CN207390811U - Large span board suspending special combination shoulder pole - Google Patents
Large span board suspending special combination shoulder pole Download PDFInfo
- Publication number
- CN207390811U CN207390811U CN201721462146.3U CN201721462146U CN207390811U CN 207390811 U CN207390811 U CN 207390811U CN 201721462146 U CN201721462146 U CN 201721462146U CN 207390811 U CN207390811 U CN 207390811U
- Authority
- CN
- China
- Prior art keywords
- shoulder pole
- pole body
- big
- platform sling
- big shoulder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of large span board suspending special combination shoulder pole, it is characterized in that:Equipped with big shoulder pole body, both ends are fixed with upward upper platform sling or upper lift ring on the big shoulder pole body, and two platform sling or the distance of hanging ring and big shoulder pole body two ends are 1/5-the 1/4 of big shoulder pole body length;Both ends are equipped with downward lower platform sling or lower lift ring below big shoulder pole body, are additionally provided with two small shoulder pole body, this two small shoulder pole bodies connect respectively from the in-between platform sling or hanging ring movable hanging set with the big shoulder pole body both ends;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt.The utility model is suitable for the handling of large span plate, simple in structure, easy to use, can guarantee the flatness of plate, and multiple suspension centres balance handling, improve work efficiency.
Description
Technical field
The utility model belongs to a kind of material handling technical field, is specifically large span board suspending special combination shoulder pole,
It is simple in structure to be applicable in particularly for long-span roofing light sheet.
Background technology
With the development of modern architecture industry, large span plate is widely used in building roof, and globality is superior, convenience is fast
Victory, that wins the market likes.But since plate span is larger, and from heavy and light, thickness is thin, plasticity is strong, cause plate
Handling brings difficulty to eminence.One lifting equipment, one suspension centre is difficult to the handling for meeting large span plate.Traditional method
It is to be worked at the same time according to panel length using the multiple suspension centres of multiple devices, but it is costly in this way, and the duration is longer.
It is, therefore, desirable to provide one kind can make the convenient and efficient handling of large span plate, and ensure the special of board balance and flatness
Instrument.
Utility model content
The purpose of this utility model is in order to solve the above-mentioned technical problem, to provide a kind of large span board suspending special combination
Shoulder pole, the shoulder pole is simple in structure, easy to use, and a lifting equipment realizes multiple suspension centres, balances handling, plate is carried out effective
Protection, ensure plate not flexural deformation, improve the efficiency of construction, reduce engineering cost.
The purpose of this utility model is achieved through the following technical solutions:A kind of large span board suspending special combination is flat
Load, it is characterized in that:Equipped with big shoulder pole body, both ends are fixed with upward upper platform sling or upper lift ring on the big shoulder pole body, should
The distance of two platform slings or hanging ring and big shoulder pole body two ends is 1/5-the 1/4 of big shoulder pole body length;Both ends are set below big shoulder pole body
Have downward lower platform sling or lower lift ring, be additionally provided with two small shoulder pole body, this two small shoulder pole bodies respectively from it is in-between with it is described
The platform sling or hanging ring movable hanging that big shoulder pole body both ends are set connect;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt.
The utility model further improves and the additional project of implementation is:
The big shoulder pole body is square steel tube structure, and the upper platform sling and upper lift ring are respectively steel plate structure and steel ring, described
The lower platform sling and lower lift ring of big shoulder pole body are steel plate structure and steel ring structure;Small shoulder pole body be round steel pipe structure, small shoulder pole body two
The hanging ring and hanging belt at end are plain bar structure.
The centre of the big shoulder pole body is equipped with tension balanced indicator, and structure is provided with dial and balanced pointers, when
During big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at centre, when both ends pulling force imbalance, pointer deviation weight
One side;Crank type is equipped at the both ends of big shoulder pole body and adjusts both ends platform sling or the adjuster of hanging ring position, structure is to shake
The position of energy left and right adjusting platform sling or hanging ring on big shoulder pole body.
Telescopic spare sunpender and lifting rope are equipped at the both ends of the big shoulder pole body, the spare sunpender and lifting rope are flexible
Structure from the stretching of the both ends of big shoulder pole body or retraction, in case lengthening the length of big shoulder pole body in handling speciality material, ensures special
The safe handling of long material.
The advantages of special combination shoulder pole of the utility model:
1st, the handling of convenient longer, overlength or speciality material, and safety, it is easy to use.
2nd, it is simple in structure, it is easy to make, it is at low cost.
3rd, performance is flexible, the degree of carrying on the arm of the degree of balance and handling when can easily adjust handling, flexible convenient, strong applicability.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
In figure:1-big shoulder pole body 2-goes up platform sling 3-small shoulder pole body 4-5-hanging ring of lower platform sling and hanging belt
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples, embodiment:Referring to attached drawing, a kind of large span
Board suspending special combination shoulder pole, equipped with big shoulder pole body 1, using square tube 200mm*200mm*5mm*12m, on the big shoulder pole body
Face both ends are fixed with upward upper platform sling 2, are welding steel 200mm*100mm*10mm, preformed hole φ 50mm on steel plate;It should
The distance of two platform slings and big shoulder pole body two ends is the 1/4 of big shoulder pole body length;Under both ends are equipped with downwards below big shoulder pole body
Platform sling 4 is welding steel 300mm*100mm*10mm, preformed hole φ 50mm on steel plate;Two small shoulder pole body 3 is additionally provided with, is adopted
With pipe 100mm*4mm*6m, this two small shoulder pole bodies are respectively from the in-between platform sling activity set with the big shoulder pole body both ends
It hangs and connects;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt (5), using plain bar φ 20mm.
The centre of the big shoulder pole body is equipped with tension balanced indicator, and structure is provided with dial and balanced pointers, when
During big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at centre, when both ends pulling force imbalance, pointer deviation weight
One side;Crank type is equipped at the both ends of big shoulder pole body and adjusts both ends platform sling or the adjuster of hanging ring position, structure is to shake
The position of energy left and right adjusting platform sling or hanging ring on big shoulder pole body.It is equipped at the both ends of the big shoulder pole body telescopic spare
Sunpender and lifting rope, the spare sunpender and lifting rope are stretching structure, from the stretching of the both ends of big shoulder pole body or retraction, in case special in handling
The length of big shoulder pole body is lengthened during long material, ensures the safe handling of speciality material.
It should be pointed out that on the premise of the utility model basic structure is not departed from, the similar technical solution made
Also it should be regarded as the protection domain of this patent.
Claims (4)
1. a kind of large span board suspending special combination shoulder pole, it is characterized in that:Equipped with big shoulder pole body (1), on the big shoulder pole body
Face both ends are fixed with upward upper platform sling (2) or upper lift ring, and two platform sling or hanging ring and the distance of big shoulder pole body two ends are
1/5-the 1/4 of big shoulder pole body length;Both ends are equipped with downward lower platform sling (4) or lower lift ring below big shoulder pole body, are additionally provided with two
A small shoulder pole body (3), this two small shoulder pole bodies are lived respectively from the in-between platform sling or hanging ring set with the big shoulder pole body both ends
Dynamic hang connects;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt (5).
2. special combination shoulder pole according to claim 1, it is characterized in that:The big shoulder pole body is square steel tube structure, described
Upper platform sling and upper lift ring are respectively steel plate structure and steel ring, and the lower platform sling and lower lift ring of the big shoulder pole body are steel plate structure and steel
Coil structures;Small shoulder pole body is round steel pipe structure, and the hanging ring and hanging belt at small shoulder pole body both ends are plain bar structure.
3. special combination shoulder pole according to claim 1, it is characterized in that:The centre of the big shoulder pole body is equipped with tension balanced
Indicator, structure are provided with dial and balanced pointers, and when big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at
Centre, when both ends pulling force imbalance, the one side of pointer deviation weight;Crank type, which is equipped with, at the both ends of big shoulder pole body adjusts both ends
Platform sling or the adjuster of hanging ring position, structure are the positions for shaking crank energy left and right adjusting platform sling or hanging ring on big shoulder pole body
It puts.
4. special combination shoulder pole according to claim 1, it is characterized in that:It is equipped at the both ends of the big shoulder pole body scalable
Spare sunpender and lifting rope, the spare sunpender and lifting rope are stretching structure, are stretched out from the both ends of big shoulder pole body or retraction, in case
The length of big shoulder pole body is lengthened during handling speciality material, ensures the safe handling of speciality material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721462146.3U CN207390811U (en) | 2017-11-06 | 2017-11-06 | Large span board suspending special combination shoulder pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721462146.3U CN207390811U (en) | 2017-11-06 | 2017-11-06 | Large span board suspending special combination shoulder pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207390811U true CN207390811U (en) | 2018-05-22 |
Family
ID=62324863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721462146.3U Active CN207390811U (en) | 2017-11-06 | 2017-11-06 | Large span board suspending special combination shoulder pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207390811U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111634793A (en) * | 2020-04-26 | 2020-09-08 | 北京空间飞行器总体设计部 | Hoisting device and hoisting method for satellite |
-
2017
- 2017-11-06 CN CN201721462146.3U patent/CN207390811U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111634793A (en) * | 2020-04-26 | 2020-09-08 | 北京空间飞行器总体设计部 | Hoisting device and hoisting method for satellite |
CN111634793B (en) * | 2020-04-26 | 2022-08-12 | 北京空间飞行器总体设计部 | Hoisting device and hoisting method for satellite |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204342250U (en) | A kind of multi-state hoisting balance beam | |
CN201882767U (en) | Hoisting frame for protecting insulating tube | |
CN205442380U (en) | Guard gate hanging beam | |
CN109095343A (en) | Assembled hanger | |
CN207390811U (en) | Large span board suspending special combination shoulder pole | |
CN205087802U (en) | Anchor clamps body and hoist frock with adjustable | |
CN210103312U (en) | Adjustable balance hanger | |
CN205442405U (en) | Anchor clamps play to put in a position | |
CN203959663U (en) | A kind of large size plate overhead hoist | |
CN206244301U (en) | A kind of architectural engineering tower crane anti-sway control device | |
CN102431885A (en) | Adjustable inner hole lifting appliance | |
CN215516349U (en) | Light wallboard lifting device | |
CN201190078Y (en) | Special slings for double cranes lifting | |
CN205616495U (en) | Hoist device for building small -size | |
CN204569150U (en) | A kind of tyre crane driver's cab hoisting fixture | |
CN208948679U (en) | Assembled hanger | |
CN204297901U (en) | Combined type lifting instrument | |
CN203754232U (en) | Simple steel rail lifting tool | |
CN208916602U (en) | Cement electric pole boom hoisting | |
CN206437799U (en) | A kind of cheery-picker | |
CN107740443B (en) | The prefabricated ring beam of town road inspection shaft and well seat mounting apparatus and installation method | |
CN206886537U (en) | Sheet material hoisting fixture | |
CN201043117Y (en) | Roll bearing integral hoisting tool | |
CN211619744U (en) | Clamp for hoisting plate | |
CN205772925U (en) | Steel-structure factory building pipeline lifting conveyer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |