CN207348443U - Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed - Google Patents
Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed Download PDFInfo
- Publication number
- CN207348443U CN207348443U CN201721237908.XU CN201721237908U CN207348443U CN 207348443 U CN207348443 U CN 207348443U CN 201721237908 U CN201721237908 U CN 201721237908U CN 207348443 U CN207348443 U CN 207348443U
- Authority
- CN
- China
- Prior art keywords
- pulley
- large form
- adjustable
- suspension
- wide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed, and includes hydraulic pressure die-shelf system and large form, has further included pulley hanging rail, length adjustable wall decoration, the upper adjustable drawbar of rear shifting and has moved lower adjustable drawbar afterwards;The pulley hanging rail is fixed in hydraulic pressure die-shelf system;The length adjustable wall decoration includes length adjustable hanger pole and suspension pulley, wherein one end of length adjustable hanger pole and the articulated connection of the upper end of large form, the other end is connected with suspension pulley, and the suspension pulley hangs on pulley hanging rail and can be slided along pulley hanging rail;The equal one end of adjustable drawbar is connected with the column in hydraulic pressure die-shelf system, the other end and large form connect under the upper adjustable drawbar of rear shifting and rear shifting.The present apparatus solves the problems, such as that Super High incline structure template system is not fixed easily in the process large form of climbing, its construction efficiency is high, and operation is simple, improves large form in the security of process of removing and climb.
Description
Technical field
A kind of Super High hydraulic climbing mould construction device is the utility model is related to, particularly a kind of Super High hydraulic climbing formwork tilts
Climb constructing device.
Background technology
Super High vertical structure is generally often inwardly indented with the increase of height, and vertical structure is most using gradually inside
Inclined mode avoids stress mutation of the structure in tilting procedure to keep the aesthetics of architectural appearance and harmony.
The high-rise vertical structures of more than 500m are vertical in Super High mainly using the formwork system using hydraulic pressure as power at present
How formwork system is applicable in wanting for the especially two-way wide-angle tilt structure of incline structure under the conditions of the leading construction deployment of structure
An important factor for Seeking Truth restricts site operation quality, security management and control and progress are vivid.
Energy-efficient to achieve the purpose that, high-rise building uses large form system mostly, and large form systematic entirety is good,
But for incline structure, large form not only needs to meet the requirement for tilting installation accuracy in installation process, and what is more important is existing
Field needs that to reach angle of inclination flexible easily working measure can be taken in molding is installed.Since large form follows knot
Structure tilts, and removes in large form, the construction safety that large form climbs etc. in process also needs to cause enough attention.It is existing
Super High incline structure especially wide-angle inclined in two-way stay in place form work progress simple operation shortcoming, process safety control
Be not easy, at the same traditional large form tilt install, remove, climb during construction efficiency it is low, complicated, progress, quality,
The indexs such as safety balanced cannot ensure.
Utility model content
The purpose of this utility model is to provide a kind of pulley suspension large form and realizes what the huge column of wide-angle inclined in two-way was tiltedly climbed
Constructing device, will solve the especially wide-angle inclined in two-way stay in place form work progress simple operation of Super High incline structure and owe
Lack, process safety control the problem of being not easy, at the same overcome traditional large form tilt install, remove, climb during construction imitate
The problem of rate is low, and the index such as complicated, progress, quality, safety is equalized ensureing.
To achieve the above object, the utility model adopts the following technical solution:A kind of pulley suspension large form realizes big angle
The constructing device that the degree huge column of inclined in two-way is tiltedly climbed, includes hydraulic pressure die-shelf system and large form, it is characterised in that:Cunning is further included
Take turns hanging rail, length adjustable wall decoration, the upper adjustable drawbar of rear shifting and move lower adjustable drawbar afterwards;The pulley hanging rail is fixed on
In hydraulic pressure die-shelf system;The length adjustable wall decoration includes length adjustable hanger pole and suspension pulley, wherein length adjustable hanger pole
One end and the articulated connection of the upper end of large form, the other end are connected with suspension pulley, and the suspension pulley hangs over pulley hanging rail
It can slide above and along pulley hanging rail;Upper adjustable drawbar and the lower equal one end of adjustable drawbar of rear shifting and hydraulic pressure die-shelf system are moved after described
Column connection, the other end and large form on system connect.
Preferably, the pulley hanging rail is made of two channel steels being symmetrical set.
Preferably, the notch of two channel steels being symmetrical set is outwardly.
Preferably, the suspension pulley includes the pulley yoke being connected with length adjustable hanger pole and is connected to double on pulley yoke
Pulley.
Preferably, the length adjustable hanger pole passes through hanging rod adjusting nut and the adjustable connection of pulley yoke.
Preferably, the pulley hanging rail is made of two channel steels being symmetrical set, and be symmetrical set
Outwardly, the suspension pulley includes the U-shaped pulley yoke being connected with length adjustable hanger pole and is connected to cunning the notch of two channel steels
Sister block on wheel carrier, two channel steels being symmetrical set are located at the inner side of U-shaped pulley yoke, and the sister block hangs over a left side
On the lower flange of right symmetrically arranged two channel steel.
Preferably, moved after described upper adjustable drawbar and it is rear move under adjustable drawbar structure it is identical, including the adjustable drawing of length
Bar, rear shifting drag link bearing and pull rod adjusting nut, move drag link bearing after described and are fixed on the column of hydraulic pressure die-shelf system, described
The adjustable connection of drag link bearing is moved in length adjustable drawbar one end by pull rod adjusting nut with large form drawknot, the other end with rear.
Preferably, the pull rod adjusting nut is wing nut.
Preferably, the large form is from top to bottom divided into five sections of top, middle and upper part, middle part, middle and lower part and lower part, after described
Adjustable drawbar is connected to the middle and upper part of large form in shifting, and the lower part that lower adjustable drawbar is connected to large form is moved after described.
Preferably, the pulley hanging rail is fixed on the frame body upper mounting plate bottom in hydraulic pressure die-shelf system.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model solves Super High incline structure especially wide-angle inclined in two-way stay in place form work progress and grasps
Make convenience shortcoming, process safety control the problem of being not easy, while overcome traditional large form and install, remove, climb tilting
During construction efficiency it is low, the index such as complicated, progress, quality, safety be equalized ensure the problem of.
The utility model solves the problems, such as that Super High incline structure template system is not fixed easily in the process large form of climbing,
Its construction efficiency is high, and operation is simple, while slides the accurate peace that flexible pulley coordinates adjusting yoke to ensure that large form
Dress, improves large form in the security of process of removing and climb, and is conducive to the guarantee of site operation progress and safety, economy effect
Benefit and social benefit are considerable.
The utility model is that a kind of Super High hydraulic climbing formwork inclined in two-way is climbed construction technology, with Super High incline structure
Rise, convenient, safety that the template system selected in work progress is constructed on the premise of structures slope Variation Features are met, together
Shi Shixian in an inclined state smoothly climb, efficiently solve the safety that template system constructs and climbs in an inclined state
Property and convenient sex chromosome mosaicism.
The utility model is under the conditions of wide-angle, inclined in two-way etc. from the influence of structure change(From structure wide-angle,
The influence of the conditions such as inclined in two-way), can be by adjusting the length of suspension arrangement and auxiliary device(I.e. mainly in the drive of pulley
Under by adjusting hanging rod and the rear length for moving pull rod), realize safe and convenient large form suspension, tilt installation, the demoulding remove and
Climb, realize inclination of the large form under suspension status and precisely install, ensure that large form move back and forth, the operating mode such as climb
Under the conditions of it is firm firm, so as to improve the constructing operation convenience and safety of the large form each operation in whole construction period
Property.
The utility model avoids incline structure and consumes human and material resources too much during template construction, is ensureing to pacify
The template construction duration of incline structure is substantially reduced while complete, overall economic efficiency is considerable.
The utility model application effect in practice of construction is notable, embodies technical feasibility, economical rationality, safe and applicable
Construction principle, ensure that the huge column hydraulic climbing formwork of Super High wide-angle inclined in two-way tiltedly climbs being smoothed out for construction.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the schematic diagram of A-A sections in Fig. 1.
Fig. 3 be I in Fig. 2 at enlarged diagram.
Fig. 4 moves the schematic diagram that adjustable drawbar is connected with large form and hydraulic pressure die-shelf system after being.
Reference numeral:1- hydraulic pressure die-shelfs system, 2- pulleys hanging rail, 3- length adjustable wall decoration, 3.1- length can
Being moved after tune hanging rod, 3.2- suspensions pulley, 3.21- pulley yokes, 3.22- sister blocks, 3.3- hanging rods adjusting nut, 4- can
Lower adjustable drawbar, 6- large forms, 7- wide-angle inclined in two-way structure, 8- length adjustable drawbar, 9- are moved after adjusting pull rod, 5-
Drag link bearing, 10- pull rod adjusting nuts are moved afterwards.
Embodiment
For embodiment referring to shown in Fig. 1-4, this pulley suspension large form realizes that what the huge column of wide-angle inclined in two-way tiltedly climbed applies
Frock is put, and includes hydraulic pressure die-shelf system 1, large form 6, pulley hanging rail 2, length adjustable wall decoration 3, the upper adjustable drawbar of rear shifting
4 move lower adjustable drawbar 5 with rear.
The pulley hanging rail 2 is fixed in hydraulic pressure die-shelf system 1.In the present embodiment, pulley hanging rail 2 is fixed on
Frame body upper mounting plate bottom in hydraulic pressure die-shelf system 1.And pulley hanging rail 2 also serves as the crossbeam of frame body upper mounting plate.
Referring to Fig. 2, Fig. 3, the length adjustable wall decoration 3 includes length adjustable hanger pole 3.1 and suspension pulley 3.2, wherein long
Spend one end of adjustable hanger pole 3.1 and the upper end articulated connection of large form 6, the other end are connected with suspension pulley 3.2, the suspension is slided
Wheel 3.2 hangs on pulley hanging rail 2 and can be slided along pulley hanging rail 2.The suspension pulley 3.2 includes adjustable with length
The pulley yoke 3.21 that hanging rod 3.1 connects and the sister block 3.22 being connected on pulley yoke 3.21.The length adjustable hanger pole 3.1 is logical
Cross hanging rod adjusting nut 3.3 and 3.21 adjustable connection of pulley yoke.The large form 6 is hung by length adjustable wall decoration 3 along pulley
Guide rail 2 moves.
In the present embodiment, 3.1 oneself this body length of length adjustable hanger pole is non-adjustable, but passes through hanging rod adjusting nut 3.3
Adjustable connection with pulley yoke 3.21 realizes that the length of length adjustable wall decoration 3 is adjustable, in other embodiments, can also use length
It is adjustable to spend 3.1 body lengths of adjustable hanger pole, the scheme being fixedly connected with pulley yoke 3.21, to realize the length of length adjustable wall decoration 3
Spend adjustable.
In the present embodiment, the pulley hanging rail 2 is made of two channel steels being symmetrical set, and is symmetrical set
The notch of two channel steels is outwardly.The pulley yoke 3.21 is U-shaped, and two channel steels being symmetrical set are located at U-shaped pulley
The inner side of frame 3.21, the sister block 3.22 are hung on the lower flange for two channel steels being symmetrical set.
In other embodiments, the pulley hanging rail 2 can also be designed to other structures, for example be set by symmetrical
Put, the two channel steels composition of notch inwardly, either use H profile steel, I-steel or the two angle steel composition being symmetrical set,
Etc..The pulley yoke 3.21 can be also designed to different shapes according to the different structure of pulley hanging rail 2.
Referring to Fig. 1, Fig. 4, upper adjustable drawbar 4 and the lower 5 equal one end of adjustable drawbar of rear shifting and hydraulic pressure die-shelf system 1 are moved after described
On column connection, the other end and large form 6 connect.
In the present embodiment, it is identical with the structure for moving lower adjustable drawbar 5 afterwards that upper adjustable drawbar 4 is moved after described, including length
Adjustable drawbar 8, rear shifting drag link bearing 9 and pull rod adjusting nut 10, move drag link bearing 9 after described and are fixed on hydraulic pressure die-shelf system 1
Column on, described 8 one end of length adjustable drawbar and large form drawknot, the other end pass through pull rod adjusting nut 10 and move pull rod with rear
9 adjustable connection of bearing.The pull rod adjusting nut 10 is preferably wing nut.
In the present embodiment, 8 oneself this body length of length adjustable drawbar is non-adjustable, but by pull rod adjusting nut 10 with after
The adjustable connection of shifting drag link bearing 9 moves upper adjustable drawbar 4 after realizing, the length of the lower adjustable drawbar 5 of rear shifting is adjustable, in other implementations
In example, 8 body lengths of length adjustable drawbar can also be used adjustable, the scheme being fixedly connected with rear shifting drag link bearing 9, to realize
Upper adjustable drawbar 4 is moved afterwards, the length of the lower adjustable drawbar 5 of rear shifting is adjustable.
Referring to Fig. 1, in the present embodiment, by the large form 6 be from top to bottom divided into top, middle and upper part, middle part, middle and lower part and
During five sections of lower part, the middle and upper part that upper adjustable drawbar 4 is connected to large form 6 is moved after described, lower adjustable drawbar 5 is moved after described and is connected to
The lower part of large form 6.
Adjustable drawbar 4, the lower adjustable drawbar 5 of rear shifting aid in the rear shifting that the middle and upper part and lower part of large form 6 pass through high intensity
The back-and-forth motion of large form 6(By adjusting adjustable drawbar 4, the rear length for moving lower adjustable drawbar 5 in rear shifting, so as to fulfill to big
The auxiliary that template moves back and forth), above adjustable drawbar 4, the lower adjustable drawbar 5 of rear shifting can also be in climb modes to large form 6 for rear shifting
It is fixed.
When template wide-angle inclined in two-way is constructed, pass through pulley hanging rail 2, length adjustable wall decoration 3, the upper adjustable drawing of rear shifting
Bar 4 and the lower adjustable drawbar 5 of rear shifting are tentatively in place by large form progress, and after in place, the length by adjusting template different parts can
The length of suspension member 3 is adjusted to realize the accurate inclination of large form different angle.Form removal is moved after large form, climbs and is hung again by pulley
Guide rail 2 and length adjustable wall decoration 3 realize that convenient movement and safety and firmness climb.
When the utility model is used, field lofting is first carried out to large form sideline according to structures slope angle;Then pass through
Pulley suspension arrangement(That is pulley hanging rail 2 and length adjustable wall decoration 3), rear move upper adjustable drawbar 4 and rear move lower adjustable drawbar 5
Large form is tentatively in place;After preliminary in place big mould is realized by adjusting the length of the length adjustable wall decoration 3 of pulley suspension arrangement
The sideline of plate is overlapped with the control line of setting-out, so that it is guaranteed that large form presses design requirement inclined in two-way, realizes that large form is precisely pacified
Dress;Ensure safety of the large form during casting concrete finally by measures such as the Screw arbor with nut at both-ends on large form.
During large form form removal, untie the Screw arbor with nut at both-ends on large form, at the same adjust length adjustable wall decoration 3, it is rear move it is upper adjustable
The length of pull rod 4 and the lower adjustable drawbar 5 of rear shifting, leads so as to pull large form 6 under the action of pulley 3.2 is hung along pulley suspension
Rail 2 slowly rearward moves, and when being moved to suitable position, is pinned by the pull rod adjusting nut 10 before and after rear shifting drag link bearing 9
Length adjustable drawbar 8 can ensure that large form consolidates so that its length no longer changes, so that safety is climbed.
The utility model can be directed to incline structure especially Super High incline structure large formwork construction, can safe and convenient it is real
Existing large form suspension, tilt installation, demould and remove and climb.
The utility model, from the influence of structure change, hangs under the conditions of wide-angle, inclined in two-way etc. by adjusting pulley
Hang device moves upper adjustable drawbar 4, the rear length for moving lower adjustable drawbar 5 with rear, and it is each to improve the large form in whole construction period
The constructing operation convenience and security of process.
Move adjustable drawbar 5 under upper adjustable drawbar 4, rear shifting afterwards to be made of high intensity material, length is adjustable, and its one end passes through
The back cord of pin and large form connects, the other end and rear 9 phase of shifting drag link bearing being installed on the column of hydraulic pressure die-shelf system 1
Even, length adjustable drawbar 8 has had the locking locating chucking tools of position-limiting action before and after rear shifting drag link bearing 9(I.e. pull rod adjusts spiral shell
Mother 10), the front and rear shifting of auxiliary large form can be realized by adjusting adjustable drawbar 4, the rear length for moving lower adjustable drawbar 5 in rear shifting
It is dynamic, and ensure stability of the large form in moving process.The firm fixation of large form can be realized by locking locating chucking tools, from
And ensure large form and climb safe and smooth.
Claims (10)
1. a kind of pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed, include hydraulic pressure die-shelf system
System(1)And large form(6), it is characterised in that:Pulley hanging rail is further included(2), length adjustable wall decoration(3), rear move can
Adjust pull rod(4)With adjustable drawbar under rear shifting(5);
The pulley hanging rail(2)It is fixed on hydraulic pressure die-shelf system(1)On;
The length adjustable wall decoration(3)Including length adjustable hanger pole(3.1)With suspension pulley(3.2), wherein length adjustable hanger pole
(3.1)One end and large form(6)Upper end articulated connection, the other end with suspension pulley(3.2)Connection, the suspension pulley
(3.2)Hang over pulley hanging rail(2)Above and can be along pulley hanging rail(2)Slide;
Upper adjustable drawbar is moved after described(4)With adjustable drawbar under rear shifting(5)Equal one end and hydraulic pressure die-shelf system(1)On column connect
Connect, the other end and large form(6)Connection.
2. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The pulley hanging rail(2)It is made of two channel steels being symmetrical set.
3. pulley suspension large form according to claim 2 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The notch of two channel steels being symmetrical set is outwardly.
4. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The suspension pulley(3.2)Including with length adjustable hanger pole(3.1)The pulley yoke of connection(3.21)Be connected to
Pulley yoke(3.21)On sister block(3.22).
5. pulley suspension large form according to claim 4 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The length adjustable hanger pole(3.1)Pass through hanging rod adjusting nut(3.3)With pulley yoke(3.21)Adjustable connection.
6. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The pulley hanging rail(2)It is made of two channel steels being symmetrical set, and two be symmetrical set
The notch of channel steel outwardly, the suspension pulley(3.2)Including with length adjustable hanger pole(3.1)The U-shaped pulley yoke of connection
(3.21)Be connected to pulley yoke(3.21)On sister block(3.22), two channel steels being symmetrical set are positioned at U-shaped
Pulley yoke(3.21)Inner side, the sister block(3.22)On the lower flange for hanging over two channel steels being symmetrical set.
7. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:Upper adjustable drawbar is moved after described(4)With adjustable drawbar under rear shifting(5)Structure it is identical, it is adjustable including length
Pull rod(8), move drag link bearing afterwards(9)With pull rod adjusting nut(10), drag link bearing is moved after described(9)It is fixed on hydraulic pressure die-shelf system
System(1)Column on, the length adjustable drawbar(8)One end passes through pull rod adjusting nut with large form drawknot, the other end(10)
With rear shifting drag link bearing(9)Adjustable connection.
8. pulley suspension large form according to claim 7 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The pull rod adjusting nut(10)For wing nut.
9. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The large form(6)From top to bottom it is divided into five sections of top, middle and upper part, middle part, middle and lower part and lower part, after described
Adjustable drawbar in shifting(4)It is connected to large form(6)Middle and upper part, move lower adjustable drawbar after described(5)It is connected to large form(6)'s
Lower part.
10. pulley suspension large form according to claim 1 realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed,
It is characterized in that:The pulley hanging rail(2)It is fixed on hydraulic pressure die-shelf system(1)On frame body upper mounting plate bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721237908.XU CN207348443U (en) | 2017-09-26 | 2017-09-26 | Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721237908.XU CN207348443U (en) | 2017-09-26 | 2017-09-26 | Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207348443U true CN207348443U (en) | 2018-05-11 |
Family
ID=62357039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721237908.XU Expired - Fee Related CN207348443U (en) | 2017-09-26 | 2017-09-26 | Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207348443U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700829A (en) * | 2017-09-26 | 2018-02-16 | 中建局集团建设发展有限公司 | Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed |
-
2017
- 2017-09-26 CN CN201721237908.XU patent/CN207348443U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700829A (en) * | 2017-09-26 | 2018-02-16 | 中建局集团建设发展有限公司 | Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208415926U (en) | A kind of jacking supporting Curved beam template | |
CN204825676U (en) | A hang basket device that is used for widen bridge floor variable cross section case roof beam cantilever to pour | |
CN203081466U (en) | Integrated moving framework for inverted arch of tunnel | |
CN207348443U (en) | Pulley suspension large form realizes the constructing device that the huge column of wide-angle inclined in two-way is tiltedly climbed | |
CN211815621U (en) | Template supporting device for concrete pouring of bridge | |
CN102605720B (en) | Integrated construction equipment for binding and lifting continuous beam steel reinforcement framework and construction method | |
CN107700829A (en) | Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed | |
CN207862728U (en) | A kind of adjustable rail mounted concrete surface layer texture construction tool of depth | |
CN203451976U (en) | Large-scale road edge stone mounting rack truck | |
CN102241057A (en) | Prefabricated aqueduct die | |
CN209457403U (en) | A kind of wall 3D printer that skyscraper can be promoted certainly | |
CN107461029B (en) | Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting | |
CN207552941U (en) | Tooth block tensioning equipment mobile formwork on roof box in a kind of cast-in-situ continuous beam | |
CN206917258U (en) | The Super High core shear wall inner template advance and retreat suspended structure of effect can be improved | |
CN217325069U (en) | Movable transverse telescopic hanging basket for bridge wet joint construction | |
CN111119470A (en) | Full-automatic hydraulic walking dragging mold | |
CN206844608U (en) | Drum-type stair tread anti-slip strip construction device | |
CN208545966U (en) | A kind of continuous cast-in-place simply supported beam assembled template structure | |
CN220954766U (en) | Spraying device for maintenance of building outer wall | |
CN217028069U (en) | Novel U-shaped aluminum die reversed ridge reinforcing member | |
CN202989783U (en) | Movable platform for bridging | |
CN219276160U (en) | Adjustable assembled mould | |
CN214717669U (en) | Spraying hanger for aluminum materials outside door and window frame bodies | |
CN215160406U (en) | Walking suspended formwork bent frame for quick block construction of slab culvert cast-in-place slab | |
CN217679091U (en) | Walking type hydraulic template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |