CN207422320U - A kind of new Regional Energy primary and secondary station energy supplying system - Google Patents

A kind of new Regional Energy primary and secondary station energy supplying system Download PDF

Info

Publication number
CN207422320U
CN207422320U CN201721075389.1U CN201721075389U CN207422320U CN 207422320 U CN207422320 U CN 207422320U CN 201721075389 U CN201721075389 U CN 201721075389U CN 207422320 U CN207422320 U CN 207422320U
Authority
CN
China
Prior art keywords
energy
valve
station
work song
stations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721075389.1U
Other languages
Chinese (zh)
Inventor
顾治国
王晓萍
廖�燕
梁伯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Saving Urban Energy Saving Research Institute Co Ltd
Original Assignee
China Energy Saving Urban Energy Saving Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Saving Urban Energy Saving Research Institute Co Ltd filed Critical China Energy Saving Urban Energy Saving Research Institute Co Ltd
Priority to CN201721075389.1U priority Critical patent/CN207422320U/en
Application granted granted Critical
Publication of CN207422320U publication Critical patent/CN207422320U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/40Geothermal heat-pumps

Landscapes

  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

The utility model provides a kind of new Regional Energy primary and secondary station energy supplying system, and including an energy centre mother station and four substations, energy resource system basic load is supplied by energy mother station, makes full use of areas adjacent available resources, meets region energy supply basic load.Outside basic load of the substation using mother station conveying, adaptation to local conditions includes soil source heat pump, water resource heat pump, air source heat pump, geothermal energy etc., as Peak Load using other energy forms.Not only resource in planning region can so be fully utilized, and ENERGY PLANNING builds the influence of sequential without being bound by function plot, both can first build mother station, it also can be according to project demands, preferential promoters station, stand station between there is cross over pipe to connect, in region energy supply formed netted.

Description

A kind of new Regional Energy primary and secondary station energy supplying system
Technical field
The utility model is related to a kind of Regional Energy primary and secondary station energy supplying systems, are related to heat supply, are led for combustion gas, heating ventilation and air-conditioning Domain scope.
Background technology
Traditional central air-conditioning energy supplying system is exactly to establish a centralized air-conditioning computer room, to whole region carry out cooling or Person's heat supply;Some energy supplying systems may be equipped with boiler to carry out heat supply.It is this generally, for the energy supply of a small range The energy supplying system of form can be met the needs of users substantially.But energized for region interior in a big way, if according to biography On the one hand the energy-provision way of system can cause the increase of installation amount, cause the waste of resource, and cannot be according to the money in each area Source condition is reasonably configured;On the other hand due to supplying energy range larger, it can also make water conservancy balance phenomenon more obvious.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model is to provide a kind of new Regional Energy primary and secondary stations to energize system System, energy resource system basic load are supplied by energy mother station, make full use of areas adjacent available resources, meet region energy supply basis Load.
Technical solution provided by the utility model is:
A kind of new Regional Energy primary and secondary station energy supplying system, including an energy centre mother station and four substations, the energy The energy supply pipeline of center mother station connects two users of its adjacent domain, while energizes pipeline and be divided into two-way, is sequentially connected 1 all the way Work song station and 2 work song stations, another way are sequentially connected 3 work song stations and 4 work song stations, and all substations directly provide institute's chilling requirement to the user Or heat, a by-pass line is connected between 1 work song station and 3 work song stations, one is also connected between 2 work song stations and 4 work song stations Root by-pass line.
The Regional Energy primary and secondary station energy supplying system of the utility model, energy resource system basic load are supplied by energy mother station, filled Divide using areas adjacent available resources, meet region energy supply basic load.Outside basic load of the substation using mother station conveying, because Ground suiting measures to different conditions includes soil source heat pump, water resource heat pump, air source heat pump, geothermal energy etc. using other energy forms, is born as peak regulation Lotus.Not only resource in planning region can so be fully utilized, and ENERGY PLANNING is built without being bound by function plot The influence of sequential both can first build mother station, can also stand according to project demands, preferential promoters station and have cross over pipe between standing Connect, in region energy supply formed netted.
Description of the drawings
Fig. 1 is Regional Energy primary and secondary station energy supplying system operation schematic diagram.
Wherein:
--- --- water supply line
--- --- water return pipeline
Specific embodiment
1 pair of the utility model is described in further detail below in conjunction with the accompanying drawings, herein mainly for illustrating energy-provision way, Therefore only water supply line is described, water return pipeline is corresponding with water supply line, is hereafter no longer described in detail.In addition 1 in figure For the valve number on water supply line, 1-1 is the valve number on water return pipeline, and so on, and in confession, water return pipeline Valve opening is consistent with closing, is hereafter no longer described in detail.The energy supplying system of mother station is generally regenerative resource, including too Positive energy, water, air, soil etc., in this patent by taking underground water as an example, using the energy supplying system of water resource heat pump.Four additional substation Energy supplying system be respectively:1 work song station and 3 work song stations are water resource heat pump energy supplying system, and 2 work song stations and 4 work song stations are cold water The energy supplying system of units plus gas boiler.
Embodiment one:
By Fig. 1, Open valve 1 and valve 2, the energy supply pipeline of mother station is its proximity intra domain user 1 and user 2 first It is energized, remaining energy is divided into two-way along energy supply pipeline.One branch first passes through 1 work song station, and Open valve 5 will Amount supply user 3,3 insufficient energy charge of user are then provided by 1 work song station.Then, Open valve 3, another part energy Then by energizing pipeline by 2 work song stations, Open valve 7 supplies energy to user 4, and 4 insufficient energy charge of user is then by 2 Work song station provides.Wherein, valve 1, valve 2, valve 3, valve 5, valve 7 are to open;Valve 9, valve 10, valve 11, valve Door 15 is to close.Similar, another branch first passes through 3 work song stations, and Open valve 6 supplies energy to user 5, and user 5 Insufficient energy charge is then provided by 3 work song stations.Then, Open valve 4, another part energy are then passed through by energizing pipeline 4 work song stations, Open valve 8 supply energy to user 6, and 6 insufficient energy charge of user is then provided by 4 work song stations.Wherein, valve Door 4, valve 6, valve 8 are to open;Valve 12, valve 13, valve 16, valve 19, valve 20 are to close.Here, valve Door 17 is to open with valve 18, plays the role of connection, makes entire energy supplying system composition one netted, this is for the ease of adjusting The variation of section energy supply load.
Embodiment two:
When winter lower temperature, water temperature is relatively low, and entire energy supplying system reduces operation to reach saving energy consumption at this time The purpose of cost, energy supplying system can be varied from.Specific embodiment is as follows:
By Fig. 1, Open valve 1 and valve 2, the energy supply pipeline of mother station is its proximity intra domain user 1 and user 2 first It is energized.In addition mother station also serves as a pre-heating system at this time, by water temperature heating to 34 DEG C or so, supplies 2 work song stations and No. 4 The water supply of substation is once heated again, is heated to 45 DEG C or so.
A part of water is sent into 2 work song stations by Open valve 9 and valve 15, and 2 work song stations carry out secondary add to this part water Heat, by valve 7, supply user 4 uses;Another part water is then by valve 13 and valve 16, into 4 work song stations, 4 work songs It stands and reheating is carried out to this part water, by valve 8, supply user 6 uses.Remaining energy of mother station along energy supply pipeline It is divided into two-way.One branch first passes through 1 work song station, and Open valve 5 supplies energy to user 3,3 insufficient energy charge of user Then provided by 1 work song station.Another branch is then by 3 work song stations, and Open valve 6 supplies energy to user 5, and user 5 is insufficient Energy charge is then provided by 3 work song stations.In whole process, valve 1, valve 2, valve 5, valve 6, valve 7, valve 8, valve 9, Valve 10, valve 12, valve 13, valve 15, valve 16 are to open;Valve 3, valve 4, valve 11, valve 14, valve 19, Valve 20 is to close.Here, valve 17 is to open with valve 18, plays the role of connection, forms entire energy supplying system One netted, this is for the ease of adjusting the variation of energy supply load.
Embodiment three:
Under winter extreme operating condition, primary energy (superficial water source etc.) water temperature is very low, at this time entire energy supplying system in order to Reach saving energy consumption, reduce the purpose of operating cost, energy supplying system can be adjusted again.Specific embodiment is as follows:
By Fig. 1, water temperature as a pre-heating system, is first promoted to 15-20 DEG C or so, supplied to 1 work song at this time by mother station It stands and 3 work song stations is again heated to 45 DEG C or so, then carry out mixed water with 2 work song stations and 4 work song stations again, temperature is down to 35 DEG C or so, 2 work song stations and 4 work song stations are entered, 45 DEG C is heated to and is energized.
Valve 9 and valve 13 are to close at this time, energize the moisture in pipeline into two parts, are partly into 1 work song station This part water is carried out reheating by it, and part supply user 3 uses, and another part is then supplied by valve 11 and valve 15 This part water is finally heated at 2 work song stations, 2 work song stations, and supply user 4 uses;Another portion of energy supply pipeline that mother station comes out Point into 3 work song stations, this part water is carried out reheating by it, and part supply user 5 uses, and another part then passes through valve 14 and valve 16 supply 4 work song stations, 4 work song stations finally heat this part water, supply user 6 and use.Here, valve 17 with valve 18 be to open, and plays the role of connection, make entire energy supplying system form one it is netted, this is for the ease of adjusting Energize the variation of load.In whole process, valve 1, valve 2, valve 5, valve 6, valve 7, valve 8, valve 11, valve 12, Valve 14, valve 15, valve 16 are to open;Valve 3, valve 4, valve 9, valve 10, valve 13, valve 19, valve 20 are It closes.Here, valve 17 is to open with valve 18, plays the role of connection, makes entire energy supplying system composition one netted, This is for the ease of adjusting the variation of energy supply load.

Claims (1)

1. a kind of new Regional Energy primary and secondary station energy supplying system, which is characterized in that including an energy centre mother station and four sons Stand, the energy supply pipeline of energy centre mother station connects two users of its adjacent domain, while energizes pipeline and be divided into two-way, all the way according to 1 work song station of secondary connection and 2 work song stations, another way are sequentially connected 3 work song stations and 4 work song stations, and all substations directly provide to the user Institute's chilling requirement or heat connect a by-pass line, between 2 work song stations and 4 work song stations between 1 work song station and 3 work song stations Also a by-pass line is connected.
CN201721075389.1U 2017-08-25 2017-08-25 A kind of new Regional Energy primary and secondary station energy supplying system Active CN207422320U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721075389.1U CN207422320U (en) 2017-08-25 2017-08-25 A kind of new Regional Energy primary and secondary station energy supplying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721075389.1U CN207422320U (en) 2017-08-25 2017-08-25 A kind of new Regional Energy primary and secondary station energy supplying system

Publications (1)

Publication Number Publication Date
CN207422320U true CN207422320U (en) 2018-05-29

Family

ID=62315296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721075389.1U Active CN207422320U (en) 2017-08-25 2017-08-25 A kind of new Regional Energy primary and secondary station energy supplying system

Country Status (1)

Country Link
CN (1) CN207422320U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111219909A (en) * 2020-01-15 2020-06-02 华电电力科学研究院有限公司 Distributed energy station regional energy supply method with energy storage device and combined with industrial waste heat

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111219909A (en) * 2020-01-15 2020-06-02 华电电力科学研究院有限公司 Distributed energy station regional energy supply method with energy storage device and combined with industrial waste heat

Similar Documents

Publication Publication Date Title
CN202868819U (en) Intelligent centralized heating system
CN103836697B (en) Circulating water direct connection waste heat supply and steam extraction heat supply coupled combined heat and power generation heat supply system
CN102589035B (en) Energy-saving heat pump and co-generation coupled heating system and coupled heating method
CN207422320U (en) A kind of new Regional Energy primary and secondary station energy supplying system
CN205403067U (en) Utilize energy -saving control system of geothermal resource heating
CN106150679A (en) Hospital's Distribution of Natural formula energy supplying system
CN201715607U (en) Mixing water heating system
CN206572600U (en) Regulation heating secondary network climate compensating system
CN202813540U (en) Energy-saving heat pump and co-generation system coupled heat supply system
CN203147942U (en) Ground source heat pump hybrid air conditioning system
CN205174864U (en) Control system jointly heats
CN204438289U (en) A kind of heat supply network balance sysmte
CN101691938A (en) Central air-conditioning floor
CN204629655U (en) The heat supply of underground heat cascade utilization and hot spring are registered one's residence bath system
CN203349380U (en) Constant temperature automatic control heat supply circulating dynamic equilibrium system
CN106594932A (en) Ground-source heat pump and active chilled beam combined air conditioning system and method
CN207196594U (en) A kind of more factories are residual heat combined to utilize system
CN206016957U (en) A kind of hospital's Distribution of Natural formula energy supplying system
CN205919555U (en) Solar energy earth source heat pump coupling energy supply system with two ground pipe laying crowd
CN202274637U (en) Automatic water replenishing device of ground source heat pump
CN204901907U (en) Complementary heating system of solar energy and gas heating water heater
CN206398977U (en) The hot-water supply device that a kind of earth source heat pump unit is combined with boiler
CN204373103U (en) Small-sized circulating type potable air conditioner
CN203837169U (en) Ground source heat pump open cooling tower heat balance system
CN205048757U (en) Solar energy jointly heats control system with air -source heat pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant