CN207398742U - A kind of construction temporary cable support device - Google Patents

A kind of construction temporary cable support device Download PDF

Info

Publication number
CN207398742U
CN207398742U CN201721211934.5U CN201721211934U CN207398742U CN 207398742 U CN207398742 U CN 207398742U CN 201721211934 U CN201721211934 U CN 201721211934U CN 207398742 U CN207398742 U CN 207398742U
Authority
CN
China
Prior art keywords
support
groove
pedestal
threaded rod
intermediate plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721211934.5U
Other languages
Chinese (zh)
Inventor
徐彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haihong Industrial Product Design Co Ltd
Original Assignee
Zhejiang Haihong Industrial Product Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haihong Industrial Product Design Co Ltd filed Critical Zhejiang Haihong Industrial Product Design Co Ltd
Priority to CN201721211934.5U priority Critical patent/CN207398742U/en
Application granted granted Critical
Publication of CN207398742U publication Critical patent/CN207398742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a kind of construction temporary cable support devices, including pedestal and the support plate being arranged on above pedestal, the upper side wall of the pedestal is fixedly connected by support device with support plate, the support device includes first support and second support, and first support is located at the lower section of second support, the groove of opening upwards is equipped in the second support, and second support is inserted in groove, the pedestal is hollow structure, and the lower end of groove is connected with the inside of pedestal, the first threaded rod laterally set is rotatably connected in the pedestal, and first threaded rod through pedestal side wall set, the second threaded rod being vertically arranged is rotatably connected in the groove.The utility model is simple in structure, easy to operate, the cable support used can be needed to rise construction, avoid the occurrence of phenomena such as cable mops floor, is crisscross;Meanwhile prevent the generation of electric shock accidents, ensure the personal safety of construction worker.

Description

A kind of construction temporary cable support device
Technical field
The utility model is related to construction engineering technical field more particularly to a kind of construction temporary cable support dresses It puts.
Background technology
Recently as the development of construction technology, various middle-size and small-size electric hand tools are increasingly used in building and apply During work, work work efficiency is greatly improved, is effectively reduced the dependence to labour.But since construction site is applied The various equipment in work scene all have the characteristics that provisional, mobility, work surface are big mostly, this results in equipment frequently to move, Phenomena such as cable mops floor, is crisscross is be easy to cause, can also cause cable soaked if indivedual place ponding.The unrest of these cables It draws and disorderly connects the generation for easily causing electric shock accidents, severely compromised the personal safety of construction personnel;It is for this purpose, it is proposed that a kind of Construction temporary cable support device solves the above problems.
Utility model content
The purpose of this utility model is to solve in construction operation of the prior art, and the frequent movement of electrical equipment is led Cable is sent a telegraph to mop floor, is crisscross;The problem of be easy to causeing electric shock accidents generation, and a kind of construction temporary cable branch proposed Support arrangement.
To achieve these goals, the utility model employs following technical solution:
A kind of construction temporary cable support device, including pedestal and the support plate being arranged on above pedestal, the bottom The upper side wall of seat is fixedly connected by support device with support plate, and the support device includes first support and second support, and First support is located at the lower section of second support, the groove of opening upwards is equipped in the second support, and second support is inserted in In groove, the pedestal is hollow structure, and the lower end of groove is connected with the inside of pedestal, and horizontal stroke is rotatably connected in the pedestal To the first threaded rod of setting, and the first threaded rod is set through the side wall of pedestal, is rotatably connected in the groove and is set vertically The second threaded rod put, and the second threaded rod is threadedly coupled through second support and with second support, second threaded rod Lower end is sequentially connected by helical gear and the first threaded rod, and the inner wall of the groove both sides is equipped with sliding slot, and second support vertically Side wall be slidably connected by sliding block and sliding slot, the accommodating groove of opening upwards is equipped in the support plate, and is equipped in accommodating groove Clamping device.
Preferably, the clamping device includes fixed block and the first flexible arc intermediate plate for being arranged on fixed block both sides and the Two flexible arc intermediate plates, are equipped in the first flexible arc intermediate plate and the second matched arc groove of flexible arc intermediate plate, institute The one side inner wall for stating arc groove is equipped with mounting groove, and mounting groove is set close to the opening of arc groove, in the mounting groove Gear is rotatably connected to, and the side wall ring of the second flexible arc intermediate plate is arranged with multiple tooth sockets matched with the gear, the installation Rack matched with the gear is equipped in slot, and rack is located at one side of the gear away from tooth socket and sets, and is also rotated in the mounting groove The 3rd threaded rod is connected with, one end of the 3rd threaded rod is set through the first flexible arc intermediate plate, and the 3rd threaded rod The other end is threadedly coupled through rack and with rack.
Preferably, the height size of the sliding slot is less than the height size of groove.
Preferably, one side inner wall of the arc groove away from gear is connected with pulley, and the second elasticity by connecting rod The side wall of arc clip is equipped with and the matched arc chute of pulley.
The utility model is simple in structure, easy to operate, the cable support used can be needed to rise construction, avoided out Phenomena such as existing cable mops floor, is crisscross;Meanwhile prevent the generation of electric shock accidents, ensure the personal safety of construction worker;Again Person can facilitate and adjust the height size that cable has been supported, as needed consequently facilitating use of the construction worker to cable.
Description of the drawings
Fig. 1 be the utility model proposes a kind of construction temporary cable support device structure diagram.
Fig. 2 is the structure diagram at A in Fig. 1.
In figure:1 pedestal, 2 first supports, 3 second supports, 4 support plates, 5 accommodating grooves, 6 grooves, 7 first threaded rods, 8 are tiltedly Gear, 9 second threaded rods, 10 sliding slots, 11 sliding blocks, 12 fixed blocks, 13 first flexible arc intermediate plates, 14 second elastic arc clevis Piece, 15 arc grooves, 16 mounting grooves, 17 gears, 18 racks, 19 the 3rd threaded rods, 20 tooth sockets, 21 connecting rods, 22 pulleys, 23 arcs Shape sliding slot.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.
With reference to Fig. 1-2, a kind of construction temporary cable support device, including pedestal 1 and the branch being arranged on above pedestal 1 Fagging 4, the upper side wall of pedestal 1 are fixedly connected by support device with support plate 4, and clamping device includes fixed block 12 and is arranged on The the first flexible arc intermediate plate 13 and the second flexible arc intermediate plate 14 of 12 both sides of fixed block are equipped in the first flexible arc intermediate plate 13 With 14 matched arc groove 15 of the second flexible arc intermediate plate, the one side inner wall of arc groove 15 is equipped with mounting groove 16, and installs Slot 16 is set close to the opening of arc groove 15, and gear 17, and the second flexible arc intermediate plate are rotatably connected in mounting groove 16 14 side wall ring be arranged with it is multiple with 17 matched tooth socket 20 of gear, be equipped in mounting groove 16 with 17 matched rack 18 of gear, And rack 18 is located at one side of the gear 17 away from tooth socket 20 and sets, and the 3rd threaded rod 19 is also rotatably connected in mounting groove 16, the One end of three threaded rods 19 is set through the first flexible arc intermediate plate 13, and the other end of the 3rd threaded rod 19 runs through rack 18 simultaneously It is threadedly coupled with rack 18, when needing to carry out clipping operation to cable, the 3rd threaded rod 19 is rotated, due to the 3rd threaded rod 19 It is connected through a screw thread, therefore can be moved with carry-over bar 18 between rack 18, when rack 18 is separated with gear 17, in gear 17 and tooth socket 20 cooperation under, facilitate and the second flexible arc intermediate plate 14 be moved in arc groove 15, can be according to cable How much is radical, adjusts the size that the second flexible arc intermediate plate 14 is moved to depth in arc groove 15, so as to facilitate clamping different The cable of number and different thicknesses after clamping is completed, rotates the 3rd threaded rod 19 and fixes this by way of fixed gear 17 Second flexible arc intermediate plate 14 of position, one side inner wall of the arc groove 15 away from gear 17 are connected with pulley by connecting rod 21 22, and the side wall of the second flexible arc intermediate plate 14 be equipped with 22 matched arc chute 23 of pulley, in pulley 22 and arc chute Facilitate under 23 cooperation and the second flexible arc intermediate plate 14 is moved in arc groove 15, support device includes 2 He of first support Second support 3, and first support 2 is located at the lower section of second support 3, is equipped with the groove 6 of opening upwards in second support 3, and the Two stents 3 are inserted in groove 6, and pedestal 1 is hollow structure, and the lower end of groove 6 is connected with the inside of pedestal 1,1 transfer of pedestal It is dynamic to be connected with the first threaded rod 7 laterally set, and the first threaded rod 7 is set through the side wall of pedestal 1, the company of rotation in groove 6 The second threaded rod 9 being vertically arranged is connected to, and the second threaded rod 9 is threadedly coupled through second support 3 and with second support 3, the The lower end of two threaded rods 9 is sequentially connected by helical gear 8 and the first threaded rod 7, and the inner wall of 6 both sides of groove is equipped with sliding slot vertically 10, and the side wall of second support 3 is slidably connected by sliding block 11 and sliding slot 10, the height size of sliding slot 10 is less than the height of groove 6 Size is spent, prevents second support 3 from being slipped from groove 6, the accommodating groove 5 of opening upwards is equipped in support plate 4, and in accommodating groove 5 Equipped with clamping device.
The utility model is simple in structure, easy to operate, and cable to be used will be needed to be placed in support plate 4 in work progress In accommodating groove 5, and pass through clamping device and clipping operation is carried out to cable, prevent that cable occurs with support plate 4 when supporting cable Loosen phenomenon;Meanwhile when needing to adjust the height of support, rotate the first threaded rod 7 and pass through the second screw thread of drive of helical gear 8 Bar 9 rotates, and due to being connected through a screw thread between the second threaded rod 9 and second support 3, second support 3 can pass through sliding block Cooperation between 11 and sliding slot 10 slides up and down in groove 6, so as to change the height size of support plate 4, therefore can change The height size that cable has been supported, construction worker can adjust the height size that cable has been supported as needed, so as to side Just use.
The above is only the preferable specific embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, in the technical scope that any one skilled in the art discloses in the utility model, according to this practicality New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (4)

1. a kind of construction temporary cable support device, including pedestal(1)Be arranged on pedestal(1)The support plate of top(4), It is characterized in that, the pedestal(1)Upper side wall pass through support device and support plate(4)It is fixedly connected, the support device bag Include first support(2)And second support(3), and first support(2)Positioned at second support(3)Lower section, the second support(3) In be equipped with opening upwards groove(6), and second support(3)It is inserted in groove(6)In, the pedestal(1)For hollow structure, and Groove(6)Lower end and pedestal(1)Inside connection, the pedestal(1)In be rotatably connected to the first threaded rod laterally set (7), and the first threaded rod(7)Through pedestal(1)Side wall set, the groove(6)In be rotatably connected to be vertically arranged Two threaded rods(9), and the second threaded rod(9)Through second support(3)And and second support(3)It is threadedly coupled, second spiral shell Rasp bar(9)Lower end pass through helical gear(8)With the first threaded rod(7)It is sequentially connected, the groove(6)The inner wall of both sides is set vertically There is sliding slot(10), and second support(3)Side wall pass through sliding block(11)With sliding slot(10)It is slidably connected, the support plate(4)In Accommodating groove equipped with opening upwards(5), and accommodating groove(5)In be equipped with clamping device.
A kind of 2. construction temporary cable support device according to claim 1, which is characterized in that the clamping device Including fixed block(12)Be arranged on fixed block(12)First flexible arc intermediate plate of both sides(13)With the second flexible arc intermediate plate (14), the first flexible arc intermediate plate(13)In be equipped with and the second flexible arc intermediate plate(14)Matched arc groove(15), The arc groove(15)One side inner wall be equipped with mounting groove(16), and mounting groove(16)Close to arc groove(15)Opening It sets, the mounting groove(16)In be rotatably connected to gear(17), and the second flexible arc intermediate plate(14)Side wall ring be arranged with Multiple and gear(17)Matched tooth socket(20), the mounting groove(16)In be equipped with and gear(17)Matched rack(18), and Rack(18)Positioned at gear(17)Away from tooth socket(20)One side set, the mounting groove(16)In be also rotatably connected to the 3rd spiral shell Rasp bar(19), the 3rd threaded rod(19)One end run through the first flexible arc intermediate plate(13)It sets, and the 3rd threaded rod (19)The other end run through rack(18)And and rack(18)It is threadedly coupled.
A kind of 3. construction temporary cable support device according to claim 1, which is characterized in that the sliding slot(10) Height size be less than groove(6)Height size.
A kind of 4. construction temporary cable support device according to claim 2, which is characterized in that the arc groove (15)Away from gear(17)One side inner wall pass through connecting rod(21)It is connected with pulley(22), and the second flexible arc intermediate plate(14) Side wall be equipped with and pulley(22)Matched arc chute(23).
CN201721211934.5U 2017-09-21 2017-09-21 A kind of construction temporary cable support device Expired - Fee Related CN207398742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721211934.5U CN207398742U (en) 2017-09-21 2017-09-21 A kind of construction temporary cable support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721211934.5U CN207398742U (en) 2017-09-21 2017-09-21 A kind of construction temporary cable support device

Publications (1)

Publication Number Publication Date
CN207398742U true CN207398742U (en) 2018-05-22

Family

ID=62403638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721211934.5U Expired - Fee Related CN207398742U (en) 2017-09-21 2017-09-21 A kind of construction temporary cable support device

Country Status (1)

Country Link
CN (1) CN207398742U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108683286A (en) * 2018-06-15 2018-10-19 安徽省亿嘉弘电器有限公司 A kind of motor harness guiding mechanism
CN110429526A (en) * 2019-07-15 2019-11-08 桐城市畅润电力工程有限公司 A kind of fixed device of conductor clamping for power equipment
CN110867791A (en) * 2019-11-12 2020-03-06 三峡大学 Electric engineering exposes spool protection device
CN111029998A (en) * 2019-12-06 2020-04-17 湖南亿网电力建设有限公司 Clamping plate for fixing wire tube
CN111193231A (en) * 2020-02-22 2020-05-22 邱凤玲 Device for preventing temporary cable of building engineering from dragging ground
CN111810722A (en) * 2020-07-21 2020-10-23 兰新伟 Pipeline fixing device on construction frame
CN112901620A (en) * 2021-01-29 2021-06-04 重庆新炬鑫机械有限公司 Quick positioning device for magnetizing flywheel magnetic steel
CN115064989A (en) * 2022-08-18 2022-09-16 兴化市永安电力工具有限公司 Electrified line detects with card traditional thread binding putting
CN116613676A (en) * 2023-07-19 2023-08-18 国网河南省电力公司新乡供电公司 Tightening device for installation of electric wires and cables

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108683286A (en) * 2018-06-15 2018-10-19 安徽省亿嘉弘电器有限公司 A kind of motor harness guiding mechanism
CN110429526A (en) * 2019-07-15 2019-11-08 桐城市畅润电力工程有限公司 A kind of fixed device of conductor clamping for power equipment
CN110867791A (en) * 2019-11-12 2020-03-06 三峡大学 Electric engineering exposes spool protection device
CN111029998A (en) * 2019-12-06 2020-04-17 湖南亿网电力建设有限公司 Clamping plate for fixing wire tube
CN111193231A (en) * 2020-02-22 2020-05-22 邱凤玲 Device for preventing temporary cable of building engineering from dragging ground
CN111810722A (en) * 2020-07-21 2020-10-23 兰新伟 Pipeline fixing device on construction frame
CN112901620A (en) * 2021-01-29 2021-06-04 重庆新炬鑫机械有限公司 Quick positioning device for magnetizing flywheel magnetic steel
CN112901620B (en) * 2021-01-29 2022-09-09 重庆新炬鑫机械有限公司 Quick positioning device for magnetizing flywheel magnetic steel
CN115064989A (en) * 2022-08-18 2022-09-16 兴化市永安电力工具有限公司 Electrified line detects with card traditional thread binding putting
CN115064989B (en) * 2022-08-18 2022-11-04 兴化市永安电力工具有限公司 Electrified line detects with card traditional thread binding putting
CN116613676A (en) * 2023-07-19 2023-08-18 国网河南省电力公司新乡供电公司 Tightening device for installation of electric wires and cables
CN116613676B (en) * 2023-07-19 2023-09-29 国网河南省电力公司新乡供电公司 Tightening device for installation of electric wires and cables

Similar Documents

Publication Publication Date Title
CN207398742U (en) A kind of construction temporary cable support device
CN107971775A (en) A kind of auto parts and components clamping device
CN108599000B (en) Cable support device when a kind of power grid is repaired
CN107512468A (en) A kind of communication cable case fixing device
CN105281280A (en) Cable stretching and retracting device
CN207421724U (en) A kind of computer data acquiring device
CN108695708A (en) A kind of electronic communication cabinet of fast quick-detach
CN207166050U (en) A kind of construction project special isolation hook
CN210724138U (en) Line support for municipal works
CN207426547U (en) A kind of auxiliary device for cable tunnel construction
CN219980243U (en) Fault processing device for power distribution network of power grid
CN205718986U (en) A kind of unwrapping wire for building pendant of automatic telescopic
CN205272116U (en) Stereoplasm insulation material hyperboloid cutting device
CN208000322U (en) A kind of high-altitude power equipment electrical test binding clip
CN106915589A (en) A kind of electric armour clamp shelf
CN106786127A (en) A kind of cable special efficient cutter sweep
CN108910488A (en) Feeding device is used in a kind of production and processing of Hardware fitting
CN206386639U (en) A kind of portable domestic household electrical appliances bogey
CN208369169U (en) A kind of cable bearer facilitating installation
CN208179497U (en) A kind of electric power tool storage scaffold
CN113696152A (en) Intelligent management device for safety tools and appliances of power plant
CN105107153A (en) Folding type wall-mounted dancing barre
CN207870660U (en) Convenient for fixed cosmetic display cabinet
CN206873888U (en) A kind of construction site climbing device
CN210678615U (en) Electromechanical installation and maintenance integral type structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20180921