CN207333961U - A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp - Google Patents

A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp Download PDF

Info

Publication number
CN207333961U
CN207333961U CN201721060098.5U CN201721060098U CN207333961U CN 207333961 U CN207333961 U CN 207333961U CN 201721060098 U CN201721060098 U CN 201721060098U CN 207333961 U CN207333961 U CN 207333961U
Authority
CN
China
Prior art keywords
pipe clamp
hole
upper strata
lower floor
folder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721060098.5U
Other languages
Chinese (zh)
Inventor
李庆恩
李良锋
杨磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian San An Iron And Steel Co Ltd
Original Assignee
Fujian San An Iron And Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian San An Iron And Steel Co Ltd filed Critical Fujian San An Iron And Steel Co Ltd
Priority to CN201721060098.5U priority Critical patent/CN207333961U/en
Application granted granted Critical
Publication of CN207333961U publication Critical patent/CN207333961U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

It the utility model is related to a kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp, the hydraulic oil pipe clamp includes upper strata pipe clamp, lower floor's pipe clamp, pipe clamp bottom plate, bolt and clamp nut, upper strata pipe clamp both sides are equipped with first through hole, lower floor's pipe clamp both sides are equipped with the second through hole, and pipe clamp bottom plate both sides are equipped with third through-hole.The first through hole of homonymy, the second through hole and third through-hole coaxially penetrate through setting, and first through hole, the second through hole and the third through-hole per side run through a bolt, and pipe clamp bottom plate is exposed in bolt lower end, and is fixedly connected by clamp nut.The utility model can reduce hydraulic oil pipe deformation and damage caused by oil pipe clamp comes off, moreover it is possible to avoid the damage of the high-pressure rubber pipe caused by pipeline play.The service life of pipe clamp and pipeline can not only be so greatly improved, ensures the normal production of blast furnace, moreover it is possible to reduce using and wasting for spare part, further save production cost.

Description

A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp
Technical field
Blast furnace tapping machine in front hydraulic oil pipe technical field is the utility model is related to, more specifically refers to that one kind changes Into blast furnace tapping machine in front hydraulic oil pipe clamp.
Background technology
At present, the oil pipe of blast furnace tapping machine in front hydraulic system is positioned using double-layer aluminium alloy pipe clamp (DN34), the positioning of this pipe clamp levels is connected by middle nut end to end using two bolts to be fastened.The positioning method It is that comparison is firm in stable fluid pressure line, but the oil for thering is one group of rock drill impact to use in opening machine hydraulic system Road, oil circuit vibration are larger so that the pipe clamp bolt of top pipe clamp easily loosens, and causes lower floor's pipe clamp to drop.And oil circuit positioning pipe The problems such as coming off, cause oil pipe play big of folder, if non-timely processing be easy to cause tubing deformation and abrasion and is connected with oil pipe High-pressure rubber pipe damage, therefore oil pipe clamp about 3 months or so just needs to concentrate to replace once.If frequently more change oil Pipe pipe clamp can not only influence the normal production of blast furnace, can also increase the cost needed for production.For this reason, we provide a kind of improvement Blast furnace tapping machine in front hydraulic oil pipe clamp.
The content of the invention
The utility model provides a kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp, to solve blast furnace Stokehold hydraulic opening machine hydraulic oil pipe upper strata pipe clamp bolt is easily loosened the problems such as causing lower floor's pipe clamp to come off.
The utility model adopts the following technical solution:
A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp, the hydraulic oil pipe clamp are managed including upper strata Folder, lower floor's pipe clamp, pipe clamp bottom plate, bolt and clamp nut, the upper strata pipe clamp both sides are equipped with first through hole, lower floor's pipe clamp Both sides are equipped with the second through hole, and the pipe clamp bottom plate both sides are equipped with third through-hole, the first through hole of homonymy, the second through hole and Three through holes coaxially penetrate through setting, and the first through hole, the second through hole and the third through-hole per side run through a bolt, institute State bolt lower end and expose the pipe clamp bottom plate, and be fixedly connected by the clamp nut.
Further, the pipe clamp bottom plate uses 50 × 5 angle steel of ∠, which is welded on pipe support.
Further, the upper strata pipe clamp is formed by being pressed from both sides on the pipe clamp of upper strata with folder two parts under the pipe clamp of upper strata, upper strata pipe clamp Folder adjacent side offers the semi-circular recesses being adapted with folded fluid pressure line radius respectively under upper folder and upper strata pipe clamp, described Folder and the semi-circular recesses pressed from both sides under the pipe clamp of upper strata dock to form the first circular hole inwards on the pipe clamp of upper strata;Lower floor's pipe clamp is by lower floor Composition is pressed from both sides under folder and lower floor's pipe clamp on pipe clamp, press from both sides adjacent side under folder and lower floor's pipe clamp on lower floor's pipe clamp opens up and folded liquid respectively The semi-circular recesses that pressure pipe road radius is adapted, the semi-circular recesses pressed from both sides under folder and lower floor's pipe clamp on lower floor's pipe clamp are right inwards Connect to form the second circular hole.
Further, the hydraulic oil pipe clamp further includes upper strata check washer and middle check washer, and the upper strata is prevented Loose gasket is located between upper strata pipe clamp and bolt, and the middle check washer is located between upper strata pipe clamp and lower floor's pipe clamp, the upper strata Check washer and middle check washer both sides are respectively equipped with fourth hole and fifth hole.
From the above-mentioned description to the utility model structure, compared to the prior art, the utility model has following excellent Point:
The utility model transforms blast furnace tapping machine in front hydraulic oil pipe clamp, passes through the bolt of oil pipe clamp Lower floor's pipe clamp and pipe clamp bottom plate are put on, improved oil pipe clamp is not easy to loosen, the clamping oil pipe that can more consolidate, and keeps hydraulic pressure Pipeline is stablized, and fluid pressure line, which is stablized, is avoided that pipeline deformation is with pipeline abrasion rupture and to high pressure caused by pipeline play The damage of sebific duct, substantially increases the service life of pipe clamp and pipeline, reduces the use of spare part.Due to can utilize old spare part into Reduce the maintenance cost of oil pipe clamp after row improvement and transformation, therefore the production cost of blast furnace can be substantially reduced.
Brief description of the drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the decomposition diagram of the utility model.
Fig. 3 is the partial sectional view of the utility model.
Fig. 4 is the schematic diagram that the utility model is installed on fluid pressure line.
Embodiment
Illustrate specific embodiment of the present utility model with reference to the accompanying drawings.
A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp, referring to figs. 1 to Fig. 3, hydraulic oil pipe clamp 1 is wrapped Include upper strata pipe clamp 2, lower floor's pipe clamp 3, pipe clamp bottom plate 4, snail 5 and clamp nut 6.On upper strata, 2 both sides of pipe clamp are equipped with first through hole 23,3 both sides of lower floor's pipe clamp are equipped with the second through hole 33, and 4 both sides of pipe clamp bottom plate are equipped with third through-hole 41, the first through hole 23 of homonymy, Coaxially perforation is set for second through hole 33 and third through-hole 41.Upper strata check washer 7 is equipped between bolt 5 and upper strata pipe clamp 2, upper Be equipped with middle check washer 8 between layer pipe clamp 2 and lower floor's pipe clamp 3, on upper strata check washer 7 and centre check washer 8 can be strengthened Stability between layer pipe clamp 2 and bolt 5 and levels pipe clamp.Check washer 7 and middle 8 both sides of check washer difference on upper strata Fourth hole 71 and fifth hole 81 are opened up, bolt 5 sequentially passes through fourth hole 71, first through hole 23, fifth hole 81, second Through hole 33 and third through-hole 41, pipe clamp bottom plate 4 is exposed in 5 lower end of bolt, and tightens fixation with trip bolt 6.
With reference to Fig. 2 and Fig. 4, upper strata pipe clamp 2 is formed by pressing from both sides 22 two parts under folder 21 on the pipe clamp of upper strata and upper strata pipe clamp, upper strata Press from both sides 22 adjacent sides under folder 21 and upper strata pipe clamp on pipe clamp and offer the semicircle being adapted with folded 9 radius of fluid pressure line respectively Groove, the semi-circular recesses of folder 22 under folder 21 on the pipe clamp of upper strata and upper strata pipe clamp are docked to form the first circular hole 24 inwards.Lower floor Pipe clamp 3 is formed by pressing from both sides folder 32 under 31 and lower floor's pipe clamp on lower floor's pipe clamp, and it is adjacent that folder 32 under 31 and lower floor's pipe clamp is pressed from both sides on lower floor's pipe clamp Side opens up the semi-circular recesses being adapted with folded 9 radius of fluid pressure line respectively, by folder 31 and lower floor's pipe clamp on lower floor's pipe clamp The semi-circular recesses of lower folder 32 dock to form the second circular hole 34 inwards.The first circular hole 24 and the second circular hole 34 of the oil pipe clamp 1 Diameter it is identical with folded 9 diameter of fluid pressure line, can be used for clamping two parallel adjacent fluid pressure lines 9 at the same time.
The pipe clamp bottom plate 4 of oil pipe clamp 1 uses 50 × 5 angle steel of ∠, and side is welded on pipe support forms one with pipe support, separately Side is connected with 3 bottom of lower floor pipe clamp.During installation, being first welded on pipe clamp bottom plate 4 and pipe support needs at fixed oil pipe 9, embedding The oil pipe 9 that need to be fixed is put after folder 32 under levels pipe clamp, folder 31 and middle check washer on lower floor's pipe clamp are clamped on oil pipe 9 8, the assembling of upper strata pipe clamp 2 is identical with lower floor pipe clamp 3, treats upper strata pipe clamp 2 and after the completion of upper strata check washer 7 clamps, bolt 5 according to The bolt of the secondary homonymy through upper strata check washer 7, upper strata pipe clamp 2, middle check washer 8, lower floor's pipe clamp 3 and pipe clamp bottom plate 4 Hole is simultaneously tightened, and finally reinforces bolt 5 in the clamp nut 6 of pipe clamp bottom plate 4 times, improved 1 empirical tests of oil pipe clamp are feasible , the service life of oil pipe clamp 1 and fluid pressure line 9 can be greatly improved.The distance and quantity that oil pipe clamp 1 is installed can bases Oil pipe play situation is set, fluid pressure line 9 vibrate that quantity that big local oil pipe clamp 1 installs is more and oil pipe clamp it Between mounting distance it is smaller.
Before oil pipe clamp is transformed, four tapping machine in front of iron-smelting furnace are counted according to 1 set of oil pipe clamp 1 of daily consumption Gauge, the high-pressure rubber pipe that pipeline play damages caused by oil pipe clamp 1 damages is according to monthly based on 1, because play deforms or grinds The pipeline of damage was replaced based on 1 time by 1 year.
I.e.:One month 1 set * 30 days=30 sets of pipe clamp of consumption.A set of pipe clamp monthly amounts to the flat of consumption pipe clamp by 22 yuan of calculations Equal expense:30 sets * 22 yuan=660 yuan.
Monthly consume high-pressure rubber pipe average cost:1 * 228 yuan=228 yuan.
Pipeline is according to 8 meters of meters, and monthly average cost is about:8 meters of * 2.391kg/m*22 members)/ 12 months=35 yuan.
Since pipe clamp repaiies useless use, without input, i.e.+660 yuan * 12 of+228 yuan of year benefit=35 yuan * 12 months * 12 months A month=11076 yuan.
The transformation of oil pipe clamp 1 is that the levels pipe clamp bolt hole of existing pipe clamp is got through expansion, and pipe clamp bottom plate 4 is welded It is connected on lower floor's pipe support, is improved using old spare part, stock and the waste of spare part will not be reduced.Improved oil pipe clamp 1 Be not easy to loosen, fluid pressure line stablize, reduce monthly oil pipe clamp 1 replace average cost, pipeline maintenance replace average cost and Average cost is replaced in high-pressure rubber pipe maintenance, has saved the production cost of blast furnace.
The above is only the specific embodiments of the present invention, but the design concept of the present invention is not limited thereto, All non-essential modifications to the present invention made by this concept, should all belong to the row for invading scope of protection of the utility model For.

Claims (4)

  1. A kind of 1. improved blast furnace tapping machine in front hydraulic oil pipe clamp, it is characterised in that:The hydraulic oil pipe clamp bag Upper strata pipe clamp, lower floor's pipe clamp, pipe clamp bottom plate, bolt and clamp nut are included, the upper strata pipe clamp both sides are equipped with first through hole, described Lower floor's pipe clamp both sides are equipped with the second through hole, and the pipe clamp bottom plate both sides are equipped with third through-hole, the first through hole of homonymy, second Through hole and third through-hole coaxially penetrate through setting, and the first through hole, the second through hole and the third through-hole per side run through an institute Bolt is stated, the pipe clamp bottom plate is exposed in the bolt lower end, and is fixedly connected by the clamp nut.
  2. A kind of 2. improved blast furnace tapping machine in front hydraulic oil pipe clamp as claimed in claim 1, it is characterised in that:Institute State pipe clamp bottom plate and use 50 × 5 angle steel of ∠, which is welded on pipe support.
  3. A kind of 3. improved blast furnace tapping machine in front hydraulic oil pipe clamp as claimed in claim 1, it is characterised in that:Institute State upper strata pipe clamp to be formed with folder two parts under the pipe clamp of upper strata by pressing from both sides on the pipe clamp of upper strata, phase is pressed from both sides under folder and upper strata pipe clamp on the pipe clamp of upper strata Adjacent side offers the semi-circular recesses being adapted with folded fluid pressure line radius respectively, and folder is managed with upper strata on the upper strata pipe clamp The semi-circular recesses of the lower folder of folder dock to form the first circular hole inwards;Lower floor's pipe clamp is by under folder and lower floor's pipe clamp on lower floor's pipe clamp Folder composition, on lower floor's pipe clamp under folder and lower floor's pipe clamp folder adjacent side open up respectively be adapted with folded fluid pressure line radius partly Circular groove, the semi-circular recesses pressed from both sides under folder and lower floor's pipe clamp on lower floor's pipe clamp dock to form the second circular hole inwards.
  4. A kind of 4. improved blast furnace tapping machine in front hydraulic oil pipe clamp as claimed in claim 1, it is characterised in that:Institute State hydraulic oil pipe clamp and further include upper strata check washer and middle check washer, the upper strata check washer be located at upper strata pipe clamp and Between bolt, the middle check washer is located between upper strata pipe clamp and lower floor's pipe clamp, the upper strata check washer and middle locking pad Piece both sides are respectively equipped with fourth hole and fifth hole.
CN201721060098.5U 2017-08-23 2017-08-23 A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp Active CN207333961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721060098.5U CN207333961U (en) 2017-08-23 2017-08-23 A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721060098.5U CN207333961U (en) 2017-08-23 2017-08-23 A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp

Publications (1)

Publication Number Publication Date
CN207333961U true CN207333961U (en) 2018-05-08

Family

ID=62374254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721060098.5U Active CN207333961U (en) 2017-08-23 2017-08-23 A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp

Country Status (1)

Country Link
CN (1) CN207333961U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110425339A (en) * 2019-06-27 2019-11-08 上海宝钢工业技术服务有限公司 The loose-proof anti-vibration structure of position hydraulic pipeline pipe clamp is vibrated in hydraulic system
CN110657285A (en) * 2019-09-27 2020-01-07 广船国际有限公司 Hydraulic control pipe fixing clamp, setting method and ship

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110425339A (en) * 2019-06-27 2019-11-08 上海宝钢工业技术服务有限公司 The loose-proof anti-vibration structure of position hydraulic pipeline pipe clamp is vibrated in hydraulic system
CN110657285A (en) * 2019-09-27 2020-01-07 广船国际有限公司 Hydraulic control pipe fixing clamp, setting method and ship
CN110657285B (en) * 2019-09-27 2021-12-21 广船国际有限公司 Hydraulic control pipe fixing clamp, setting method and ship

Similar Documents

Publication Publication Date Title
CN207333961U (en) A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp
CN201297448Y (en) Vibration isolator for pipe clamp of pipeline
CN205859360U (en) Channel bend support means
CN107269938A (en) A kind of petroleum pipeline bracket for realizing size regulation
CN201575234U (en) Hose fixing device
CN202629396U (en) Flange pipeline clamp
CN201339703Y (en) Oil return channel device of electric wheel gear box on power drive truck
CN207421525U (en) A kind of shockproof conduit saddle of oil transfer pump inlet/outlet pipeline
CN206608618U (en) A kind of petroleum pipeline bracket
CN201259021Y (en) Tube supporting rack
CN205978838U (en) Hydraulic pressure steel pipe fixed knot constructs
CN201177104Y (en) Adjusting type ground anchorage supporting fixing fixture
CN203115295U (en) Ultra-deep-water drilling ship high-pressure mud pipe clamp
CN207064965U (en) Nuclear power station pipeline suspension and support
CN205135984U (en) Dismantle convenient stuff pump
CN202165696U (en) Cable bridge fixing support clamping device of joist steel
CN201802987U (en) double-fixing pipe clamp
CN206668376U (en) Automobile exhaust pipe and applied to the connector on the blast pipe
CN206361257U (en) A kind of pipeline module carrier leads support arrangement
CN210421961U (en) Fixing device for pre-buried sleeve of pipe gallery
CN206001114U (en) The anti-axial impact pipe holder of large-diameter pipeline
CN207762358U (en) A kind of mounting device of pressure pipeline
CN207049440U (en) A kind of quick interim fixed -piping device
CN220870225U (en) Originating protection device used in reinforced concrete pipe-jacking pipeline
CN203868519U (en) Double bolt pipe clamp and pipe supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant