CN207333998U - Improve the petroleum pipeline structure of service life - Google Patents

Improve the petroleum pipeline structure of service life Download PDF

Info

Publication number
CN207333998U
CN207333998U CN201721362163.XU CN201721362163U CN207333998U CN 207333998 U CN207333998 U CN 207333998U CN 201721362163 U CN201721362163 U CN 201721362163U CN 207333998 U CN207333998 U CN 207333998U
Authority
CN
China
Prior art keywords
interior conduit
insulating
petroleum pipeline
resistant coating
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721362163.XU
Other languages
Chinese (zh)
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Kesheng Petroleum Technology Co Ltd
Original Assignee
Chengdu Kesheng Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kesheng Petroleum Technology Co Ltd filed Critical Chengdu Kesheng Petroleum Technology Co Ltd
Priority to CN201721362163.XU priority Critical patent/CN207333998U/en
Application granted granted Critical
Publication of CN207333998U publication Critical patent/CN207333998U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermal Insulation (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Pipe Accessories (AREA)

Abstract

The utility model discloses the petroleum pipeline structure for improving service life, including interior conduit and Outer Tube, insulating layer, erosion resistant coating, waterproof layer are equipped between interior conduit and Outer Tube, multiple insulating tubes are equipped with insulating layer, mineral wool is filled with outside insulating layer inside holding pipe, is equipped with demarcation strip in insulating tube, insulating tube is divided into two cavitys by demarcation strip, foam is filled with the cavity of interior conduit, drier is filled with the cavity away from interior conduit;Heater strip is wound with the outer wall of insulating tube;Waterproof layer and the sawtooth of erosion resistant coating are mutually chimeric, and the both sides of Outer Tube are equipped with transport hanging block, and the bottom surface for transporting hanging block is equipped with card slot.The petroleum pipeline of the utility model, pass through special structure, so that pipeline has good heat-insulating property, oil can be avoided to block, the convenience of oil transportation is improved, strengthens the stability of petroleum pipeline structure, and is equipped with erosion resistant coating and waterproof layer, the corrosion-resistanting waterproofing performance of pipeline is substantially increased, and easy to carry and install.

Description

Improve the petroleum pipeline structure of service life
Technical field
It the utility model is related to a kind of petroleum pipeline, and in particular to improve the petroleum pipeline structure of service life.
Background technology
One of oil, the main object of geological prospecting, is a kind of sticky, dark brown liquid, is referred to as " industry blood Liquid ".There are petroleum storage in upper crustal some areas.Main component is the mixture of various alkane, cycloalkane, aromatic hydrocarbon.Oil Corresponding machining sector must be transported after exploitation, just can more preferably be utilized, the petroleum pipeline of wherein transfer oil is then Essential equipment.And oil is in oil recovery process, since oil paraffin content is excessive, it is big to carry oil concentration, often causes oil transportation Pipeline oil transportation is difficult, and the flow resistance of the oil especially in cold season, petroleum pipeline can be significantly increased, it is necessary in oil Discharge pressure is heated or increased on pipeline to solve the problems, such as that oil transportation is difficult.And for increasing discharge pressure, this method energy consumption Greatly.Existing petroleum pipeline in order to keep the temperature, usually using insulating layer reduce pipe in oil heat scatter and disappear, still, its exist Some shortcomings, the heavier mass of bitumen layer, increases weight the load of pipeline, and is air between insulating layer and inner cylinder, it keeps the temperature effect Fruit is bad.In addition, pipeline not anti-corrosion waterproof in existing pipeline heat-insulating technology, not only service life is short, but also easily to conveying Oil impact.
Utility model content
Technical problem to be solved in the utility model be existing petroleum pipeline in order to keep the temperature, usually using protect Oil heat is lost in warm layer reduction pipe, and still, it comes with some shortcomings, the heavier mass of bitumen layer, to the load of pipeline Weightening, and be air between insulating layer and inner cylinder, its heat insulation effect is bad.In addition, pipeline is not in existing pipeline heat-insulating technology Anti-corrosion waterproof, not only service life is short, but also easily the oil of conveying is impacted, and it is an object of the present invention to provide improving service life Petroleum pipeline structure, pass through special structure so that pipeline has good heat-insulating property, oil can be avoided to block, carried The convenience of high oil transportation, and pipeline saves bitumen layer, using the thermal insulation material of lightweight, substantially reduces quality, reduces Pipeline is born, and strengthens the stability of petroleum pipeline structure, and is equipped with erosion resistant coating and waterproof layer, and erosion resistant coating and waterproof layer are mutual It is chimeric, the corrosion-resistanting waterproofing performance of pipeline is substantially increased, while the utility model pipeline is easy to carrying and installation.
The utility model is achieved through the following technical solutions:
Improve the petroleum pipeline structure of service life, including interior conduit and the Outer Tube being set in outside interior conduit, interior conduit From interior by being equipped with insulating layer, erosion resistant coating and waterproof layer, the interior circle along interior conduit of the insulating layer successively outside between Outer Tube Circumferential direction is equipped with multiple axis insulating tube parallel with interior conduit axis successively, and mineral wool is filled with outside insulating layer inside holding pipe, Zigzag demarcation strip is equipped with insulating tube, the demarcation strip is located at insulating tube axis and insulating tube is divided into close to inner tube Road and two cavitys away from interior conduit, foam is filled with the cavity of interior conduit, filling in the cavity away from interior conduit There is a drier, spiral winding has heater strip on the outer wall of insulating tube;The outer surface cross section of the erosion resistant coating is the circle with sawtooth Shape, waterproof layer and the sawtooth of erosion resistant coating are mutually chimeric, and the both sides of Outer Tube are equipped with transport hanging block, and the bottom surface for transporting hanging block is equipped with Convex card slot.
The petroleum pipeline of the utility model, passes through special structure so that pipeline has good heat-insulating property, can keep away Exempt from oil blocking, improve the convenience of oil transportation, and pipeline saves bitumen layer, using the thermal insulation material of lightweight, subtracts significantly Small quality, reduces pipeline burden, strengthens the stability of petroleum pipeline structure, and is equipped with erosion resistant coating and waterproof layer, and anti-corrosion Layer is mutually chimeric with waterproof layer, substantially increases the corrosion-resistanting waterproofing performance of pipeline, at the same the utility model pipeline easy to carrying and Installation.Insulating layer, erosion resistant coating, waterproof layer are equipped between interior conduit and Outer Tube, good insulation antiseptic can be played the role of, Wherein insulating layer includes the insulating tube set gradually, and insulating tube is outer by filling glass cotton, so that first layer insulation effect is played, Mineral wool can be tightly packed between interior conduit at the same time, will not form air cavity, close to the cavity of interior conduit in insulating tube It is interior to be filled with foam, second layer insulation effect is played, by double-deck embedded structure, the surrounding of interior conduit can be carried out uniform The light quality and high insulating effect of good insulation effect, wherein asbestos and foam, greatly alleviate the weight of pipeline, no The burden of pipeline itself is only alleviated, and causes pipeline to easily facilitate carrying, while insulating tube external spiral is wound with heater strip, By winding heater strip outside insulating tube, heat caused by heater strip can carry out insulating tube lasting heating, so that right Interior conduit surrounding is uniformly kept the temperature;The cavity away from interior conduit is desiccant-filled in insulating tube, because in insulating process In, the moisture in air can be made by thermal coagulation, and moisture absorption can be ensured by the drying in pipeline by drier;Waterproof Layer is mutually chimeric with the sawtooth of erosion resistant coating, i.e., in radial directions, waterproof layer is mutually chimeric with erosion resistant coating, increases between two layers Contact area, improve anti-corrosion water proofing property, while reduce the gross thickness of erosion resistant coating and waterproof layer, reduce the occupation of land body of pipeline Product;The both sides of Outer Tube are equipped with transport hanging block, and the bottom surface for transporting hanging block is equipped with convex card slot, by the card for hooking both sides Groove, can very easily carry out the carrying and installation of pipeline.
The material of erosion resistant coating is silicon nitride, and antiseptic property is good.
Waterproof layer is made of polyvinyl chloride so that and pipeline has good water resistance and with barriering effect, ageing-resistant, It is corrosion-resistant.
The sawtooth of erosion resistant coating is equipped with the axis through hole parallel with interior conduit axis, and deodorant is filled with through hole, can Peculiar smell in pipeline is adsorbed.
The diameter ratio of insulating tube and interior conduit is 1:8-10, not only can guarantee that good heat insulation effect, but also will not be to inner tube Cause to bear in road.
Said inner tube road uses spiral welded steel pipe with Outer Tube so that the endurance of petroleum pipeline and intensity are enough, no Fragile rupture.
The utility model compared with prior art, has the following advantages and advantages:
1st, the utility model improves the petroleum pipeline structure of service life, passes through special structure so that pipeline has good Good heat-insulating property, can avoid oil from blocking, improve the convenience of oil transportation, and pipeline saves bitumen layer, using light The thermal insulation material of matter, substantially reduces quality, reduces pipeline burden, strengthens the stability of petroleum pipeline structure, and equipped with anti- Rotten layer and waterproof layer, and erosion resistant coating is mutually chimeric with waterproof layer, substantially increases the corrosion-resistanting waterproofing performance of pipeline, while this practicality Novel pipeline is easy to carrying and installation;
2nd, the utility model improves the petroleum pipeline structure of service life, and the material of erosion resistant coating is silicon nitride, antiseptic property Well, waterproof layer is made of polyvinyl chloride so that pipeline has good water resistance and with barriering effect, ageing-resistant, resistance to Corrosion, the sawtooth of erosion resistant coating are equipped with the axis through hole parallel with interior conduit axis, deodorant are filled with through hole, can be to pipe Peculiar smell in road is adsorbed;
3rd, the diameter ratio of the petroleum pipeline structure of the utility model raising service life, insulating tube and interior conduit is 1:8- 10, it not only can guarantee that good heat insulation effect, but also interior conduit will not be caused to bear, said inner tube road uses spiral welding with Outer Tube Connect steel pipe so that the endurance of petroleum pipeline is enough with intensity, is hardly damaged rupture.
Brief description of the drawings
Attached drawing described herein is used for providing further understanding the utility model embodiment, forms the one of the application Part, does not form the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the utility model structure diagram.
Mark and corresponding parts title in attached drawing:
1- interior conduits, 2- Outer Tubes, 3- insulating layers, 4- erosion resistant coatings, 5- insulating tubes, 6- demarcation strips, 7- waterproof layers, 8- transports Hanging block, 9- card slots, 10- through holes.
Embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, with reference to embodiment and attached drawing, The utility model is described in further detail, and the exemplary embodiment and its explanation of the utility model are only used for explaining this Utility model, is not intended to limit the scope of the present invention.
Embodiment
As shown in Figure 1, the petroleum pipeline structure of the utility model raising service life, including interior conduit 1 are interior with being set in Outer Tube 2 outside pipeline 1, from interior by being equipped with insulating layer 3, erosion resistant coating 4 and waterproof layer successively outside between interior conduit 1 and Outer Tube 2 7, the interior circumferencial direction along interior conduit 1 of the insulating layer 3 is equipped with multiple axis insulating tube parallel with 1 axis of interior conduit successively 5,3 inside holding pipe 5 of insulating layer is filled with mineral wool outside, is equipped with zigzag demarcation strip 6 in insulating tube 5, the demarcation strip 6 is located at It is divided at 5 axis of insulating tube and by insulating tube 5 close to interior conduit 1 and two cavitys away from interior conduit 1, close to interior conduit 1 Cavity in be filled with foam, the cavity away from interior conduit 1 is interior to be filled with drier, there is spiral winding on the outer wall of insulating tube 5 Heater strip;The outer surface cross section of the erosion resistant coating 4 is the circle with sawtooth, and waterproof layer 7 and the sawtooth of erosion resistant coating 4 are mutually embedding Close, the both sides of Outer Tube are equipped with transport hanging block 8, and the bottom surface of transport hanging block 8 is equipped with convex card slot 9.
The petroleum pipeline of the utility model, passes through special structure so that pipeline has good heat-insulating property, can keep away Exempt from oil blocking, improve the convenience of oil transportation, and pipeline saves bitumen layer, using the thermal insulation material of lightweight, subtracts significantly Small quality, reduces pipeline burden, strengthens the stability of petroleum pipeline structure, and is equipped with erosion resistant coating and waterproof layer, and anti-corrosion Layer is mutually chimeric with waterproof layer, substantially increases the corrosion-resistanting waterproofing performance of pipeline, at the same the utility model pipeline easy to carrying and Installation.Insulating layer, erosion resistant coating, waterproof layer are equipped between interior conduit and Outer Tube, good insulation antiseptic can be played the role of, Wherein insulating layer includes the insulating tube set gradually, and insulating tube is outer by filling glass cotton, so that first layer insulation effect is played, Mineral wool can be tightly packed between interior conduit at the same time, will not form air cavity, close to the cavity of interior conduit in insulating tube It is interior to be filled with foam, second layer insulation effect is played, by double-deck embedded structure, the surrounding of interior conduit can be carried out uniform The light quality and high insulating effect of good insulation effect, wherein asbestos and foam, greatly alleviate the weight of pipeline, no The burden of pipeline itself is only alleviated, and causes pipeline to easily facilitate carrying, while insulating tube external spiral is wound with heater strip, By winding heater strip outside insulating tube, heat caused by heater strip can carry out insulating tube lasting heating, so that right Interior conduit surrounding is uniformly kept the temperature;The cavity away from interior conduit is desiccant-filled in insulating tube, because in insulating process In, the moisture in air can be made by thermal coagulation, and moisture absorption can be ensured by the drying in pipeline by drier;Waterproof Layer is mutually chimeric with the sawtooth of erosion resistant coating, i.e., in radial directions, waterproof layer is mutually chimeric with erosion resistant coating, increases between two layers Contact area, improve anti-corrosion water proofing property, while reduce the gross thickness of erosion resistant coating and waterproof layer, reduce the occupation of land body of pipeline Product;The both sides of Outer Tube are equipped with transport hanging block, and the bottom surface for transporting hanging block is equipped with convex card slot, by the card for hooking both sides Groove, can very easily carry out the carrying and installation of pipeline.
Preferably, the material of erosion resistant coating is silicon nitride, and antiseptic property is good.
Preferably, waterproof layer is made of polyvinyl chloride so that and pipeline has good water resistance and with barriering effect, It is ageing-resistant, corrosion-resistant.
Preferably, the sawtooth of erosion resistant coating is equipped with the axis through hole 10 parallel with interior conduit axis, is filled with through hole anti- Smelly dose, the peculiar smell in pipeline can be adsorbed.
Preferably, the diameter ratio of insulating tube and interior conduit is 1:8-10, not only can guarantee that good heat insulation effect, but also will not Interior conduit is caused to bear.
Preferably, said inner tube road uses spiral welded steel pipe with Outer Tube so that the endurance and intensity of petroleum pipeline Enough, it is hardly damaged rupture.
Above-described embodiment, the purpose of this utility model, technical solution and beneficial effect have been carried out into One step describes in detail, it should be understood that the foregoing is merely specific embodiment of the present utility model, is not used to limit Determine the scope of protection of the utility model, where within the spirit and principles of the present invention, any modification for being made, equally replace Change, improve, should be included within the scope of protection of this utility model.

Claims (6)

1. improve the petroleum pipeline structure of service life, it is characterised in that including interior conduit (1) and be set in interior conduit (1) outside Outer Tube (2), from interior by being equipped with insulating layer (3), erosion resistant coating (4) and waterproof successively outside between interior conduit (1) and Outer Tube (2) Layer (7), the insulating layer (3) is interior to put down equipped with multiple axis with interior conduit (1) axis successively along the circumferencial direction of interior conduit (1) Capable insulating tube (5), insulating layer (3) inside holding pipe (5) are filled with mineral wool, zigzag separation are equipped with insulating tube (5) outside Plate (6), the demarcation strip (6) be located at insulating tube (5) axis and by insulating tube (5) be divided into close to interior conduit (1) with it is remote Two cavitys of interior conduit (1), foam is filled with the cavity of interior conduit (1), filling in the cavity away from interior conduit (1) There is a drier, spiral winding has heater strip on the outer wall of insulating tube (5);The outer surface cross section of the erosion resistant coating (4) is that band is sawed The circle of tooth, waterproof layer (7) and the sawtooth of erosion resistant coating (4) are mutually chimeric, and the both sides of Outer Tube are equipped with transport hanging block (8), transport The bottom surface of hanging block (8) is equipped with convex card slot (9).
2. the petroleum pipeline structure according to claim 1 for improving service life, it is characterised in that the material of erosion resistant coating (4) Matter is silicon nitride.
3. the petroleum pipeline structure according to claim 1 for improving service life, it is characterised in that waterproof layer uses polychlorostyrene Ethene is made.
4. the petroleum pipeline structure according to claim 1 for improving service life, it is characterised in that the saw of erosion resistant coating (4) Tooth is equipped with the axis through hole (10) parallel with interior conduit (1) axis, and deodorant is filled with through hole (10).
5. it is according to claim 1 improve service life petroleum pipeline structure, it is characterised in that insulating tube (5) with it is interior The diameter ratio of pipeline (1) is 1:8-10.
6. the petroleum pipeline structure according to claim 1 for improving service life, it is characterised in that said inner tube road (1) Spiral welded steel pipe is used with Outer Tube (2).
CN201721362163.XU 2017-10-20 2017-10-20 Improve the petroleum pipeline structure of service life Expired - Fee Related CN207333998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721362163.XU CN207333998U (en) 2017-10-20 2017-10-20 Improve the petroleum pipeline structure of service life

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721362163.XU CN207333998U (en) 2017-10-20 2017-10-20 Improve the petroleum pipeline structure of service life

Publications (1)

Publication Number Publication Date
CN207333998U true CN207333998U (en) 2018-05-08

Family

ID=62365513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721362163.XU Expired - Fee Related CN207333998U (en) 2017-10-20 2017-10-20 Improve the petroleum pipeline structure of service life

Country Status (1)

Country Link
CN (1) CN207333998U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107606394A (en) * 2017-10-20 2018-01-19 成都科盛石油科技有限公司 A kind of efficient insulation petroleum transportation pipeline
CN111396677A (en) * 2019-04-11 2020-07-10 徐昊阳 Modular temperature tracing unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107606394A (en) * 2017-10-20 2018-01-19 成都科盛石油科技有限公司 A kind of efficient insulation petroleum transportation pipeline
CN111396677A (en) * 2019-04-11 2020-07-10 徐昊阳 Modular temperature tracing unit

Similar Documents

Publication Publication Date Title
CN206555579U (en) A kind of high-performance antiseptic petroleum pipeline
CN207333998U (en) Improve the petroleum pipeline structure of service life
GB1493140A (en) Tubing
RU121855U1 (en) INSULATED PIPE
CN107606329A (en) petroleum transportation pipeline with anti-corrosion function
US9702631B2 (en) Systems and methods to insulate components of industrial infrastructure
CN206754808U (en) A kind of petroleum pipeline
CN207334095U (en) The petroleum pipeline of good heat insulating
CN107990087A (en) A kind of corrosion resistant natural gas transportation device
CN107606394A (en) A kind of efficient insulation petroleum transportation pipeline
CN207364469U (en) Highly effective petroleum pipeline with filtering function
CN103727359B (en) The pipe insulation construction method of a kind of many solidifying foam glass material and device thereof
CN205678362U (en) A kind of insulating tube with heating function
CN108105515A (en) A kind of oil pipeline component of heating and heat-insulating type
CN204328250U (en) A kind of compound thermal insulation pipe
CN207364471U (en) The thermal insulatnig petroleum pipeline road of lifting can efficiently be carried
CN207364544U (en) A kind of thermal insulatnig petroleum pipeline road for improving oil transportation efficiency
CN207333991U (en) A kind of petroleum transportation pipeline and transport system
CN215060133U (en) Energy-concerving and environment-protective formula has steel bushing steel insulating tube of dampproofing function
CN109354803A (en) A kind of anti-icing blocking package covers cladding material, casing and its manufacture craft
CN206299946U (en) Superhigh temperature prefabricated direct-buried thermal insulation pipe
CN206018152U (en) A kind of high prefabricated direct-buried thermal insulation pipe of structural strength
CN107654739A (en) Improve the petroleum pipeline of corrosion-resistant thermal insulation
CN107606395A (en) The nonpetroleum pipeline being efficiently readily transported
CN207364470U (en) A kind of new petroleum transportation pipeline structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20181020