CN207390811U - Large span board suspending special combination shoulder pole - Google Patents

Large span board suspending special combination shoulder pole Download PDF

Info

Publication number
CN207390811U
CN207390811U CN201721462146.3U CN201721462146U CN207390811U CN 207390811 U CN207390811 U CN 207390811U CN 201721462146 U CN201721462146 U CN 201721462146U CN 207390811 U CN207390811 U CN 207390811U
Authority
CN
China
Prior art keywords
shoulder pole
pole body
big
platform sling
big shoulder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721462146.3U
Other languages
Chinese (zh)
Inventor
陈斌
畅健
赵峰
郝俊杰
边丽
韩美青
张胜全
闫伟斌
李校鸣
李强
屈瑞花
冀立红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan First Building & Engineering Group Co Ltd
Original Assignee
Taiyuan First Building & Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan First Building & Engineering Group Co Ltd filed Critical Taiyuan First Building & Engineering Group Co Ltd
Priority to CN201721462146.3U priority Critical patent/CN207390811U/en
Application granted granted Critical
Publication of CN207390811U publication Critical patent/CN207390811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of large span board suspending special combination shoulder pole, it is characterized in that:Equipped with big shoulder pole body, both ends are fixed with upward upper platform sling or upper lift ring on the big shoulder pole body, and two platform sling or the distance of hanging ring and big shoulder pole body two ends are 1/5-the 1/4 of big shoulder pole body length;Both ends are equipped with downward lower platform sling or lower lift ring below big shoulder pole body, are additionally provided with two small shoulder pole body, this two small shoulder pole bodies connect respectively from the in-between platform sling or hanging ring movable hanging set with the big shoulder pole body both ends;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt.The utility model is suitable for the handling of large span plate, simple in structure, easy to use, can guarantee the flatness of plate, and multiple suspension centres balance handling, improve work efficiency.

Description

Large span board suspending special combination shoulder pole
Technical field
The utility model belongs to a kind of material handling technical field, is specifically large span board suspending special combination shoulder pole, It is simple in structure to be applicable in particularly for long-span roofing light sheet.
Background technology
With the development of modern architecture industry, large span plate is widely used in building roof, and globality is superior, convenience is fast Victory, that wins the market likes.But since plate span is larger, and from heavy and light, thickness is thin, plasticity is strong, cause plate Handling brings difficulty to eminence.One lifting equipment, one suspension centre is difficult to the handling for meeting large span plate.Traditional method It is to be worked at the same time according to panel length using the multiple suspension centres of multiple devices, but it is costly in this way, and the duration is longer. It is, therefore, desirable to provide one kind can make the convenient and efficient handling of large span plate, and ensure the special of board balance and flatness Instrument.
Utility model content
The purpose of this utility model is in order to solve the above-mentioned technical problem, to provide a kind of large span board suspending special combination Shoulder pole, the shoulder pole is simple in structure, easy to use, and a lifting equipment realizes multiple suspension centres, balances handling, plate is carried out effective Protection, ensure plate not flexural deformation, improve the efficiency of construction, reduce engineering cost.
The purpose of this utility model is achieved through the following technical solutions:A kind of large span board suspending special combination is flat Load, it is characterized in that:Equipped with big shoulder pole body, both ends are fixed with upward upper platform sling or upper lift ring on the big shoulder pole body, should The distance of two platform slings or hanging ring and big shoulder pole body two ends is 1/5-the 1/4 of big shoulder pole body length;Both ends are set below big shoulder pole body Have downward lower platform sling or lower lift ring, be additionally provided with two small shoulder pole body, this two small shoulder pole bodies respectively from it is in-between with it is described The platform sling or hanging ring movable hanging that big shoulder pole body both ends are set connect;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt.
The utility model further improves and the additional project of implementation is:
The big shoulder pole body is square steel tube structure, and the upper platform sling and upper lift ring are respectively steel plate structure and steel ring, described The lower platform sling and lower lift ring of big shoulder pole body are steel plate structure and steel ring structure;Small shoulder pole body be round steel pipe structure, small shoulder pole body two The hanging ring and hanging belt at end are plain bar structure.
The centre of the big shoulder pole body is equipped with tension balanced indicator, and structure is provided with dial and balanced pointers, when During big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at centre, when both ends pulling force imbalance, pointer deviation weight One side;Crank type is equipped at the both ends of big shoulder pole body and adjusts both ends platform sling or the adjuster of hanging ring position, structure is to shake The position of energy left and right adjusting platform sling or hanging ring on big shoulder pole body.
Telescopic spare sunpender and lifting rope are equipped at the both ends of the big shoulder pole body, the spare sunpender and lifting rope are flexible Structure from the stretching of the both ends of big shoulder pole body or retraction, in case lengthening the length of big shoulder pole body in handling speciality material, ensures special The safe handling of long material.
The advantages of special combination shoulder pole of the utility model:
1st, the handling of convenient longer, overlength or speciality material, and safety, it is easy to use.
2nd, it is simple in structure, it is easy to make, it is at low cost.
3rd, performance is flexible, the degree of carrying on the arm of the degree of balance and handling when can easily adjust handling, flexible convenient, strong applicability.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
In figure:1-big shoulder pole body 2-goes up platform sling 3-small shoulder pole body 4-5-hanging ring of lower platform sling and hanging belt
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples, embodiment:Referring to attached drawing, a kind of large span Board suspending special combination shoulder pole, equipped with big shoulder pole body 1, using square tube 200mm*200mm*5mm*12m, on the big shoulder pole body Face both ends are fixed with upward upper platform sling 2, are welding steel 200mm*100mm*10mm, preformed hole φ 50mm on steel plate;It should The distance of two platform slings and big shoulder pole body two ends is the 1/4 of big shoulder pole body length;Under both ends are equipped with downwards below big shoulder pole body Platform sling 4 is welding steel 300mm*100mm*10mm, preformed hole φ 50mm on steel plate;Two small shoulder pole body 3 is additionally provided with, is adopted With pipe 100mm*4mm*6m, this two small shoulder pole bodies are respectively from the in-between platform sling activity set with the big shoulder pole body both ends It hangs and connects;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt (5), using plain bar φ 20mm.
The centre of the big shoulder pole body is equipped with tension balanced indicator, and structure is provided with dial and balanced pointers, when During big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at centre, when both ends pulling force imbalance, pointer deviation weight One side;Crank type is equipped at the both ends of big shoulder pole body and adjusts both ends platform sling or the adjuster of hanging ring position, structure is to shake The position of energy left and right adjusting platform sling or hanging ring on big shoulder pole body.It is equipped at the both ends of the big shoulder pole body telescopic spare Sunpender and lifting rope, the spare sunpender and lifting rope are stretching structure, from the stretching of the both ends of big shoulder pole body or retraction, in case special in handling The length of big shoulder pole body is lengthened during long material, ensures the safe handling of speciality material.
It should be pointed out that on the premise of the utility model basic structure is not departed from, the similar technical solution made Also it should be regarded as the protection domain of this patent.

Claims (4)

1. a kind of large span board suspending special combination shoulder pole, it is characterized in that:Equipped with big shoulder pole body (1), on the big shoulder pole body Face both ends are fixed with upward upper platform sling (2) or upper lift ring, and two platform sling or hanging ring and the distance of big shoulder pole body two ends are 1/5-the 1/4 of big shoulder pole body length;Both ends are equipped with downward lower platform sling (4) or lower lift ring below big shoulder pole body, are additionally provided with two A small shoulder pole body (3), this two small shoulder pole bodies are lived respectively from the in-between platform sling or hanging ring set with the big shoulder pole body both ends Dynamic hang connects;The both ends of two small shoulder pole bodies are equipped with hanging ring and hanging belt (5).
2. special combination shoulder pole according to claim 1, it is characterized in that:The big shoulder pole body is square steel tube structure, described Upper platform sling and upper lift ring are respectively steel plate structure and steel ring, and the lower platform sling and lower lift ring of the big shoulder pole body are steel plate structure and steel Coil structures;Small shoulder pole body is round steel pipe structure, and the hanging ring and hanging belt at small shoulder pole body both ends are plain bar structure.
3. special combination shoulder pole according to claim 1, it is characterized in that:The centre of the big shoulder pole body is equipped with tension balanced Indicator, structure are provided with dial and balanced pointers, and when big shoulder pole body both ends pulling force, that is, weight balancing, pointer is located at Centre, when both ends pulling force imbalance, the one side of pointer deviation weight;Crank type, which is equipped with, at the both ends of big shoulder pole body adjusts both ends Platform sling or the adjuster of hanging ring position, structure are the positions for shaking crank energy left and right adjusting platform sling or hanging ring on big shoulder pole body It puts.
4. special combination shoulder pole according to claim 1, it is characterized in that:It is equipped at the both ends of the big shoulder pole body scalable Spare sunpender and lifting rope, the spare sunpender and lifting rope are stretching structure, are stretched out from the both ends of big shoulder pole body or retraction, in case The length of big shoulder pole body is lengthened during handling speciality material, ensures the safe handling of speciality material.
CN201721462146.3U 2017-11-06 2017-11-06 Large span board suspending special combination shoulder pole Active CN207390811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721462146.3U CN207390811U (en) 2017-11-06 2017-11-06 Large span board suspending special combination shoulder pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721462146.3U CN207390811U (en) 2017-11-06 2017-11-06 Large span board suspending special combination shoulder pole

Publications (1)

Publication Number Publication Date
CN207390811U true CN207390811U (en) 2018-05-22

Family

ID=62324863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721462146.3U Active CN207390811U (en) 2017-11-06 2017-11-06 Large span board suspending special combination shoulder pole

Country Status (1)

Country Link
CN (1) CN207390811U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111634793A (en) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 Hoisting device and hoisting method for satellite

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111634793A (en) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 Hoisting device and hoisting method for satellite
CN111634793B (en) * 2020-04-26 2022-08-12 北京空间飞行器总体设计部 Hoisting device and hoisting method for satellite

Similar Documents

Publication Publication Date Title
CN204342250U (en) A kind of multi-state hoisting balance beam
CN201882767U (en) Hoisting frame for protecting insulating tube
CN205442380U (en) Guard gate hanging beam
CN109095343A (en) Assembled hanger
CN207390811U (en) Large span board suspending special combination shoulder pole
CN205087802U (en) Anchor clamps body and hoist frock with adjustable
CN210103312U (en) Adjustable balance hanger
CN205442405U (en) Anchor clamps play to put in a position
CN203959663U (en) A kind of large size plate overhead hoist
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN102431885A (en) Adjustable inner hole lifting appliance
CN215516349U (en) Light wallboard lifting device
CN201190078Y (en) Special slings for double cranes lifting
CN205616495U (en) Hoist device for building small -size
CN204569150U (en) A kind of tyre crane driver's cab hoisting fixture
CN208948679U (en) Assembled hanger
CN204297901U (en) Combined type lifting instrument
CN203754232U (en) Simple steel rail lifting tool
CN208916602U (en) Cement electric pole boom hoisting
CN206437799U (en) A kind of cheery-picker
CN107740443B (en) The prefabricated ring beam of town road inspection shaft and well seat mounting apparatus and installation method
CN206886537U (en) Sheet material hoisting fixture
CN201043117Y (en) Roll bearing integral hoisting tool
CN211619744U (en) Clamp for hoisting plate
CN205772925U (en) Steel-structure factory building pipeline lifting conveyer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant