A kind of multi-functional automatic pile driver Download PDFInfo
- Publication number
- CN207419469U CN207419469U CN201721569026.3U CN201721569026U CN207419469U CN 207419469 U CN207419469 U CN 207419469U CN 201721569026 U CN201721569026 U CN 201721569026U CN 207419469 U CN207419469 U CN 207419469U
- Authority
- CN
- China
- Prior art keywords
- pulley
- piling
- main
- pile
- power head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model provides a kind of multi-functional automatic pile driver, and including piling machine equipment and control system, the multi-functional automatic pile driver includes piling unit, lifting elements and automated exchanged cutter unit;The power head of the piling machine can connect to perform the instrument of piling, piling, vibration piling or the operation of deep-layer stirring cementitious composite soil respectively, the development of pile foundation and the requirement continuously improved for stake machine of pile-formation process are met well, reduces operating expenses and personnel, the cost of use of construction equipment.
Description
Technical field
The utility model is related to concrete works field more particularly to a kind of multi-functional automatic pile drivers.
Background technology
Piling machine is common engineering machinery in architectural engineering, and piling machine can be divided into static pressure method piling machine, diesel hammer piling
Machine, vibration hammer piling machine, helical blade pile digger etc., static pressure method piling machine since fuselage is from great, to construction site requirement compared with
Height is not suitable in the more area construction of relatively narrower or building;The pollution of diesel hammer piling machine is more serious, and vibration hammering method is beaten
Prefabricated pile method all there are certain requirements soil layer construction and prefabricated pile, suitable for constructing in compared with Soft Soil Layer, and for harder soil layer
For, difficulty of construction is big, and easily damages prefabricated pile, helical blade pile digger, is only capable of beating the stake of a certain type, function list
One.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of multi-functional automatic pile driver, and the utility model is
It is realized with following technical solution:
A kind of full-automatic piling machine, including piling machine equipment and control system,
The piling machine equipment includes pedestal, and main motor, clutch, brake master winch are disposed on the pedestal
Machine, auxiliary-motor, secondary hoist engine, principal arm, arm support, its lower end of the arm support is hinged on the pedestal;The principal arm is vertically arranged,
Lower part is fixed on pedestal, and top is connected with the upper end of the arm support, and top is set there are two pulley, and the pulley includes hanging
It hammers pulley into shape and hangs a pulley;
The main shaft of the main motor is connected by clutch with main winch, and the main winch is matched somebody with somebody with the brake
It closes, the main winch is connected by main push-towing rope rope with power head, and the main push-towing rope rope is around the sash weight pulley and the power head
Connection,
The auxiliary-motor is connected with secondary hoist engine, and the pair hoist engine is connected by auxiliary cable with pile body, the auxiliary cable
It is connected around the pulley that hangs with the pile body,
The automatic Pile holding mechanism is arranged on the principal arm of the piling machine, and the automatic Pile holding mechanism is clamped with pile body.
The control system includes, central controller, drive piles control unit, hoist controlling unit and automated exchanged cutter unit;
The piling control unit is by main control circuit, main motor, clutch and brake control, hawser and power
Head composition, central controller, main control circuit, main motor, clutch and brake control, main winch, hawser and dynamic
Power head is sequentially connected,
The hoist controlling unit includes positive and reverse rotation control circuit, auxiliary-motor, and the positive and reverse rotation control circuit is respectively in
Controller, secondary elevator motor connection are entreated,
The automated exchanged cutter unit includes clip pile control system, automated exchanged cutter mechanism and pile body, the clip pile control system
It is connected respectively with central controller, automated exchanged cutter mechanism.
Preferably, the power head can connect to perform piling, piling, vibration piling or deep-layer stirring cement and answer respectively
Close the instrument of the operation of soil.
Preferably, pile body measuring for verticality part is further included, the pile body measuring for verticality part is arranged on the principal arm, root
Pile body verticality signal is exported according to the verticality of the pile body;The central controller of the piling machine and the measuring for verticality part
Connection receives the verticality signal of the pile body.
It is highly preferred that the pulley includes power head pulley and hangs a pulley, the power head pulley is arranged on described
Hang the front end of a pulley, and the axis of power head pulley and the axis for hanging a pulley at grade, power head pulley
It is more than 2 meters with the centre-to-centre spacing for hanging a pulley.
The beneficial effects of the utility model:This machine, which solves a variety of construction technologies, more stake machines to be used to coordinate ability
The shortcomings that bore forming, while this function completes piling, piling, the vibration operations such as piling or deep-layer stirring cementitious composite soil,
The development of pile foundation and the requirement continuously improved for stake machine of pile-formation process are met well, reduces operating expenses and people
Member, the cost of use of construction equipment.
Description of the drawings
Fig. 1 is a kind of structure diagram of full-automatic piling machine provided in this embodiment;
Fig. 2 is a kind of control system block diagram of full-automatic piling machine provided in this embodiment;
Wherein:1- pedestals, 2- main motors, 3- clutches, 4- brakes, 5- main winch, 6- auxiliary-motors, 7- pair elevators
Machine, 8- principal arms, 9- arm supports, 10- main push-towing rope ropes, 11- sash weight pulleys, 12- auxiliary cables, 13- hang a pulley, 14- power heads, 15-
Body, 16- automated exchanged cutters mechanism, 17- measuring for verticality parts, A- central controllers, B- piling control units, C- hoist controlling lists
Member, D- automated exchanged cutter units, B1- main control circuits, B2- clutches and brake control, C1- positive and reverse rotation control circuits,
D1- clip pile control systems.
Specific embodiment
It is new to this practicality below in conjunction with attached drawing to make the purpose of this utility model, technical solution and advantage clearer
Type is described in further detail.
A kind of full-automatic piling machine, including piling machine equipment and control system,
The piling machine equipment includes pedestal 1, be disposed on the pedestal 1 main motor 2, clutch 3, brake 4,
Main winch 5, auxiliary-motor 6, secondary hoist engine 7, principal arm 8, arm support 9, described its lower end of arm support 9 is hinged on the pedestal 1;It is described
Principal arm 8 is vertically arranged, and lower part is fixed on pedestal 1, and top is connected with the upper end of the arm support 9, and top is set there are two pulley,
The pulley includes sash weight pulley 13 and hangs a pulley 11;
The main shaft of the main motor 2 is connected by clutch 3 with main winch 5, the main winch 5 and the brake
4 cooperations, the main winch 5 are connected by main push-towing rope rope 10 with power head 14, and the main push-towing rope rope 10 bypasses the sash weight pulley 13
It is connected with the power head 14;
The auxiliary-motor 6 is connected with secondary hoist engine 7, and the pair hoist engine 7 is connected by auxiliary cable 12 with pile body 15, described
Auxiliary cable 12 hangs a pulley 11 around described in and is connected with the pile body 15;
The automatic Pile holding mechanism 16 is arranged on the principal arm 8 of the piling machine, and the automatic Pile holding mechanism 16 is clamped with
Pile body 15.
The control system includes, central controller A, drive piles control unit B, hoist controlling unit C and automated exchanged cutter list
First D;
The piling control unit is by main control circuit B1, main motor 2, clutch and brake control B2, hawser
And power head composition, central controller A, main control circuit B1, main motor 2, clutch and brake control B2, master winch
Machine, hawser and power head are sequentially connected;
The hoist controlling unit C includes positive and reverse rotation control circuit C1, auxiliary-motor 6, and the positive and reverse rotation control circuit C1 divides
It is not connected with central controller A, auxiliary-motor 6;
The automated exchanged cutter cells D includes clip pile control system D1, automated exchanged cutter mechanism 16 and pile body 15, the clip pile control
System D1 processed is connected respectively with central controller A, automated exchanged cutter mechanism 16.
Preferably, the power head 14 can connect to perform piling, piling, vibration piling or deep-layer stirring cement respectively
The instrument of the operation of composite earth.
Preferably, full-automatic piling machine further includes pile body measuring for verticality part 17, and the pile body measuring for verticality part 17 is set
It puts on the principal arm 8, pile body verticality signal is exported according to the verticality of the pile body;The central controller of the piling machine
A is connected with the measuring for verticality part 17, receives the verticality signal of the pile body.
Preferably, the automatic Pile holding mechanism 16 along 8 short transverse of piling machine principal arm it is setting up and down there are two, two are automatic
The spacing of Pile holding mechanism 16 is not less than 0.5 meter.
It must use the cooperation of more stake machines could be into the utility model lies in that the stake machine provided solves a variety of construction technologies
The shortcomings that pile driving construction, while this function completes piling, piling, the vibration operations such as piling or deep-layer stirring cementitious composite soil, very
Good meets the development of pile foundation and the requirement continuously improved for stake machine of pile-formation process, reduces operating expenses and people
Member, the cost of use of construction equipment.
Although the utility model essentially describes above example, example is intended only as to be described, and this reality
Embodiment is not limited to this with new.Those of ordinary skill in the art can make a variety of modifications and application without departing from embodiment
Essential characteristics, it is believed that be included in the scope of protection of the utility model as defined in the appended claims.
Claims (4)
1. a kind of multi-functional automatic pile driver, which is characterized in that including piling machine equipment and control system,
The piling machine equipment includes pedestal, be disposed on the pedestal main motor, clutch, brake main winch,
Auxiliary-motor, secondary hoist engine, principal arm, arm support, its lower end of the arm support is hinged on the pedestal;The principal arm is vertically arranged, under
Portion is fixed on pedestal, and top is connected with the upper end of the arm support, and top is set there are two pulley, and the pulley includes sash weight
Pulley and hang a pulley;
The main shaft of the main motor is connected by clutch with main winch, and the main winch coordinates with the brake, institute
It states main winch to be connected with power head by main push-towing rope rope, the main push-towing rope rope is connected around the sash weight pulley with the power head;
The auxiliary-motor is connected with secondary hoist engine, and the pair hoist engine is connected by auxiliary cable with automatic Pile holding mechanism, the pair
Hawser hangs a pulley around described in and is connected with the automatic Pile holding mechanism;
The automatic Pile holding mechanism is arranged on the principal arm of the piling machine, and the automatic Pile holding mechanism is clamped with pile body;
The control system includes, central controller, drive piles control unit, hoist controlling unit and automated exchanged cutter unit;
The piling control unit is by main control circuit, main motor, clutch and brake control, hawser and power head group
Into central controller, main control circuit, main motor, clutch and brake control, main winch, hawser and power head
It is sequentially connected;
The hoist controlling unit includes positive and reverse rotation control circuit, auxiliary-motor, and the positive and reverse rotation control circuit is controlled respectively with center
Device processed, auxiliary-motor connection;
The automated exchanged cutter unit includes clip pile control system, automated exchanged cutter mechanism and pile body, the clip pile control system difference
It is connected with central controller, automated exchanged cutter mechanism.
2. multi-functional automatic pile driver according to claim 1, which is characterized in that the power head can be connected and is used for respectively
Perform the instrument of piling, piling, vibration piling or the operation of deep-layer stirring cementitious composite soil.
3. multi-functional automatic pile driver according to claim 1, which is characterized in that pile body measuring for verticality part is further included,
The pile body measuring for verticality part is arranged on the principal arm, and pile body verticality signal is exported according to the verticality of the pile body;
The central controller of the piling machine is connected with the measuring for verticality part, receives the verticality signal of the pile body.
4. a kind of multi-functional automatic pile driver according to claim 1, which is characterized in that the pulley includes power head
Pulley and hang a pulley, the power head pulley is arranged on the front end for hanging a pulley, and the axis of power head pulley with
The axis for hanging a pulley at grade, power head pulley and hang a pulley centre-to-centre spacing be more than 2 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721569026.3U CN207419469U (en) | 2017-11-22 | 2017-11-22 | A kind of multi-functional automatic pile driver |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721569026.3U CN207419469U (en) | 2017-11-22 | 2017-11-22 | A kind of multi-functional automatic pile driver |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207419469U true CN207419469U (en) | 2018-05-29 |
Family
ID=62304172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721569026.3U Expired - Fee Related CN207419469U (en) | 2017-11-22 | 2017-11-22 | A kind of multi-functional automatic pile driver |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207419469U (en) |
-
2017
- 2017-11-22 CN CN201721569026.3U patent/CN207419469U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924585B (en) | The construction method of wind-powered electricity generation socketed pile | |
CN203855328U (en) | Novel hoisting machine | |
CN207419469U (en) | A kind of multi-functional automatic pile driver | |
CN102330426A (en) | Transversely rotating type deep mixing pile machine | |
CN108049404A (en) | A kind of multi-functional automatic pile driver | |
CN111911131A (en) | Drilling machine control system for foundation stabilization and control method thereof | |
CN112878330A (en) | Precast pile sinking equipment and construction method thereof | |
CN212153383U (en) | Concrete pipe pile core hole cleaning device | |
CN201972594U (en) | Multifunctional hydraulic pile driver | |
CN1260425A (en) | Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment | |
CN201785752U (en) | Transverse rotation type deep-mixing pile driver | |
CN206069234U (en) | Multi-functional crawler crane | |
CN206173966U (en) | Stake end reinforcing apparatus | |
CN112412154B (en) | Ultra-high voltage transmission line construction process with floating type overwater platform as operation surface | |
CN1214396A (en) | Portable flood controlling emergency pile driver and self-propelled flood controlling emergency pile driver | |
CN203513129U (en) | Lifting device for conveying digging pile construction materials | |
CN208009425U (en) | A kind of all-hydraulic full-automatic piling machine | |
CN204510221U (en) | Rotary marine piling saddle | |
CN206545423U (en) | A kind of building structure drag-line antidetonation system | |
CN107675700A (en) | The construction method of diaphram wall | |
CN107059872A (en) | Oblique cord pile extracting method and oblique cord pile pulling system | |
CN108952568B (en) | Drilling machine | |
CN207419473U (en) | A kind of crawler-belt type full-automatic piling machine | |
CN205387703U (en) | Connect deep cement stirring stake machine of rod -type | |
CN206245310U (en) | Jack up steel reinforcement cage joint bar servicing unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180529 Termination date: 20201122 |