CN207422724U - A kind of dedicated small tube diameter evaporator of heat pump unit - Google Patents

A kind of dedicated small tube diameter evaporator of heat pump unit Download PDF

Info

Publication number
CN207422724U
CN207422724U CN201721460119.2U CN201721460119U CN207422724U CN 207422724 U CN207422724 U CN 207422724U CN 201721460119 U CN201721460119 U CN 201721460119U CN 207422724 U CN207422724 U CN 207422724U
Authority
CN
China
Prior art keywords
pipe
heat
pump unit
heat pump
air blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721460119.2U
Other languages
Chinese (zh)
Inventor
张嘉庆
郭宇航
李财航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Guangteng New Energy Co Ltd
Original Assignee
Foshan Guangteng New Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Guangteng New Energy Co Ltd filed Critical Foshan Guangteng New Energy Co Ltd
Priority to CN201721460119.2U priority Critical patent/CN207422724U/en
Application granted granted Critical
Publication of CN207422724U publication Critical patent/CN207422724U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Semiconductors Or Solid State Devices (AREA)

Abstract

The utility model discloses a kind of dedicated small tube diameter evaporators of heat pump unit, including vaporization chamber, heat-dissipating pipe and air blower, the vaporization chamber one side is provided with heat pump unit access tube and enters pipe control valve, the opposite side of the vaporization chamber is provided with heat pump unit and picks out pipe and outlet pipe control valve, the evaporation chamber surface is provided with heat emission hole, the air blower is provided with below the evaporation chamber, blast pipe and infundibulate discharge pipe are provided on the air blower, heat dissipation pipe holder is provided among the evaporation chamber, the heat-dissipating pipe is provided on the heat dissipation pipe holder, mounting hole and Elastic buckle, radiating aluminium sheet is provided with above the heat-dissipating pipe, the heat-dissipating pipe periphery is provided with temperature sensor.Heat dissipation evaporation is carried out by heat-dissipating pipe and radiating aluminium sheet, air flow cyclical acceleration heat dissipation evaporation process is formed by air blower, small, appearance is simply generous, uses work efficiency height.

Description

A kind of dedicated small tube diameter evaporator of heat pump unit
Technical field
The utility model is related to evaporator device technical fields, and in particular to a kind of dedicated pipe with small pipe diameter evaporation of heat pump unit Device.
Background technology
With present people's living standards continue to improve, requirement of the people to the comfort level of living environment is also constantly carrying With the appearance of heat pump unit, good experience is brought to people’s lives for height, in the course of work of heat pump unit, one As in the case of be unable to do without evaporator, evaporator can realize the exchange of heat, to achieve the purpose that use, but traditional evaporation Device work efficiency is low, and heat exchange process is relatively slow, has dragged down the work efficiency of heat pump unit, and traditional steaming on the whole Send out that device is also fairly simple for the control of evaporation process, it is necessary to which that a kind of work efficiency is high, control system is fairly perfect is new Evaporator meets the needs of market.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of heat pump unit dedicated pipe with small pipe diameter Evaporator.
The utility model is achieved through the following technical solutions above-mentioned purpose:A kind of dedicated pipe with small pipe diameter evaporation of heat pump unit Device, including vaporization chamber, heat-dissipating pipe and air blower, the vaporization chamber one side is provided with heat pump unit access tube and enters pipe control valve, The opposite side of the vaporization chamber is provided with heat pump unit and picks out pipe and outlet pipe control valve, and the evaporation chamber surface is provided with heat dissipation Hole, the evaporation chamber lower section are provided with the air blower, blast pipe and infundibulate discharge pipe are provided on the air blower, Be provided with heat dissipation pipe holder among the evaporation chamber, be provided on the heat dissipation pipe holder heat-dissipating pipe, mounting hole and Elastic buckle, the heat-dissipating pipe top are provided with radiating aluminium sheet, and the heat-dissipating pipe periphery is provided with temperature sensor.
In said structure, first the efferent duct of heat pump unit is connected with the heat pump unit access tube, by heat pump unit Input pipe picks out pipe with the heat pump unit and is connected, then by entering pipe control valve and the outlet pipe described in controller control Control valve is opened, and heat pump unit forms the cycling of a flowing, the heat-dissipating pipe and the radiation aluminium inside the heat-dissipating pipe Piece carries out heat dissipation evaporation to the fluid, evaporated by the heat emission hole, and the air blower work can accelerate heat dissipation to steam Hair process, the temperature sensor can detect the real time temperature of the evaporation chamber, and then the heat dissipation completed to fluid is steamed Hair process.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, the heat emission hole forms in institute The surface of vaporization chamber is stated, the heat dissipation pipe holder is fixed on the inside of the vaporization chamber by playing screw.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, the heat-dissipating pipe passes through described Elastic buckle is fixed on the top of the heat dissipation pipe holder, and the radiating aluminium sheet is fixed on the heat-dissipating pipe by welding manner Top.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, it is described enter pipe control valve and institute Heat pump unit access tube to be stated to be connected through a screw thread, the outlet pipe control valve picks out pipe with people's pump assembly and is connected through a screw thread, The heat pump unit access tube, the heat pump unit pick out to be connected through a screw thread between pipe and the heat-dissipating pipe.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, the temperature sensor passes through Screw is fixed on the inside of the vaporization chamber, and the air blower is bolted on the inside of the vaporization chamber.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, the blast pipe and the leakage Bucket shape discharge pipe is connected with each other with the air blower by screw thread, and the controller is fixed by screws in outside the vaporization chamber Side.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, the temperature sensor, institute State air blower, it is described enter pipe control valve, the outlet pipe control valve be electrically connected with the controller.
Advantageous effect is:Heat dissipation evaporation is carried out by heat-dissipating pipe and radiating aluminium sheet, air flow is formed by air blower Cyclical acceleration heat dissipation evaporation process, small, appearance is simply generous, uses work efficiency height.
Description of the drawings
Fig. 1 is a kind of front view of the dedicated small tube diameter evaporator of heat pump unit described in the utility model.
Fig. 2 is a kind of sectional view of the front view of the dedicated small tube diameter evaporator of heat pump unit described in the utility model.
Fig. 3 is the section of heat-dissipating pipe fixing end in the dedicated small tube diameter evaporator of a kind of heat pump unit described in the utility model Figure.
The reference numerals are as follows:
1st, vaporization chamber;2nd, heat pump unit access tube;3rd, pipe control valve is entered;4th, radiating aluminium sheet;5th, radiate pipe holder;6th, it is elastic Buckle;7th, heat pump unit picks out pipe;8th, outlet pipe control valve;9th, heat-dissipating pipe;10th, temperature sensor;11st, blast pipe;12nd, infundibulate Discharge pipe;13rd, air blower;14th, controller;15th, heat emission hole;16th, mounting hole.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1, Figure 2 and Figure 3, the dedicated small tube diameter evaporator of a kind of heat pump unit, including vaporization chamber 1, heat-dissipating pipe 9 With air blower 13,1 one side of vaporization chamber is provided with heat pump unit access tube 2 and enters pipe control valve 3, and heat pump unit access tube 2 is main It is connected for the efferent duct with heat pump unit, the opposite side of vaporization chamber 1 is provided with heat pump unit and picks out pipe 8 and outlet pipe control valve 7, heat pump unit picks out pipe 8 and is mainly used to be connected with heat pump unit input pipe, and 1 surface of vaporization chamber is provided with heat emission hole 15, dissipates Hot hole 15 is mainly used to distribute heat, and 1 lower inside of vaporization chamber is provided with air blower 13, and air blower 13 is used for dissipating for accelerated heat Thermal evaporation process is provided with blast pipe 11 and infundibulate discharge pipe 12 on air blower 13, and 1 bosom of vaporization chamber is provided with heat dissipation Pipe holder 5 is provided with heat-dissipating pipe 9, mounting hole 16 and Elastic buckle 6 on the pipe holder 5 that radiates, and 9 top of heat-dissipating pipe is provided with heat dissipation Aluminium flake 4, heat-dissipating pipe 9 and radiating aluminium sheet 4 are mainly used to the evaporation heat that radiates, and 9 periphery of heat-dissipating pipe is provided with temperature sensor 10, temperature Degree sensor 10 is used for detecting the implementation temperature variations inside vaporization chamber 1.
In said structure, first the efferent duct of heat pump unit is connected with heat pump unit access tube 2, by the input of heat pump unit Pipe picks out pipe 8 with heat pump unit and is connected, and is then controlled by controller 14 and is opened into pipe control valve 3 and outlet pipe control valve 7, heat pump Unit forms the cycling of a flowing inside heat-dissipating pipe 9, and heat-dissipating pipe 9 carries out heat dissipation evaporation to fluid with radiating aluminium sheet 4, passes through Heat emission hole 15 is evaporated, and the work of air blower 13 can accelerate the evaporation process that radiates, and temperature sensor 10 can detect vaporization chamber 1 Internal real time temperature, and then complete the heat dissipation evaporation process to fluid.
In order to further improve the use function of the dedicated small tube diameter evaporator of heat pump unit, heat emission hole 15 forms in evaporation The surface of room 1, heat dissipation pipe holder 5 are fixed on the inside of vaporization chamber 1 by playing screw, and heat-dissipating pipe 9 is fixed on by Elastic buckle 6 The top of heat dissipation pipe holder 5, radiating aluminium sheet 4 are fixed on the top of heat-dissipating pipe 9 by welding manner, enter pipe control valve 3 and heat pump Unit access tube 2 is connected through a screw thread, and outlet pipe control valve 7 picks out pipe 8 with people's pump assembly and is connected through a screw thread, heat pump unit access Pipe 2, heat pump unit pick out to be connected through a screw thread between pipe 8 and heat-dissipating pipe 9, and temperature sensor 10 is fixed by screws in vaporization chamber 1 inside, air blower 13 are bolted on the inside of vaporization chamber 1, blast pipe 11 and infundibulate discharge pipe 12 and air blower 13 are connected with each other by screw thread, and controller 13 is fixed by screws in 1 outside of vaporization chamber, and temperature sensor 10, air blower 13 enter Pipe control valve 3, outlet pipe control valve 7 are electrically connected with controller 14.
The basic principle, main feature and advantage of the utility model has been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by appending claims and equivalents.

Claims (7)

1. a kind of dedicated small tube diameter evaporator of heat pump unit, it is characterised in that:Including vaporization chamber, heat-dissipating pipe and air blower, institute It states vaporization chamber one side to be provided with heat pump unit access tube and enter pipe control valve, the opposite side of the vaporization chamber is provided with heat pump unit Pipe and outlet pipe control valve are picked out, the evaporation chamber surface is provided with heat emission hole, the drum is provided with below the evaporation chamber Wind turbine is provided with blast pipe and infundibulate discharge pipe on the air blower, heat-dissipating pipe branch is provided among the evaporation chamber Frame is provided with the heat-dissipating pipe, mounting hole and Elastic buckle on the heat dissipation pipe holder, heat dissipation is provided with above the heat-dissipating pipe Aluminium flake, the heat-dissipating pipe periphery are provided with temperature sensor.
2. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:The heat emission hole The surface of the vaporization chamber is formed in, the heat dissipation pipe holder is fixed on the inside of the vaporization chamber by playing screw.
3. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:The heat-dissipating pipe The top of the heat dissipation pipe holder is fixed on by the Elastic buckle, the radiating aluminium sheet is fixed on described by welding manner The top of heat-dissipating pipe.
4. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:It is described enter management and control Valve processed is connected through a screw thread with the heat pump unit access tube, and the outlet pipe control valve picks out pipe with the heat pump unit and passes through spiral shell Line connects, and the heat pump unit access tube, the heat pump unit pick out to be connected through a screw thread between pipe and the heat-dissipating pipe.
5. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:The temperature passes Sensor is fixed by screws in the inside of the vaporization chamber, and the air blower is bolted on the inside of the vaporization chamber.
6. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:The blast pipe It is connected with each other with the infundibulate discharge pipe with the air blower by screw thread, the controller is fixed by screws in the steaming Send out outside.
7. a kind of dedicated small tube diameter evaporator of heat pump unit according to claim 1, it is characterised in that:The temperature passes Sensor, the air blower, it is described enter pipe control valve, the outlet pipe control valve be electrically connected with the controller.
CN201721460119.2U 2017-11-06 2017-11-06 A kind of dedicated small tube diameter evaporator of heat pump unit Expired - Fee Related CN207422724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721460119.2U CN207422724U (en) 2017-11-06 2017-11-06 A kind of dedicated small tube diameter evaporator of heat pump unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721460119.2U CN207422724U (en) 2017-11-06 2017-11-06 A kind of dedicated small tube diameter evaporator of heat pump unit

Publications (1)

Publication Number Publication Date
CN207422724U true CN207422724U (en) 2018-05-29

Family

ID=62307445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721460119.2U Expired - Fee Related CN207422724U (en) 2017-11-06 2017-11-06 A kind of dedicated small tube diameter evaporator of heat pump unit

Country Status (1)

Country Link
CN (1) CN207422724U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109028662A (en) * 2018-06-29 2018-12-18 安徽新店软件开发有限公司 A kind of finned evaporator and refrigeration equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109028662A (en) * 2018-06-29 2018-12-18 安徽新店软件开发有限公司 A kind of finned evaporator and refrigeration equipment

Similar Documents

Publication Publication Date Title
CN107092319B (en) A kind of computer cabinet of cooling, dust preventing
CN206761364U (en) A kind of electric steam furnace with condensation structure
CN207702610U (en) A kind of cool-down dehumidification device using condensed water
CN207037592U (en) A kind of computer heat radiation system
CN207422724U (en) A kind of dedicated small tube diameter evaporator of heat pump unit
CN207262539U (en) Economical air conditioner
CN105021058A (en) Energy-saving, water-saving and environment-friendly type technological adiabatic air cooler
CN208736206U (en) For the steam(-)coil in vapor heat exchanger
CN206618060U (en) Split evaporation type cold wind fan device
CN207369499U (en) A kind of explosion-proof positive pressure cabinet of active cooling with air -return duct
CN207179378U (en) A kind of LED using radiating structure is towards day lamp
CN216049027U (en) Integrated heat pump with heat recovery and dehumidification functions and drying device applied to integrated heat pump
CN211669978U (en) Universal case for instruments and meters
CN108088128A (en) A kind of efficient condenser
CN210198032U (en) Three-dimensional air duct heat pump dryer
CN203672034U (en) Centralized processing system for condenser heat of supermarket refrigerators
CN208566971U (en) A kind of super energy-saving cold and heat air conditioner
CN207649433U (en) A kind of heat pipe evaporating condensation type heat exchanger
CN207350764U (en) Air conditioner condensation water treatment system and the air-conditioning using the condensate water processing system
CN208205851U (en) A kind of container data center cooling unit of evaporation
CN207252114U (en) A kind of heat dissipation system for computer room
CN202470269U (en) Constant temperature and constant humidity generator
CN206160800U (en) A device, indirect heating equipment and air conditioner for improving condenser heat exchange efficiency
CN105757814B (en) Cooling-heating integrated machine air-conditioning
CN211111136U (en) MVR sewage pretreatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

Termination date: 20201106

CF01 Termination of patent right due to non-payment of annual fee