CN207355957U - Multi-pipeline beverage preparing system - Google Patents

Multi-pipeline beverage preparing system Download PDF

Info

Publication number
CN207355957U
CN207355957U CN201720166645.1U CN201720166645U CN207355957U CN 207355957 U CN207355957 U CN 207355957U CN 201720166645 U CN201720166645 U CN 201720166645U CN 207355957 U CN207355957 U CN 207355957U
Authority
CN
China
Prior art keywords
pipeline
brewing
stable
solenoid valve
way pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720166645.1U
Other languages
Chinese (zh)
Inventor
程晶
江中华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dingjia Hongsi Beverage Technology Co Ltd
Original Assignee
Shenzhen Dingjia Hongsi Beverage Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dingjia Hongsi Beverage Technology Co Ltd filed Critical Shenzhen Dingjia Hongsi Beverage Technology Co Ltd
Priority to CN201720166645.1U priority Critical patent/CN207355957U/en
Application granted granted Critical
Publication of CN207355957U publication Critical patent/CN207355957U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of multi-pipeline beverage preparing system, including control mainboard and the pipeline group and brewing component that are connected in control mainboard;Brewing group includes brewing group casing, it is arranged at the extraction module of brewing group casing internal, extraction module includes plunger shaft, it is arranged at the first pressure release extraction pin of plunger shaft inner right side, it is arranged at the second pressure release extraction pin of plunger shaft inside left, the capsule being arranged on the downside of the first pressure release extraction pin and the second pressure release extraction pin, the stable-pressure device that pipeline group includes brewing pipeline and is arranged on brewing pipeline, making pipeline includes the first brewing pipeline and the second brewing pipeline, pass through the stable-pressure device that a plurality of brewing pipeline is set and is arranged on brewing pipeline, solves water in existing beverage preparing system, electric circuit design is single, hydraulic pressure is unstable in brewing, causing cannot be more flexible, the problem of variation is used.

Description

Multi-pipeline beverage preparing system
Technical field
Beverage preparing field is the utility model is related to, more particularly to a kind of multi-pipeline beverage preparing system.
Background technology
People in application of electronic technology to coffee machine, realize milling, press-powder, dress powder, brew, removes residue etc. brew Automatically controlling for coffee overall process, creates coffee machine.The full-automatic coffee machine of high-quality is according to most scientific data and program Carry out brewing coffee, and be designed with perfect protection system, use and both facilitated, need to only gently press with regard to available coffee Coffee, changes the mode of heating of the water for brewing coffee, allows the water made coffee to be not directly contacted with heat source, but use it is similar every The method of water heating, its convenience are better than the product of conventional coffee machine.Full-automatic coffee machine is convenient, fast, uniform quality, efficiently Outstanding advantages of rate, operating personnel need not train, is so that it is increasingly liked by client.
But coffee machine currently on the market is needing to reconstitute different mouths since its internal water, electric circuit design are excessively single , it is necessary to increase other beverage outlet during the coffee of taste, also have in brewing, pressure instability causes inconvenient to use ask Topic.
Utility model content
The utility model is intended to solve at least some of the technical problems in related technologies.For this reason, this reality Be to provide a kind of multi-pipeline beverage preparing system with new main purpose, it is intended to solve in the prior art coffee machine due to it Internal water, electric circuit design are excessively single, when needing to reconstitute the coffee of different taste, it is necessary to increase other beverage outlet, Also in brewing, pressure instability causes inconvenient problem with use.
To achieve the above object, the utility model provides a kind of multi-pipeline beverage preparing system, including control mainboard and company The pipeline group and brewing group being connected in control mainboard, brewing group include brewing group casing, are arranged at the extraction of brewing group casing internal Component is taken, extraction module includes plunger shaft, the first pressure release extraction pin for being arranged at plunger shaft inner right side, is arranged at brewing group machine The second pressure release extraction pin of shell inside left, the capsule being arranged on the downside of the first pressure release extraction pin and the second pressure release extraction pin, pipe Road group includes preprocessing pipeline;The the first brewing pipeline and the second brewing pipeline being connected on preprocessing pipeline;
Wherein, preprocessing pipeline includes water pump and the boiler being connected with water pump;
Wherein, the first brewing pipeline includes the first solenoid valve, and the first solenoid valve is connected with the first pressure release extraction pin;
Wherein, the second brewing pipeline includes second solenoid valve, and second solenoid valve is connected with the second pressure release extraction pin.
In one of the embodiments, water pump upper end is provided with the first stable-pressure device, one end of the first stable-pressure device and the One end of No. three ports connection of one three-way pipe, the other end and boiler connects, the No.1 port of the first three-way pipe and the first draining Mouth connection.
In one of the embodiments, the second stable-pressure device, the second voltage stabilizing are additionally provided between the first stable-pressure device and boiler No. three ports of device are connected with No. two ports of the first three-way pipe.
In one of the embodiments, the other end of boiler is connected with No. two ports of the second three-way pipe, the second three-way pipe No. three ports be connected with one end of the first solenoid valve.
In one of the embodiments, one end of the No.1 port of the second three-way pipe and second solenoid valve connects, the second electricity The other end of magnet valve is connected with No. two ports of the 3rd three-way pipe, and No. three ports of the 3rd three-way pipe and the second pressure release extraction pin connect Connect, the No.1 port of the 3rd three-way pipe is connected with the 3rd stable-pressure device one end, the other end of the 3rd stable-pressure device and the second draining Mouth connection.
In one of the embodiments, the lower end of water pump is connected with flowmeter one end, and the other end and the water storage of flowmeter fill Put connection.
In one of the embodiments, control mainboard includes control module and induction module, induction module and control module Connection, induction module include the Speed sensing device being connected with water pump;The flow sensing device being connected with flowmeter;Connect with boiler The temperature sensing device connect, water pump are connected with control module, and boiler is connected with control module, and control module is also steady with first respectively Pressure device, the second stable-pressure device, the first solenoid valve, second solenoid valve, the connection of the 3rd stable-pressure device.
The utility model also provides a kind of multi-pipeline beverage preparing system operation method, it is characterised in that including following step Suddenly:
S1, preliminary step:Sent and referred to water pump, the first stable-pressure device, the second stable-pressure device, boiler using control module Order, makes its energization, at this moment water pump starts to draw water from water storage device, and water flows to water pump by flowmeter, and it is steady to flow to first from water pump Pressure device, the second stable-pressure device is flowed to from the first stable-pressure device, flows to boiler from the second stable-pressure device, boiler adds water Heat, while temperature sensing device detects the temperature of water in boiler, if being not reaching to default water temperature, temperature sensing device can be sent out Breath deliver letters to control module, control module can send instruction to water pump makes pump rotary speed slack-off, so that water leads to the stream of boiler Speed is slack-off, and when reaching default water temperature, temperature sensing device will send information to control module, and control module will be to water pump Instruction is sent, so as to accelerate the speed of drawing water of water pump, by the current after heating to the second three-way pipe.
S2, the pattern of brewing can be divided into that single-pipeline brews pattern and multi-pipeline brews pattern:
Single-pipeline brews pattern including following two:
1) No. three ports of the second stable-pressure device are closed using control module, second solenoid valve is closed, by the first electricity Magnet valve is opened, and the water heated can flow to the first solenoid valve from the second three-way pipe, and the first pressure release extraction is flowed to from the first solenoid valve Pin, flows to capsule from the first pressure release extraction pin and is brewed;
2) No. three ports of the second stable-pressure device are closed using control module, the first solenoid valve is closed, by the second electricity Magnet valve is opened, and the 3rd stable-pressure device is closed, the water heated can flow to second solenoid valve from the second three-way pipe, from the second electromagnetism Valve flows to the 3rd three-way pipe, and the second pressure release extraction pin is flowed to from the 3rd three-way pipe, and flowing to capsule from the second pressure release extraction pin carries out Brew;
Multi-pipeline is brewed including following one kind:
3) No. three ports of the second stable-pressure device are closed using control module, the 3rd stable-pressure device is closed, is heated Water can flow to the first solenoid valve, second solenoid valve respectively from the second three-way pipe, from the first solenoid valve flow to the first pressure release extraction Pin, flows to capsule from the first pressure release extraction pin and is brewed, the 3rd three-way pipe can be also flowed to from second solenoid valve, from the 3rd threeway Pipe flows to the second pressure release extraction pin, and flowing to capsule from the second pressure release extraction pin is brewed.
S3, brew at the end of pressure release drainage pattern have it is following two:
1) brew when reaching cup amount, flow sensing device can send information to control module, using control module by water pump Power-off, No. three ports of the second stable-pressure device, No. two ports are opened, second solenoid valve is powered off, the 3rd stable-pressure device is broken Electricity, powers off after the first solenoid valve three seconds, the current in plunger shaft flow to the second threeway to the first solenoid valve from the first solenoid valve Pipe, flows to boiler from the second three-way pipe, the second stable-pressure device is flowed to from boiler, No. two, No. three ports from the second stable-pressure device The first three-way pipe is flowed to, flowing to the first discharge outlet from the first three-way pipe discharges water, and the water in capsule can be extracted by the second pressure release Take pin to flow to the 3rd triple valve, the 3rd stable-pressure device is flowed to from the 3rd triple valve, the second discharge outlet is flowed to from the 3rd stable-pressure device Water is discharged.
2) when brewing soon arrival cup amount, flow sensing device can send information to control module, use control module By Pump Failure, the second stable-pressure device is powered, and the 3rd stable-pressure device is powered, and second solenoid valve is powered, and boiler is powered, and boiler is by water Steam is thermally formed, steam enters the second three-way pipe, enters second solenoid valve from the second three-way pipe, enters the from second solenoid valve Three three-way pipes, enter the second pressure release extraction pin from the 3rd three-way pipe, enter capsule from the second pressure release extraction pin, steam enters capsule Afterwards, combined with remaining water in capsule, can fill remaining cup amount, after steam, boiler is powered off, by second solenoid valve Power-off, the 3rd stable-pressure device is powered off, and the second stable-pressure device is powered off and opens No. three ports, after the first solenoid valves three seconds Power off, the water in plunger shaft can flow to the second three-way pipe by the first solenoid valve, boiler be flowed to from the second three-way pipe, from boiler stream To the second stable-pressure device, No. two ports, No. three ports from the second stable-pressure device flow to the first three-way pipe, from the first three-way pipe stream Water is discharged to the first discharge outlet.
Have the beneficial effect that:
By the design of multi-pipeline, the species of brewing coffee can be made more diversified, and other drink need not be opened up Material outlet, each bar voltage stabilizing pipeline of setting, can make the hydraulic pressure on inner multi-pipe road be in stable state at work, this rational Design is so that people are more convenient when in use.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to the structure shown in these attached drawings.
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is the utility model brewing group structure diagram.
Fig. 3 is the utility model preprocessing pipeline structure schematic diagram.
Fig. 4 makes pipeline schematic diagram for the utility model first.
Fig. 5 makes pipeline schematic diagram for the utility model second.
Fig. 6 is the utility model control structure schematic diagram.
Drawing reference numeral explanation:
Label Title Label Title
1 Water storage device 15 Brewing group
2 First three-way pipe 150 Brewing group casing
3 First stable-pressure device 151 Plunger shaft
4 Water pump 152 First pressure release extracts pin
5 Second stable-pressure device 153 Second pressure release extracts pin
6 Boiler 154 Capsule
7 Flowmeter 100 Control module
8 Second three-way pipe 101 Speed sensing device
9 Second solenoid valve 102 Flow sensing device
10 3rd three-way pipe 103 Temperature sensing device
11 First solenoid valve 16 First brewing pipeline
12 3rd stable-pressure device 17 Second brewing pipeline
13 First discharge outlet 18 Preprocessing pipeline
14 Second discharge outlet
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the part of the embodiment of the utility model, rather than all Embodiment.
Based on the embodiment in the utility model, those of ordinary skill in the art are without creative efforts All other embodiments obtained, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining relative position relation under a certain particular pose (as shown in drawings) between each component, motion conditions etc., such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In the utility model such as relating to the description of " first ", " second " etc. be only used for description purpose, and it is not intended that Indicate or imply its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", At least one this feature can be expressed or be implicitly included to the feature of " second ".
In the description of the utility model, " multiple " are meant that at least two, such as two, three etc., unless otherwise It is clearly specific to limit.
In the utility model, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should do broad sense reason Solution, for example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can mechanically connect, also may be used Be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be the connection inside two elements Or the interaction relationship of two elements, unless otherwise restricted clearly.For the ordinary skill in the art, can be with Concrete meaning of the above-mentioned term in the utility model is understood as the case may be.
In addition, the technical solution between each embodiment of the utility model can be combined with each other, but must be with ability Domain those of ordinary skill can be implemented as basis, will be understood that when the combination appearance of technical solution is conflicting or can not realize The combination of this technical solution is not present, also not within the protection domain of the requires of the utility model.
With reference to Fig. 1~6, a kind of multi-pipeline beverage preparing system, including control mainboard and the pipe being connected in control mainboard Road group and brewing group 15, brewing group 15 include brewing group casing 150, the extraction module being arranged inside brewing group casing 150, extraction Component is taken to include plunger shaft 151, the first pressure release extraction pin 152 for being arranged at 151 inner right side of plunger shaft, be arranged at brewing group 15 The second pressure release on the left of casing internal extracts pin 153, is arranged under the first pressure release extraction pin 152 and second pressure release extraction pin 153 The capsule 154 of side, pipeline group include preprocessing pipeline;The first brewing pipeline 16 and second being connected on preprocessing pipeline is made Pipeline 17;
Wherein, preprocessing pipeline includes water pump 4 and the boiler 6 being connected with water pump 4;
Wherein, the first brewing pipeline 16 includes the first solenoid valve 11, and the first solenoid valve 11 connects with the first pressure release extraction pin 152 Connect;
Wherein, the second brewing pipeline 17 includes second solenoid valve 9, and second solenoid valve 9 connects with the second pressure release extraction pin 153 Connect.
Preferably, 4 upper end of water pump is provided with the first stable-pressure device 3, one end of the first stable-pressure device 3 and the first three-way pipe 2 The connection of No. three ports, the other end is connected with one end of boiler 6, and the No.1 port of the first three-way pipe 2 connects with the first discharge outlet 13 Connect.
Preferably, it is additionally provided with the second stable-pressure device 5 between the first stable-pressure device 3 and boiler 6, the three of the second stable-pressure device 5 Number port is connected with No. two ports of the first three-way pipe 2.
Preferably, the other end of boiler 6 is connected with No. two ports of the second three-way pipe 8, No. three ports of the second three-way pipe 8 It is connected with one end of the first solenoid valve 11.
Preferably, the No.1 port of the second three-way pipe 8 is connected with one end of second solenoid valve 9, second solenoid valve 9 it is another End is connected with No. two ports of the 3rd three-way pipe 10, and No. three ports of the 3rd three-way pipe 10 are connected with the second pressure release extraction pin 153, The No.1 port of 3rd three-way pipe 10 is connected with 12 one end of the 3rd stable-pressure device, the other end and second row of the 3rd stable-pressure device 12 The mouth of a river 14 connects.
Preferably, the lower end of water pump 4 is connected with 7 one end of flowmeter, and the other end of flowmeter 7 is connected with water storage device 1.
Preferably, control mainboard includes control module 100 and induction module, and induction module is connected with control module 100, sense Module is answered to include the Speed sensing device 101 being connected with water pump 4;The flow sensing device 102 being connected with flowmeter 7;With boiler 6 The temperature sensing device 103 of connection, water pump 4 are connected with control module 100, and boiler 6 is connected with control module 100, control module 100 also respectively with the first stable-pressure device 3, the second stable-pressure device 5, the first solenoid valve 11, second solenoid valve 9, the 3rd stable-pressure device 12 connections.
The utility model also provides a kind of multi-pipeline beverage preparing system operation method, it is characterised in that including following step Suddenly:
S1, preliminary step:Using control module 100 to water pump 4, the first stable-pressure device 3, the second stable-pressure device 5, boiler 6 send instruction, make its energization, at this moment water pump 4 starts to draw water from water storage device 1, and water flows to water pump 4 by flowmeter 7, from water pump 4 flow to the first stable-pressure device 3, and the second stable-pressure device 5 is flowed to from the first stable-pressure device 3, and boiler 6 is flowed to from the second stable-pressure device 5, Boiler 6 heats water, while temperature sensing device 103 detects the temperature of water in boiler 6, if being not reaching to default water Temperature, temperature sensing device 103 can send information to control module 100, and control module 100 can send instruction to water pump 4 makes water pump 4 Rotating speed is slack-off, so that the flow velocity that water leads to boiler 6 is slack-off, when reaching default water temperature, temperature sensing device 103 will be sent Information will send to water pump 4 and instruct, so as to accelerate the speed of drawing water of water pump 4, will add to control module 100, control module 100 Current after heat are to the second three-way pipe 8.The scope of default water temperature is 50~100 degree.
S2, the pattern of brewing can be divided into that single-pipeline brews pattern and multi-pipeline brews pattern:
Single-pipeline brews pattern including following two:
1) No. three ports of the second stable-pressure device 5 are closed using control module 100, second solenoid valve 9 is closed, by the One solenoid valve 11 is opened, and the water heated can flow to the first solenoid valve 11 from the second three-way pipe 8, and is flowed to from the first solenoid valve 11 One pressure release extracts pin 152, and flowing to capsule 154 from the first pressure release extraction pin 152 is brewed;
2) No. three ports of the second stable-pressure device 5 are closed using control module 100, the first solenoid valve 11 is closed, will Second solenoid valve 9 is opened, and the 3rd stable-pressure device 12 is closed, and the water heated can flow to second solenoid valve from the second three-way pipe 8 9, the 3rd three-way pipe 10 is flowed to from second solenoid valve 9, the second pressure release extraction pin 153 is flowed to from the 3rd three-way pipe 10, is let out from second Pressure extraction pin 153 flows to capsule 154 and is brewed;
Multi-pipeline is brewed including following one kind:
3) No. three ports of the second stable-pressure device 5 are closed using control module 100, the 3rd stable-pressure device 12 are closed, The water heated can flow to the first solenoid valve 11, second solenoid valve 9 respectively from the second three-way pipe 8, be flowed to from the first solenoid valve 11 First pressure release extracts pin 152, and flowing to capsule 154 from the first pressure release extraction pin 152 is brewed, and can also be flowed from second solenoid valve 9 To the 3rd three-way pipe 10, the second pressure release extraction pin 153 is flowed to from the 3rd three-way pipe 10, glue is flowed to from the second pressure release extraction pin 153 Capsule 154 is brewed.
S3, brew at the end of pressure release drainage pattern have it is following two:
1) when brewing arrival cup amount, flow sensing device 102 can send information to control module 100, use control module 100 power off water pump 4, and No. three ports of the second stable-pressure device 5, No. two ports are opened, second solenoid valve 9 is powered off, by the Three stable-pressure devices 12 power off, and are powered off after the first solenoid valve 11 3 seconds, and the current in plunger shaft 151 are to the first solenoid valve 11, from One solenoid valve 11 flows to the second three-way pipe 8, and boiler 6 is flowed to from the second three-way pipe 8, and the second stable-pressure device 5 is flowed to from boiler 6, from No. two of second stable-pressure device 5, No. three ports flow to the first three-way pipe 2, flow to the first discharge outlet 13 by water from the first three-way pipe 2 Discharge, the water in capsule 154 can extract pin 153 by the second pressure release and flow to the 3rd triple valve, and the 3rd is flowed to from the 3rd triple valve Stable-pressure device 12, flows to the second discharge outlet 14 from the 3rd stable-pressure device 12 and discharges water.
2) when brewing soon arrival cup amount, flow sensing device 102 can send information to control module 100, use control Molding block 100 powers off water pump 4, and the second stable-pressure device 5 is powered, and the 3rd stable-pressure device 12 is powered, and second solenoid valve 9 is powered, pot Stove 6 is powered, and boiler 6 heats water into steam, and steam enters the second three-way pipe 8, enters second solenoid valve from the second three-way pipe 8 9, enter the 3rd three-way pipe 10 from second solenoid valve 9, enter the second pressure release extraction pin 153 from the 3rd three-way pipe 10, let out from second Pressure extraction pin 153 enters capsule 154, after steam enters capsule 154, is combined with remaining water in capsule 154, can fill residue Cup amount, after steam, boiler 6 is powered off, second solenoid valve 9 is powered off, the 3rd stable-pressure device 12 is powered off, it is steady by second Pressure device 5 powers off and opens No. three ports, and the first solenoid valve 11 powers off after being powered three seconds, and the water in plunger shaft 151 can be by the One solenoid valve 11 flows to the second three-way pipe 8, and boiler 6 is flowed to from the second three-way pipe 8, and the second stable-pressure device 5 is flowed to from boiler 6, from No. two ports, No. three ports of second stable-pressure device 5 flow to the first three-way pipe 2, and the first discharge outlet 13 is flowed to from the first three-way pipe 2 Water is discharged.
The utility model can allow a machine to brew the drink of different taste by setting the brewing pipeline of at least two Material, the stable-pressure device 5 being arranged on brewing pipeline, the hydraulic pressure that can be allowed in brewing is stable always, adds safety coefficient, User can control it by the control module 100 being arranged in control mainboard, in brewing process, when sensor device is supervised When measuring the hydraulic pressure exception in pipeline, control module 100 can be sent information to, after control module 100 is subject to information, pipeline can be given On associated component send instruction, allow unnecessary water to discharge, so as to ensure the security used.
The above is only the preferred embodiment of the present invention, and it does not limit the scope of the patent of the present invention, Under every utility model in the utility model is conceived, equivalent structure made based on the specification and figures of the utility model Conversion, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (7)

1. a kind of multi-pipeline beverage preparing system, it is characterised in that including control mainboard and be connected in the control mainboard Pipeline group and brewing group, the brewing group include brewing group casing, are arranged at the extraction module of the brewing group casing internal, institute Stating extraction module includes plunger shaft, the first pressure release extraction pin for being arranged at the plunger shaft inner right side, is arranged at the brewing The second pressure release extraction pin on the left of group casing internal, be arranged on the downside of first pressure release extraction pin and the second pressure release extraction pin Capsule, the pipeline group include preprocessing pipeline;The first brewing pipeline being connected on the preprocessing pipeline and the second brewing Pipeline;
Wherein, the preprocessing pipeline includes water pump and the boiler being connected with the water pump;
Wherein, the first brewing pipeline includes the first solenoid valve, and first solenoid valve connects with first pressure release extraction pin Connect;
Wherein, the second brewing pipeline includes second solenoid valve, and the second solenoid valve connects with second pressure release extraction pin Connect.
2. multi-pipeline beverage preparing system according to claim 1, it is characterised in that the water pump upper end is provided with first Stable-pressure device, one end of first stable-pressure device are connected with No. three ports of the first three-way pipe, the other end and the boiler One end connects, and the No.1 port of first three-way pipe is connected with the first discharge outlet.
3. multi-pipeline beverage preparing system according to claim 2, it is characterised in that first stable-pressure device and described The second stable-pressure device is additionally provided between boiler, No. three ports of second stable-pressure device are logical with No. two of first three-way pipe Mouth connection.
4. multi-pipeline beverage preparing system according to claim 1, it is characterised in that the other end of the boiler and second No. two ports connection of three-way pipe, No. three ports of second three-way pipe are connected with one end of first solenoid valve.
5. multi-pipeline beverage preparing system according to claim 4, it is characterised in that the one number service of second three-way pipe Mouth is connected with one end of the second solenoid valve, and No. two ports of the other end of the second solenoid valve and the 3rd three-way pipe connect Connect, No. three ports of the 3rd three-way pipe are connected with second pressure release extraction pin, the No.1 port of the 3rd three-way pipe It is connected with the 3rd stable-pressure device one end, the other end of the 3rd stable-pressure device is connected with the second discharge outlet.
6. multi-pipeline beverage preparing system according to claim 1, it is characterised in that the lower end of the water pump and flowmeter One end connects, and the other end of the flowmeter is connected with water storage device.
7. multi-pipeline beverage preparing system according to claim 1, it is characterised in that the control mainboard includes control mould Block and induction module, the induction module are connected with the control module, and the induction module includes what is be connected with the water pump Speed sensing device;The flow sensing device being arranged in the water route of the water pump rear end;The temperature sense being connected with the boiler Device, the water pump are connected with the control module, and the boiler is connected with the control module, and the control module is also distinguished It is connected with the first stable-pressure device, the second stable-pressure device, first solenoid valve, the second solenoid valve, the 3rd stable-pressure device.
CN201720166645.1U 2017-02-23 2017-02-23 Multi-pipeline beverage preparing system Expired - Fee Related CN207355957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720166645.1U CN207355957U (en) 2017-02-23 2017-02-23 Multi-pipeline beverage preparing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720166645.1U CN207355957U (en) 2017-02-23 2017-02-23 Multi-pipeline beverage preparing system

Publications (1)

Publication Number Publication Date
CN207355957U true CN207355957U (en) 2018-05-15

Family

ID=62424414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720166645.1U Expired - Fee Related CN207355957U (en) 2017-02-23 2017-02-23 Multi-pipeline beverage preparing system

Country Status (1)

Country Link
CN (1) CN207355957U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111752227A (en) * 2019-03-27 2020-10-09 赵龙 Intelligent allocation control system for continuous production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111752227A (en) * 2019-03-27 2020-10-09 赵龙 Intelligent allocation control system for continuous production

Similar Documents

Publication Publication Date Title
CN106618214A (en) Multi-pipeline beverage brewing system and operation method
CN202537195U (en) Multifunctional encapsulating machine
CN101415356A (en) Process and apparatus for preparing a beverage under controlled pressure
CN205018844U (en) Instant heating type beverage machine
CN207355957U (en) Multi-pipeline beverage preparing system
CN107388565A (en) A kind of electric heater and its isolation control method
CN204784860U (en) Two handles clean water tap device that can adjust temperature
CN106821000A (en) A kind of water path system of coffee machine
CN106691201A (en) Waterway device for coffee machine
CN108618617A (en) A kind of method making cold coffee and the coffee machine using this method
CN112244638A (en) Milk tea machine and tea making process thereof
CN209605421U (en) A kind of instant heating type pressure extraction tea heating system
CN204049285U (en) A kind of two tea kinds two outlet Full-automatic tea making machine
CN107495837A (en) A kind of soy bean milk making machine and its pulping process
CN206995094U (en) A kind of water path system of coffee machine
CN206228208U (en) A kind of automatic-watering formula coffee machine
CN210631085U (en) Milk foam ware and have beverage machine of this subassembly
CN206995095U (en) A kind of coffee extractor
CN211355021U (en) Heating device capable of stably and accurately outputting hot water with set temperature
CN205083281U (en) Full -automatic intelligence machine of making tea of many tea kind
CN106618219A (en) Drink machine capable of preventing liquid from reversely jetting or leaking and brewing method of the drink machine
CN204105768U (en) Coffee maker box structure
ITTO20100930A1 (en) COFFEE MACHINE'
CN201510147U (en) Making equipment for Hongkong hot milk tea
CN206995101U (en) A kind of coffee machine passway for water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515