CN207376635U - A kind of construction of hydro project drainage arrangement - Google Patents

A kind of construction of hydro project drainage arrangement Download PDF

Info

Publication number
CN207376635U
CN207376635U CN201721392006.3U CN201721392006U CN207376635U CN 207376635 U CN207376635 U CN 207376635U CN 201721392006 U CN201721392006 U CN 201721392006U CN 207376635 U CN207376635 U CN 207376635U
Authority
CN
China
Prior art keywords
supporting rack
top surface
sleeve
kickboard
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721392006.3U
Other languages
Chinese (zh)
Inventor
王宝德
曹硕
刘剑雍
李浩杰
刚绪广
潘旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721392006.3U priority Critical patent/CN207376635U/en
Application granted granted Critical
Publication of CN207376635U publication Critical patent/CN207376635U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A kind of construction of hydro project drainage arrangement, including supporting rack, the inside of front and rear two bars of the top surface of supporting rack connects two line wheels by bearing respectively, two line wheels per horizontal direction are symmetrical with the center line of supporting rack horizontal direction, it is fixedly connected between two line wheels per longitudinal direction by shaft, belt wheel is fixedly mounted in the middle part of the periphery of every shaft, it supports and motor is fixedly mounted in the middle part of the bar back side on front side of top of support, the end of the output shaft of motor connects the bar forward, central part of support top of support back side by bearing.The utility model passes through the mutual cooperation between belt wheel, shaft, conveyer belt, gear, it can realize the synchronous operating of line wheel, and line wheel is rotated to the interior direction of supporting rack, folding and unfolding kickboard is more stablized, pass through the mutual cooperation of floating ball, montant and sleeve, contact switch, it can realize the automatic unwrapping wire of hawser, it is no longer necessary to which staff operates repeatedly makes the water inlet of water pump not have in upstream face, so as to improve the work efficiency of draining.

