CN207376640U - Wind turbines prestressing force foundation structure - Google Patents

Wind turbines prestressing force foundation structure Download PDF

Info

Publication number
CN207376640U
CN207376640U CN201721473370.2U CN201721473370U CN207376640U CN 207376640 U CN207376640 U CN 207376640U CN 201721473370 U CN201721473370 U CN 201721473370U CN 207376640 U CN207376640 U CN 207376640U
Authority
CN
China
Prior art keywords
girder
wind turbines
foundation structure
prestressing force
important actor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721473370.2U
Other languages
Chinese (zh)
Inventor
邓阳
屈宋源
斯静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201721473370.2U priority Critical patent/CN207376640U/en
Application granted granted Critical
Publication of CN207376640U publication Critical patent/CN207376640U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Wind turbines prestressing force foundation structures, it is related to the foundation structure field of Wind turbines, it solves large-scale wind electricity unit and uses existing beam and slab type Wind turbines foundation structure, the ratio of reinforcement of girder substantially increases, not only increase cost, and bar spacing is small, is unfavorable for constructing operation, the problem of influencing structural concrete security.The technical solution adopted in the utility model is:Wind turbines prestressing force foundation structure, for beam and slab type, it is important actor including sole plate, in the middle part of sole plate, manhole is set in important actor, the girder of uniformly distributed divergent shape around important actor, prestressed cable is set to replace the vertical muscle of script in girder, foundation structure concrete is mainly prestressed concrete, and prestressed cable uses post- tension tensioning, by manhole, the service work that basis carries out prestressed cable can be entered.By introducing the theory of prestressed concrete, reduction steel using amount is cost-effective, convenient for construction, ensures pouring quality, and easy access.

Description

Wind turbines prestressing force foundation structure
Technical field
The utility model is related to the foundation structure fields of Wind turbines, are specifically a kind of Wind turbines prestressing force basis knot Structure.
Background technology
At present, by land in wind power engineering widely used shallow embedding gravity type spread foundation, i.e., conventional mat foundation, The type of foundation has the advantages that excavation of foundation pit is shallower during construction, working procedure is less.To improve economy, conventional mat foundation Structural shape be optimized for waffle-slab raft.Due to waffle-slab raft concrete stress levels higher, can more give full play to mixed Solidifying soil resistance to compression, the ability of reinforcing bar tension have notable economic property.According to statistics, the same Wind turbines top knot of same engineering Structure using waffle-slab raft than the construction cost using conventional board-like base section about 10%, is roughly equal to 10~150,000 yuan.
With the development of wind-powered electricity generation industry, Wind turbines develop towards high wheel hub, big impeller direction, Wind turbines and pylon conduct Superstructure, the eccentric load increase being integrally subject to is more, and substructure Wind turbines basis is caused to be subject to the eccentric lotus of bigger It carries.Requirement is calculated to meet foundation structure, the diameter of Wind turbines waffle-slab raft increases, and bottom surface span and area have larger Increase.To meet crack and deflection design requirement of the large span base concrete under limiting condition, the base concrete ratio of reinforcement Increase.The increase of the above-mentioned ratio of reinforcement is only to meet concrete cracking and amount of deflection control requirement, significantly adds engineering cost, and And it is unfavorable for controlling construction quality.
As depicted in figs. 1 and 2, large-scale wind electricity unit uses existing beam and slab type Wind turbines foundation structure, sole plate 1 Middle part is cylindric, solid important actor 2, and 1 outer edge of sole plate is basic three-dimensional-structure outer profile, and connection is set in important actor 2 The anchor bolt cage of Wind turbines tower, the girder 5 of uniformly distributed divergent shape around important actor 2, the outside of two neighboring girder 5 is by edge girder 7 connections.For hollow structure between two neighboring girder 5, when construction, carries out backfill processing.For large-scale wind electricity unit, basic bottom The diameter of plate 1 is up to 18~23m, a diameter of 5~6m of solid important actor 2, to meet large span base concrete in limiting condition Under crack and deflection design requirement, the base concrete ratio of reinforcement increase 0.08t/m3~0.14t/m3.It is indulged to meet in girder 5 9 section force request of muscle is indulged muscle 9 in girder 5 and is selectedReinforcing bar (HRB400), result of calculation shows:In Fig. 2,5 width of girder For 1100mm, a diameter of 5.4m of important actor 2, the vertical muscle 9 at 5 top of girder includes:Upper row 14Reinforcing bar, middle row 14 Reinforcing bar, lower row 7Reinforcing bar;The vertical muscle 9 of 5 bottom of girder includes:Upper row 7Reinforcing bar, lower row 11Reinforcing bar.Girder 5 topsReinforcing bar clear spacing is even up to 44mm.
There are following deficiencies for above-mentioned design:Firstth, girder bar diameter is larger, and vertical muscle clear spacing is smaller, root According to code requirement, beam upper reinforcement clear spacing is not less than 1.5d, i.e. 48mm;Beam lower rebar spacing is not less than d, i.e. 32mm.It can To see, it is overstocked that girder indulges muscle, and reinforcing bar is caused to be difficult to bind regular, concrete and be difficult to vibration compacting, influences binding and concreting, It is unfavorable for ensureing the construction quality of foundation structure, seriously affects structure safety.Secondth, since foundation structure span is larger, by curved Square effect is larger, and the increased purpose of the base concrete ratio of reinforcement, which is only that, meets structural cracks and deflection deformation control requirement, It is economically less cost-effective due to increasing the reinforcing bar of a large amount of " extra ".3rd, structure reinforcing bars are not only overstocked, but also model is more, unfavorable In the guarantee project construction duration.
Utility model content
The utility model provides a kind of Wind turbines prestressing force foundation structure, solves large-scale wind electricity unit and uses existing beam Board-like Wind turbines foundation structure, to meet distress in concrete and deflection design requirement, the ratio of reinforcement of girder substantially increases, not only Increase cost, and bar spacing is small, is unfavorable for constructing operation, the problem of influencing structural concrete security.
Technical solution is used by the utility model solves its technical problem:Wind turbines prestressing force foundation structure is Beam and slab type is columned important actor in the middle part of sole plate including sole plate, sets to connect Wind turbines tower in important actor Anchor bolt cage, manhole is set in important actor, and the girder of uniformly distributed divergent shape around important actor sets constructional reinforcement inside girder, adjacent The outside of two girders is connected by edge girder, and mounting hole, peace are set along girder between the outside of each girder and manhole It fills and prestressed cable is set in hole.
It is further:Mounting hole in the girder is formed by metal bellows, inside metal bellows steel is set to twist Line is as the prestressed cable.Specifically, the prestressed cable from the manhole of important actor to girder outside cloth diagonally downward It puts, prestressed cable is located at one end of manhole for fixing end, and one end on the outside of girder is stretching end.Specifically, it is each A branch of prestressed cable is only set in girder.
Specifically, a diameter of 1000mm of the manhole.
The beneficial effects of the utility model are:Wind turbines prestressing force foundation structure, by Wind turbines basis important actor center The solid concrete of script sets manhole, and manhole is also used for prestressed cable wire, while prestressing force is set in girder Cable wire replaces the vertical muscle of script, and girder inner region reinforcing bar is constructional reinforcement, and foundation structure concrete is mainly prestressed concrete, Prestressed cable uses post- tension tensioning, by the manhole on important actor, can enter the maintenance that basis carries out prestressed cable Work.
Since prestressed cable has the material property of high tensioning underrelaxation, compared to regular reinforcement (HRB400), it is subject to same When pulling force, prestressed cable is also smaller than the deformation that regular reinforcement occurs, and the arrangement of prestressed cable can be bunchy Into stock flexible arrangement, from effect of distance, the vertical muscle that can solve former scheme girder top is overstocked and seriously affects reinforcing bar and ties up It pricks, the problem of concrete vibrating, ensures pouring quality.In addition, prestressed concrete have to the control of malformation it is larger excellent Gesture, prestressed cable are stretched to design load step by step after concrete strength reaches design requirement, and concrete is applied from girder both ends Add precompression, Member Lip is made not generate tensile stress during the work time, so as to which concrete be avoided to generate cracking.
Wind turbines prestressing force foundation structure can ensure base concrete structure stress requirement, ensure crack, amount of deflection On the premise of it is required that, the ratio of reinforcement of beam and slab type Wind turbines foundation structure is greatly reduced, reduces reinforcing bar cost, solves girder reinforcing bar The problem of overstocked, makes girder indulge muscle connection and reasonable arrangement, and constructing operation is simple, and the easy vibration compacting of concreting contributes to Ensure the construction quality of concrete.The non-principal steel bar stress model of foundation structure presses constructional reinforcement, and main principal rod uses Prestressed cable has accomplished reduction structure reinforcing bars model purpose, has advantageously ensured that the construction period.
Description of the drawings
Fig. 1 is the horizontal layout schematic diagram that large-scale wind electricity unit uses existing beam and slab type Wind turbines foundation structure.
A-A sectional views in Fig. 1 in Fig. 2.
Fig. 3 is the horizontal layout schematic diagram of the utility model Wind turbines prestressing force foundation structure.
Fig. 4 is B-B sectional views in Fig. 3.
Fig. 5 is C-C sectional views in Fig. 4.Parts, position and number in figure:Sole plate 1, important actor 2, anchor bolt cage 3, inspection Repair hole 4, girder 5, constructional reinforcement 6, edge girder 7, prestressed cable 8, vertical muscle 9, metal bellows 10.Ruler in Fig. 1~5 For very little mark except having indicated unit, other units are mm.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As seen in figures 3-5, the utility model Wind turbines prestressing force foundation structure is beam and slab type, including sole plate 1, Sole plate 1 is rounded, and the outer edge of sole plate 1 is basic build structure outline line, and 1 middle part of sole plate is cylindric Important actor 2, set in important actor 2 to connect the anchor bolt cage 3 of the first section tower of Wind turbines, manhole 4, maintenance be set in important actor 2 The diameter in hole 4 can be entered with people and is advisable, such as a diameter of 1 meter, it can enter convenient for later stage worker in the hollow structure of important actor 2 and carry out Service work.The girder 5 of uniformly distributed divergent shape, the outside of two neighboring girder 5 are connected by edge girder 7 around important actor 2, and adjacent two Area being emptied for triangle between a girder 5, being backfilled after the completion of prestressing force foundation structure, each edge girder 7 is connected shape Into regular polygon.
Mounting hole is set along girder 5 between manhole 4 in the outside of each girder 5 and important actor 2, is set in mounting hole pre- Stress cable wire 8, one end that prestressed cable 8 is located at 5 outside of girder is stretching end, and prestressed cable 8 is located at manhole 4 Interior one end is fixing end.Prestressed cable 8 in girder 5 is set according to result of calculation, the inspection out of important actor 2 of prestressed cable 8 It repaiies hole 4 to be in tilted layout to the outside of girder 5, as shown in Figure 4.Prestressed cable 8 replaces the vertical muscle 9 in former designing scheme, girder 5 Interior regular reinforcement is constructional reinforcement 6.Mounting hole is formed after girder 5 is poured, by setting 10 shape of metal bellows in girder Into.
Prestressed cable 8 is prestress wire, and steel strand wires have the material property of high tensioning underrelaxation, can play it The characteristic of high tensile.Specifically, a mounting hole in each girder 5 is set, prestressed cable 8 is set in mounting hole, such as Fig. 5 institutes Show.Prestressed cable 8 in girder 5 is set according to the stress envelope being calculated, and ensures compliance with section force request.In advance should Power cable wire 8 can flexible arrangement, calculate the required section gross area and significantly reduce, that is, arrange that a small amount of prestressed cable 8 can expire Sufficient structure stress requirement, is greatly reduced rolled steel dosage, cost-effective.Bar spacing is closed in Wind turbines prestressing force foundation structure Reason convenient for concreting, ensures the quality of concrete foundation.
Wind turbines prestressing force foundation structure introduces the theory of prestressed concrete, reduces steel using amount, cost-effective, just In construction, ensure quality, and convenient for later stage repair and maintenance.

Claims (5)

1. Wind turbines prestressing force foundation structure is beam and slab type, including sole plate (1), to be cylindric in the middle part of sole plate (1) Important actor (2), it is characterised in that:Setting sets for connecting the anchor bolt cage (3) of Wind turbines tower in important actor (2) in important actor (2) It puts manhole (4), the girder (5) of divergent shape is evenly distributed with around important actor (2), constructional reinforcement (6) is set inside girder (5), adjacent two The outside of a girder (5) is connected by edge girder (7), along girder (5) between the outside of each girder (5) and manhole (4) Mounting hole is set, prestressed cable (8) is set in mounting hole.
2. Wind turbines prestressing force foundation structure as described in claim 1, it is characterised in that:Installation in the girder (5) Hole is formed by metal bellows (10), and steel strand wires are set inside metal bellows (10) as the prestressed cable (8).
3. Wind turbines prestressing force foundation structure as described in claim 1, it is characterised in that:The prestressed cable (8) from The manhole (4) of important actor (2) arranges that prestressed cable (8) is located at one end of manhole (4) diagonally downward to girder (5) outside For fixing end, one end on the outside of girder (5) is stretching end.
4. Wind turbines prestressing force foundation structure as described in claim 1, it is characterised in that:It is only set in each girder (5) A branch of prestressed cable (8).
5. Wind turbines prestressing force foundation structure as described in claim 1, it is characterised in that:The diameter of the manhole (4) For 1000mm.
CN201721473370.2U 2017-11-07 2017-11-07 Wind turbines prestressing force foundation structure Active CN207376640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721473370.2U CN207376640U (en) 2017-11-07 2017-11-07 Wind turbines prestressing force foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721473370.2U CN207376640U (en) 2017-11-07 2017-11-07 Wind turbines prestressing force foundation structure

Publications (1)

Publication Number Publication Date
CN207376640U true CN207376640U (en) 2018-05-18

Family

ID=62335322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721473370.2U Active CN207376640U (en) 2017-11-07 2017-11-07 Wind turbines prestressing force foundation structure

Country Status (1)

Country Link
CN (1) CN207376640U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829444A (en) * 2017-11-07 2018-03-23 中国电建集团成都勘测设计研究院有限公司 Wind turbines prestressing force foundation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829444A (en) * 2017-11-07 2018-03-23 中国电建集团成都勘测设计研究院有限公司 Wind turbines prestressing force foundation structure

Similar Documents

Publication Publication Date Title
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN101982629B (en) Assembly-type self-compaction steel tube and concrete composite structure
CN206144185U (en) Existing brickwork and steel framework composition building structure
CN203923924U (en) No. 0 section bracket prepressing device
CN104005919B (en) Anchored ribbed type connecting device for prestressed concrete and steel tower section of wind power combined tower
CN105821750B (en) A kind of precast prestressed T plate and its application method
CN105649203A (en) Prefabricated prestressed concrete frame beam column joint with U-shaped steel bar and sleeves
CN103994034A (en) Connection device of prestress concrete and steel combination wind power generation tower
CN107829444A (en) Wind turbines prestressing force foundation structure
CN202194129U (en) Composite prestress soil-blocking pile
CN207376640U (en) Wind turbines prestressing force foundation structure
CN208473072U (en) A kind of damping assembly concrete building cover structure
CN206190458U (en) Prestressing force antifatigue combination steel construction wind tower of qxcomm technology
CN206554277U (en) A kind of antidetonation beam column construction of low-rise building
CN206830380U (en) A kind of prefabricated mixing pylon of Wind turbines bottom burst
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN201526006U (en) Prestressed concrete continuous box girder
CN208219689U (en) Prefabricated components concrete tower fan foundation structure
CN108691380A (en) A kind of damping assembly concrete building cover structure and its construction method
CN201794215U (en) Pretensioning method prestress reinforced concrete prefabricated beam
CN209244093U (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam
CN107100095A (en) A kind of T-shaped rigid frame bridge oblique pull ruggedized construction and its construction method
CN102322060A (en) Composite prestressing retaining pile
CN206539057U (en) A kind of reinforced beam bracing means
CN206418632U (en) A kind of steel plate concrete shearing wall member with tie hoop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant