CN207330188U CN201720930713.7U CN201720930713U CN207330188U CN 207330188 U CN207330188 U CN 207330188U CN 201720930713 U CN201720930713 U CN 201720930713U CN 207330188 U CN207330188 U CN 207330188U
Authority
CN
China
Prior art keywords
tower crane
attachment device
reinforcing steel
super high
swing arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720930713.7U
Other languages
Chinese (zh)
Inventor
陈星�
王亮
李炎
钟智贤
张凯毅
朱振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720930713.7U priority Critical patent/CN207330188U/en
Application granted granted Critical
Publication of CN207330188U publication Critical patent/CN207330188U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a formula swing arm tower crane combination attachment device climbs in superelevation layer. The utility model discloses a tower crane support frame, the formula of encorbelmenting of tower crane support frame sets up between two shear force walls of a core section of thick bamboo, and this two shear force wall outsides of a core section of thick bamboo respectively are equipped with a first reinforcing steel roof beam, this first reinforcing steel roof beam one end with the built-in fitting of tower crane support frame is connected, and the other end buries spare and perpendicular to through the addition the wall connection of core section of thick bamboo shear force wall. The movable arm tower crane combination attachment device provided by the utility model adopts the method of reinforcing by section steel, the operation is simple, the installation is convenient, and the section steel can be recycled; the method is suitable for reinforcing a tower crane wall system in a super high-rise building, greatly reduces the use risk of the tower crane, and provides guarantee for the safety production of engineering.

Description

A kind of Super High inner climbing type swing arm tower crane combines attachment device
Technical field
It the utility model is related to a kind of Super High inner climbing type swing arm tower crane combination attachment device.
Background technology
At present, with high-rise building tower crane climb, the thickness of Core Walls Structure shear wall constantly reduces, bearing capacity It is gradually reduced, it is gradual on the contrary to the tilting moment of wall that the position of tower crane supporting rack moves inward tower crane with inside contracting for wall Increase, tower crane attachment structure can the effect of bearing load become urgent problem to be solved.And except to local vertical of wall and Horizontal reinforcement is encrypted to improve outside wall bearing capacity, how to share a part of power of supporting rack generation, and by power It is delivered to can yet be regarded as on the big wall of flat in-plane stiffness and reduces a kind of fine approach of tower crane attachment structural load.
The content of the invention
The purpose of this utility model is to provide a kind of Super High inner climbing type swing arm tower crane combination attachment device, above-mentioned to overcome Deficiency.
To achieve the above object, the technical solution of the utility model is:A kind of Super High inner climbing type swing arm tower crane group Attachment device is closed, including tower crane supporting rack, the tower crane supporting rack overhanging type are arranged between two shear wall of Core Walls Structure, the core First reinforcing steel beam is respectively provided with the outside of two shear walls of cylinder, the first reinforcing steel beam one end is pre-buried with the tower crane supporting rack Part connects, and the other end passes through additional embedded part and the wall connecting perpendicular to the Core Walls Structure shear wall.
The second reinforcing steel beam is further included, and may be contained within the homonymy of Core Walls Structure shear wall with first reinforcing steel beam, should Second reinforcing steel beam and the first reinforcing steel beam pass through I-steel drawknot.
The I-steel is arranged in parallel with the Core Walls Structure shear wall.
The additional embedded part includes anchor slab and dowel, which is equipped with welding hole, and one end of dowel penetrates welding hole and anchor slab It is welded to connect.
Described be welded to connect connects for pressure submerged-arc welding.
The both ends of the dowel are equipped with anchor slab, which is located at the two of the wall vertical with Core Walls Structure shear wall respectively Side, the both ends of the dowel respectively penetrate welding hole and are welded to connect with anchor slab.
First reinforcing steel beam, the second reinforcing steel beam and the tower crane supporting rack are located in the same horizontal plane.
The beneficial effects of the utility model are:1st, swing arm tower crane attachment reinforces the method for using section steel reinforcement, operation letter Single, installation facility, shaped steel can recycle;2nd, suitable for high-rise building tower crane attached wall system reinforcing, substantially reduce Tower crane application risk, for the safety in production of engineering provides guarantee.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model.
Structure diagram when Fig. 2 is the utility model list reinforcing steel beam.
Fig. 3 is the additional embedded parts structure schematic diagram of single side anchor slab in the utility model.
Fig. 4 is the additional embedded parts structure schematic diagram of two-sided anchor slab in the utility model.
In figure:1- tower crane supporting racks, 2- shear walls, the first reinforcing steel beams of 3-, the second reinforcing steel beams of 4-, 5- built-in fittings, 6- Additional embedded part, 7- I-steel.
Embodiment
The utility model and its embodiment are described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1 to Fig. 4, the utility model includes tower crane supporting rack 1, and 1 overhanging type of tower crane supporting rack is arranged on core Between two shear wall 2 of heart cylinder, which is respectively provided with first reinforcing steel beam 3, first reinforcing steel beam 3 one end are connected with the built-in fitting 5 of the tower crane supporting rack 1, and the other end is by additional embedded part 6 with being sheared perpendicular to the Core Walls Structure The wall connecting of wall 2.The second reinforcing steel beam 4 is further included, and Core Walls Structure shear wall 2 is may be contained within first reinforcing steel beam 3 Homonymy, which passes through 7 drawknot of I-steel.First reinforcing steel beam 3 and second is reinforced Girder steel 4 is H profile steel beam.
I-steel 7 is arranged in parallel with the Core Walls Structure shear wall 2.Described be welded to connect connects for pressure submerged-arc welding.
Additional embedded part 6 includes anchor slab and dowel, which is equipped with welding hole, and one end of dowel penetrates welding hole and welded with anchor slab Connection, using 700mm wall thicknesses as boundary, the wall thickness more than 700mm uses the additional embedded part 6 of such a single side anchor slab.
The both ends of dowel are equipped with anchor slab, which is located normal to the both sides of the wall of Core Walls Structure shear wall 2 respectively, should The both ends of dowel respectively penetrate welding hole and are welded to connect with anchor slab, and the wall thickness less than 700mm is buried using such a the additional of two-sided anchor slab Part 6.First reinforcing steel beam 3, the second reinforcing steel beam 4 and the tower crane supporting rack 1 are located in the same horizontal plane.
The utility model reversely increases the girder steel and reinforcing wall of reinforcement effect in tower crane supporting rack 1, and reinforcing steel beam can divide A part of power that tower crane supporting rack produces is carried on a shoulder pole, and is transferred force on the big wall of flat in-plane stiffness.By using reinforcing steel beam By tower crane attachment structure and the larger structure drawknot of peripheral rigid, reinforcing steel beam is connected by built-in fitting and concrete wall structure Connect;Therefore the load that tower crane is acted at attachment passes to other larger rigid walls to meet that bearing capacity will by reinforcing steel beam Ask.The swing arm tower crane attachment of the utility model reinforces the method for using section steel reinforcement, easy to operate, and installation facility, shaped steel can To recycle;And suitable for high-rise building tower crane attached wall system reinforcing, greatly reduce tower crane application risk, be work The safety in production of journey provides guarantee.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in Other relevant technical fields, are equally included in the patent within the scope of the utility model.

Claims (7)

1. a kind of Super High inner climbing type swing arm tower crane combines attachment device, including tower crane supporting rack, it is characterised in that:The tower crane Supporting rack overhanging type is arranged between two shear wall of Core Walls Structure, and one first reinforcing steel is respectively provided with the outside of two shear wall of Core Walls Structure Beam, the first reinforcing steel beam one end are connected with the built-in fitting of the tower crane supporting rack, the other end by additional embedded part with perpendicular to The wall connecting of the Core Walls Structure shear wall.
2. Super High inner climbing type swing arm tower crane according to claim 1 combines attachment device, it is characterised in that:Further include Two reinforcing steel beams, and may be contained within first reinforcing steel beam homonymy of Core Walls Structure shear wall, second reinforcing steel beam and One reinforcing steel beam passes through I-steel drawknot.
3. Super High inner climbing type swing arm tower crane according to claim 2 combines attachment device, it is characterised in that:The I-shaped Steel is arranged in parallel with the Core Walls Structure shear wall.
4. Super High inner climbing type swing arm tower crane according to claim 1 combines attachment device, it is characterised in that:It is described additional Embedded part includes anchor slab and dowel, which is equipped with welding hole, and one end of dowel penetrates welding hole and is welded to connect with anchor slab.
5. Super High inner climbing type swing arm tower crane according to claim 4 combines attachment device, it is characterised in that:The welding It is connected as pressure submerged-arc welding connection.
6. Super High inner climbing type swing arm tower crane according to claim 4 or 5 combines attachment device, it is characterised in that:It is described The both ends of dowel are equipped with anchor slab, the anchor slab respectively be located at the wall vertical with Core Walls Structure shear wall both sides, the two of the dowel End respectively penetrates welding hole and is welded to connect with anchor slab.
7. Super High inner climbing type swing arm tower crane according to claim 2 combines attachment device, it is characterised in that:Described first Reinforcing steel beam, the second reinforcing steel beam and the tower crane supporting rack are located in the same horizontal plane.
CN201720930713.7U 2017-07-28 2017-07-28 Super high-rise internal climbing type movable arm tower crane combination attachment device Expired - Fee Related CN207330188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720930713.7U CN207330188U (en) 2017-07-28 2017-07-28 Super high-rise internal climbing type movable arm tower crane combination attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720930713.7U CN207330188U (en) 2017-07-28 2017-07-28 Super high-rise internal climbing type movable arm tower crane combination attachment device

Publications (1)

Publication Number Publication Date
CN207330188U true CN207330188U (en) 2018-05-08

Family

ID=62376953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720930713.7U Expired - Fee Related CN207330188U (en) 2017-07-28 2017-07-28 Super high-rise internal climbing type movable arm tower crane combination attachment device

Country Status (1)

Country Link
CN (1) CN207330188U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113666279A (en) * 2021-08-16 2021-11-19 中国建筑第八工程局有限公司 Wall-attached embedded part of external climbing tower crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113666279A (en) * 2021-08-16 2021-11-19 中国建筑第八工程局有限公司 Wall-attached embedded part of external climbing tower crane
CN113666279B (en) * 2021-08-16 2023-11-21 中国建筑第八工程局有限公司 Wall-attached embedded part of external climbing tower crane

Similar Documents

Publication Publication Date Title
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN103924680B (en) Prestressing without bondn is connected precast concrete beam square steel tube concrete column combination node with regular reinforcement
CN204023411U (en) Novel assembled bracket bracket construction equipment
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN103410101A (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN203531148U (en) Wing-expanding corrugated web plate H-shaped steel beam-column joint connecting component
CN205475929U (en) Steel construction arch without beam plate -column structure
CN207330188U (en) Super high-rise internal climbing type movable arm tower crane combination attachment device
CN205296831U (en) Supporting type that bears joist that uses of support is buckled to socket joint type dish
CN105625198A (en) Reinforced rigid-framed arch bridge
CN106245769A (en) A kind of structure of profile steel concrete column beam column universal nodes
CN202787512U (en) H-shaped steel column leg connecting structure
CN204715540U (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN204738400U (en) A connected node that is used for increasing equipment that hangs under concrete beam having
CN104265005B (en) The back ruggedized construction that a kind of steel plate combines with reinforcing bar
CN202672484U (en) Steel pipe single-post structure
CN205822472U (en) A kind of square set side's Concrete-filled Double Skin Steel Tube Columns and steel beam connecting joint
CN204917674U (en) Hoist girder
CN102817467A (en) Operating platform for high-altitude installation of steel structure
CN103726585B (en) The buckling and energy consumption preventing steel plate shear wall of built-in support
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN202380479U (en) Cast-in-situ connecting device for 220-kilovolt transformer station equipment bracket and blinding layer foundation
CN207314527U (en) H profile steel, the connection structure of H profile steel and H profile steel concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508