CN207393142U - A kind of casing recovery instrument - Google Patents
A kind of casing recovery instrument Download PDFInfo
- Publication number
- CN207393142U CN207393142U CN201721114474.4U CN201721114474U CN207393142U CN 207393142 U CN207393142 U CN 207393142U CN 201721114474 U CN201721114474 U CN 201721114474U CN 207393142 U CN207393142 U CN 207393142U
- Authority
- CN
- China
- Prior art keywords
- pipe portion
- casing
- pipe
- tool body
- recovery instrument
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model is related to fastening means technical fields, and in particular to a kind of casing recovery instrument, for there is the sleeve A of different-diameter and/or casing B by drilling tool recycling, including:Tool body;Outlet structure is connected inside tool body, for detachably connected with drilling tool;Passage is formed in inside tool body, and is connected with connector;And be formed in the connecting portion of tool body lower part, for sleeve A and or casing B it is detachably connected;Wherein, connecting portion includes pipe portion A corresponding with sleeve A and pipe portion B corresponding with casing B, pipe portion B construction in the top of pipe portion A, and the outer diameter of pipe portion B is more than the outer diameter of pipe portion A.The rotation of manpower has simply been transferred to drilling equipment progress by the function that the promotion required by can meeting scene acts on simultaneously with torsion, and safety labor-saving merges multiple functions using the structure of instrument and carried out in an instrument, cost-effective.
Description
Technical field
The utility model is related to fastening means technical fields, and in particular to a kind of casing recovery instrument.
Background technology
In current drilling operation at sea, shallow water operations block is particularly, probing is engaged in using self-elevating drilling platform and makees
During industry, in order to save drilling cost, the well that show value in exploratory well must produce directly is transferred to development well, will be used a kind of special
The mud line suspension system of door.The main purpose of this system is exactly to drill a well, needs to be transferred to development well after tested
In the case of, it dismantles at this system, without damaging casing programme, and well protection is got up, when exploitation is needed, profit
Production can be directly transferred to by being connected with tie back tool with well head.
In pervious operation, row recycling dismounting is anchored into using salvaging, it is to hang to carry using slip-type anchor fluke to salvage anchor
Casing is played, since this anchor fluke cannot rotate, dismounting every time is required for first lifting, and is then manually rotated, due to operation position
Limited between emptying, entire operation process is slow, and dangerous very big.Also there are some companies using steel wire rope lifting, manually revolve
Turn, be equally unable to solving practical problems.
It is to lift casing using the suspension of slip-type anchor fluke to salvage anchor, and hoisting power is very strong, but due to the tooth of this anchor fluke
It only stings upwards tight, it is impossible to rotate, dismounting every time is required for first lifting, and is then manually rotated, casing and following well head
Connection is screw-type, is generally had more than 12 teeth, and anchor is salvaged when rotation and then to be rotated, once rotation cannot be synchronous,
Salvaging the anchor fluke tooth of anchor will come off, and cause the damage or even injury to personnel of wellhead equipment, brought greatly to production operation
Risk and inconvenience.
Even if using steel wire rope lifting instead, since steel wire rope is flexible material, in rotary course, it may occur that torsion is played, and
Steel wire rope easily distorts in the case of stress, and difficulty is caused to rotation, dismantles operation every time, spends the time longer, and endangers
It is dangerous very big.
Therefore, how to design one kind makes salvaging anchor be consolidated with casing connection, rotation easily casing recovery instrument just into
For current urgent problem to be solved.
Utility model content
Shortcoming present in regarding to the issue above, the utility model provide a kind of casing recovery instrument.
To achieve the above object, the utility model provides a kind of casing recovery instrument, has for being recycled by drilling tool
There are the sleeve A of different-diameter or casing B, including:
Tool body;
Connector, the connection outlet structure is inside the tool body, for detachably connected with drilling tool;
Passage, the passage are formed in inside the tool body, and are connected with the connector;And
Connecting portion, the connecting portion are formed in the lower part of the tool body, for described sleeve pipe A and or the set
Pipe B is detachably connected;Wherein, the connecting portion includes pipe portion A corresponding with described sleeve pipe A and corresponding with described sleeve pipe B
Pipe portion B, pipe portion B construction is in the top of the pipe portion A, and the outer diameter of the pipe portion B is more than the circle
The outer diameter of pipe portion A.
In above-mentioned casing recovery instrument, it is preferable that the connector is machined with screw thread.
In above-mentioned casing recovery instrument, it is preferable that the connector is taper or perpendicular shape or L shapes or J-shaped.
In above-mentioned casing recovery instrument, it is preferable that the tool body outer surface of upper is even surface.
In above-mentioned casing recovery instrument, further,
The connecting portion further includes:
Blocking portion, the stop cage structure is in the top of the pipe portion B;
Wherein, the top of described sleeve pipe A below the pipe portion B with contacting, so that described sleeve pipe A /Vs, described
The top of casing B below the blocking portion with contacting, so that described sleeve pipe B /Vs.
In above-mentioned casing recovery instrument, further,
The pipe portion A, the pipe portion B and the blocking portion are set into stairstepping.
In above-mentioned casing recovery instrument, further,
At least two pin hole A symmetrical machinings are inserted into, so that described on the circumference of the pipe portion A for torsional pin A
Sleeve A is fixed with the pipe portion A;
At least two pin hole B symmetrical machinings are inserted into, so that described on the circumference of the pipe portion B for torsional pin B
Casing B is fixed with the pipe portion B.
In above-mentioned casing recovery instrument, further,
The diameter of the blocking portion is more than the diameter of the pipe portion B.
In above-mentioned casing recovery instrument, further,
What the connecting portion was integrally formed with the tool body.
The beneficial effects of the utility model are:By in tool body internal structure connector, the connector and spudder
Have it is detachably connected, processing connecting portion processing it is on tool body and detachably connected with sleeve A and casing B, utilize torsion
Power pin connects connecting portion with sleeve A, casing B, can lift or reverse, and meets promotion and torsion required by scene
The rotation of manpower, has simply been transferred to drilling equipment progress, safety labor-saving utilizes the structure handle of instrument by the function of effect simultaneously
Multiple functions merge to be carried out in an instrument, cost-effective.
Description of the drawings
Fig. 1 is the structure diagram of the casing recovery instrument in the utility model one embodiment.
Specific embodiment
In order to be more clearly understood that the above-mentioned purpose of the utility model, feature and advantage, below in conjunction with the accompanying drawings and have
Body embodiment further describes the utility model.It should be noted that in the case where there is no conflict, embodiments herein and
Feature in embodiment can be mutually combined.
Many details are elaborated in the following description to fully understand the utility model, and still, this practicality is new
Type can also be implemented using other different from mode described here, therefore, the scope of protection of the utility model and under
The limitation of specific embodiment disclosed in face.
As shown in Figure 1, the utility model embodiment provides a kind of casing recovery instrument, including:Tool body 1, in work
Connector 13 is machined with inside tool body 1, passage 14 is processed inside tool body 1, and is connected with connector (13), is further included
Processing is in 1 connecting portion of tool body, for detachably connected with sleeve A 6 and casing B9.
By the way that in tool body internal structure connector, the connector and drilling tool are detachably connected, processing connection
Portion's processing is on tool body and detachably connected with sleeve A and casing B, using torsional pin by connecting portion and sleeve A, casing
B connections, can lift or reverse, the function that the promotion required by meeting scene acts on simultaneously with torsion, manpower
Rotation has simply been transferred to drilling equipment progress, and safety labor-saving is merged multiple functions in an instrument using the structure of instrument
It carries out, it is cost-effective.
In the above-described embodiments, connector 13 be machined with screw thread 12 and or buckle, can so connect with drilling tool
It connects, avoids separating at work, also it is quick and easy for installation.
In this embodiment, connector 13 is taper or perpendicular shape or L-shaped or J-shaped.It can be according to the company of drilling tool
Connection interface selects different structures, as long as being connected with drilling tool.Further, the size shape of the connector and drilling well
Tool shape size is adapted, and it is insecure so as to improving the fastness of connection to avoid the occurrence of installation.
In the above-described embodiments, 1 outer surface of upper of tool body is even surface.
In the above-described embodiments, connecting portion includes pipe portion A15, pipe portion B16 and blocking portion 17, wherein,
Pipe portion B16 is constructed in the top of pipe portion A15.Blocking portion 17, blocking portion 17 are constructed in the upper of pipe portion B16
Side.Further the top of sleeve A 6 below pipe portion B16 with contacting so that 6 /V of sleeve A, the top of casing B9 with
Blocking portion 17 contacts below, so that casing B9 /Vs.Sleeve A 6, casing B9 can preferably be limited using above-mentioned connection mode,
It avoids generating movement, can lift can also reverse, the function that the promotion required by meeting scene acts on simultaneously with torsion, people
The rotation of power has simply been transferred to drilling equipment progress, and safety labor-saving is merged multiple functions at one using the structure of instrument
Instrument carries out, cost-effective.
In the above-described embodiments, pipe portion A15, pipe portion B16 and blocking portion 17 are set into stairstepping.It can be respectively by set
Pipe A6, casing B9 are promoted and torsion.
In the above-described embodiments, by the way that at least two pin hole A5,7 symmetrical machinings on the circumference of pipe portion A15, are being incited somebody to action
Torsional pin A4,8 are inserted into two pin hole A5, in 7, sleeve A 6 can so with pipe portion A15 fixed, realizes carrying for sleeve A
It rises and the operation can be completed without a large amount of manpowers with torsion.
In the above-described embodiments, by by least two pin hole B11,2 symmetrical machinings on the circumference of pipe portion B16,
Two pin hole B11 are inserted into torsional pin B3,10, in 2, casing B9 can so fixed with pipe portion B16, realization sleeve A
Promotion the operation can be completed without a large amount of manpowers with torsion.
In the above-described embodiments, the diameter of pipe portion B16 is more than the diameter of pipe portion A15;The diameter of blocking portion 17 is more than
The diameter of pipe portion B16.
Combine being promoted with torsion rotation, so as to fulfill the dismantlement work of well head, and combine the feelings of real work
Condition merges two instruments of two kinds of casings of dismounting, exactly same instrument can dismantle A pipes and two kinds of casings of B pipes
Operation.
Pipe portion A15 and pipe portion B16, is coordinated according to the size of sleeve A and casing B, specifically can be according to reality
Demand provide pipe portion A15 and pipe portion B16 size.
When specifically used:
In recovery of casing A6 operations, the screw thread 12 at the top of tool body 1 be connected with drilling tool, taking-up torsional pin A4 with
8, at the top of sleeve A 6 according to tool sizes and its position of torsional pin A4 and 8, make a call to two pin hole A5 and 7, then slowly under
Put instrument so that the internal diameter of tools for alignment sleeve A 6, and the position of alignment pin holes A5 and 7 tighten torsional pin A4 and 8, lift
The weight of tubing string rotates instrument according to the shackle direction of rig tool, while keeps lifting weight constant, and wellhead column unloads
Entire tubing string can be lifted after opening, taking out torsional pin A4 and 8 in rig floor is proposed that instrument, and whole dismounting process safety is reliable,
It is and time saving and energy saving.
Equally in recovery of casing B9 operations, the screw thread 12 at 1 top of tool body is connected with drilling tool, takes out torsional pin
B3 and 10 at the top of casing B9 according to tool sizes and its position of torsional pin B3 and 10, bores two pin hole B2 and 11, so
Instrument is slowly transferred afterwards so that the internal diameter of tools for alignment casing B9, and the position of alignment pin holes B2 and 11 tighten torsional pin 3
With 10, lift the weight kept a grip on, rotate instrument according to the shackle direction of rig tool, while keep lifting weight constant,
Wellhead column can lift after dismantling entirely to be kept a grip on, and torsional pin B3 and 10 is taken out i.e. it is proposed that instrument, whole dismounting mistake in rig floor
Journey is equally safe and reliable, time saving and energy saving.
This instrument is easy to use, simple in structure, is easy to maintain, and can realize several work task.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modifications, equivalent replacements and improvements are made should be included within the scope of protection of this utility model.
Claims (9)
1. a kind of casing recovery instrument, for there is the sleeve A (6) of different-diameter or casing B (9) by drilling tool recycling,
It is characterised in that it includes:
Tool body (1);
Connector (13), the connector (13) construction is internal in the tool body (1), for drilling tool removably
Connection;
Passage (14), the passage (14) is formed in the tool body (1) inside, and is connected with the connector (13);With
And
Connecting portion, the connecting portion are formed in the lower part of the tool body (1), for described sleeve pipe A (6) and or it is described
Casing B (9) is detachably connected;Wherein, the connecting portion include pipe portion A (15) corresponding with described sleeve pipe A (6) and with institute
State the corresponding pipe portion B (16) of casing B, pipe portion B (16) construction is and described in the top of the pipe portion A (15)
The outer diameter of pipe portion B (16) is more than the outer diameter of the pipe portion A (15).
2. casing recovery instrument according to claim 1, which is characterized in that
The connector (13) is machined with screw thread (12).
3. casing recovery instrument according to claim 1 or 2, which is characterized in that
The connector (13) is taper or perpendicular shape or L-shaped or J-shaped.
4. casing recovery instrument according to claim 1, which is characterized in that
Tool body (1) outer surface of upper is even surface.
5. casing recovery instrument according to claim 1, which is characterized in that
The connecting portion further includes:
Blocking portion (17);
Blocking portion (17) construction is in the top of the pipe portion B (16);
Wherein, the top of described sleeve pipe A (6) below the pipe portion B (16) with contacting, so that described sleeve pipe A (6) is limited
Position, the top of described sleeve pipe B (9) contacts below with the blocking portion (17), so that described sleeve pipe B (9) /V.
6. casing recovery instrument according to claim 5, which is characterized in that
The pipe portion A (15), the pipe portion B (16) and the blocking portion (17) are set into stairstepping.
7. casing recovery instrument according to claim 5 or 6, which is characterized in that
At least two pin hole A (5,7) symmetrical machinings are inserted on the circumference of the pipe portion A (15) for torsional pin A (4,8),
So that described sleeve pipe A (6) is fixed with the pipe portion A (15);
At least two pin hole B (11,2) symmetrical machinings are inserted on the circumference of the pipe portion B (16) for torsional pin B (3,10)
Enter, so that described sleeve pipe B (9) is fixed with the pipe portion B (16).
8. casing recovery instrument according to claim 5, which is characterized in that
The diameter of the blocking portion (17) is more than the diameter of the pipe portion B (16).
9. casing recovery instrument according to claim 8, which is characterized in that
What the connecting portion was integrally formed with the tool body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721114474.4U CN207393142U (en) | 2017-09-01 | 2017-09-01 | A kind of casing recovery instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721114474.4U CN207393142U (en) | 2017-09-01 | 2017-09-01 | A kind of casing recovery instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207393142U true CN207393142U (en) | 2018-05-22 |
Family
ID=62415491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721114474.4U Active CN207393142U (en) | 2017-09-01 | 2017-09-01 | A kind of casing recovery instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207393142U (en) |
-
2017
- 2017-09-01 CN CN201721114474.4U patent/CN207393142U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112014032429B1 (en) | drill pipe mountable well cleaning tool mechanism and method for cleaning a well | |
BR112020004887A2 (en) | wireless emergency stop | |
CN209838359U (en) | Oil field is a fishing barrel in pit | |
US20130025105A1 (en) | Blowout preventer head removal tools and methods | |
CN207393142U (en) | A kind of casing recovery instrument | |
CN104929558A (en) | Fixed-point sleeve taking and replacement process method | |
CN207453923U (en) | A kind of abandoned well protective cap | |
CN210087252U (en) | Underground continuous pipe cable separation sealing adapter | |
CN203319496U (en) | Lock ring type underwater Christmas tree lifting tool | |
CN103573204A (en) | Fallen steel wire fisher passing through tapered string | |
CN208996700U (en) | Anti-falling device for well head in tripping operation | |
CN111561285B (en) | Intelligent composite salvaging method for oil-gas well | |
CN111042737B (en) | Device and method for casing running operation by using common faucet | |
CN204703788U (en) | Short joint for pressure test of casing of well plugging device | |
CN205936423U (en) | Novel petroleum screen pipe safety joint | |
CN216240536U (en) | Well head rubber protection bushing suitable for semi-submersible platform | |
CN204627495U (en) | A kind of drilling well downhole instrument fishing spear | |
CN207634052U (en) | Underwater wellhead specific purpose tool | |
CN207554006U (en) | A kind of guide shoe formula drags for lance | |
CN208267779U (en) | A kind of lifting sub for quickly testing with drill tools | |
CN211038565U (en) | Fishing device for hanger of sucker rod | |
CN204716170U (en) | Fixed point takes covering device | |
CN208734278U (en) | Setting of casing midway circulation tool | |
CN210829153U (en) | Combined outer hook | |
CN204899829U (en) | Cover mills back -off integration fishing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |