CN207334069U - A kind of new overall pipeline - Google Patents
A kind of new overall pipeline Download PDFInfo
- Publication number
- CN207334069U CN207334069U CN201721162626.8U CN201721162626U CN207334069U CN 207334069 U CN207334069 U CN 207334069U CN 201721162626 U CN201721162626 U CN 201721162626U CN 207334069 U CN207334069 U CN 207334069U
- Authority
- CN
- China
- Prior art keywords
- installation set
- tube body
- pipeline
- protective layer
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipeline Systems (AREA)
Abstract
The utility model discloses a kind of new overall pipeline,Including tube body,Rubber protective layer,Internal layer,Intelligent controller,Abampere loading nut,Stud is installed,Right installation set,Left installation set,Middle pipe,Pressure inductor and intubation,The outside of the tube body is provided with rubber protective layer,And internal layer is provided with the inside of rubber protective layer,Middle pipe is provided with the inside of the internal layer,And the inside of middle pipe is provided with pressure inductor at the position of internal layer,It is provided with the sucking action that abampere loading nut can be by magnetism to metal when fixing,Quick and installation stud installation is fixed,It is very convenient,And be provided with pressure sensing device can sense at any time pipeline internal pressure change,Then ground control's terminal is delivered to by intelligent controller,If pipeline failure pressure change finds normal range (NR),Ground maintenance personnel can be quickly found out abort situation according to positioning and carry out maintenance,Avoid influencing pipeline normal work.
Description
Technical field
The utility model belongs to pipeline technology field, and in particular to a kind of new overall pipeline.
Background technology
China's gas supply industry is compared with developed country starts late, and the combustion gas dispensed at present mainly includes coal air-liquid
Three kinds of liquefied oil gas and natural gas.The gas supply in China has from the nineties in last century to increase substantially.Wherein, artificial coal gas
Supply, since it pollutes the shortcomings of larger, toxicity is stronger, is currently in more slow after the increasing substantially of nineteen ninety
Build phase;Liquefied petroleum gas is influenced be subject to rise in oil price, and supply maintains to stablize;The day of identical calorific value is produced at present
For right gas price lattice are with respect to gasoline and diesel oil, cheap 30%-50%, has obvious economy, while national pay attention to day by day environment
Protection, market obtain clean energy resource demand sustainable growth as cleaning, efficient, the cheap energy, natural gas consumption in recent years
Fast development, the use of natural gas need a kind of pipeline, and existing pipeline is in use there are some defects, for example, making
With when installation it is not convenient enough, and pipeline easily breaks down in external environment condition and cannot find to influence to use in time.
Utility model content
The purpose of this utility model is to provide a kind of new overall pipeline, to solve peace proposed in the above background technology
Dress is not convenient enough, and pipeline easily breaks down in external environment condition and cannot find to influence to use problem in time.
To achieve the above object, the utility model provides following technical solution:A kind of new overall pipeline, including tube body,
Rubber protective layer, internal layer, intelligent controller, abampere loading nut, installation stud, right installation set, left installation set, middle pipe, pressure sense
Device and intubation are answered, the outside of the tube body is provided with rubber protective layer, and internal layer is provided with the inside of rubber protective layer, described interior
The inner side of layer is provided with middle pipe, and the inside of middle pipe is provided with pressure inductor at the position of internal layer, the tube body it is upper
Side is provided with intelligent controller at the position of pressure inductor, and left installation set is provided with the right side of tube body, the left peace
Right installation set is provided with the right side of encapsulation, and the junction of left installation set and right installation set is provided with intubation, the right installation set
It is upper that installation stud is provided with the position of tube body, and install and be provided with abampere loading nut, the pressure sense on the left of stud
Device is answered to be electrically connected with intelligent controller.
Preferably, the installation stud is provided with four altogether, and four installation studs are separately mounted to lean in right installation set
At the position of nearly tube body.
Preferably, the left installation set and right installation set are a kind of component of metal material.
Preferably, the abampere loading nut is a kind of component of magnetic material.
Preferably, the rubber protective layer is a kind of component of rubber-covered material.
Compared with prior art, the beneficial effects of the utility model are:The utility model is scientific and reasonable for structure, safe to use
It is convenient, it is provided with the sucking action that abampere loading nut can be by magnetism to metal when fixing, quick and installation stud
Installation fix, it is very convenient, and be provided with pressure sensing device can sense at any time pipeline internal pressure change, then pass through intelligence
Energy controller is delivered to ground control's terminal, if pipeline failure pressure change finds normal range (NR), ground dimension
Shield personnel can be quickly found out abort situation according to positioning and carry out maintenance, and avoid influencing pipeline normal work.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the attachment structure schematic diagram of the utility model;
In figure:1- tube bodies, 2- rubber protective layers, 3- internal layers, 4- intelligent controllers, 5- abamperes loading nut, 6- installation stud,
The right installation sets of 7-, the left installation sets of 8-, 9- middle pipes, 10- pressure inductor, 11- intubations.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1 and Fig. 2, the utility model provide a kind of technical solution:A kind of new overall pipeline, including tube body 1,
Rubber protective layer 2, internal layer 3, intelligent controller 4, abampere loading nut 5, installation stud 6, right installation set 7, left installation set 8, middle pipe
9th, pressure inductor 10 and intubation 11, the outside of tube body 1 is provided with rubber protective layer 2, and the inner side of rubber protective layer 2 is provided with
Internal layer 3, the inner side of internal layer 3 is provided with middle pipe 9, and the inside of middle pipe 9 is provided with pressure inductor at the position of internal layer 3
10, the top of tube body 1 is provided with intelligent controller 4 at the position of pressure inductor 10, and the right side of tube body 1 is provided with a left side
Installation set 8, the right side of left installation set 8 are provided with right installation set 7, and the junction of left installation set 8 and right installation set 7 be provided with it is slotting
Pipe 11, installation stud 6 is provided with right installation set 7 at the position of tube body 1, and the left side for installing stud 6 is provided with abampere
Loading nut 5, pressure inductor 10 are electrically connected with intelligent controller 4.
In order to be more firmly mounted, the present embodiment, it is preferred that installation stud 6 is provided with four, and four installations altogether
Stud 6 is separately mounted in right installation set 7 at the position of tube body 1.
In order to be more firmly mounted, the present embodiment, it is preferred that left installation set 8 and right installation set 7 are a kind of metal
The component of material.
Connected in order to convenient, the present embodiment, it is preferred that abampere loading nut 5 is a kind of component of magnetic material.
In order to carry out protective conduit, the present embodiment, it is preferred that rubber protective layer 2 is a kind of rubber-covered material
Component.
Intelligent controller 4 is made of alignment system and network communication device in the utility model, and network leads to when work
The pressure that pressure inductor 10 senses can be delivered to command terminal by news device, and command terminal can be accurate according to alignment system
Find the position of equipment.
The operation principle and process for using of the utility model:After the utility model installs, the intubation 11 of equipment is inserted
Enter inside the right side pipeline of equipment, be then fixedly mounted by left installation set 8 and right installation set 7, equipment starts work after installation
Make, for natural gas by being transmitted inside middle pipe 9, pressure inductor 10 can be inside moment monitoring sensing middle pipe 9 when work
Pressure change, data are then delivered to command and monitor terminal by intelligent controller 4, if large change occur super for pressure
Go out normal range (NR), at this moment can be quickly found out at the position of failure and carried out maintenance according to positioning at ground control, prevent pipeline
Failure cannot find to influence normal work in time.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of new overall pipeline, including tube body(1), rubber protective layer(2), internal layer(3), intelligent controller(4), abampere dress
Nut(5), installation stud(6), right installation set(7), left installation set(8), middle pipe(9), pressure inductor(10)And intubation(11),
It is characterized in that:The tube body(1)Outside be provided with rubber protective layer(2), and rubber protective layer(2)Inner side be provided with
Layer(3), the internal layer(3)Inner side be provided with middle pipe(9), and middle pipe(9)Inside close to internal layer(3)Position at be provided with
Pressure inductor(10), the tube body(1)Top close to pressure inductor(10)Position at be provided with intelligent controller
(4), and tube body(1)Right side be provided with left installation set(8), the left installation set(8)Right side be provided with right installation set(7),
And left installation set(8)With right installation set(7)Junction be provided with intubation(11), the right installation set(7)Upper close tube body(1)
Position at be provided with installation stud(6), and stud is installed(6)Left side be provided with abampere loading nut(5), the pressure sensing
Device(10)With intelligent controller(4)It is electrically connected.
2. the new overall pipeline of one kind according to claim 1, it is characterised in that:The installation stud(6)It is provided with altogether
Four, and four installation studs(6)It is separately mounted to right installation set(7)Upper close tube body(1)Position at.
3. the new overall pipeline of one kind according to claim 1, it is characterised in that:The left installation set(8)With right installation
Set(7)It is a kind of component of metal material.
4. the new overall pipeline of one kind according to claim 1, it is characterised in that:The abampere loading nut(5)For one kind
The component of magnetic material.
5. the new overall pipeline of one kind according to claim 1, it is characterised in that:The rubber protective layer(2)For one kind
The component of rubber-covered material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721162626.8U CN207334069U (en) | 2017-09-12 | 2017-09-12 | A kind of new overall pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721162626.8U CN207334069U (en) | 2017-09-12 | 2017-09-12 | A kind of new overall pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207334069U true CN207334069U (en) | 2018-05-08 |
Family
ID=62372253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721162626.8U Expired - Fee Related CN207334069U (en) | 2017-09-12 | 2017-09-12 | A kind of new overall pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207334069U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110690671A (en) * | 2019-09-17 | 2020-01-14 | 厦门大学 | External wiring harness protection device of computer |
-
2017
- 2017-09-12 CN CN201721162626.8U patent/CN207334069U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110690671A (en) * | 2019-09-17 | 2020-01-14 | 厦门大学 | External wiring harness protection device of computer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207334069U (en) | A kind of new overall pipeline | |
CN204886054U (en) | Protection tube of carbon fiber complex core cable | |
CN207599198U (en) | A kind of supplying drainage attachment device | |
CN203549191U (en) | Union reducing joint | |
CN205806918U (en) | Gas fired-boiler small intelligent LNG air supply system | |
CN202903267U (en) | Flowmeter with rotatable meter head | |
CN203108248U (en) | Control device for methanol recovery tower reboiler | |
CN206891251U (en) | tube plate structure | |
CN202868309U (en) | Intelligent avoiding wax and reducing viscosity descaling device | |
CN208138045U (en) | A kind of heavy oil box type power station ducting module | |
CN205029004U (en) | Synthesize block terminal antenna fixing device | |
CN201058817Y (en) | Water energy level regulating controlled horizontal plane water-taking device | |
CN201853545U (en) | Voltage divider sleeve for electronic type transformer | |
CN205078215U (en) | Water injection well head device | |
CN205242438U (en) | Utility tunnel | |
CN206627179U (en) | A kind of automatic shutoff gas meter, flow meter | |
CN204083611U (en) | A kind of transformer pouring is drained the oil special-purpose multifunctional connector | |
CN203322602U (en) | Three-way joint of refrigerating device | |
CN204459588U (en) | The bindiny mechanism of transformer and Electrode in Gas Insulated System | |
CN204464472U (en) | A kind of antenna protecting equipment | |
CN204628939U (en) | Electric preheating equipment and heat supply steel pipe tie point device | |
CN203466539U (en) | Cable protection tube | |
CN203103103U (en) | On-load voltage adjusting switch of bell jar type power transformer | |
CN203979876U (en) | The device of the BOG that a kind of integrated treatment LNG receiving station produces | |
CN108054708A (en) | A kind of removing ice of power transmission line method and system based on new energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180508 Termination date: 20180912 |
|
CF01 | Termination of patent right due to non-payment of annual fee |