Description

A kind of construction of hydro project drainage arrangement
Technical field
The utility model belongs to hydraulic engineering technical field, specifically a kind of construction of hydro project drainage arrangement.
Background technology
During construction of hydro project, it is often necessary to draining is carried out to foundation pit internal water accumulation, to prevent ponding to applying Work impacts.When carrying out draining to foundation pit, the mode of generally use is that centrifugal water pump runs in water pipe, then with rope Son ties down centrifugal water pump and the centrifugal water pump for being connected with drainpipe slowly is put into the following certain position of the water surface along foundation pit.Centrifugal water Pump is put into the bad control in position below the water surface, it is necessary to which worker by virtue of experience carries out, and due to dark in foundation pit, worker is often It needs just select suitable position after repeatedly attempting, it is time-consuming and laborious, as water pump places too deep, the sediment charge of base underground water Height easily blocks water pump, causes impeded drainage, and drainage efficiency is low, and after the water surface reduces, worker needs to adjust again by rope Water pump location, it is excessively cumbersome.
Utility model content
The utility model provides a kind of construction of hydro project drainage arrangement, the defects of to solve in the prior art.
The utility model is achieved by the following technical programs:
A kind of construction of hydro project drainage arrangement, including supporting rack, the inside of front and rear two bars of the top surface of supporting rack Two line wheels are connected by bearing respectively, two line wheels per horizontal direction are mutually right with the center line of supporting rack horizontal direction Claim, be fixedly connected between two line wheels per longitudinal direction by shaft, belt wheel, supporting rack are fixedly mounted in the middle part of the periphery of every shaft Motor is fixedly mounted in the middle part of the bar back side on front side of top surface, the end of the output shaft of motor connects support top of support back side by bearing Bar forward, central part, gear and same belt wheel is fixedly mounted on the output shaft of motor respectively, supports the back of the body of top of support antero-lateral rod Face one side connects same gear with bearing by connecting shaft, and two gears engage, and the back side of the gear on the outside of motor passes through company Spindle is fixedly connected before same belt wheel, and the belt wheel positioned at both sides is connected between corresponding belt wheel by conveyer belt respectively It connects, the periphery of each line wheel is fixedly connected with one end of hawser, and hawser winds several weeks, the other end of hawser rotating around corresponding line wheel The top surface corner of same kickboard is respectively fixedly connected with, kickboard can be passed through from the bottom surface of supporting rack, and the top surface of kickboard fixes peace Holding water pump, the water inlet of water pump is through kickboard, and the top surface one side of kickboard opens up through hole, and the top surface of through hole is fixedly connected with the bottom of sleeve Face, the lower openings of sleeve, the diameter of through hole are equal to the centerline collineation of the inner diameter of sleeve, through hole and sleeve, sleeve with Communicated inside through hole and with the either flush of kickboard, contact switch, contact switch and motor is fixedly mounted in the inside top surface of sleeve Circuit connects, and activity installation montant in sleeve, the periphery of montant can be engaged with the inner wall of sleeve and can glide on Dynamic, the top surface of montant can be engaged with contact switch, and through through hole and floating ball is fixedly mounted in the lower end of montant.
A kind of construction of hydro project drainage arrangement as described above, the hawser are wirerope.
A kind of construction of hydro project drainage arrangement as described above, the water inlet of the water pump is interior to be equipped with filter screen.
A kind of construction of hydro project drainage arrangement as described above, the bottom of front and rear two bars of the supporting rack bottom surface Face both sides open up groove respectively, and the top surface of each groove is fixedly connected with the fixed link of electric putter, and the piston rod of electric putter is solid respectively Dingan County fills universal wheel, and each universal wheel can be fully located in corresponding groove.
A kind of construction of hydro project drainage arrangement as described above, the both sides of the kickboard open up respectively two it is impermeable Eye screw hole, the outside of the montant of supporting rack open up screw hole respectively, and the both ends of screw hole are communicated with the external world, each screw hole internal thread peace Bolt is filled, bolt can be respectively with corresponding screw hole thread fitting, and the inner end of bolt can be located at corresponding not through hole spiral shell respectively It and can thread fitting therewith in hole.
The utility model has the advantages that:Belt wheel on the outside of the utility model motor is located at supporting rack two by conveyer belt connection Side and its similar belt wheel, belt wheel on motor output shaft by conveyer belt connection positioned at another belt wheel of supporting rack both sides, Belt wheel on the outside of motor is by connecting the corresponding gear of axis connection, two gear engagements, so the belt wheel of eccentric side and motor are defeated The rotation direction of belt wheel on shaft on the contrary, so that line wheel respectively simultaneously to rotating on the inside of supporting rack, the line wheels of both sides with The center line of supporting rack horizontal direction is symmetrical, and so as to ensure that kickboard steadily moves, motor work drives line wheel to loosen Hawser, kickboard move down, and after floating ball is contacted with the water surface, under the buoyancy of water, floating ball drives montant to be transported upwards along sleeve Dynamic, until the tip contact contact switch of montant, contact switch are connected with motor circuit, motor is stopped, at this time kickboard Bottom surface is engaged with the water surface, and the water inlet of water pump is stretched to below the water surface, and after the water surface reduces, floating ball and montant are in gravity Lower downslide, the top surface of montant no longer contact contact switch, and motor is reworked until montant touches contact switch again.This Utility model can realize the synchronous operating of line wheel, and line wheel by the mutual cooperation between belt wheel, shaft, conveyer belt, gear To supporting rack interior direction rotate, folding and unfolding kickboard more stablize, by floating ball, montant and sleeve, contact switch it is mutual Cooperation can realize the automatic unwrapping wire of hawser, it is no longer necessary to staff operates repeatedly makes the water inlet of water pump not have in upstream face, So as to improve the work efficiency of draining.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is Some embodiments of the utility model, for those of ordinary skill in the art, in the premise of not making the creative labor property Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of the utility model;Fig. 2 is the A direction views of Fig. 1.
Reference numeral:1 supporting rack, 2 line wheel, 3 shaft, 4 belt wheel, 5 gear, 6 conveyer belt, 7 hawser, 8 kickboard, 9 water pump 10 15 electric putter of through hole 11 sleeve, 12 montant, 13 floating ball, 14 groove, 16 universal wheel 17 not 18 screw hole of through hole screw hole, 19 spiral shell Bolt.
Specific embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, those of ordinary skill in the art's all other embodiments obtained without creative efforts, belongs to The scope of the utility model protection.
A kind of construction of hydro project drainage arrangement, as shown in the figure, including supporting rack 1, front and rear the two of the top surface of supporting rack 1 The inside of root bar connects two line wheels 2 by bearing respectively, and two line wheels 2 per horizontal direction are with 1 horizontal direction of supporting rack Center line is symmetrical, is fixedly connected between two line wheels 2 per longitudinal direction by shaft 3, fixed in the middle part of the periphery of every shaft 3 Belt wheel 4 is installed, motor is fixedly mounted in the middle part of the bar back side on front side of 1 top surface of supporting rack, the end of the output shaft of motor passes through bearing The bar forward, central part of 1 top surface back side of supporting rack is connected, gear 5 and same belt wheel 4 are fixedly mounted respectively on the output shaft of motor, The reverse side of 1 top surface antero-lateral rod of supporting rack connects same gear 5 by connecting shaft with bearing, and two gears 5 engage, motor The back side of the gear 5 in outside is fixedly connected by connecting shaft before same belt wheel 4, positioned at both sides belt wheel 4 respectively with it is right It is connected between the belt wheel 4 answered by conveyer belt 6, the periphery of each line wheel 2 is fixedly connected with one end of hawser 7, and hawser 7 is rotating around right The line wheel 2 answered winds several weeks, and the other end of hawser 7 is respectively fixedly connected with the top surface corner of same kickboard 8, and kickboard 8 can be from The bottom surface of supporting rack 1 passes through, and water pump 9 is fixedly mounted in the top surface of kickboard 8, and the water inlet of water pump 9 passes through kickboard 8, the top surface of kickboard 8 One side opens up through hole 10, and the top surface of through hole 10 is fixedly connected with the bottom surface of sleeve 11, the lower openings of sleeve 11, the diameter of through hole 10 Equal to the inner diameter of sleeve 11, the centerline collineation of through hole 10 and sleeve 11, sleeve 11 inside through hole 10 with communicating and with floating Contact switch is fixedly mounted in the either flush of plate 8, the inside top surface of sleeve 11, and contact switch is connected with motor circuit, sleeve 11 Interior activity installation montant 12, the periphery of montant 12 can be engaged with the inner wall of sleeve 11 and can be slided up and down along it, montant 12 top surface can be engaged with contact switch, and through through hole 10 and floating ball 13 is fixedly mounted in the lower end of montant 12.This practicality Belt wheel 4 on the outside of New-type electric machine is by the connection of conveyer belt 6 on 1 both sides of supporting rack and its similar belt wheel 4, motor output shaft Belt wheel 4 by the connection of conveyer belt 6 positioned at another belt wheel 4 of 1 both sides of supporting rack, the belt wheel 4 on the outside of motor passes through connecting shaft Corresponding gear 5 is connected, two gears 5 engage, so the rotation side of the belt wheel 4 of eccentric side and the belt wheel 4 on motor output shaft To on the contrary, so that line wheel 2 rotates respectively to 1 inside of supporting rack simultaneously, the line wheel 2 of both sides is with 1 horizontal direction of supporting rack Center line is symmetrical, and so as to ensure that kickboard 8 is steadily mobile, motor work drives line wheel 2 to loosen hawser 7, and kickboard 8 is downward Mobile, after floating ball 13 is contacted with the water surface, under the buoyancy of water, floating ball 13 drives montant 12 to be moved upwards along sleeve 11, directly To the tip contact contact switch of montant 12, contact switch is connected with motor circuit, and motor is stopped, at this time the bottom of kickboard 8 Face is engaged with the water surface, and the water inlet of water pump 9 is stretched to below the water surface, and after the water surface reduces, floating ball 13 and montant 12 are in gravity Effect is lower to glide, and the top surface of montant 12 no longer contacts contact switch, and motor is reworked until montant 12 touches contact and opens again Until pass.The utility model can realize line wheel 2 by the mutual cooperation between belt wheel 4, shaft 3, conveyer belt 6, gear 5 Synchronous operating, and line wheel 2 is rotated to the interior direction of supporting rack 1, folding and unfolding kickboard 8 is more stablized, and passes through floating ball 13, montant 12 With the mutual cooperation of sleeve 11, contact switch, the automatic unwrapping wire of hawser 7 can be realized, it is no longer necessary to which staff operates repeatedly The water inlet of water pump 9 is made not have in upstream face, so as to improve the work efficiency of draining.
Specifically, the hawser 7 described in the present embodiment is wirerope.The structure can avoid hawser 7 from impregnating in water for a long time After be broken, so as to ensure the security of water pump 9.
Specifically, the water inlet of the water pump 9 described in the present embodiment is interior to be equipped with filter screen.The structure can avoid miscellaneous in water Object, silt enter water pump, avoid blocking water pump, so as to ensure the normal work of water pump 9.
Further, the bottom surface both sides of front and rear two bars of 1 bottom surface of supporting rack described in the present embodiment open up groove respectively 14, the top surface of each groove 14 is fixedly connected with the fixed link of electric putter 15, and the piston rod of electric putter 15 is fixedly mounted universal respectively Wheel 16, each universal wheel 16 can be fully located in corresponding groove 14.The utility model can be convenient for by universal wheel 16 It is mobile, and universal wheel 16 can be taken in by electric putter 15 in groove 14, it is controlled after the utility model is moved to designated position Electric putter 15 processed, which is shunk, withdraws universal wheel 16, and the bottom surface of supporting rack 1 can be engaged with ground, so as to ensure this practicality New stability.
Further, the both sides of the kickboard 8 described in the present embodiment open up two not through hole screw holes 17, supporting rack 1 respectively The outside of montant open up screw hole 18 respectively, the both ends of screw hole 18 are communicated with the external world, each 18 internal thread installation bolt of screw hole 19, bolt 19 can be respectively with corresponding 18 thread fitting of screw hole, and the inner end of bolt 19 can be located at corresponding not through hole respectively It and can thread fitting therewith in screw hole 17.Control motor work move upwards kickboard 8, until not through hole screw hole 17 respectively with it is right The centerline collineation for the screw hole 18 answered, respectively adjusting bolt 19 feed them into corresponding not through hole screw hole 17, which can Kickboard 8 and water pump 9 are stabilized, water pump 9 and kickboard 8 during mobile the utility model is avoided to rock.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It still can modify to the technical solution recorded in foregoing embodiments or which part technical characteristic is carried out etc. With replacement;And these modifications or replacement, the essence of appropriate technical solution is not made to depart from various embodiments of the utility model technology The spirit and scope of scheme.

Claims (5)

1. a kind of construction of hydro project drainage arrangement, it is characterised in that:Including supporting rack(1), supporting rack(1)Top surface before The inside of two bars connects two line wheels by bearing respectively afterwards(2), two line wheels per horizontal direction(2)With supporting rack(1) The center line of horizontal direction is symmetrical, per two line wheels of longitudinal direction(2)Between pass through shaft(3)It is fixedly connected, every shaft (3)Periphery in the middle part of be fixedly mounted belt wheel(4), supporting rack(1)Motor is fixedly mounted in the middle part of the bar back side on front side of top surface, motor The end of output shaft connects supporting rack by bearing(1)The bar forward, central part of top surface back side is fixed respectively on the output shaft of motor Gear is installed(5)With same belt wheel(4), supporting rack(1)The reverse side of top surface antero-lateral rod is connected by connecting shaft with bearing Same gear(5), two gears(5)It engages, the gear on the outside of motor(5)The back side be fixedly connected similarly by connecting shaft Belt wheel(4)Before, the belt wheel positioned at both sides(4)Respectively with corresponding belt wheel(4)Between pass through conveyer belt(6)Connection, each Line wheel(2)Periphery be fixedly connected with hawser(7)One end, hawser(7)Rotating around corresponding line wheel(2)Wind several weeks, hawser(7) The other end be respectively fixedly connected with same kickboard(8)Top surface corner, kickboard(8)It can be from supporting rack(1)Bottom surface pass through, Kickboard(8)Top surface be fixedly mounted water pump(9), water pump(9)Water inlet pass through kickboard(8), kickboard(8)Top surface one side open up Through hole(10), through hole(10)Top surface be fixedly connected with sleeve(11)Bottom surface, sleeve(11)Lower openings, through hole(10)It is straight Footpath is equal to sleeve(11)Inner diameter, through hole(10)With sleeve(11)Centerline collineation, sleeve(11)With through hole(10)It is interior Portion communicates and and kickboard(8)Either flush, sleeve(11)Inside top surface contact switch, contact switch and motor is fixedly mounted Circuit connects, sleeve(11)Interior activity installation montant(12), montant(12)Periphery can be with sleeve(11)Inner wall contact match somebody with somebody It closes and can be slided up and down along it, montant(12)Top surface can be engaged with contact switch, montant(12)Lower end through logical Hole(10)And floating ball is fixedly mounted(13).
2. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:The hawser(7) For wirerope.
3. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:The water pump(9) Water inlet in be equipped with filter screen.
4. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:The supporting rack (1)The bottom surface both sides of front and rear two bars of bottom surface open up groove respectively(14), each groove(14)Top surface be fixedly connected with electricity and push away Bar(15)Fixed link, electric putter(15)Piston rod universal wheel is fixedly mounted respectively(16), each universal wheel(16)It can be complete It is located at corresponding groove entirely(14)It is interior.
5. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that:The kickboard(8) Both sides open up two not through hole screw holes respectively(17), supporting rack(1)The outside of montant open up screw hole respectively(18), screw hole (18)Both ends communicated with the external world, each screw hole(18)Internal thread installation bolt(19), bolt(19)Can respectively with it is corresponding Screw hole(18)Thread fitting, bolt(19)Inner end can be located at corresponding not through hole screw hole respectively(17)It is interior and can spiral shell therewith Line coordinates.
CN201721392006.3U 2017-10-25 2017-10-25 A kind of construction of hydro project drainage arrangement Expired - Fee Related CN207376635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721392006.3U CN207376635U (en) 2017-10-25 2017-10-25 A kind of construction of hydro project drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721392006.3U CN207376635U (en) 2017-10-25 2017-10-25 A kind of construction of hydro project drainage arrangement

Publications (1)

Publication Number Publication Date
CN207376635U true CN207376635U (en) 2018-05-18

Family

ID=62337399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721392006.3U Expired - Fee Related CN207376635U (en) 2017-10-25 2017-10-25 A kind of construction of hydro project drainage arrangement

Country Status (1)

Country Link
CN (1) CN207376635U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109502803A (en) * 2018-11-07 2019-03-22 北方民族大学 Organic waste-water treating apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109502803A (en) * 2018-11-07 2019-03-22 北方民族大学 Organic waste-water treating apparatus
CN109502803B (en) * 2018-11-07 2021-06-04 北方民族大学 Organic wastewater treatment device

Similar Documents

Publication Publication Date Title
CN207469398U (en) The sponge urban rainwater circulatory system
CN209676010U (en) A kind of gravity force energy storage system for relying on coal mine
CN207376635U (en) A kind of construction of hydro project drainage arrangement
CN208251113U (en) A kind of anti-collapse device of building foundation pit
CN110700282B (en) Side wall supporting device for foundation engineering construction
CN207369813U (en) A kind of lawn irrigation device of solar wind-energy hybrid power
CN207047805U (en) A kind of combined type water channel
CN212843701U (en) Civil engineering measuring device
CN205637789U (en) Portable wire pole
CN213923830U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN210857941U (en) Lifting device for housing construction
CN213653381U (en) Quick patching device of gate for water conservancy water and electricity
CN110604037A (en) Irrigation system
CN211036931U (en) River course cleaning device for hydraulic engineering
CN204662396U (en) A kind of tilting for high slope blocks dirty drift structure
CN210827357U (en) Dam with automatic cleaning function
CN207109731U (en) A kind of dash module of hydraulic engineering
CN208363039U (en) A kind of checkdam for hydraulic and hydroelectric engineering
CN105220665A (en) A kind of ocean current generation platform of improvement
CN205314212U (en) Prevent back -flushed waste disposal adjusting device
CN208981353U (en) A kind of hydraulic engineering earth-retaining device
CN211773346U (en) Dykes and dams curing device is newly repaired to hydraulic engineering
CN218145490U (en) Auxiliary hanging bracket for bridge and culvert construction
CN201436007U (en) Electric turning leveling arm head structure of double-arm window cleaning machine
CN104110052B (en) Square internal-external water inflow type wellhead device of infiltration recharge well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee