other embodiments obtained on the premise of not making the creative labor, all belongs to In the scope of the utility model protection.
Refering to Fig. 1-6, the utility model provides a kind of technical solution:As shown in Figure 1, a kind of power of alterating and direct current compbined test Platform, including power distribution equipment, operation switch board, programmable power supply cabinet, frequency converter control cabinet, generator dragging platform and load box.Outside It connects after power supply enters power distribution equipment and is separately input to frequency converter control cabinet, operation switch board, programmable power supply cabinet, generator dragging platform And load box.
As shown in Fig. 2, the power distribution equipment output terminal is connected with the programmable power supply cabinet input terminal, the power distribution equipment is made Monitoring and power distribution unit for input power, indicated by 380V inputs display, sequence examing and instruction, inverter supply, First air blower power supply instruction, load box cooling fan power supply instruction, dragging platform cooling fan power supply instruction, programmable power supply cabinet supply The compositions such as electricity instruction, operation switch board power supply instruction.
The power distribution equipment includes power distribution cabinet and distribution box, and general supply controller, the distribution are equipped in the power distribution cabinet Case exports three-phase alternating current to general supply controller, and alternating current is distributed to corresponding electrical equipment by the general supply controller, Computer and central controller in general supply controller carry out reasonability control according to the power supply requirement property of electrical equipment to power supply.
Several voltage output controllers are additionally provided in the power distribution cabinet, the alternating current of general supply controller distribution is through voltage O controller is input to corresponding electrical equipment, and the electrical equipment includes frequency converter control cabinet, operation switch board, program-controlled electric Source cabinet and load box.
The operation switch board passes through the bus control signal with the programmable power supply cabinet, the frequency converter control cabinet respectively Input terminal is connected.
The programmable power supply cabinet output terminal is connected with the frequency converter control cabinet energization input, the frequency-conversion control cabinet profit The control action for dragging platform on aircraft at a high speed is realized with internal frequency converter, realizes the speed regulating control of high-speed induction motor 7.
Phase sequence relay is additionally provided in the power distribution cabinet, the three-phase alternating current that distribution box is input to power distribution cabinet is first input into Phase sequence relay, then general supply controller is input to by phase sequence relay.The phase sequence relay be used as sequence examing, only when Main contactor, and the protective relay of the automatic phase sequence cognition of energy are just connected when input power phase sequence is correct, avoids some special machines Electric equipment causes accident or equipment damage because of being reversed after power phase is reversed.The control signal output of general supply controller Also realize that signal is connected with system controller, display unit and protection circuit, system controller, display unit and protection circuit are General supply controller provides the logistics support guarantee on basis, plays the role of management, display and protection, protects general supply controller Hold normal operating conditions.
The friendship that connection is matched there are three overcurrent relay and respectively with three overcurrent relays is set in the distribution box Current transformer, each phase of three-phase alternating current concatenates an overcurrent relay respectively, by the three-phase alternating current of overcurrent relay It is input in power distribution cabinet.
After external three-phase 380V/50Hz power inputs, overcurrent protective device is designed in inlet wire distribution box, i.e., in power supply The overcurrent relay of three 0~9.99A is introduced in three-phase alternating current, by matching somebody with somebody 50 outside:1 D.C mutual-inductor is realized when being When any one phase current in circuit of uniting is more than setting electric current, the just function protected of disconnection system input power.
The power distribution equipment further includes several one-way safety isolating transformers, the single-phase electricity of the general supply controller distribution Respectively operation switch board, programmable power supply cabinet and load box are distributed to through one-way safety isolating transformer, voltage output controller. The one-way safety isolating transformer makes input winding and output by least corresponding to double insulation or strengthening the insulation of insulation Winding is electrically separating, and single-phase electricity is transported to voltage output controller with extra low voltage, voltage output controller is then pressed Voltage is delivered to operation switch board, programmable power supply cabinet and load box according to the nominal parameter of electrical equipment.
Computer and adaptation unit are equipped in the operation switch board, the operation switch board is the core of whole system Part, is responsible for the integrated management of all experiment resources, and the operation switch board designs to complete whole system using PXI bussing techniques Function and performance test work.
The computer mainly include industrial personal computer, 1553B emulators, data acquisition module, data discrete control module with And communication module etc..
The hardware interface of the computer support hardware can by PXI interfaces and AD capture cards, isolate and exports I/O cards, goes here and there Mouth expansion card, 1553B boards communicate;Serial ports(RS232, RS485) pass through serial ports and programmable power supply cabinet, frequency converter control cabinet Communication.
The 1553B emulators mainly include 1553B boards and communication cable two parts form, and can send and receive confluence The order of power controller, engine controller, so that testing stand identifies its working condition and parameter.
The data discrete control module mainly complete switch amount, the control of relay box contactor and 64 tunnels every From output.
The communication module needs the RS422 communications of completion busbar power control unit, the RS485 of frequency converter control cabinet to lead to News, the RS485 communications of electrical quantity sensor, the RS485 communications of load box, the RS232 communications of programmable power supply cabinet, RS232 communications connect Mouthful it is more, using PXI serial port expanding modules, realize that interface connects.
The data acquisition module mainly completes voltage, electric current, discrete switch amount, system reaction time and various power supplys letter Number test.48 road acquisition channels gather 0~5VDC signals per road, can meet millivolt signal acquisition, are mainly used for acquisition and come from The voltage signal of signal adapter.
The adaptation unit mainly has electrical quantity sensor, voltage and current sensor, shunting meter, relay, contactor etc. Device, for completing signal conversion and control.
The electrical quantity sensor uses three-phase four-wire system connection mode, can test exchange output parameter, passes through its own RS485 Communications And Computers realize signal exchange.
The voltage-current sensor its power supply, signal input, signal output are isolated, and by each voltage and current Sensor output collects data collecting plate card.
The time measurement of measured piece is realized by software, when software receives the commencing signal of time measurement, is begun to Timing when receiving stop signal, just stops timing.The control of relay, contactor is controlled by digital I/O cards, works as number When word I/O cards receive the order of software, corresponding port just exports signal, to control relay coil, is closed relay, after The closure of electric switch controls corresponding relay and contactor, to carry out signal switching.
The programmable power supply cabinet is divided into program-control DC power cabinet and exchanges programmable power supply cabinet two parts, and it acts as carrying out During power-supply system performance test, output current is to meet the different power supply requirement of tested department enclosure.
It is described operation switch board be connected with the load box input terminal, as shown in figure 3, the load box including housing 1 with And the movement circuit inside housing 1 is arranged on, the bottom of housing 1 is provided with cool air inlet 2, and the top of housing 1 is equipped with heat sky Gas exports 5, and filter screen 3 is equipped at the cool air inlet 2, cooling fan 4 is additionally provided with inside housing 1.
The filter screen 3 is used to filter the impurity in cold air, purifies cold air;Cooling fan 4 is arranged on element and installs shape Into heat dissipation wind channel in, by outside the heat generated during element manipulation discharge babinet so as to the unlikely damage of protection element.
In test job, which is blown into cold wind using the cool air inlet 2 from 1 bottom of housing, and the heat at top is empty Gas outlet 5 suctions out hot wind, realizes box house and external heat exchange, and the heat of discharge is cold under the action of cooling fan 4 But, so that entire box house heat dissipation effect reaches optimal.
As shown in figure 4, the movement circuit include Switching Power Supply, load output protection circuit, temperature survey protection circuit, Cooling fan interlock control circuit, control detection circuit and RLC load arrays.
The power distribution cabinet provides the alternating current of single-phase 220V for load box, inside sets the current output terminal difference of Switching Power Supply By the way that detection circuit, relay contacts device assembly and temperature survey is controlled to protect the power supply of circuit, load output protection circuit defeated Enter end to be connected, the power of alterating and direct current multi-function test stand load box further includes parameter display circuit, the parameter display circuit Energization input be connected with the current output terminal of Switching Power Supply.
The Switching Power Supply is parameter display circuit, control detection circuit and relay contacts device assembly provide required electricity Energy;Signal input part of the control detection circuit respectively with relay contacts device assembly, parameter display circuit is connected.It is described Relay contacts device assembly, parameter display circuit signal output part with control detection circuit be connected.Control detection circuit energy The signal that relay contacts device assembly is sent is controlled and detected, and controls the display of load parameter, relay contacts device assembly rises The effects that automatic adjustment, safeguard protection, conversion circuit.
The signal output part of the temperature survey protection circuit is protected respectively with cooling fan interlock control circuit, load output The signal input part of protection circuit is connected, temperature survey protection circuit can monitor in real time cooling fan interlock control circuit, load it is defeated Go out to protect the temperature change of circuit, alarm signal is sent in too high or too low state, so as to adjust cooling fan interlocked control Circuit, the temperature for loading output protection circuit, make component not be burned.
The alternating current of single-phase 220V is directly inputted to cooling fan interlock control circuit to provide required electric energy, heat dissipation The control with temperature survey protection circuit, load output protection circuit respectively of the control signal output of interlock of fan control circuit Signal input part is connected.Temperature change is fed back to temperature survey protection circuit by cooling fan interlock control circuit, load exports Circuit is protected, so as to ensure that component is always worked within the scope of safe temperature;The cooling fan interlock control circuit It is connected with cooling fan unit, necessary requirement is provided for heat dissipation work.
The signal output part of the load output protection circuit is controlled respectively with temperature survey protection circuit, cooling fan interlocking Circuit processed is connected with the signal input part of RLC load arrays.The signal output part of the RLC load arrays is protected with load output The signal input part of protection circuit is connected, and the performance when accessing different loads is controlled for load output protection circuit;Described is negative It carries output protection circuit and is equipped with load output interface, beneficial to the receiving efficiency for improving equipment when data latch.
The frequency converter control cabinet output terminal is connected with generator dragging platform energization input, generator dragging platform output terminal It is connected with operation switch board.
As shown in figure 5, the generator dragging platform includes pedestal 6 and the frequency converter being arranged on pedestal 6 and high speed frequency conversion Motor 7.
The high-speed induction motor 7 combines the advantages of high-speed electric expreess locomotive and variable-frequency motor, high-speed electric expreess locomotive is small, It can be connected directly to save traditional machinery speed increasing device with high speed load, drive system is improved while reducing system noise Efficiency, the magnetic flux frequency that is mainly characterized by spinner velocity high, stator winding current and iron core is high, power density and loss are close Degree is big.And variable-frequency motor refers under normal environment conditions, is connected with 100% nominal load in the range of 10% ~ 100% normal speed Reforwarding row, Wen Sheng do not exceed the motor of motor calibration feasible value.The two combination can improve high-speed induction motor 7 efficiency and Heating property makes it be more in line with the technology requirement in dragging platform.
Electromagnetic brake is installed, electromagnetic brake makes the fortune in high-speed induction motor 7 on the high-speed induction motor 7 The effects that moving part stops or slows down, passing power and controlled motion are mainly played in the transmission system in high-speed induction motor 7, it By the interaction force between magnetic pole and magnetic pole high-speed induction motor 7 is made to brake, there is compact-sized, easy to operate, response It is sensitive, using reliable, it is easy to accomplish the advantages that far distance controlled.
The frequency converter realizes that signal is connected with high-speed induction motor 7, and high-speed induction motor 7 is directly driven using frequency converter Method realize the stepless speed regulation of motor, in a manner that the frequency for gathering frequency converter is multiplied by multiplying power realize high speed variable-frequency electric The real-time rotating speed acquisition of machine 7, realizes the miniaturization of equipment, is operated convenient for the use of army.
The high-speed induction motor 7 is realized by shaft coupling 8 and tested generator and linked, in high-speed induction motor 7 and quilt It surveys in the power train process of generator, shaft coupling 8 plays the role of buffering, vibration damping and improves dynamic property.The shaft coupling 8 Bell-jar is installed outside so that total is compact, effectively saves space, reduces dragging stage body product.
The generator dragging platform further includes the first air blower and the second air blower, the supply input of first air blower End is connected with the frequency converter control cabinet, first air blower by air passage to 7 ventilation and heat of high-speed induction motor, described the Two air blowers radiate to tested hydro-generator ventilation by air passage.Preferably, the air passage wants short and straight, and turn will be lacked.Because When structure size is unaffected, increase air passage area can reduce the pressure loss, while can reduce the noise of air blower.
The power of alterating and direct current multi-function test stand generator dragging platform further includes signal detection controller and several settings Temperature monitor on high-speed induction motor 7, the inspection of the detection signal output part and signal detection controller of temperature monitor It surveys signal input part to be connected, the control signal output of signal detection controller and the control signal input phase of the first air blower Even.
Temperature measuring device is the high precision instrument of thermometric, can be influenced by temperature and be expanded with heat and contract with cold using gas, Neng Goushi When detect the temperature change of high-speed induction motor 7, the temperature of high-speed induction motor 7 is made to be maintained in normal range (NR), so as to increase Long life of winding.
Signal detection controller receives the temperature data from temperature monitor, and then analyzes the data, then passes through it Control signal output output data adjusts the wind speed of the first air blower, so as to complete high-speed induction motor and the first air blower it Between signal transfer and feedback operation.
Described power of alterating and direct current multi-function test stand generator dragging platform further includes the first wind pressure flow detector, and described the One wind pressure flow detector is arranged in the air passage between the first air blower and high-speed induction motor 7, the first wind pressure flow detection The detection signal output part of device is connected with the detection signal input part of signal detection controller, the control letter of signal detection controller Number output terminal is connected with the control signal input of the first air blower.
Described power of alterating and direct current multi-function test stand generator dragging platform further includes the second wind pressure flow detector, and described the Two wind pressure flow detectors are arranged in the air passage between the second air blower and tested generator, the second wind pressure flow detector Detection signal output part is connected with the detection signal input part of signal detection controller, and the control signal of signal detection controller is defeated Outlet is connected with the control signal input of the second air blower.
The data that the analysis wind pressure flow detector transmission of signal detection controller comes, then control air blower, adjust Wind speed of blast blower size is saved, has the function that adjust high-speed induction motor 7 and tested generator-temperature detection, so that entirely dragging platform It is maintained at work in normal temperature range.
A kind of power of alterating and direct current multi-function test stand further includes radiator, described radiator one end and frequency converter Switch board energization input is connected, and the other end is connected with the operation switch board control signal input, the radiator pair The operation switch board ventilation and heat.
The frequency converter control cabinet is mainly used for the control of the generator dragging platform, realizes the tune of high-speed induction motor 7 Speed control, the rotating speed mode that first air blower changes alternating current generator through frequency converter carry out the control of compressor flow, can be with Energy loss caused by previous mechanical system regulating flow is greatly reduced, the radiator output terminal is also respectively with exchanging Generator with operation switch board be connected, be continuously alternating current generator and operation switch board radiate, avoid both equipment because Temperature is excessively high and damages.
The power supply of entire testing stand is all drawn by the power distribution equipment, with the control of the operation switch board as a whole Center.The power supply of entire testing stand is 380V/50Hz three-phase four-wire systems, power supply capacity 150kVA, which distributes through power cabinet For two parts, a part supplies frequency converter control cabinet for three-phase 380V supply voltages, and being conveyed to dragging system through frequency converter supplies Electricity, another part exchange after using transformer isolation to entire testing stand, load box and the single-phase 220V of programmable power supply cabinet offer Voltage.Switch board is operated as control centre, by bus marco frequency converter, and then realizes the control of the generator dragging platform System, by bus marco programmable power supply, realizes the automatic management of entire pilot system power supply, by operating inside switch board Digital output modul realizes the automation control of the load box load, meanwhile, operation switch board is also the connection behaviour of equipment under test Make platform, the connectivity port of all power-supply system department enclosures in addition to generator is provided.
For the variable-frequency control technique employed in the utility model, the utility model also adaptation to local conditions take it is corresponding Scheme, particular problem and solve method it is as follows:
1)The electromagnetic interference and countermeasure directly conducted by power supply
Frequency converter can make to generate higher hamonic wave in the electric power system of testing stand at work, to being connected to same power supply system The electrical equipment of system generates interference, such as:Controller, industrial computer etc..Set solution countermeasure mainly carries out isolation work Make:First, it is powered by using isolating transformer to industrial computer, control power supply, signal power source etc..Second is that it all adopts With measuring cell and control element with physical isolation and Phototube Coupling, opened as the high frequency of generator speed measurement use is close It closes.
2)The interference conducted by earthed system and countermeasure
Frequency converter is by earthed system to weak current part(Measurement and control signal circuit, industrial computer etc.)Direct-coupling is generated to do It disturbs.Solution mainly carries out grounding design work:It is first, the signal ground of system and the ground of frequency converter and dragging motor is tight Lattice separate.Second is that signal line uses multipoint earthing form, each earth point in signal system is all directly connected to apart from it most Near earth point, finally unifies ground connection again, and the performance being experimentally confirmed in high frequency is very good.Third, on the software of system It works more, such as using superposed average, singular value screening, digital filtering, filters out and shake scheduling algorithm and method.Fourth, in some moulds The input terminal of analog quantity sensor installs wave filter additional, filters out higher hamonic wave part.
3)Interference and countermeasure by Space Coupling
Frequency converter is by space radiation to weak current part(Measurement and control signal circuit, industrial computer etc.)The interference of generation.Become In inverter bridge mostly using PWM technologies, solid switch device switches at high speed frequency device(Du/dt is up to more than 1kV/us)It is caused Radiation interference problem it is quite prominent, can be by space to the powerful electromagnetic wave of external radiation.Its radiation field intensity depends on interference The current strength and tranmitting frequency in source etc..For this problem, the embodiment of the utility model is individually to do one to the frequency converter A totally-enclosed metal safe carries out corresponding signal shielding.To improve the antijamming capability of observing and controlling, select and filtered with input and output The frequency converter of device, the observing and controlling power supply of electrical source of power carries out electrical isolation using isolating transformer, using with isolation features Electric signal transmitter, for measurement circuit using measures such as effective shielding, ground connection and hardware filterings, it is anti-dry that software carries out a variety of numbers It the various technologies such as disturbs, ensures the stability and accuracy of TT&C system work.
Above-mentioned Switching Power Supply, load output protection circuit, temperature survey protection circuit, cooling fan interlock control circuit, Control detection circuit and RLC loads array, general supply controller, voltage output controller, phase sequence relay, signal detection control Device processed, wind pressure flow detector are existing structure, and therefore, the concrete structure of above-mentioned various pieces just no longer repeats one by one, this Field technology personnel can be realized on the basis of the goal of the invention and technical solution of the utility model is understood with reference to the prior art The utility model.
The above is only the preferred embodiment of the utility model, it should be understood that the utility model is not limited to herein Disclosed form is not to be taken as the exclusion to other embodiment, and available for various other combinations, modification and environment, and It can be modified in contemplated scope described herein by the technology or knowledge of above-mentioned introduction or association area.And this field The modifications and changes that personnel are carried out do not depart from the spirit and scope of the utility model, then all should be in right appended by the utility model It is required that protection domain in.

Claims (10)

1. a kind of power of alterating and direct current multi-function test stand, it is characterised in that:Including power distribution equipment, operation switch board, programmable power supply cabinet, Frequency converter control cabinet, generator dragging platform and load box, the power distribution equipment output terminal and the programmable power supply cabinet input terminal It is connected, the programmable power supply cabinet output terminal is connected with the frequency converter control cabinet energization input, frequency converter control cabinet output terminal It is connected with generator dragging platform energization input, generator drags platform output terminal and is connected with operation switch board, and operation switch board leads to It crosses control signal input of the bus respectively with programmable power supply cabinet, frequency converter control cabinet to be connected, operates switch board and load box is defeated Enter end to be connected.
2. a kind of power of alterating and direct current multi-function test stand according to claim 1, it is characterised in that:The power distribution equipment includes Power distribution cabinet and distribution box, the power distribution cabinet is interior to be equipped with general supply controller, and the distribution box exports three-phase alternating current to general supply Alternating current is distributed to corresponding electrical equipment by controller, the general supply controller;
Several voltage output controllers are additionally provided in the power distribution cabinet, the alternating current of the general supply controller distribution is through voltage O controller is input to corresponding electrical equipment;
Phase sequence relay is additionally provided in the power distribution cabinet, the three-phase alternating current that distribution box is input to power distribution cabinet is first input into phase sequence Protector, then general supply controller is input to by phase sequence relay;
It is set in the distribution box there are three overcurrent relay and mutual with exchanging for three overcurrent relays matching connection respectively Sensor, each phase of three-phase alternating current concatenate an overcurrent relay respectively, are inputted by the three-phase alternating current of overcurrent relay Into power distribution cabinet.
3. a kind of power of alterating and direct current multi-function test stand according to claim 2, it is characterised in that:The power distribution equipment also wraps Several one-way safety isolating transformers are included, the single-phase electricity of the general supply controller distribution isolates transformation through one-way safety respectively Device, voltage output controller distribute to operation switch board, programmable power supply cabinet and the load box.
4. a kind of power of alterating and direct current multi-function test stand according to claim 1, it is characterised in that:The load box includes shell Body(1)And it is arranged on housing(1)Internal movement circuit, housing(1)Bottom be provided with cool air inlet(2), housing(1) Top be equipped with hot air outlet(5), the cool air inlet(2)Place is equipped with filter screen(3), housing(1)Inside is additionally provided with scattered Air-heater(4);
The movement circuit includes Switching Power Supply, load output protection circuit, temperature survey protection circuit, cooling fan interlocking control Circuit processed, control detection circuit and RLC load arrays, the current output terminal of Switching Power Supply respectively by control detection circuit, Relay contacts device assembly is connected with the energization input of temperature survey protection circuit, load output protection circuit;Temperature survey Protect circuit signal output part respectively with cooling fan interlock control circuit, load output protection circuit signal input part phase Even, the control signal output of cooling fan interlock control circuit is electric with temperature survey protection circuit, load output protection respectively The control signal input on road is connected, and the signal output part for loading output protection circuit is protected circuit with temperature survey, dissipated respectively Air-heater interlock control circuit is connected with the signal input part of RLC load arrays.
5. a kind of power of alterating and direct current multi-function test stand according to claim 1, it is characterised in that:The generator drags platform Including pedestal(6)Be arranged on pedestal(6)On frequency converter and high-speed induction motor(7), the frequency converter and high speed variable-frequency electric Machine(7)Realize signal connection, the high-speed induction motor(7)Pass through shaft coupling(8)It realizes and links with tested generator, it is described High-speed induction motor(7)On be also equipped with electromagnetic brake.
6. a kind of power of alterating and direct current multi-function test stand according to claim 5, it is characterised in that:The generator drags platform Further include the first air blower and the second air blower, the energization input of first air blower and the frequency converter control cabinet phase Even, first air blower is by air passage to high-speed induction motor(7)Ventilation and heat, second air blower is by air passage to quilt Survey hydro-generator ventilation heat dissipation.
7. a kind of power of alterating and direct current multi-function test stand according to claim 6, it is characterised in that:The generator drags platform It further includes signal detection controller and several is arranged on high-speed induction motor(7)On temperature monitor, the inspection of temperature monitor It surveys signal output part with the detection signal input part of signal detection controller to be connected, the control signal output of signal detection controller End is connected with the control signal input of the first air blower.
8. a kind of power of alterating and direct current multi-function test stand according to claim 6, it is characterised in that:The generator drags platform The first wind pressure flow detector is further included, the first wind pressure flow detector is arranged on the first air blower and high-speed induction motor (7)Between air passage in, the detection signal of detection signal output part and the signal detection controller of the first wind pressure flow detector Input terminal is connected, and the control signal output of signal detection controller is connected with the control signal input of the first air blower.
9. a kind of power of alterating and direct current multi-function test stand according to claim 6, it is characterised in that:The generator drags platform Further include the second wind pressure flow detector, the second wind pressure flow detector be arranged on the second air blower and tested generator it Between air passage in, the detection signal input part of detection signal output part and the signal detection controller of the second wind pressure flow detector It is connected, the control signal output of signal detection controller is connected with the control signal input of the second air blower.
10. a kind of power of alterating and direct current multi-function test stand according to claim 1, it is characterised in that:Further include radiator, Described radiator one end is connected with frequency converter control cabinet energization input, the control signal of the other end and the operation switch board Input terminal is connected, and the radiator is to the operation switch board ventilation and heat.
CN201721629710.6U 2017-11-29 2017-11-29 A kind of power of alterating and direct current multi-function test stand Active CN207424225U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721629710.6U CN207424225U (en) 2017-11-29 2017-11-29 A kind of power of alterating and direct current multi-function test stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721629710.6U CN207424225U (en) 2017-11-29 2017-11-29 A kind of power of alterating and direct current multi-function test stand

Publications (1)

Publication Number Publication Date
CN207424225U true CN207424225U (en) 2018-05-29

Family

ID=62396476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721629710.6U Active CN207424225U (en) 2017-11-29 2017-11-29 A kind of power of alterating and direct current multi-function test stand

Country Status (1)

Country Link
CN (1) CN207424225U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109799410A (en) * 2019-03-19 2019-05-24 西北工业大学 Flight profile, mission profile control device, aircraft electrical power system integrated test system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109799410A (en) * 2019-03-19 2019-05-24 西北工业大学 Flight profile, mission profile control device, aircraft electrical power system integrated test system and method
CN109799410B (en) * 2019-03-19 2021-03-26 西北工业大学 Flight profile control device, and airplane power system comprehensive test system and method

Similar Documents

Publication Publication Date Title
CN107748339A (en) A kind of power of alterating and direct current multi-function test stand
CN104362736B (en) A kind of Intelligent component cabinet and its monitoring method for intelligent transformer
CN110333412A (en) New energy automobile electric drive system electromagnetic compatibility test load device and test system
CN204961364U (en) Air suspension centrifugal fan control system
CN103257314A (en) Power grid adaptability testing system of mobile wind turbine generator
CN104133465A (en) Simulation testing device for ship high-voltage electricity
CN106405414A (en) Integrated automatic test device for wind pitch motor
CN207908945U (en) A kind of wind power pitch-controlled system supply voltage monitoring relay test-device
CN103454511B (en) A kind of train auxiliary power supply system detection platform of ground type
CN101764550A (en) Integrated protection controller for wireless intelligent motor
CN207424225U (en) A kind of power of alterating and direct current multi-function test stand
CN205159875U (en) Low -voltage distribution box
CN202661562U (en) Ground type detection platform of train auxiliary power supply system
CN202276135U (en) Comprehensive protection controller for wireless intelligent motor
CN219498725U (en) Energy storage integrated preassembled transformer substation
CN207424226U (en) Power of alterating and direct current multi-function test stand load box
CN201382998Y (en) Online monitoring screen for electric energy error of multi-loop electric energy meter
CN106527300A (en) Building electrical equipment integrated management system
CN206060225U (en) Centralized control equipment based on small photovoltaic power generation system
CN204989836U (en) Marine generating set distribution system
CN203850993U (en) Synchronous generator apparatus and excitation device thereof
CN208190041U (en) A kind of electronic engineering machinery power distribution cabinet
CN210120335U (en) Main control power distribution unit
CN211183805U (en) Integrated structure compact type high-voltage frequency converter
CN211183778U (en) Integrated structure compact type high-voltage frequency converter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant