CN207348172U - A kind of construction of hydro project drainage arrangement - Google Patents

A kind of construction of hydro project drainage arrangement Download PDF

Info

Publication number
CN207348172U
CN207348172U CN201721437975.6U CN201721437975U CN207348172U CN 207348172 U CN207348172 U CN 207348172U CN 201721437975 U CN201721437975 U CN 201721437975U CN 207348172 U CN207348172 U CN 207348172U
Authority
CN
China
Prior art keywords
fixedly connected
side wall
movable plate
plate
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721437975.6U
Other languages
Chinese (zh)
Inventor
张伟青
姚洁彩
刘建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721437975.6U priority Critical patent/CN207348172U/en
Application granted granted Critical
Publication of CN207348172U publication Critical patent/CN207348172U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a kind of construction of hydro project drainage arrangement, including support plate, the upper surface of the support plate is fixedly connected with water pump, the input terminal of the water pump is fixedly connected with water inlet pipe, the one end of the water inlet pipe away from water pump is fixedly connected with retainer ring, the filter plate with multiple filter hole is equipped with the retainer ring, a plurality of cavities is equipped with the filter plate, the first spring is fixedly connected with the side wall of the cavity, one end of first spring is fixedly connected with movable plate, the movable plate is movably connected in cavity, the movable plate is fixedly connected with inserted link in the one side wall of the first spring, the one end of the inserted link away from movable plate is through through hole in cavity sidewalls and is plugged on the madial wall of retainer ring.The utility model prevents the impurity such as water plant to enter in water inlet pipe, causes the blocking of water inlet pipe, while easy to the installation and support of water pump, therefore this construction of hydro project is worthy to be popularized with drainage arrangement.

Description

A kind of construction of hydro project drainage arrangement
Technical field
It the utility model is related to a kind of drainage arrangement, more particularly to a kind of construction of hydro project drainage arrangement.
Background technology
At present, during construction of hydro project, it is often necessary to give water-proof drainage, but existing construction of hydro project The impurity such as water plant is entered in water pump with drainage arrangement, result in blockage to the input pipe in water pump, while be not easy to water pump Support and installation, the placement of feed pump causes certain puzzlement, for this reason, a kind of it is proposed that construction of hydro project draining Device solves the above problems.
Utility model content
The purpose of this utility model is easily to make water plant to solve construction of hydro project drainage arrangement in the prior art Enter water pump inner question Deng impurity, and a kind of construction of hydro project drainage arrangement proposed.
To achieve these goals, the utility model employs following technical solution:
A kind of construction of hydro project drainage arrangement, including support plate, the upper surface of the support plate are fixedly connected with water Pump, the input terminal of the water pump are fixedly connected with water inlet pipe, and the one end of the water inlet pipe away from water pump is fixedly connected with retainer ring, The filter plate with multiple filter hole is equipped with the retainer ring, a plurality of cavities, the side wall of the cavity are equipped with the filter plate On be fixedly connected with the first spring, one end of first spring is fixedly connected with movable plate, and the movable plate is movably connected in In cavity, the movable plate is fixedly connected with inserted link in the one side wall of the first spring, the inserted link away from movable plate one End is through through hole in cavity sidewalls and is plugged on the madial wall of retainer ring, and one end of the movable plate is fixedly connected with push plate, One end of the push plate is through the through hole in cavity sidewalls and extends to the outside of retainer ring;The lower surface of the support plate is equipped with Holding tank, accommodates support plate in the holding tank, one end of the support plate is rotatably connected in holding tank, the holding tank Be rotatably connected to rotating bar, the lower end of the rotating bar is fixedly connected with bar, and accommodating chamber is equipped with the rotating bar, described Multiple second springs are fixedly connected with the side wall of accommodating chamber, one end of the second spring is fixedly connected with movable plate, described Movable plate is movably connected in accommodating chamber, and the one side wall contact of the movable plate has cam, and the cam rotation is connected to receiving Intracavitary, a wheel shaft of the cam are fixedly connected with knob, one end of the knob through the through hole on accommodating chamber side wall simultaneously The outside of rotating bar is extended to, the one side wall of the movable plate is fixedly connected with fixed link, and one end of the fixed link, which passes through, to hold Receive and the through hole on chamber side wall and be plugged on the side wall of holding tank.
Preferably, the side wall of the cavity is equipped with the first sliding groove, and the both ends of the movable plate are slidably connected at first In sliding slot.
Preferably, the side wall of the holding tank is equipped with limiting slot, and one end of the rotating bar is rotatably connected on limiting slot It is interior.
Preferably, the side wall of the accommodating chamber is equipped with the second sliding slot, and the both ends of the movable plate have been fixedly connected with cunning Block, the sliding block are slidably connected in the second sliding slot.
Preferably, the one side wall of the cam is fixedly connected with rotation axis, and the rotation axis is rotatably connected on accommodating chamber On side wall.
Preferably, one end of the fixed link is fixedly connected with conical rod, and the small end of the conical rod is plugged in holding tank Side wall on.
The utility model in filter plate by being equipped with inserted link, easy to the installation and dismounting of filter plate, by holding tank Interior setting lever, plate easy to support is fixedly connected on holding tank and exists, by setting fixed link in rotating bar, easy to rotating bar position The fixation put, this construction of hydro project prevent the impurity such as water plant to enter in water inlet pipe, cause water inlet pipe with drainage arrangement Block, while easy to the installation and support of water pump, therefore this construction of hydro project is worthy to be popularized with drainage arrangement.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction of hydro project drainage arrangement structure diagram;
Fig. 2 is the partial enlarged view at A in Fig. 1;
Fig. 3 is the partial enlarged view at B in Fig. 1.
In figure:1 support plate, 2 water pumps, 3 water inlet pipes, 4 retainer rings, 5 filter plates, 6 first springs, 7 movable plates, 8 inserted links, 9 Support plate, 10 rotating bars, 11 bars, 12 second springs, 13 movable plates, 14 cams, 15 knobs, 16 fixed links, 17 push plates.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the utility model, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", The orientation or position relationship of the instruction such as " top ", " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
With reference to Fig. 1-3, a kind of construction of hydro project drainage arrangement, including support plate 1, the upper surface of support plate 1 are fixed Water pump 2 is connected with, the input terminal of water pump 2 is fixedly connected with water inlet pipe 3, and the one end of water inlet pipe 3 away from water pump 2 is fixedly connected with Determine ring 4, the filter plate 5 with multiple filter hole is equipped with retainer ring 4, a plurality of cavities is equipped with filter plate 5, is consolidated on the side wall of cavity Surely the first spring 6 is connected with, one end of the first spring 6 is fixedly connected with movable plate 7, and movable plate 7 is movably connected in cavity, tool Body says that the side wall of cavity is equipped with the first sliding groove, and the both ends of movable plate 7 are slidably connected in the first sliding groove, easy to activity Plate 7 is movably connected in cavity, and movable plate 7 is fixedly connected with inserted link 8 in the one side wall of the first spring 6, and inserted link 8 is away from living One end of movable plate 7 is through through hole in cavity sidewalls and is plugged on the madial wall of retainer ring 4, and one end of movable plate 7 is fixedly connected There is push plate 17, one end of push plate 17 through the through hole in cavity sidewalls and extends to the outside of retainer ring 4.
The lower surface of support plate 1 is equipped with holding tank, and support plate 9, one end rotation connection of support plate 9 are accommodated in holding tank In holding tank, holding tank is rotatably connected to rotating bar 10, and concretely, the side wall of holding tank is equipped with limiting slot, rotates One end of bar 10 is rotatably connected in limiting slot, is rotatably connected on easy to rotating bar 10 in holding tank, and the lower end of rotating bar 10 is consolidated Surely bar 11 is connected with, accommodating chamber is equipped with rotating bar 10, multiple second springs 12 is fixedly connected with the side wall of accommodating chamber, the One end of two springs 12 is fixedly connected with movable plate 13, and movable plate 13 is movably connected in accommodating chamber, concretely, accommodating chamber Side wall is equipped with the second sliding slot, and the both ends of movable plate 13 have been fixedly connected with sliding block, and sliding block is slidably connected in the second sliding slot, just It is movably connected in movable plate 13 in accommodating chamber.
The one side wall contact of movable plate 13 has cam 14, and cam 14 is rotatably connected in accommodating chamber, concretely, cam 14 One side wall be fixedly connected with rotation axis, rotation axis is rotatably connected on the side wall of accommodating chamber, is rotatably connected on easy to cam 14 In accommodating chamber, a wheel shaft of cam 14 is fixedly connected with knob 15, and one end of knob 15 passes through the through hole on accommodating chamber side wall And the outside of rotating bar 10 is extended to, the one side wall of movable plate 13 is fixedly connected with fixed link 16, and one end of fixed link 16 passes through Through hole on accommodating chamber side wall is simultaneously plugged on the side wall of holding tank, and concretely, one end of fixed link 16 is fixedly connected with circle Bar is bored, the small end of conical rod is plugged on the side wall of holding tank, and one end easy to fixed link 16 is plugged on the side wall of holding tank.
In the utility model, push plate 17 is promoted, the movement of inserted link 8 is driven by movable plate 7, when one end of inserted link 8 plugs On the madial wall of retainer ring 4, realize and be fixedly connected on filter plate 5 on the madial wall of retainer ring 4, turning knob 15, leads to The movement that cam 14 drives movable plate 13 is crossed, when fixed link 16 departs from the side wall of holding tank, lever 11 is rotated, when 11 turns of lever Suitable position is moved, when the fixed link 16 is plugged in holding tank, the fixation of 11 position of lever is realized, consequently facilitating support plate 9 are fixedly connected in holding tank.
The above, is only the preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of construction of hydro project drainage arrangement, including support plate (1), it is characterised in that the upper table of the support plate (1) Face is fixedly connected with water pump (2), and the input terminal of the water pump (2) is fixedly connected with water inlet pipe (3), and the water inlet pipe (3) is remote One end of water pump (2) is fixedly connected with retainer ring (4), and the filter plate (5) with multiple filter hole is equipped with the retainer ring (4), A plurality of cavities is equipped with the filter plate (5), the first spring (6), first bullet are fixedly connected with the side wall of the cavity One end of spring (6) is fixedly connected with movable plate (7), and the movable plate (7) is movably connected in cavity, movable plate (7) back of the body Inserted link (8) is fixedly connected with one side wall from the first spring (6), the one end of the inserted link (8) away from movable plate (7) passes through sky Through hole and it is plugged on chamber side wall on the madial wall of retainer ring (4), one end of the movable plate (7) is fixedly connected with push plate (17), one end of the push plate (17) through the through hole in cavity sidewalls and extends to the outside of retainer ring (4);The support plate (1) lower surface is equipped with holding tank, and support plate (9), one end rotation connection of the support plate (9) are accommodated in the holding tank In holding tank, the holding tank is rotatably connected to rotating bar (10), and the lower end of the rotating bar (10) is fixedly connected with gear Bar (11), the rotating bar (10) is interior to be equipped with accommodating chamber, and multiple second springs are fixedly connected with the side wall of the accommodating chamber (12), one end of the second spring (12) is fixedly connected with movable plate (13), and the movable plate (13) is movably connected in receiving Intracavitary, the one side wall contact of the movable plate (13) have cam (14), and the cam (14) is rotatably connected in accommodating chamber, described One wheel shaft of cam (14) is fixedly connected with knob (15), and one end of the knob (15) passes through the through hole on accommodating chamber side wall And the outside of rotating bar (10) is extended to, the one side wall of the movable plate (13) is fixedly connected with fixed link (16), the fixation One end of bar (16) is through the through hole on accommodating chamber side wall and is plugged on the side wall of holding tank.
A kind of 2. construction of hydro project drainage arrangement according to claim 1, it is characterised in that the side wall of the cavity The first sliding groove is equipped with, the both ends of the movable plate (7) are slidably connected in the first sliding groove.
A kind of 3. construction of hydro project drainage arrangement according to claim 1, it is characterised in that the side of the holding tank Wall is equipped with limiting slot, and one end of the rotating bar (10) is rotatably connected in limiting slot.
A kind of 4. construction of hydro project drainage arrangement according to claim 1, it is characterised in that the side of the accommodating chamber Wall is equipped with the second sliding slot, and the both ends of the movable plate (13) have been fixedly connected with sliding block, and the sliding block is slidably connected at second In sliding slot.
5. a kind of construction of hydro project drainage arrangement according to claim 1, it is characterised in that the cam (14) One side wall is fixedly connected with rotation axis, and the rotation axis is rotatably connected on the side wall of accommodating chamber.
A kind of 6. construction of hydro project drainage arrangement according to claim 1, it is characterised in that the fixed link (16) One end be fixedly connected with conical rod, the small end of the conical rod is plugged on the side wall of holding tank.
CN201721437975.6U 2017-11-01 2017-11-01 A kind of construction of hydro project drainage arrangement Expired - Fee Related CN207348172U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721437975.6U CN207348172U (en) 2017-11-01 2017-11-01 A kind of construction of hydro project drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721437975.6U CN207348172U (en) 2017-11-01 2017-11-01 A kind of construction of hydro project drainage arrangement

Publications (1)

Publication Number Publication Date
CN207348172U true CN207348172U (en) 2018-05-11

Family

ID=62354045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721437975.6U Expired - Fee Related CN207348172U (en) 2017-11-01 2017-11-01 A kind of construction of hydro project drainage arrangement

Country Status (1)

Country Link
CN (1) CN207348172U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627207A (en) * 2020-12-04 2021-04-09 安徽丰之源工程建设有限公司 Waterproof drainage device of hydraulic engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627207A (en) * 2020-12-04 2021-04-09 安徽丰之源工程建设有限公司 Waterproof drainage device of hydraulic engineering construction

Similar Documents

Publication Publication Date Title
CN207348172U (en) A kind of construction of hydro project drainage arrangement
CN114152466A (en) Secondary salinization soil leachate sampling device
CN208354216U (en) A kind of fixed device of planting fruit trees
CN109247106A (en) A kind of open field greening plant encloses native device
CN207161304U (en) Preventing clogging up device for deep well pump
CN207316349U (en) A kind of Novel elbow tee pipe fitting
CN209314253U (en) Efficient farmland plough
CN208353866U (en) A kind of well cellar grooved bit of adjustable aperture
CN211262859U (en) Water quality sampling device
CN108062148A (en) A kind of computer cabinet
CN209788066U (en) Embedded cylindrical drip irrigation pipe
CN108033501B (en) A kind of domestic drinking water cleaning equipment
CN208144074U (en) A kind of mountain Soviet Union plantation irrigation device
CN209436088U (en) Perfusion machine
CN114082772B (en) Pesticide soil residue jointly administers equipment
CN214508526U (en) Overhead plant protection equipment for cigar tobacco planting
CN209135040U (en) A kind of well irrigation volume control device
CN216739524U (en) Big tree planting drainage system easy and simple to handle
CN209442630U (en) Perfusion machine
CN209442628U (en) Perfusion machine
CN209436087U (en) Perfusion machine
CN213009844U (en) Storage device is used in water based paint production
CN208845742U (en) A kind of fixed mechanism for valve
CN212368068U (en) Agricultural equipment irrigation equipment
CN214125906U (en) Soil treatment equipment before organic tea planting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180511

Termination date: 20211101

CF01 Termination of patent right due to non-payment of annual fee