CN207405995U - It can week transformation specification pin-connected panel clear water steel column mould - Google Patents

It can week transformation specification pin-connected panel clear water steel column mould Download PDF

Info

Publication number
CN207405995U
CN207405995U CN201721305049.3U CN201721305049U CN207405995U CN 207405995 U CN207405995 U CN 207405995U CN 201721305049 U CN201721305049 U CN 201721305049U CN 207405995 U CN207405995 U CN 207405995U
Authority
CN
China
Prior art keywords
steel
steel plate
punching block
mould
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721305049.3U
Other languages
Chinese (zh)
Inventor
蓝元海
王振
柳鹏
殷文超
林秉耿
林昌源
吴晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201721305049.3U priority Critical patent/CN207405995U/en
Application granted granted Critical
Publication of CN207405995U publication Critical patent/CN207405995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses one kind to change specification pin-connected panel clear water steel column mould in week, including the frame being made of four steel forms, is equipped with lockset successively from the bottom up outside frame;Steel form is one kind in A, B, C, D shaped steel mould;A shaped steel mould is formed by connecting by the first punching block and the second punching block;Type B punching block is formed by connecting by 2 the 3rd punching blocks;C-type steel mould is formed by connecting by the first punching block and the 3rd punching block, and D shaped steel mould is formed by connecting by 2 the 4th punching blocks.The utility model is easy to assembly, packaging efficiency is high.

Description

It can week transformation specification pin-connected panel clear water steel column mould
Technical field
The utility model belongs to building field, and in particular to one kind can week transformation specification pin-connected panel clear water steel column mould.
Background technology
Steel form is for the molding steel template of concreting, and high with its intensity, composite rigidity is big, is unlikely to deform, The features such as template good integrity, shock resistance is strong, is widely used in architectural engineering.But existing steel form specification fixes, Weight is not easy to carry, construct cumbersome, low construction efficiency greatly.
Utility model content
The purpose of this utility model is to provide a kind of easy to assembly, construction efficiency it is high can week transformation specification pin-connected panel it is clear Water steel column mould.
Technical solution is used by the utility model:
One kind can change specification pin-connected panel clear water steel column mould in week, including the frame being made of four steel forms, in frame It is equipped with lockset successively from the bottom up outside;
The steel form is A shaped steel mould, one kind in Type B punching block, C-type steel mould, D shaped steel moulds;The A shaped steel mould is by first Punching block and the second punching block are formed by connecting;The Type B punching block is formed by connecting by 2 the 3rd punching blocks;The C-type steel mould is by the first punching block It is formed by connecting with the 3rd punching block, the D shaped steel mould is formed by connecting by 2 the 4th punching blocks;
First punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, The both sides of first steel plate are respectively equipped with the second steel plate;
Second punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, The one side of first steel plate is equipped with the second steel plate, and angle steel is equipped in the opposite side of the first steel plate;
3rd punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, the The one side of one steel plate is circular arc chamfering, and the second steel plate is respectively equipped in the both sides of the first steel plate;
4th punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, the The one side of one steel plate is circular arc chamfering, angle steel is set in the one side for setting circular arc chamfering of the first steel plate, in the opposite side of the first steel plate If the second steel plate.
By said program, positioned at the lowermost lockset centre distance steel form bottom 150mm, adjacent lockset at intervals of 500mm, to ensure the intensity of total.
By said program, the lockset is in frame structure, and the first back cord being arranged in parallel including 2 and 2 parallel set The second back cord put, and the first back cord and the second back cord are connected by gib headed bolt.First back cord is welded by two square steel, And the spacing between two square steel is 20mm;Second back cord includes the first back cord, and steel plate is respectively welded at the both ends of the first back cord, And reserve circular hole at the center of steel plate.The structure facilitates the fixation of steel form.
By said program, the second steel plate and angle steel are drilled with several circular holes in the longitudinal direction.Spacing between circular hole is 300mm, vertical range of the center from the second steel plate bottom of the lowermost circular hole is 150mm.The structure can ensure that total Stablize, is reliable.
By said program, four steel forms are bolted by M14.
In the utility model, the first steel plate with angle steel, the second steel plate, vertically and horizontally ribbed stiffener is welded to connect, and using two-sided Angle welding, Size of welds 5mm.
The beneficial effects of the utility model are:
Can tetra- kinds of punching blocks of A, B, C, D be spliced into according to the form of Baogang's column at the scene, tetra- kinds of punching blocks of A, B, C, D can be passed through Plate is combined into different steel column moulds;
Pass through four kinds of basic punching blocks(First punching block, the second punching block, the 3rd punching block, the 4th punching block)Form four kinds of different types Steel form(A, B, C, D shaped steel mould), it is assembled at the scene according to the size of Baogang's column and form, it is bolted by M14, surrounding Along with lockset is fixed, operation is very simple, is easy to fixed, can construct without workman, reduces cost of labor, and apply Work is efficient;
Using four kinds of basic punching blocks(First punching block, the second punching block, the 3rd punching block, the 4th punching block)Assemble four kinds of steel forms (A, B, C, D shaped steel mould), easy to operate, assembled speed is fast;And the flatness of the steel column mould formed is high, cooperation efficient water soluble takes off Mould agent can reach clear-water concrete effect, compared with conventional steel plus the fixed form of Screw arbor with nut at both-ends, accelerate construction speed Degree, reduces operation difficulty, improves fair-faced concrete molding rate;
Steel column mould is spliced by the individual steel form of multi-disc, as long as the side that arbitrary two basic punching blocks have size identical is i.e. Sliceable use repeats using repeatedly, convenient for turnover, has greatly saved cost;Every steel form lighter in weight simultaneously, just In scene transport, installation, splicing;
The utility model solves the problems, such as that template should not be fixed, preferably deformed when both sides, three side formworks, while solves wood The problem of Baogang's column 50mm circular arc chamfering Forming Qualities are bad during template construction, suitable spillage;The utility model carries circular arc chamfering And ensure that the shaping impression quality of Baogang's column circular arc chamfering in the fixed mode of steel form external application bolt, to reach owner's clear water The requirement of concrete Baogang column provides guarantee;
The utility model makes precision height, and piece is tight, is unlikely to deform, template good integrity, and intensity is high, good rigidity, no Easy swollen mould, unsuitable spillage, solves the construction difficult problem of circular arc chamfering, can reach clear-water concrete effect.
Description of the drawings
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail, in attached drawing:
Fig. 1 is the structure diagram of the first punching block;
Fig. 2 is the structure diagram of the second punching block;
Fig. 3 is the structure diagram of the 3rd punching block;
Fig. 4 is the structure diagram of the 4th punching block;
Fig. 5 is the overlooking the structure diagram of A shaped steel moulds;
Fig. 6 is the structure schematic diagram of A shaped steel moulds;
Fig. 7 is the positive structure schematic of A shaped steel moulds;
Fig. 8 is the side structure schematic view of A shaped steel moulds;
Fig. 9 is the overlooking the structure diagram of Type B punching block;
Figure 10 is the structure schematic diagram of Type B punching block;
Figure 11 is the positive structure schematic of Type B punching block;
Figure 12 is the side structure schematic view of Type B punching block;
Figure 13 is the overlooking the structure diagram of C-type steel mould;
Figure 14 is the structure schematic diagram of C-type steel mould;
Figure 15 is the positive structure schematic of C-type steel mould;
Figure 16 is the side structure schematic view of C-type steel mould;
Figure 17 is the overlooking the structure diagram of D shaped steel moulds;
Figure 18 is the structure schematic diagram of D shaped steel moulds;
Figure 19 is the positive structure schematic of D shaped steel moulds;
Figure 20 is the side structure schematic view of D shaped steel moulds;
Figure 21 is the structure diagram that can change specification pin-connected panel clear water steel column mould week;
Figure 22 is the A-A sectional views of Figure 21;
Figure 23 is the positive structure diagram of the first back cord;
Figure 24 is the side structure schematic view of the second back cord;
Figure 25 is the positive structure diagram of the second back cord;
Figure 26 is the side structure schematic view of the second back cord.
In figure:1st, the first steel plate, 2, transverse stiffener, 3, longitudinal stiffener, the 4, second steel plate, 5, angle steel, 6, circular hole, 7, Circular arc chamfering, 8, steel form, 9, lockset, the 10, first back cord, the 11, second back cord, 12, gib headed bolt, the 13, first punching block, 14, Second punching block, the 15, the 3rd punching block, the 16, the 4th punching block.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only explaining this Utility model is not used to limit the utility model.
Referring to Fig. 1-Figure 26, one kind can change specification pin-connected panel clear water steel column mould in week, including being passed through by four steel forms 8 The frame of M14 bolts composition, is equipped with lockset 9, positioned at the centre distance steel of the lowermost lockset 9 successively from the bottom up outside frame 8 bottom 150mm of template, adjacent lockset 9 at intervals of 500mm.Steel form is A shaped steel mould, Type B punching block, C-type steel mould, D shaped steel moulds In one kind, according to the size of Baogang's column and form be assembled at the scene, combination.A shaped steel mould is by the first punching block 13 and the second punching block 14 are formed by connecting;Type B punching block is formed by connecting by 2 the 3rd punching blocks 15;C-type steel mould is connected by the first punching block 13 and the 3rd punching block 15 It connects, D shaped steel mould is formed by connecting by 2 the 4th punching blocks 16.First punching block 13 includes the first steel plate 1, is set on the first steel plate 1 There are transverse stiffener 2 and longitudinal stiffener 3, the second steel plate 4 is respectively equipped in the both sides of the first steel plate 1, in the second steel plate 4 along length It spends on direction and is drilled with multiple A16 circular holes 6, the spacing between circular hole 6 is 300mm, and the center of the lowermost circular hole 6 is from the second steel The vertical range of 4 bottom of plate is 150mm.Second punching block 14 includes the first steel plate 1, and the first steel plate 1 is equipped with 2 He of transverse stiffener Longitudinal stiffener 3 is equipped with the second steel plate 4 in the one side of the first steel plate 1, and angle steel 5 is equipped in the opposite side of the first steel plate 1; Two steel plates 4, angle steel 5 are drilled with multiple A16 circular holes 6 on along its length, the spacing between circular hole 6 is 300mm, the lowermost circle The center in hole 6 is from the second steel plate 4(Angle steel 5)The vertical range of bottom is 150mm.3rd punching block 15 include the first steel plate 1, first Steel plate 1 is equipped with transverse stiffener 2 and longitudinal stiffener 3, and the one side of the first steel plate 1 is circular arc chamfering 7, in the first steel plate 1 Both sides are respectively equipped with the second steel plate 4;Be drilled with multiple A16 circular holes 6 on along its length in the second steel plate 4, between circular hole 6 between Away from for 300mm, vertical range of the center from 4 bottom of the second steel plate of the lowermost circular hole 6 is 150mm.4th punching block 16 includes First steel plate 1, the first steel plate 1 are equipped with transverse stiffener 2 and longitudinal stiffener 3, and the one side of the first steel plate 1 is circular arc chamfering 7, Angle steel 5 is set in the one side for setting circular arc chamfering 7 of the first steel plate 1, the second steel plate 4 is set in the opposite side of the first steel plate 1;Second Steel plate 4, angle steel 5 are drilled with multiple A16 circular holes 6 on along its length, the spacing between circular hole 6 is 300mm, the lowermost circular hole 6 center is from the second steel plate 4(Angle steel 5)The vertical range of bottom is 150mm.
In the present embodiment, lockset 9 is in frame structure, and the first back cord 10 being arranged in parallel including 2 and 2 are arranged in parallel The second back cord 11, and the first back cord 10 and the second back cord 11 are connected by gib headed bolt 12.First back cord 10 is by two square steel It is welded, and the spacing between two square steel is 20mm.Second back cord 11 includes the first back cord 10, the two of the first back cord 10 Each welding steel plate is held, and circular hole is reserved at the center of steel plate.
In the present embodiment, in order to ensure intensity and cost-effective, the thickness of the first steel plate 1 is 5mm, surface smoothness for ± 1.5mm.Second steel plate 4 is 50 × 5mm steel plates or 100 × 5mm steel plates.Angle steel 5 is 50 × 50 × 5mm angle steel.Transverse stiffener 2 For 30 × 5mm transverse stiffener@360mm.Longitudinal stiffener 3 is 30 × 5mm longitudinal stiffeners.Circular arc chamfering 7 is 50 × 50mm Circular arc chamfering.First steel plate 1, the second steel plate 4, angle steel 5, vertically and horizontally the intensity of ribbed stiffener is Q235.
It should be appreciated that for those of ordinary skills, can be improved or converted according to the above description, And all these modifications and variations should all belong to the protection domain of the appended claims for the utility model.

Claims (6)

1. one kind can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:Including the frame being made of four steel forms, It is equipped with lockset successively from the bottom up outside frame;
The steel form is A shaped steel mould, one kind in Type B punching block, C-type steel mould, D shaped steel moulds;The A shaped steel mould is by the first punching block It is formed by connecting with the second punching block;The Type B punching block is formed by connecting by 2 the 3rd punching blocks;The C-type steel mould is by the first punching block and Three punching blocks are formed by connecting, and the D shaped steel mould is formed by connecting by 2 the 4th punching blocks;
First punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, first The both sides of steel plate are respectively equipped with the second steel plate;
Second punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, first The one side of steel plate is equipped with the second steel plate, and angle steel is equipped in the opposite side of the first steel plate;
3rd punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, the first steel The one side of plate is circular arc chamfering, and the second steel plate is respectively equipped in the both sides of the first steel plate;
4th punching block includes the first steel plate, and first steel plate is equipped with transverse stiffener and longitudinal stiffener, the first steel The one side of plate is circular arc chamfering, and angle steel is set in the one side for setting circular arc chamfering of the first steel plate, and the is set in the opposite side of the first steel plate Two steel plates.
2. according to claim 1 can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:Positioned at the lowermost Lockset centre distance steel form bottom 150mm, adjacent lockset at intervals of 500mm.
3. according to claim 1 or 2 can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:The lockset In frame structure, the first back cord being arranged in parallel including 2 and 2 the second back cords being arranged in parallel, and the first back cord and Two back cords are connected by gib headed bolt.
4. according to claim 3 can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:First back cord is by two Root square steel is welded, and the spacing between two square steel is 20mm;Second back cord includes the first back cord, the two of the first back cord Each welding steel plate is held, and circular hole is reserved at the center of steel plate.
5. according to claim 1 can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:Second steel plate and angle Steel is drilled with several circular holes in the longitudinal direction.
6. according to claim 5 can change specification pin-connected panel clear water steel column mould in week, it is characterised in that:Between between circular hole Away from for 300mm, vertical range of the center from the second steel plate bottom of the lowermost circular hole is 150mm.
CN201721305049.3U 2017-10-11 2017-10-11 It can week transformation specification pin-connected panel clear water steel column mould Expired - Fee Related CN207405995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721305049.3U CN207405995U (en) 2017-10-11 2017-10-11 It can week transformation specification pin-connected panel clear water steel column mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721305049.3U CN207405995U (en) 2017-10-11 2017-10-11 It can week transformation specification pin-connected panel clear water steel column mould

Publications (1)

Publication Number Publication Date
CN207405995U true CN207405995U (en) 2018-05-25

Family

ID=62407115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721305049.3U Expired - Fee Related CN207405995U (en) 2017-10-11 2017-10-11 It can week transformation specification pin-connected panel clear water steel column mould

Country Status (1)

Country Link
CN (1) CN207405995U (en)

Similar Documents

Publication Publication Date Title
CN202627491U (en) Forming template for deformation joint position shear wall of high-rise building
CN114482375A (en) Integral joint type reinforced concrete laminated slab and construction method
CN203238548U (en) Concrete pier template device
CN204356911U (en) Angle-variable space free-form surface wood reticulated shell assembled node
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN206110650U (en) Assembled aluminum alloy compound template
CN207405995U (en) It can week transformation specification pin-connected panel clear water steel column mould
CN109317911A (en) A kind of cross column welding production line
CN202731293U (en) Beam column joint template device
CN211143440U (en) Assembled bidirectional steel bar truss floor
CN206581456U (en) Steel construction wall component with reinforced pipe
CN207331975U (en) A kind of bolted connection structure of assembled floor
CN210828545U (en) High canned type assembled concrete water tank
CN210713526U (en) Steel pipe bundle combined structure composed of steel plate and T-shaped steel
CN209194854U (en) A kind of low-rise building H profile steel combined special-shaped column
CN209620590U (en) A kind of back cord inner corner trim connection fastener
CN207405989U (en) Punching block panel assembly in a kind of self-propelled
CN203160251U (en) Connecting device for joints of steel and wood templates
CN206071047U (en) A kind of beam formwork for building
CN206956518U (en) A kind of small-sized chamfering formwork of box beam
CN215631409U (en) Steel form laminating device
CN220928690U (en) Detachable steel mould frame for special-shaped concrete roof of greenhouse
CN219316096U (en) Environment-friendly steel structure building wall
CN218149726U (en) Exquisite regularization steel form of building of expansion joint
CN216641050U (en) Steel shell composite cement board non-bearing wall without removing form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525

CF01 Termination of patent right due to non-payment of annual fee