CN207376016U - A kind of coal chemical industry gasification furnace - Google Patents

A kind of coal chemical industry gasification furnace Download PDF

Info

Publication number
CN207376016U
CN207376016U CN201721492448.5U CN201721492448U CN207376016U CN 207376016 U CN207376016 U CN 207376016U CN 201721492448 U CN201721492448 U CN 201721492448U CN 207376016 U CN207376016 U CN 207376016U
Authority
CN
China
Prior art keywords
passage
combustion chamber
type feeding
exhaust fan
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721492448.5U
Other languages
Chinese (zh)
Inventor
韩雅楠
侯小伟
苏慧锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721492448.5U priority Critical patent/CN207376016U/en
Application granted granted Critical
Publication of CN207376016U publication Critical patent/CN207376016U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

The utility model discloses a kind of coal chemical industry gasification furnaces, including waste slag chamber, cooling coil, furnace body and L-type feeding-passage, the furnace interior is equipped with combustion chamber, the bottom of combustion chamber is tiltedly installed with jolting plate by (the first back-moving spring, the bottom of the jolting plate is equipped with the first vibration motor, the middle position of the jolting plate is equipped with blast pipe, the one side of the bottom of combustion chamber is equipped with the second exhaust fan, and the input terminal of the second exhaust fan is connected by pipeline with the bottom of blast pipe.The utility model installs spiral agitator in L-type feeding-passage inner bottom, L-type feeding-passage bottom is installed by air intake passage, and uniform through hole is set between air intake passage and L-type feeding-passage, the coal dust of extruding is stirred, again even into air intake passage, first exhaust fan is blown into combustion chamber, facilitates burning more abundant while also prevents indoor gas leakage of burning.

Description

A kind of coal chemical industry gasification furnace
Technical field
The utility model is related to coal chemical industry equipment technical fields, are specially a kind of coal chemical industry gasification furnace.
Background technology
Crude stockpile at present in the world is very nervous, therefore its price is very high, in order to alleviate this pressure, many times Selection utilization cheap coal substitutes the crude oil of high cost, and country proposes clear energy sources policy therefore, and takes and rationally utilize coal Every behave of charcoal, gasification furnace plays very crucial effect in coal gasification apparatus, and existing coal chemical industry gasification furnace exists Coal dust firing can together distribute later with coal gas, cause to waste and block pipeline, the gas when feed inlet adds coal dust The gas changed in stove can be released from feed inlet, and staff's health is impacted.
Utility model content
The purpose of this utility model is to provide a kind of coal chemical industry gasification furnace, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides following technical solution:A kind of coal chemical industry gasification furnace, including waste residue Room, cooling coil, furnace body and L-type feeding-passage, the furnace interior are equipped with combustion chamber, and the bottom of combustion chamber passes through the One resetting spring is tiltedly installed with jolting plate, and the bottom of the jolting plate is equipped with the first vibration motor, in the jolting plate Between blast pipe is installed at position, the one side of the bottom of combustion chamber is equipped with the second exhaust fan, and the input of the second exhaust fan End is connected by pipeline with the bottom of blast pipe, and flame injection is all equipped on the Inner Wall of Combustion Chamber above the jolting plate both ends Device, one side of the bottom of furnace body away from the second exhaust fan are equipped with waste slag chamber, and waste slag chamber and combustion chamber, the combustion chamber The internal helicoid of side wall is disposed with cooling coil, and the furnace interior above the combustion chamber is equipped with gas chamber, the gas chamber with Coal powder collection plate is equipped with by second back-moving spring between combustion chamber, the upper surface of the coal powder collection plate is equipped with the second shake Dynamic motor, the top of the gas chamber are equipped with gas exit, and the furnace body is equipped with L-type on the outer wall away from remote waste slag chamber one side Feeding-passage, the top installation inside the L-type feeding-passage is there are two the extruding wheel being mutually parallel, and at extruding wheel position It is fixed on L-type feeding-passage outer wall there are two the first motor, the output terminal of first motor and the input terminal of extruding wheel connect, The inside of the L-type feeding-passage horizontal component is equipped with spiral agitator, and the L-type feeding-passage bottom is equipped with air inlet Passage, and stent is installed on the outer wall of air intake passage one end, the first exhaust fan is installed, and first takes out above the stent The input terminal of wind turbine is connected with air intake passage, the air intake passage one end and combustion chamber away from the first exhaust fan, described One end away from the first exhaust fan is equipped with the second motor on stent, the output terminal of second motor by pulley mechanism with Spiral agitator connects, and is equipped with flame generating means on the furnace body outer wall below the stent, the flame thrower it is defeated The output terminal for entering end and flame generating means connects.
Preferably, the inside of the waste slag chamber is equipped with cinder collecting tank by slide.
Preferably, air hole is uniformly provided on the coal powder collection plate, and strainer filled layer is fixed with inside air hole.
Preferably, it is uniformly provided with through hole between the top of the air intake passage and the bottom of L-type feeding-passage.Preferably, Loading hopper is installed at the top of the L-type feeding-passage.
Compared with prior art, the beneficial effects of the utility model are:By installing two in L-type feeding-passage inner tip Coal cinder, is squeezed into tiny coal dust by a parallel extruding wheel, is filled by installing auger in L-type feeding-passage inner bottom It puts, L-type feeding-passage bottom installation air intake passage, and uniform through hole is set between air intake passage and L-type feeding-passage, it is right The coal dust of extruding is stirred, then even into air intake passage, the first exhaust fan is blown into combustion chamber, facilitates burning more fully simultaneously Indoor gas leakage of burning also is prevented, by installing coal powder collection plate between combustion chamber and gas chamber, convenient for will be in coal gas The coal dust of carrying separates, and prevents from causing to waste and block gas pipe, by outer wall of combustion chamber inner wrap cooling coil, side Just cool down after the completion of gasification furnace burning to gasification furnace.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the top view of the utility model.
Fig. 3 is the coal powder collection plate of the utility model.
In figure:1- cinder collecting tanks;2- slag cases;3- flame throwers;4- cooling coils;5- furnace bodies;6- combustion chambers;7- (the first back-moving spring;8- coal powder collection plates;9- gas chambers;10- gas exits;The first vibration motors of 11-;12- air intake passages; 13- loading hoppers;14-L type feeding-passages;15- extruding wheels;16- spiral agitators;17- pulley mechanisms;The second electricity of 18- Machine;19- stents;20- flame generating means;The first exhaust fans of 21-;The second exhaust fans of 22-;23- pipelines;The second vibration motors of 24-; 25- intake stacks;26 jolting plates;27- second back-moving springs;The first motors of 28-.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of embodiment provided by the utility model:A kind of coal chemical industry gasification furnace, including waste slag chamber 2, Cooling coil 4, furnace body 5 and L-type feeding-passage 14, furnace body 5 are internally provided with combustion chamber 6, and the bottom inside combustion chamber 6 passes through One resetting spring 27 is tiltedly installed with jolting plate 26, and the bottom of jolting plate 26 is equipped with the first vibration motor 24, jolting plate 26 Middle position is equipped with blast pipe 25, and the one side of 6 bottom of combustion chamber is equipped with the second exhaust fan 22, and the second exhaust fan 22 Input terminal is connected by pipeline 23 with the bottom of blast pipe 25, and the model of second exhaust fan 22 can be 4-72 2.8A, jolting plate Flame thrower 3, one side of 5 bottom of furnace body away from the second exhaust fan 22 are all installed on 6 inner wall of combustion chamber above 26 both ends Equipped with waste slag chamber, and waste slag chamber 2 connects with combustion chamber 6, and the inside of waste slag chamber 2 is equipped with cinder collecting tank 1 by slide, burning The internal helicoid of 6 side wall of room is disposed with cooling coil 4, and the furnace body 5 of 6 top of combustion chamber is internally provided with gas chamber 9, gas chamber 9 with Coal powder collection plate 8 is equipped with by second back-moving spring 7 between combustion chamber 6, the upper surface of coal powder collection plate 8 is equipped with the second shake Motor 11 is moved, air hole is uniformly provided on coal powder collection plate 8, and strainer filled layer is fixed with inside air hole, the top of gas chamber 9 Portion is equipped with gas exit 10, and furnace body 5 is equipped with L-type feeding-passage 14 on the outer wall away from remote 2 one side of waste slag chamber, L-type charging is logical The top in road 14 is equipped with loading hopper 13, and there are two the extruding wheels being mutually parallel for the top installation inside L-type feeding-passage 14 15, and there are two the first motor 28, the types of first motor 28 for fixation on 14 outer wall of L-type feeding-passage at 15 position of extruding wheel Number can be Y801-2, the output terminal of the first motor 28 is connected with the input terminal of extruding wheel 15,14 horizontal component of L-type feeding-passage Inside is equipped with spiral agitator 16, and 14 bottom of L-type feeding-passage is equipped with air intake passage 12, the top of air intake passage 12 with Through hole is uniformly provided between the bottom of L-type feeding-passage 14, and stent 19, stent are installed on the outer wall of 12 one end of air intake passage 19 top is equipped with the first exhaust fan 21, and the input terminal of the first exhaust fan 21 is connected with air intake passage 12, the 3rd exhausting The model of machine 21 can be 4-72 2.8A, and the one end of air intake passage 12 away from the first exhaust fan 21 is connected with combustion chamber 6, stent 19 Upper one end away from the first exhaust fan 21 is equipped with the second motor 18, and the model of second motor 18 can be Y801-2, and second is electric The output terminal of machine 18 is connected by pulley mechanism 17 with spiral agitator 16, is installed on 5 outer wall of furnace body of 19 lower section of stent There is a flame generating means 20, the model of flame generating means 20 can be PGO-300, the input terminal and flame generating means of flame thrower 3 20 output terminal connection.
Operation principle:Coal cinder is poured into from loading hopper 13 first, coal cinder, which falls into L-type feeding-passage 14 and is squeezed pinch roller 15, to be ground Tiny coal dust is pressed into, tiny coal dust falls into 14 bottom of L-type feeding-passage, and the second motor 18 is driven by pulley mechanism 17 Spiral agitator 16 rotates to be stirred coal dust and be sent into air intake passage 12, the first exhaust fan 21 of air intake passage 12 Coal dust is pumped into combustion chamber 6, flame generating means 20 fires coal dust 6 jet flames of combustion chamber by flame thrower 3 It burns, the second exhaust fan 22 brings from blast pipe 25 into combustion chamber 6 the air and coal dust of unburned burning-out is another by pipeline 23 Secondary be blown into carries out the coal dust carried in primary combustion, coal gas by being adsorbed during coal powder collection plate 8 in the air, and coal gas enters coal Gas chamber 9 is discharged from gas exit 10, the coal dust adsorbed by coal powder collection plate 8, the second vibration motor 11 vibrations coal powder collection plate 8 Coal dust is made to fall down progress to burn in one side, the cinder of coal dust firing falls on jolting plate 26, the vibrations vibrations of the first vibration motor 24 Plate 26 makes cinder slip into waste slag chamber 2.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The scope of type is indicated by the appended claims rather than the foregoing description, it is intended that will fall containing in the equivalent requirements of the claims All changes in justice and scope are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of coal chemical industry gasification furnace, including waste slag chamber (2), cooling coil (4), furnace body (5) and L-type feeding-passage (14), It is characterized in that:The furnace body (5) is internally provided with combustion chamber (6), and combustion chamber (6) internal bottom passes through (the first back-moving spring (27) Jolting plate (26) is tiltedly installed with, the bottom of the jolting plate (26) is equipped with the first vibration motor (24), the jolting plate (26) middle position is equipped with blast pipe (25), and the one side of combustion chamber (6) bottom is equipped with the second exhaust fan (22), And second the input terminal of exhaust fan (22) connected by pipeline (23) with the bottom of blast pipe (25), jolting plate (26) both ends Flame thrower (3) is all installed, furnace body (5) bottom is away from the second exhaust fan (22) on combustion chamber (6) inner wall of top One side be equipped with waste slag chamber (2), and waste slag chamber (2) connects with combustion chamber (6), the internal helicoid cloth of combustion chamber (6) side wall It is equipped with cooling coil (4), the furnace body (5) above the combustion chamber (6) is internally provided with gas chamber (9), the gas chamber (9) and combustion Coal powder collection plate (8), the upper surface peace of the coal powder collection plate (8) are equipped with by second back-moving spring (7) between burning room (6) Equipped with the second vibration motor (11), the top of the gas chamber (9) is equipped with gas exit (10), and the furnace body (5) is away from remote useless L-type feeding-passage (14) is installed, the internal top of the L-type feeding-passage (14) is equipped on the outer wall of grit chamber (2) one side Two extruding wheels (15) being mutually parallel, and on L-type feeding-passage (14) outer wall at extruding wheel (15) position there are two fixations First motor (28), the output terminal of first motor (28) are connected with the input terminal of extruding wheel (15), the L-type feeding-passage (14) inside of horizontal component is equipped with spiral agitator (16), and it is logical that L-type feeding-passage (14) bottom is equipped with air inlet Road (12), and stent (19) is installed on the outer wall of air intake passage (12) one end, it is equipped with first above the stent (19) Exhaust fan (21), and the input terminal of the first exhaust fan (21) is connected with air intake passage (12), the air intake passage (12) is away from the One end of one exhaust fan (21) is connected with combustion chamber (6), and one end away from the first exhaust fan (21) is installed on the stent (19) There is the second motor (18), the output terminal of second motor (18) is connected by pulley mechanism (17) and spiral agitator (16) Connect, flame generating means (20) be installed on furnace body (5) outer wall below the stent (19), the flame thrower (3) it is defeated The output terminal for entering end with flame generating means (20) is connected.
2. a kind of coal chemical industry gasification furnace according to claim 1, it is characterised in that:The inside of the waste slag chamber (2) passes through Slide is equipped with cinder collecting tank (1).
3. a kind of coal chemical industry gasification furnace according to claim 1, it is characterised in that:On the coal powder collection plate (8) uniformly Strainer filled layer is fixed with equipped with air hole, and inside air hole.
4. a kind of coal chemical industry gasification furnace according to claim 1, it is characterised in that;The top of the air intake passage (12) with Through hole is uniformly provided between the bottom of L-type feeding-passage (14).
5. a kind of coal chemical industry gasification furnace according to claim 1, it is characterised in that:The top of the L-type feeding-passage (14) Portion is equipped with loading hopper (13).
CN201721492448.5U 2017-11-10 2017-11-10 A kind of coal chemical industry gasification furnace Expired - Fee Related CN207376016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721492448.5U CN207376016U (en) 2017-11-10 2017-11-10 A kind of coal chemical industry gasification furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721492448.5U CN207376016U (en) 2017-11-10 2017-11-10 A kind of coal chemical industry gasification furnace

Publications (1)

Publication Number Publication Date
CN207376016U true CN207376016U (en) 2018-05-18

Family

ID=62335648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721492448.5U Expired - Fee Related CN207376016U (en) 2017-11-10 2017-11-10 A kind of coal chemical industry gasification furnace

Country Status (1)

Country Link
CN (1) CN207376016U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108913211A (en) * 2018-08-14 2018-11-30 朋仁锋 A kind of coal gas reparation technology
CN108913212A (en) * 2018-08-14 2018-11-30 朋仁锋 A kind of coal chemical industry gasification furnace
CN113025381A (en) * 2021-03-26 2021-06-25 南京万德斯环保科技股份有限公司 Small vibrating type pyrolytic carbon gasification device and gasification process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108913211A (en) * 2018-08-14 2018-11-30 朋仁锋 A kind of coal gas reparation technology
CN108913212A (en) * 2018-08-14 2018-11-30 朋仁锋 A kind of coal chemical industry gasification furnace
CN108913211B (en) * 2018-08-14 2020-12-04 山东天智信息科技有限公司 Coal gas preparation process
CN113025381A (en) * 2021-03-26 2021-06-25 南京万德斯环保科技股份有限公司 Small vibrating type pyrolytic carbon gasification device and gasification process

Similar Documents

Publication Publication Date Title
CN207376016U (en) A kind of coal chemical industry gasification furnace
CN102252317B (en) Gasification combustor for biomass granules
CN201945191U (en) Novel alloy baking device
CN207922199U (en) a kind of biomass combustion boiler
CN202048565U (en) Biomass particle gasifying combustor
CN103383143A (en) Novel efficient air heater
CN206973570U (en) A kind of incinerator
CN105571321A (en) Multi-level coupling type zinc oxide bio-particle sintering system
CN205640876U (en) Improved generation biomass burning machine
CN204388040U (en) A kind of particle burning machine
CN204176670U (en) A kind of charging gear of coal burner
CN204438098U (en) A kind of biomass particle combustion apparatus
CN201106023Y (en) Environment-friendly type calcining vertical kiln
CN201615601U (en) Rice husk powder combustion hot-blast stove
CN206276125U (en) Cleaning shaft spark blowout
CN206410138U (en) A kind of double helix regenerative gas electronic waste pyrolysis installation
CN110841615A (en) Furnace tube fixed type gas heating powdered activated carbon regeneration furnace
CN104406187A (en) Supply device of pulverized coal burner
CN208170377U (en) A kind of INVENTIONLiquid-fueled combustion furnace
CN214612670U (en) Quenching oil gas reburning type water purification heat treatment equipment
CN101747914A (en) Smoke prevention and dust control device for tamping coke oven
CN220728531U (en) Biomass hot air device
CN209726166U (en) A kind of gazogene
CN102393069B (en) Gas-solid mixing combustion hot-air oven with double towers and double furnace cavities
CN212284050U (en) Furnace tube fixed type gas heating powdered activated carbon regeneration furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

Termination date: 20201110

CF01 Termination of patent right due to non-payment of annual fee