CN207395094U - A kind of steel construction processing workshop ventilating and purifying air system - Google Patents

A kind of steel construction processing workshop ventilating and purifying air system Download PDF

Info

Publication number
CN207395094U
CN207395094U CN201721485123.4U CN201721485123U CN207395094U CN 207395094 U CN207395094 U CN 207395094U CN 201721485123 U CN201721485123 U CN 201721485123U CN 207395094 U CN207395094 U CN 207395094U
Authority
CN
China
Prior art keywords
air
workshop
exterior wall
ventilation
jet blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721485123.4U
Other languages
Chinese (zh)
Inventor
陈胜元
尹华礼
袁焕鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Honglu Steel Structure Co Ltd
Original Assignee
Hubei Honglu Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Honglu Steel Structure Co Ltd filed Critical Hubei Honglu Steel Structure Co Ltd
Priority to CN201721485123.4U priority Critical patent/CN207395094U/en
Application granted granted Critical
Publication of CN207395094U publication Critical patent/CN207395094U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Prevention Of Fouling (AREA)
  • Ventilation (AREA)
  • Duct Arrangements (AREA)

Abstract

The utility model is related to a kind of steel construction processing workshop ventilating and purifying air systems, include natural ventilation equipment, mechanical ventilator and local ventilation and dust removal device, natural ventilation equipment includes several light aluminum alloy roof ventilators, several exterior wall shutters and several exterior wall air-inlet windows, exterior wall shutter is arranged on the flank wall of workshop, exterior wall air-inlet window is arranged between the exterior wall shutter on the flank wall of workshop, and exterior wall air-inlet window is equipped with awning;Mechanical ventilator includes being arranged at the exhaust blower of workshop roof genesis analysis and the jet blower group being arranged on the wall of workshop side, and jet blower component is upper strata jet blower group and lower floor's jet blower group;Stereotypes hoses air suction arm, ventilation duct, exhaust fan and the air-suction cover that local ventilation and dust removal device includes mobile stent, is located on mobile stent, wherein ventilation duct are equipped with volume damper;The utility model device has the advantages that efficient, easy for installation, adaptation is wide, lower-cost.

Description

A kind of steel construction processing workshop ventilating and purifying air system
Technical field
The utility model is related to dust removal by ventilation equipment technical field, especially a kind of steel construction processing workshop dust removal by ventilation system System.
Background technology
With advances in technology, the building of steel structural form, bridge are more and more used among construction, this is expedited the emergence of Large quantities of Steel structure manufacturing enterprises.The works such as the processing of steel construction is broadly divided into blanking, group is stood, correction, welding, ball blast, spray painting Sequence, these processes are all completed in steel construction processing workshop.Wherein, the most key welding sequence can generate substantial amounts of welding cigarette Dirt and pernicious gas pollute working environment.
In welding process, due to the high temperature action of welding arc(4000 DEG C~6000 DEG C)Make the gold of welding material and base material Belong to elements vaporization, the steam that metal melting generates, rapid oxidation, condensation, become varigrained solids in air;Together When also generate some pernicious gases such as CO2、NO2、NO3It is pernicious gas and metal oxide dust mixture Deng, weld fumes, It includes cigarette and dust.Wherein particle of the diameter less than 0.1 μm is known as cigarette, and particle of the diameter between 0.1 μm ~ 10 μm claims For dirt, it is floated on aerosol shape in operating environment air.
Currently, mainly based on gravity-flow ventilation, part workshop is equipped with certain machinery for the ventilation of steel construction processing workshop Ventilation equipment, still, since floor space is big, the effect of dust removal by ventilation is very undesirable, the pernicious gas and cigarette diffused in workshop Dirt serious threat the health of worker, and with the industrialized progress in China, steel building is constantly towards Super High, overlength Across development, workshop scale maximizes increasingly, and the harm of weld fumes becomes increasingly conspicuous, it has also become the Important Problems of entire industry.
The content of the invention
The purpose of this utility model is aiming at the deficiency of the ventilating and purifying air system in existing steel construction processing workshop Place, provides that a kind of structure design is simple, and dedusting mechanism is comprehensive, steel construction processing workshop ventilating and purifying air system with obvious effects.
The concrete scheme of the utility model is:A kind of steel construction processing workshop ventilating and purifying air system, includes gravity-flow ventilation Device, mechanical ventilator and local ventilation and dust removal device, the natural ventilation equipment lead to including several light aluminum alloy roofs Wind device, several exterior wall shutters and several exterior wall air-inlet windows, wherein the light aluminum alloy roof ventilator is along workshop longitudinal direction cloth Put, the exterior wall shutter is arranged on the flank wall of workshop, the exterior wall air-inlet window be arranged on exterior wall on the flank wall of workshop into Between air door, exterior wall air-inlet window is equipped with awning;The mechanical ventilator includes being arranged at the row of workshop roof genesis analysis Wind turbine and the jet blower group being arranged on the wall of workshop side, the jet blower component are upper strata jet blower group and lower floor Jet blower group;The part ventilation and dust removal device includes mobile stent, the stereotypes hoses air suction arm that is located on mobile stent, Ventilation duct, exhaust fan and air-suction cover, wherein ventilation duct are equipped with volume damper.
The group of upper strata jet blower described in the utility model sets height as 1m, and lower floor's jet blower group, which is set, is highly 4m。
The setting height of exterior wall air-inlet window described in the utility model is 3m~4m.
The utility model has the advantages that:Local ventilation and dust removal device effectively reduces welding job point part Pernicious gas and dust concentration significantly reduce the threat to workers ' health, and this device can be with free switch, without welding It can be closed during operation, avoid wasting;Natural ventilation equipment make use of workshop hot pressing and outside wind pressure to be aerated, energy-saving ring It protects;Supplement of the mechanical ventilator as gravity-flow ventilation, ensure that the air quality in entire workshop;The utility model device has High efficiency, easy for installation, wide, the lower-cost advantage of adaptation.
Description of the drawings
Fig. 1 is the exterior section mounting structure schematic diagram of the utility model;
Fig. 2 is the structure diagram that the utility model is located at either inside.
In figure:1-steel construction processing workshop, 2-exhaust blower, 3-light aluminum alloy roof ventilator, 4-upper strata jet stream Blower fan group, 5-exterior wall shutter, 6-lower floor jet blower group, 7-exterior wall air-inlet window, 8-exhaust fan, 9-volume damper, 10-ventilation duct, 11-stereotypes hoses air suction arm, 12-air-suction cover, 13-welding machine, 14-movement stent.
Specific embodiment
Referring to Fig. 1, Fig. 2, the utility model is a kind of steel construction processing workshop ventilating and purifying air system, includes gravity-flow ventilation Device, mechanical ventilator and local ventilation and dust removal device, the natural ventilation equipment lead to including several light aluminum alloy roofs Wind device 3, several exterior wall shutters 5 and several exterior wall air-inlet windows 7, wherein the light aluminum alloy roof ventilator adds along steel construction Work workshop 1 is longitudinally arranged, and the exterior wall shutter is arranged on the flank wall of workshop, and the exterior wall air-inlet window is arranged on workshop side Between exterior wall shutter on wall, exterior wall air-inlet window is equipped with awning;The mechanical ventilator includes being arranged at workshop roof The exhaust blower 2 of genesis analysis and the jet blower group being arranged on the wall of workshop side, the jet blower component are penetrated for upper strata Flow fan group 4 and lower floor's jet blower group 6;The part ventilation and dust removal device includes mobile stent 14, is located at mobile stent On stereotypes hoses air suction arm 11, ventilation duct 10, exhaust fan 8 and air-suction cover 12, wherein ventilation duct be equipped with volume damper 9.
The group of upper strata jet blower described in the present embodiment sets height as 1m, and it is 4m that lower floor's jet blower group, which sets height,.
The setting height of exterior wall air-inlet window described in the present embodiment is 3m~4m.
The utility model has the advantages that:Local ventilation and dust removal device effectively reduces welding job point part Pernicious gas and dust concentration significantly reduce the threat to workers ' health, and this device can be with free switch, without welding It can be closed during operation, avoid wasting;Natural ventilation equipment make use of workshop hot pressing and outside wind pressure to be aerated, energy-saving ring It protects;Supplement of the mechanical ventilator as gravity-flow ventilation, ensure that the air quality in entire workshop;The utility model device has High efficiency, easy for installation, wide, the lower-cost advantage of adaptation.

Claims (3)

1. a kind of steel construction processing workshop ventilating and purifying air system, it is characterised in that:Include natural ventilation equipment, force ventilation dress Put and local ventilation and dust removal device, the natural ventilation equipment include several light aluminum alloy roof ventilators, several exterior walls into Air door and several exterior wall air-inlet windows, wherein the light aluminum alloy roof ventilator is longitudinally arranged along workshop, the exterior wall air inlet Door be arranged on the flank wall of workshop, the exterior wall air-inlet window is arranged between the exterior wall shutter on the flank wall of workshop, exterior wall into Air regulator is equipped with awning;The mechanical ventilator includes being arranged at the exhaust blower of workshop roof genesis analysis and is arranged at workshop Jet blower group on the wall of side, the jet blower component are upper strata jet blower group and lower floor's jet blower group;It is described Local ventilation and dust removal device includes mobile stent, is located on mobile stent stereotypes hoses air suction arm, ventilation duct, exhaust fan and Air-suction cover, wherein ventilation duct are equipped with volume damper.
2. a kind of steel construction processing workshop ventilating and purifying air system according to claim 1, it is characterised in that:The upper strata is penetrated Flow fan group sets height as 1m, and it is 4m that lower floor's jet blower group, which sets height,.
3. a kind of steel construction processing workshop ventilating and purifying air system according to claim 1, it is characterised in that:The exterior wall into The setting height of air regulator is 3m~4m.
CN201721485123.4U 2017-11-09 2017-11-09 A kind of steel construction processing workshop ventilating and purifying air system Expired - Fee Related CN207395094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721485123.4U CN207395094U (en) 2017-11-09 2017-11-09 A kind of steel construction processing workshop ventilating and purifying air system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721485123.4U CN207395094U (en) 2017-11-09 2017-11-09 A kind of steel construction processing workshop ventilating and purifying air system

Publications (1)

Publication Number Publication Date
CN207395094U true CN207395094U (en) 2018-05-22

Family

ID=62325643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721485123.4U Expired - Fee Related CN207395094U (en) 2017-11-09 2017-11-09 A kind of steel construction processing workshop ventilating and purifying air system

Country Status (1)

Country Link
CN (1) CN207395094U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571245A (en) * 2018-12-28 2019-04-05 太仓联洲机械设备有限公司 Polishing dust remover is welded in multi-functional noise elimination
CN110195903A (en) * 2019-06-04 2019-09-03 南京冠福建设工程技术有限公司 A kind of sleeve configuration paper mill workshop fresh air processing method
CN112097380A (en) * 2020-09-10 2020-12-18 天津大学 Mechanical ventilation/local ventilation conversion system and control method for machining plant
CN113908651A (en) * 2021-11-22 2022-01-11 江苏科技大学 Steel structure workshop welding smoke dust collecting and purifying system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571245A (en) * 2018-12-28 2019-04-05 太仓联洲机械设备有限公司 Polishing dust remover is welded in multi-functional noise elimination
CN110195903A (en) * 2019-06-04 2019-09-03 南京冠福建设工程技术有限公司 A kind of sleeve configuration paper mill workshop fresh air processing method
CN112097380A (en) * 2020-09-10 2020-12-18 天津大学 Mechanical ventilation/local ventilation conversion system and control method for machining plant
CN113908651A (en) * 2021-11-22 2022-01-11 江苏科技大学 Steel structure workshop welding smoke dust collecting and purifying system and method

Similar Documents

Publication Publication Date Title
CN207395094U (en) A kind of steel construction processing workshop ventilating and purifying air system
CN101619881B (en) Dedusting system of whole factory building
CN105240040A (en) Ventilation method of inclined shaft assisted double-hole construction
CN205858397U (en) Inclined shaft and positive hole ventilating system in constructing tunnel
CN107998817A (en) Single column type smoke eliminator and flue gas purifying method
CN202229578U (en) Gas sealing device of roaster charging pipe
CN208555457U (en) Top suction type gantry Numerical control cutting Special dedusting device
CN201281421Y (en) Tunnel aspiration channel
CN207289249U (en) A kind of numerical control cutting machine lathe longitudinal direction dust-removing device
CN201157744Y (en) Swirl type humidifying pre-dedusting apparatus
CN208712489U (en) The connection structure of cement kiln flue gas introducing CCUS system
CN208583784U (en) A kind of synchronizing moving flue dust collecting device on automatic welding machinery arm
CN205420468U (en) Can effectively collect converter tower ease cigarette collection device of flue gas
CN207221539U (en) A kind of equipment using dedusting fan dedusting
CN202452632U (en) Ventilation device for pipeline and narrow space
CN208024386U (en) A kind of multi-functional coal mine ventilation device
CN201071731Y (en) Exhausting and purifying mechanism of tunnel low wind well
CN205477705U (en) Intelligence exhaust system
CN206944701U (en) A kind of corrosion-resistant long-life rotary kiln in outer surface
CN109084593A (en) A kind of device and method using the dry slag micropowder of sintering flue gas waste heat
CN219452154U (en) Ventilation equipment for coal mining
CN219465153U (en) Container production workshop
CN203005426U (en) Travelling crane blowing-in device
CN216132042U (en) Ventilation structure of steel structure factory building
CN213395709U (en) Air inlet dust removal device for wall type fresh air machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

CF01 Termination of patent right due to non-payment of annual fee