CN207346984U - A kind of mine flight conveyer chute boom hoisting - Google Patents
A kind of mine flight conveyer chute boom hoisting Download PDFInfo
- Publication number
- CN207346984U CN207346984U CN201721405514.0U CN201721405514U CN207346984U CN 207346984 U CN207346984 U CN 207346984U CN 201721405514 U CN201721405514 U CN 201721405514U CN 207346984 U CN207346984 U CN 207346984U
- Authority
- CN
- China
- Prior art keywords
- hole
- lifting lug
- cylinder
- chute
- card leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is a kind of mine flight conveyer chute boom hoisting, including lifting lug, cylinder, play chain sling, connecting rod, card leg, axis pin, bolt, the front side of lifting lug is equipped with a lifting eye and two through holes I, axis pin is inserted with through hole I, the downside of lifting lug is equipped with four through holes II, cylinder is connected on lifting lug with bolt in through hole II, the right side of lifting lug is equipped with square through hole;The front side of card leg is equipped with a through hole III and two through holes IV, is inserted with connecting rod in through hole III, axis pin is inserted with through hole IV, the upside of card leg is equipped with rubber pad;The utility model employs card leg structure lifting chute, repetition is not only avoid to be tied, extract chain process, add the frictional force between card leg and chute, save the construction time, and also reduce labor intensity, safety coefficient is improved, has the advantages that simple in structure, easy to operate and cost is low.
Description
Technical field
Chute of Scraper Conveyor lifting tool field is the utility model is related to, is specifically a kind of mine flight conveyer
Chute boom hoisting.
Background technology
For coal mine fully-mechanized mining working mechanized equipment during installation or Demolition Construction, chute lifting is essential ring
Section, when lifting by crane chute using traditional handicraft, needs after wearing chain binding in shovel board side and rack bar side respectively, will form a chain
Ring, then chain ring is hung on the cucurbit for lifting by crane chute, lifted by crane chute by operating cucurbit.The drawback is that in operating process
Need to repeat be tied, extract chain, complex procedures, labor intensity is big, and due to chute structure or so imbalance, uses chain
Easy slot breaks off relations when bolt lifts by crane after hanging, and safety coefficient is low.
Utility model content
The purpose of this utility model is to provide a kind of mine flight conveyer chute boom hoisting, which employs card leg
Structure lifts by crane chute, not only avoid repetition and is tied, extracts chain process, adds the frictional force between card leg and chute, saves
The construction time has been saved, and has also reduced labor intensity, has improved safety coefficient, there is simple in structure, easy to operate and cost
The advantages of low.
To realize object above, the utility model adopts the following technical solution:
A kind of mine flight conveyer chute boom hoisting, it is characterised in that:Including lifting lug 1, cylinder 2, play chain sling 3, company
Bar 4, card leg 5, axis pin 6, bolt 7, the front side of the lifting lug 1 are equipped with a lifting eye 11 and two through holes I 12, the through hole I
Axis pin 6 is inserted with 12, and the downside of lifting lug 1 is equipped with four through holes II 13, cylinder 2 is connected to bolt 7 in the through hole II 13
On lifting lug 1, the right side of lifting lug 1 is equipped with square through hole 14;The front side of the card leg 5 is equipped with a through hole III 51 and two through holes IV
53, connecting rod 4 is inserted with the through hole III 51, axis pin 6 is inserted with the through hole IV 53, the upside of card leg 5 is equipped with rubber pad 52.
Further, the upside of cylinder 2 is equipped with four through holes V 24, and bolt 7 is used in the through hole V 24 by cylinder 2
It is connected with lifting lug 1, the downside push rod 21 of cylinder 2 is equipped with through hole VI 22, and connecting pin 23 is used in the through hole VI 22 by push rod 21
It is connected with connecting rod 4.
Further, 4 center section of connecting rod is the square body of rod 41, and the square right side of the body of rod 41 is equipped with a through hole
VII 45, connecting pin 23 is inserted with the through hole VII 45, and the front side of connecting rod 4 and rear side are equipped with cylinder boss 42, and the cylinder is convex
Platform 42 is equipped with screw thread 43, pin hole 44.
Beneficial effect:
Compared with prior art, its advantage is embodied in the utility model:When being lifted by crane to drag conveyor chute,
Repetition can not only be efficiently avoid to be tied, extract chain work, while mine flight conveyer chute can also be make use of to lift by crane
The rubber pad and cylinder installed on device, realize antiskid function, improve safe operation coefficient, and it is strong to reduce worker's work
Degree, process is simple, simple operation.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model.
Main structure diagram when Fig. 2 is utility model works.
Fig. 3 is close-up schematic view at A in the utility model Fig. 2.
Fig. 4 is the structure diagram of the utility model lifting lug.
Fig. 5 is the structure diagram of the utility model card leg.
Fig. 6 is the structure diagram of the utility model cylinder.
Fig. 7 is the structure diagram of the utility model connecting rod.
In figure, 1, lifting lug;11st, lifting eye;12nd, through hole I;13rd, through hole II;14th, square through hole;2nd, cylinder;21st, push rod;
22nd, through hole VI;23rd, connecting pin;24th, through hole V;3rd, chain sling is played;4th, connecting rod;41st, the square body of rod;42nd, cylinder boss;43rd, spiral shell
Line;44th, pin hole;45th, through hole VII;5th, card leg;51st, through hole III;52nd, rubber pad;53rd, through hole IV;6th, axis pin;7th, bolt;8th, slip
Groove.
Embodiment
In order to make the architectural feature of the utility model, functional characteristics more easy-to-understand, with reference to embodiments, attached drawing pair
The utility model is further explained explanation.
As shown in Fig. 1~Fig. 7, a kind of mine flight conveyer chute boom hoisting provided by the utility model, including hang
Ear 1, cylinder 2, play chain sling 3, connecting rod 4, card leg 5, axis pin 6, bolt 7, and the front side of the lifting lug 1 is equipped with 11 He of lifting eye
Two through holes I 12, are inserted with axis pin 6 in the through hole I 12, the downside of lifting lug 1 is equipped with four through holes II 13, the through hole II 13
Interior that cylinder 2 is connected on lifting lug 1 with bolt 7, the right side of lifting lug 1 is equipped with square through hole 14;The front side of the card leg 5 is equipped with
One through hole III 51 and two through holes IV 53, are inserted with connecting rod 4 in the through hole III 51, axis pin 6 are inserted with the through hole IV 53, block
The upside of leg 5 is equipped with rubber pad 52.
Preferably, the upside of the cylinder 2 is equipped with four through holes V 24, the through hole V 24 it is interior with bolt 7 by cylinder 2 with hanging
Ear 1 connects, and the downside push rod 21 of cylinder 2 is equipped with through hole VI 22, by push rod 21 and is connected with connecting pin 23 in the through hole VI 22
Bar 4 connects.
Preferably, 4 center section of connecting rod is the square body of rod 41, and the square right side of the body of rod 41 is equipped with a through hole VII
45, connecting pin 23 is inserted with the through hole VII 45, and the front side of connecting rod 4 and rear side are equipped with cylinder boss 42, the cylinder boss
42 are equipped with screw thread 43, pin hole 44.
When specifically used, the utility model lifting lug 1 is hung on cucurbit or manipulator suspension hook by lifting eye 11, gas
The push rod 21 of cylinder 2 is withdrawn, and card leg 5 makes the lateral middle gathering of 5 liang of card leg by conducting oneself with dignity hingedly to act on connecting rod 4, then card leg 5 is put
Enter intracavitary on chute 8, slowly release the push rod 21 of cylinder 2 so that card leg 5 struts to both sides while is tightly stuck in 8 epicoele of chute
On, lifted by crane with cucurbit or manipulator, withdrawn the push rod 21 of cylinder 2 so that card leg 5 exits chute after 8 entrucking of chute
8 epicoele, you can complete a chute 8 and play sling cart process.
To sum up, the utility model embodiment has the advantages that:When being lifted by crane to drag conveyor chute, not only
Repetition can be efficiently avoid to be tied, extract chain work, while mine flight conveyer chute boom hoisting can also be make use of
The rubber pad and cylinder of upper installation, realize antiskid function, improve safe operation coefficient, reduce labor strength, work
Sequence is simple, simple operation.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The scope of type is indicated by the appended claims rather than the foregoing description, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical solution, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (3)
- A kind of 1. mine flight conveyer chute boom hoisting, it is characterised in that:Including lifting lug (1), cylinder (2), play chain sling (3), connecting rod (4), card leg (5), axis pin (6), bolt (7), the front side of the lifting lug (1) are equipped with a lifting eye (11) and two Through hole I (12), the through hole I (12) is interior to be inserted with axis pin (6), and the downside of lifting lug (1) is equipped with four through holes II (13), the through hole Cylinder (2) is connected on lifting lug (1) with bolt (7) in II (13), the right side of lifting lug (1) is equipped with square through hole (14);It is described The front side of card leg (5) is equipped with a through hole III (51) and two through holes IV (53), and connecting rod (4) is inserted with the through hole III (51), Axis pin (6) is inserted with the through hole IV (53), the upside of card leg (5) is equipped with rubber pad (52).
- A kind of 2. mine flight conveyer chute boom hoisting according to claim 1, it is characterised in that:The cylinder (2) upside is equipped with four through holes V (24), and cylinder (2) is connected by the interior bolt of the through hole V (24) (7) with lifting lug (1), gas The downside push rod (21) of cylinder (2) is equipped with through hole VI (22), the interior connecting pin of the through hole VI (22) (23) by push rod (21) with Connecting rod (4) connects.
- A kind of 3. mine flight conveyer chute boom hoisting according to claim 1, it is characterised in that:The connecting rod (4) center section is the square body of rod (41), and a through hole VII (45), the through hole VII are equipped with the right side of the square body of rod (41) (45) it is inserted with connecting pin (23) in, the front side of connecting rod (4) and rear side are equipped with cylinder boss (42), on the cylinder boss (42) Equipped with screw thread (43), pin hole (44).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721405514.0U CN207346984U (en) | 2017-10-29 | 2017-10-29 | A kind of mine flight conveyer chute boom hoisting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721405514.0U CN207346984U (en) | 2017-10-29 | 2017-10-29 | A kind of mine flight conveyer chute boom hoisting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207346984U true CN207346984U (en) | 2018-05-11 |
Family
ID=62353059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721405514.0U Expired - Fee Related CN207346984U (en) | 2017-10-29 | 2017-10-29 | A kind of mine flight conveyer chute boom hoisting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207346984U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107640694A (en) * | 2017-10-29 | 2018-01-30 | 安徽理工大学 | A kind of mine flight conveyer chute boom hoisting |
-
2017
- 2017-10-29 CN CN201721405514.0U patent/CN207346984U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107640694A (en) * | 2017-10-29 | 2018-01-30 | 安徽理工大学 | A kind of mine flight conveyer chute boom hoisting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205381872U (en) | Aircraft fuselage turning device | |
CN204454254U (en) | A kind of steel rolling tube suspender | |
CN207346984U (en) | A kind of mine flight conveyer chute boom hoisting | |
CN203486756U (en) | Lifting tool suitable for I-shaped steel | |
CN206052477U (en) | Dismantling of track device | |
CN107640694A (en) | A kind of mine flight conveyer chute boom hoisting | |
CN201224886Y (en) | Automatic uncoupling device for suspending pile of pile machine | |
CN204778292U (en) | Aluminium bar instrument of suspending in midair | |
CN202609781U (en) | Hanger special for pipeline | |
CN203754206U (en) | Finished train lifting appliance | |
CN209242472U (en) | A kind of bull-dozer lifting device | |
CN201280390Y (en) | Large-tonnage suspending beam | |
CN201296598Y (en) | Convenient-safe lifting device | |
CN207596318U (en) | A kind of mechanical semi-automatic hook | |
CN206126644U (en) | Substation equipment lifting device | |
CN104176629A (en) | Lifting appliance suitable for I-shaped steel | |
CN207363698U (en) | Formula elevating conveyor discharge plate can be passed through | |
CN207296892U (en) | Novel drought resistant well drill bit device | |
CN204751876U (en) | Simple gate is erected heavy -duty machine swift current tail and is taken off row integration special lifting device | |
CN201710851U (en) | Deep-well rescue device | |
CN201254427Y (en) | Card hanging type coil steel composite cargo sling | |
CN206645746U (en) | A kind of quick pulling off device of sintering pallet | |
CN205241050U (en) | I -shaped wheel lifting device | |
CN201189361Y (en) | Deep well rescuing device | |
CN207493072U (en) | A kind of work about electric power catching device with safety protection function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 Termination date: 20191029 |