CN207419765U - A kind of sleeper structure in the middle part of wall - Google Patents
A kind of sleeper structure in the middle part of wall Download PDFInfo
- Publication number
- CN207419765U CN207419765U CN201721261785.3U CN201721261785U CN207419765U CN 207419765 U CN207419765 U CN 207419765U CN 201721261785 U CN201721261785 U CN 201721261785U CN 207419765 U CN207419765 U CN 207419765U
- Authority
- CN
- China
- Prior art keywords
- wall
- sleeper
- reinforcing bar
- utility
- thickness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides the sleeper structure in the middle part of a kind of wall, including wall and sleeper;The sleeper is arranged in wall, and positioned at the one side of the wall close to Liang Yuzhu;The thickness of the sleeper is less than the section long edge size of wall;Sleeper reinforcing bar is equipped in the sleeper, wall steel bar is equipped in wall.The utility model sets sleeper at suspension column within the walls and beam-ends, the internal force and moment of flexure that column and beam are transferred on wall are undertaken by sleeper, ensure the plastic deformation ability of wall and the collapse resistant capacity of structure, the thickness of entire wall can be thinned, save the usage amount of the materials such as walls concrete and reinforcing bar, also save the duration of concreting and reinforcing bar binding, add the space of lower part auxiliary power house, the facility of bigger is provided for the laying of equipment and the current of personnel, and construction method is simple, it is easily mastered, it is easy to spread, there is certain practical value.
Description
Technical field
The utility model is related to the sleeper structures in the middle part of a kind of wall, belong to the hydro-structure neck in hydraulic and hydroelectric engineering
Domain.
Background technology
Wall is the important component of building, its effect is load-bearing, is gone along with sb. to guard him or the compartment, wall by wall by
Power situation and material are divided into load bearing wall and non-load bearing wall, are divided into solid wall, sintering hollow brick wall, empty bucket by wall structure mode
Wall, composite wall etc..In the design, it is desirable that wall have enough bearing capacity and stability, should also meet heat preservation, it is heat-insulated, insulate against sound,
The requirements such as fire prevention, moisture-proof, waterproof.
Powerhouse of hydropower station structure generally can be divided into three components:Superstructure, substructure and generator supporting knot
Structure;Superstructure mainly includes workshop framework, each floor plate, crane girder Roof system and building enclosure etc., and substructure is main
There are draft tube, spiral case and machine pier and underwater wall, pier etc..House bent frame upstream column is typically secured to head bay wall wall top, downstream row
Trestle is generally fixed at the top of tail water gate pier, and workshop downstream wall uses the thick wall of one-piece casting, workshop inner wall with tail water gate pier
Generally using reinforced concrete wall, wall is vertical cantilever design, and wall lower end connects with basis, upper end and plate or beam phase
It connects.The moment-in-plane effect being subject to for bearing wall, generally can in the end set sleeper of wall limb plane, for suspension column with
Walls internal force concentrates action point at beam-ends etc., will not generally take effective engineering measure, this just needs the section for increasing wall
Size to meet the requirement of structure axial compression ratio, with the ductility of control structure, ensures the plastic deformation ability of structure and resisting for structure
Collapse capacity.By the way that entire thickness of wall body is increased to be built, although this way also meets structural requirement, make
Unnecessary property into quantities increases, and has also accordingly increased the duration of concreting.
A variety of methods are provided to the structure design of sleeper in the prior art, but not can effectively ensure that sleeper
The collapse resistant capacity of plastic deformation ability and structure, such as Chinese patent, " a kind of existing building masonry increases sleeper structure and its applies
Work method (publication number:CN103075018A, publication date:2013.5.1 sleeper structure disclosed in) ", the structure are primarily directed to
The renovation program for reinforcement of sleeper structure in existing building masonry, the method for use be by the additional channel steel in wall both sides, and
Being connected with through-wall bolt with batten plate makes channel steel link closely wall, and compressive pre-stress is generated to wall, forms sleeper supporting wall top lotus
It carries.
Utility model content
In order to solve the above technical problems, the utility model provides the sleeper structure in the middle part of a kind of wall, wall middle part
Sleeper construction method it is simple, be easily mastered, it is easy to spread, have certain practical value, ensure that the plasticity of wall
The collapse resistant capacity of deformability and structure.
The utility model is achieved by the following technical programs.
Sleeper structure in the middle part of a kind of wall provided by the utility model, including wall and sleeper;The sleeper is arranged on wall
In vivo, and positioned at the one side of the wall close to Liang Yuzhu;The thickness of the sleeper is less than the section long edge size of wall;It is described dark
Sleeper reinforcing bar is equipped in column, wall steel bar is equipped in wall.
The quantity of the sleeper is determined according to the stress of wall.
It is mutually parallel between the sleeper.
The sleeper is arranged along vertical direction.
The section of the sleeper is one kind in regular texture, anisotropic approach or variable section structure.
The beneficial effects of the utility model are:Sleeper at suspension column within the walls and beam-ends is set, column is undertaken by sleeper
The internal force and moment of flexure being transferred to beam on wall, ensure the plastic deformation ability of wall and the collapse resistant capacity of structure, can be thinned whole
The thickness of a wall saves the usage amount of the materials such as walls concrete and reinforcing bar, also saves concreting and is bound with reinforcing bar
Duration, add the space of lower part auxiliary power house, be the laying of equipment and the current facility for providing bigger of personnel, and construct
Method is simple, is easily mastered, easy to spread, has certain practical value.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
In figure:1- walls, 2- sleeper, 11- wall steel bars, 21- sleeper reinforcing bars.
Specific embodiment
Be described further below the technical solution of the utility model, but claimed scope be not limited to it is described, it is all
The technical solution formed using equivalent substitution or equivalent transformation is all fallen within the protection domain required by the utility model.
As shown in Figure 1, the sleeper structure in the middle part of a kind of wall, including wall 1 and sleeper 2;The sleeper 2 is arranged on wall 1
It is interior, and positioned at the one side of the wall 1 close to Liang Yuzhu;The thickness of the sleeper 2 is less than the section long edge size of wall 1;It is described
Sleeper reinforcing bar 21 is equipped in sleeper 2, wall steel bar 11 is equipped in wall 1.
One or more sleeper reinforcing bars 21 are equipped in the sleeper 2, the quantity of sleeper 2 is determined according to 1 stress of wall, some
Position stress compares concentration, it is necessary to which very thick wall sets sleeper 2 that the thickness of entire wall 1 can be thinned, sleeper reinforcing bar 21
Improving bud grafting is bound according to the reinforcement manner of column.
The setting of sleeper reinforcing bar 21 should meet《Design of hydraulic concrete structures specification》(DL/T5057-2009) design in
Structural specifications.
It is mutually parallel between the sleeper 2, wherein sleeper 2 should meet《Design of hydraulic concrete structures specification》(DL/
T5057-2009) serviceability limit state checking computations and ultimate limit states checking computations.
The sleeper 2 arranges that, such as because structure needs or space limitation, 2 section of sleeper can be regular texture along vertical direction
(such as:Square, rectangle and Three-legged etc.) or anisotropic approach or variable section structure in one kind, the trend of sleeper 2 can also
Not exclusively by vertical direction, wherein wall 1 should meet《Design of hydraulic concrete structures specification》(DL/T5057-2009) normally make
It is checked with limiting condition checking computations and ultimate limit states.
The implementation process of the utility model is as follows:
1. it should just intend the structure sizes such as bent columns, beam, wall 1 first.
2. according to bent columns and the stressing conditions of beam, analyze and calculate suspension column and the internal force and moment of flexure of beam-ends.
3. according to the transfer principle of power, analyze and calculate wall 1 and the internal force and moment of flexure of sleeper 2.
4. according to the internal force and moment of flexure of each structure, check and adjust structure size.
5. it analyzes and calculates each structural reinforcement.
In conclusion the utility model is primarily directed to the concrete wall newly poured 1, the method for use is in wall
According to the reinforcing bar inside the reinforcement manner binding sleeper 2 of column in the range of 1 stress concentration, 1 original reinforcing bar of wall is according to wall 1
Reinforcement manner is bound, and after the completion for the treatment of 1 concreting of wall, is just formd a sleeper 2 in the position that stress is concentrated, is so done
Not only ensure the plastic deformation ability of structure and the collapse resistant capacity of structure, but also save the materials such as 1 concrete and rebar of wall
Usage amount saves the duration of concreting and reinforcing bar binding.
Claims (5)
1. a kind of sleeper structure in the middle part of wall, including wall (1) and sleeper (2), it is characterised in that:The sleeper (2) is arranged on
In wall (1), and positioned at the one side of the wall (1) close to Liang Yuzhu;The thickness of the sleeper (2) is less than the section of wall (1)
Long edge size;Sleeper reinforcing bar (21) is equipped in the sleeper (2), wall steel bar (11) is equipped in wall (1).
2. the sleeper structure in the middle part of wall as described in claim 1, it is characterised in that:The quantity of the sleeper (2) is according to wall
The stress of body (1) determines.
3. the sleeper structure in the middle part of wall as described in claim 1, it is characterised in that:It is mutually parallel between the sleeper (2).
4. the sleeper structure in the middle part of wall as described in claim 1, it is characterised in that:The sleeper (2) is along vertical direction cloth
It puts.
5. the sleeper structure in the middle part of wall as described in claim 1, it is characterised in that:The section of the sleeper (2) is rule
One kind in structure, anisotropic approach or variable section structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721261785.3U CN207419765U (en) | 2017-09-28 | 2017-09-28 | A kind of sleeper structure in the middle part of wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721261785.3U CN207419765U (en) | 2017-09-28 | 2017-09-28 | A kind of sleeper structure in the middle part of wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207419765U true CN207419765U (en) | 2018-05-29 |
Family
ID=62314398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721261785.3U Active CN207419765U (en) | 2017-09-28 | 2017-09-28 | A kind of sleeper structure in the middle part of wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207419765U (en) |
-
2017
- 2017-09-28 CN CN201721261785.3U patent/CN207419765U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206090967U (en) | Perforation rib pull rod restraint double -layer steel plate concrete shear force wall | |
CN106930436B (en) | Reinforced concrete shear wall with built-in prestressed steel diagonal bracing | |
CN206479124U (en) | Roof steel bar protective layer thickness detects instrument | |
CN103572784A (en) | Supporting system and construction method of post-cast strip template of super-thick raft | |
CN202007535U (en) | Supporting reinforcing structure | |
CN206438529U (en) | Beam and slab type raft foundation formwork support structure | |
CN104775649A (en) | Shock-resistant steel-bar concrete structure side coal bunker | |
CN208534081U (en) | A kind of reconstruction structure of old building constructional column | |
CN207944630U (en) | A kind of detached column | |
CN208280453U (en) | Girder with rolled steel section en cased in concrete lacing wire constructing device | |
CN203905298U (en) | Superimposed component of reinforced concrete filled FRP pipe and concrete filled steel pipe | |
CN204370573U (en) | Matrix pattern Rebar anchor | |
CN103046743B (en) | A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method | |
CN203613727U (en) | Wall reinforcing bar controller | |
CN207419765U (en) | A kind of sleeper structure in the middle part of wall | |
CN108755955A (en) | Reinforcement structure between light gauge cold-formed steel shape house longitudinal cross wall | |
CN204715539U (en) | A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure | |
CN208415690U (en) | A kind of steel ripple crust and prestressed concrete combination beam | |
CN204385941U (en) | Prestressing force buckling restrained brace | |
CN207376945U (en) | A kind of concrete prefabricated wallboard of steel bar girder and structural system | |
CN203034879U (en) | Casing refuge bin structure of existing masonry structure | |
CN204715537U (en) | A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure | |
CN103046789A (en) | Wrapping refuge cabin of existing masonry structure and construction method thereof | |
CN202611112U (en) | Reinforcing steel bar frame body for controlling thicknesses of protective layers of plate negative reinforcements | |
CN206903060U (en) | The concrete composite beam of strap end portion shaped steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |