CN207405499U - A kind of highway bridge pier support shuttering for building - Google Patents

A kind of highway bridge pier support shuttering for building Download PDF

Info

Publication number
CN207405499U
CN207405499U CN201721519967.6U CN201721519967U CN207405499U CN 207405499 U CN207405499 U CN 207405499U CN 201721519967 U CN201721519967 U CN 201721519967U CN 207405499 U CN207405499 U CN 207405499U
Authority
CN
China
Prior art keywords
arm
assembly
component
bridge pier
force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721519967.6U
Other languages
Chinese (zh)
Inventor
方玉
陈泽腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fang Ling (fuzhou) Co Ltd Bridge Frame
Original Assignee
Fang Ling (fuzhou) Co Ltd Bridge Frame
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fang Ling (fuzhou) Co Ltd Bridge Frame filed Critical Fang Ling (fuzhou) Co Ltd Bridge Frame
Priority to CN201721519967.6U priority Critical patent/CN207405499U/en
Application granted granted Critical
Publication of CN207405499U publication Critical patent/CN207405499U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of highway bridge pier support shutterings for building, including first arm of force, second arm of force, first assembly and the second component, the both sides of first assembly are equipped with first arm of force, the both sides of second component are equipped with second arm of force, two first arm of forces are fixedly connected with two second arm of forces by pin one-to-one corresponding, the outer wall of first assembly and the second component is equipped with horizontal reinforcement strip and longitudinal reinforcement item, one of horizontal reinforcement strip is fixedly connected by connector with manual operation platform, the top of first assembly and the second component is equipped with ten equally distributed fixed columns.The utility model is equipped with lifting hole(eyelet) and manual operation platform facilitates the installation of mold and pouring for bridge pier, is made of first assembly and the second component, after the completion of bridge pier pours, by separating the dismounting of first assembly and the realization of the second component to mold, mold good seal performance prevents the generation of bubble, and it is firm to consolidate.

Description

A kind of highway bridge pier support shuttering for building
Technical field
The utility model is related to building mould technical fields, are specially a kind of highway bridge pier support shuttering for building.
Background technology
With advances in technology with the development of society, whole concrete steel mold is no longer desirable for the fast of bridge and highway Speed construction and construction, it is necessary to which strong mold is reinforced in the process of construction of highway bridge pier, and in actual Bridge Pier Construction In, pouring for bridge pier mostly is carried out using the steel die of customization, and whole steel die is excessively heavy, transports and using not Just, and construction site can not make mold corrosion serious by appropriate placement, seriously affect the service life of mold and using reliable Property, therefore we make this improvement, propose a kind of highway bridge pier support shuttering for building.
Utility model content
For solution transport existing in the prior art, the defects of inconvenience is disposed and used, the utility model provides a kind of building With highway bridge pier support shuttering.
In order to solve the above-mentioned technical problem, the utility model provides following technical solution:
A kind of highway bridge pier support shuttering for building of the utility model, including first arm of force, second arm of force, first assembly and Second component, the both sides of the first assembly are equipped with first arm of force, and the both sides of second component are equipped with second arm of force, and two A first arm of force and two second arm of forces are fixedly connected by pin one-to-one corresponding, the first assembly and the second component Outer wall is equipped with horizontal reinforcement strip and longitudinal reinforcement item, one of them described horizontal reinforcement strip passes through connector and manual operation platform It is fixedly connected, is all provided at the top of the first assembly and the second component there are five equally distributed fixed column, the first assembly It is all provided with the bottom of the second component there are five equally distributed mounting hole.
Further, the top of two first arm of forces and two the second arm of force one sides offers lifting hole(eyelet).
Further, the junction of two first arm of forces and two second arm of forces is equipped with several cat ladders.
Further, sealing ring, the first assembly and second are equipped at the top of the first assembly and the second component The bottom of component offers seal groove.
Further, the top and first assembly of the first assembly and the second component outer wall and the bottom of the second component outer wall Portion is equipped with edge fixed strip.
Compared with prior art, the utility model has the advantages that:This kind of highway bridge pier support shuttering for building, Facilitate the installation of mold and pouring for bridge pier equipped with lifting hole(eyelet) and manual operation platform, be made of first assembly and the second component, bridge pier After the completion of pouring, by separating the dismounting of first assembly and the realization of the second component to mold, mold good seal performance prevents bubble Generation, consolidate it is firm.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality New embodiment for explaining the utility model, does not form the limitation to the utility model together.In the accompanying drawings:
Fig. 1 is a kind of top view of highway bridge pier support shuttering for building of the utility model;
Fig. 2 is a kind of side structure schematic diagram of highway bridge pier support shuttering for building of the utility model.
In figure:1st, first arm of force;2nd, first assembly;3rd, mounting hole;4th, manual operation platform;5th, cat ladder;6th, second arm of force;7、 Second component;8th, lifting hole(eyelet);9th, pin;10th, fixed column;11st, longitudinal reinforcement item;12nd, horizontal reinforcement strip.
Specific embodiment
Technical means, creative features, achievable purpose and effectiveness to realize the utility model are easy to understand, below With reference to specific embodiment, the utility model is expanded on further.
As shown in Figs. 1-2, a kind of highway bridge pier support shuttering for building, including first arm of force 1,6, first groups of second arm of force 2 and second component 7 of part, the both sides of first assembly 2 are equipped with first arm of force 1, and first assembly 2 fixes two first arm of forces 1, and second The both sides of component 7 are equipped with second arm of force 6, and the second component 7 fixes two second arm of forces 6, two first arm of forces 1 and two second The arm of force 6 is fixedly connected by the one-to-one corresponding of pin 9, by the fixation of first arm of force 1 and second arm of force 6, makes first assembly 2 and the Two components 7 are closely joined together, and the outer wall of 2 and second component 7 of first assembly is equipped with horizontal reinforcement strip 12 and longitudinal reinforcement Item 11, horizontal reinforcement strip 12 and longitudinal reinforcement item 11 reinforce 2 and second component 7 of first assembly, one of laterally to add Gu item 12 is fixedly connected by connector with manual operation platform 4, one of horizontal reinforcement strip 12 is fixed artificial by connector Operation console 4, manual operation platform 4 facilitate construction personnel to carry out constructing operation, and the top of 2 and second component 7 of first assembly is equipped with Five equally distributed fixed columns 10, the bottom of 2 and second component 7 of first assembly are all provided with there are five equally distributed mounting hole 3, Mold is spliced by fixed column 10 and mounting hole 3.
Wherein, the top of two first arm of forces 1 and two second arm of force, 6 one sides offers lifting hole(eyelet) 8, and loop wheel machine is facilitated to pass through Lifting hole(eyelet) 8 slings mold.
Wherein, the junction of two first arm of forces 1 and two second arm of forces 6 is equipped with several cat ladders 5, and construction personnel is led to It crosses cat ladder 5 and climbs up manual operation platform 4.
Wherein, the top of 2 and second component 7 of first assembly is equipped with sealing ring, the bottom of 2 and second component 7 of first assembly Portion offers seal groove, and agreeing with by sealing ring and seal groove, makes mould inside keep sealing, improve between two molds Pouring quality.
Wherein, the bottom of 7 outer wall of the top of 2 and second component of first assembly, 7 outer wall and 2 and second component of first assembly is equal Equipped with edge fixed strip, the junction between two molds is fixed in edge fixed strip.
It should be noted that the utility model is a kind of highway bridge pier support shuttering for building, and during specific works, first group Part 2 fixes two first arm of forces 1, and the second component 7 fixes two second arm of forces 6, passes through consolidating for first arm of force 1 and second arm of force 6 It is fixed, it is closely joined together 2 and second component 7 of first assembly, the top of two first arm of forces 1 and two second arm of force, 6 one sides Portion offers lifting hole(eyelet) 8, loop wheel machine is facilitated to sling mold by lifting hole(eyelet) 8, horizontal reinforcement strip 12 and longitudinal reinforcement item 11 are to first group 2 and second component 7 of part is reinforced, and one of horizontal reinforcement strip 12 fixes manual operation platform 4, manual operation by connector Platform 4 facilitates construction personnel to carry out constructing operation, and construction personnel climbs up manual operation platform 4 by cat ladder 5, by fixed column 10 and admittedly Determine hole 3 to splice mold, the junction between two molds is fixed in edge fixed strip, between two molds passes through Sealing ring and seal groove agree with, and mould inside is made to keep sealing, improve pouring quality.
The basic principle of the utility model and main feature and the advantages of the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description Simply illustrate the principle of the utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model is also Various changes and modifications are had, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed scope is defined by the appending claims and its equivalent thereof.

Claims (5)

1. a kind of highway bridge pier support shuttering for building, including first arm of force(1), second arm of force(6), first assembly(2)With Two components(7), which is characterized in that the first assembly(2)Both sides be equipped with first arm of force(1), second component(7)'s Both sides are equipped with second arm of force(6), two first arm of forces(1)With two second arm of forces(6)Pass through pin(9)It corresponds It is fixedly connected, the first assembly(2)With the second component(7)Outer wall be equipped with horizontal reinforcement strip(12)With longitudinal reinforcement item (11), one of them described horizontal reinforcement strip(12)Pass through connector and manual operation platform(4)It is fixedly connected, the first assembly (2)With the second component(7)Top be all provided with there are five equally distributed fixed column(10), the first assembly(2)With second group Part(7)Bottom be all provided with there are five equally distributed mounting hole(3).
A kind of 2. highway bridge pier support shuttering for building according to claim 1, which is characterized in that two first power Arm(1)With two second arm of forces(6)The top of one side offers lifting hole(eyelet)(8).
A kind of 3. highway bridge pier support shuttering for building according to claim 1, which is characterized in that two first power Arm(1)With two second arm of forces(6)Junction be equipped with several cat ladders(5).
A kind of 4. highway bridge pier support shuttering for building according to claim 1, which is characterized in that the first assembly (2)With the second component(7)Top be equipped with sealing ring, the first assembly(2)With the second component(7)Bottom offer Seal groove.
A kind of 5. highway bridge pier support shuttering for building according to claim 1, which is characterized in that the first assembly (2)With the second component(7)The top of outer wall and first assembly(2)With the second component(7)The bottom of outer wall is equipped with edge and fixes Item.
CN201721519967.6U 2017-11-15 2017-11-15 A kind of highway bridge pier support shuttering for building Expired - Fee Related CN207405499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721519967.6U CN207405499U (en) 2017-11-15 2017-11-15 A kind of highway bridge pier support shuttering for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721519967.6U CN207405499U (en) 2017-11-15 2017-11-15 A kind of highway bridge pier support shuttering for building

Publications (1)

Publication Number Publication Date
CN207405499U true CN207405499U (en) 2018-05-25

Family

ID=62319336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721519967.6U Expired - Fee Related CN207405499U (en) 2017-11-15 2017-11-15 A kind of highway bridge pier support shuttering for building

Country Status (1)

Country Link
CN (1) CN207405499U (en)

Similar Documents

Publication Publication Date Title
CN108678775B (en) Transverse oval deformation resistant shield tunnel reinforcing structure of embedded steel plate and construction method
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN101117791B (en) Abnormal shape steel case and orthotropic plate bottom formwork combined type moving die carrier framework and construction method thereof
CN105839667A (en) Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN110700119A (en) Upper traveling system of assembled Bailey beam hanging basket and design method thereof
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN202064281U (en) Slip form frame
CN207405499U (en) A kind of highway bridge pier support shuttering for building
CN203795311U (en) Multi-leg high pier and slip form construction device
CN202401753U (en) Sliding die device
CN205466673U (en) Concrete flotation tank forming die
CN209603182U (en) A kind of adjustable die system of pipe gallery automatic control section
CN216194097U (en) Prefabricated square column positioning and hoisting system
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN210395127U (en) Assembled Bailey beam hanging basket upper walking system
CN111119067B (en) Concrete pouring template for outer packing bottom plate of arch bridge and construction method thereof
CN203361631U (en) Variable-diameter fabricated sliding mode platform of sliding mode system
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN208473293U (en) Narrow deformation joint easy-dismount template system
CN208455613U (en) A kind of sleeve connection assembled pile foundation
CN208456126U (en) The monoblock type pull steel core die of pre-cast hollow slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Road bridge mound for building public supports template

Effective date of registration: 20200701

Granted publication date: 20180525

Pledgee: Bank of China Limited by Share Ltd. Fuqing branch

Pledgor: FANGLING BRIDGE AND TUNNEL FORMWORK (FUZHOU) Co.,Ltd.

Registration number: Y2020350000067

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180525

Pledgee: Bank of China Limited by Share Ltd. Fuqing branch

Pledgor: FANGLING BRIDGE AND TUNNEL FORMWORK (FUZHOU) CO.,LTD.

Registration number: Y2020350000067

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525