CN207326288U - Splicing frock for communication iron tower - Google Patents

Splicing frock for communication iron tower Download PDF

Info

Publication number
CN207326288U
CN207326288U CN201721154814.6U CN201721154814U CN207326288U CN 207326288 U CN207326288 U CN 207326288U CN 201721154814 U CN201721154814 U CN 201721154814U CN 207326288 U CN207326288 U CN 207326288U
Authority
CN
China
Prior art keywords
lappet
plate
positioning
hemsl
engler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721154814.6U
Other languages
Chinese (zh)
Inventor
刘凯俊
蔡百灵
石磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN TELECOM PHOTOELECTRIC TECHNOLOGY CO LTD
Original Assignee
WUHAN TELECOM PHOTOELECTRIC TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN TELECOM PHOTOELECTRIC TECHNOLOGY CO LTD filed Critical WUHAN TELECOM PHOTOELECTRIC TECHNOLOGY CO LTD
Priority to CN201721154814.6U priority Critical patent/CN207326288U/en
Application granted granted Critical
Publication of CN207326288U publication Critical patent/CN207326288U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Spinning Or Twisting Of Yarns (AREA)

Abstract

The utility model discloses a kind of splicing frock for communication iron tower,Base including strip structure,The top surface both ends of the base are respectively perpendicular the ring flange positioning plate being provided with for location and installation ring flange,Spacing between two ring flange positioning plates is engaged with the length of steel pipe,The position that termination leaflet daughter board is installed on the steel pipe is corresponded on the base top surface equipped with the small lappet positioning support component for being used for the small lappet in termination described in location and installation and the support steel pipe,The position that installation middle part lappet on the steel pipe is corresponded on the base top surface is equipped with the middle part lappet positioning support component for being used for middle part lappet described in location and installation and supporting the steel pipe,The position that termination Astilbo idestabularis (Hemsl.) Engler plate is installed on the steel pipe is corresponded on the base top surface equipped with the Astilbo idestabularis (Hemsl.) Engler plate positioning support component for being used for Astilbo idestabularis (Hemsl.) Engler plate in termination described in location and installation and the support steel pipe.Suitable for the assembly of communication iron tower.

Description

Splicing frock for communication iron tower
Technical field
Communication iron tower field is the utility model is related to, more particularly to a kind of splicing frock for communication iron tower.
Background technology
At present, communication iron tower is generally assembled by some sections of tower body welding sections, and every section of tower body welding section is by tower body Welding section tubing connecting assembly is spliced, and therefore, the joining quality of tower body welding section tubing connecting assembly directly decides logical Interrogate the assembled quality of steel tower.
Wherein, tower body welding section tubing connecting assembly generally comprises a steel pipe a, two ring flange b, a pair of of termination leaflet Daughter board c, at least a pair of of middle part lappet d and a pair of termination Astilbo idestabularis (Hemsl.) Engler plate e, two ring flange b the two ends phase with steel pipe a respectively Even, the small lappet c in termination is welded on one end outer wall of steel pipe a, and termination Astilbo idestabularis (Hemsl.) Engler plate e is welded on the other end outer wall of steel pipe a On, middle part lappet d is welded on the position corresponded on steel pipe a outer walls between termination leaflet daughter board c and termination Astilbo idestabularis (Hemsl.) Engler plate e.It is existing Have technique it is assembled when, due between steel pipe a and ring flange b, between steel pipe a and lappet and between lappet and lappet all There is certain angle and distance requirement, so only first carrying out mark on steel pipe a by bevel protractor and tape measure, then use bevel protractor Carry out manual assembling welding.In this way, it is quite time-consuming, and the accuracy spliced is poor, so as to directly affects the spelling of communication steel tower Packing quality.
Utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned background technology, there is provided a kind of spelling for communication iron tower Connect frock.
In order to realize the above object a kind of splicing frock for communication iron tower provided by the utility model, including strip The base of shape structure, the top surface both ends of the base are respectively perpendicular the ring flange positioning being provided with for location and installation ring flange Plate, the spacing between two ring flange positioning plates are engaged with the length of steel pipe, and the steel is corresponded on the base top surface The position that termination leaflet daughter board is installed on pipe is equipped with for the small lappet in termination described in location and installation and supports the small of the steel pipe Lappet positions support component, and the position that installation middle part lappet on the steel pipe is corresponded on the base top surface is equipped with for fixed Position installs the middle part lappet and supports the middle part lappet positioning support component of the steel pipe, corresponding on the base top surface The position that termination Astilbo idestabularis (Hemsl.) Engler plate is installed on the steel pipe is equipped with for Astilbo idestabularis (Hemsl.) Engler plate in termination described in location and installation and supports the steel The Astilbo idestabularis (Hemsl.) Engler plate positioning support component of pipe.
By separately designing the ring flange positioning plate for location and installation ring flange on base top surface, for location and installation The small lappet of the small lappet in termination and supporting steel pipe positions support component, for lappet in the middle part of location and installation and supporting steel pipe Middle part lappet positioning support component and positioned for the Astilbo idestabularis (Hemsl.) Engler plate of location and installation termination Astilbo idestabularis (Hemsl.) Engler plate and supporting steel pipe Support component, in this way, during assembled tower body welding section tubing connecting assembly, only needs that two ring flanges first are set in steel pipe On both ends and it is placed in this splicing frock, then ring flange is fixed on ring flange positioning plate with positioning pin and bolt, is connect Respectively to be corresponded to the small lappet in termination, middle part lappet and termination Astilbo idestabularis (Hemsl.) Engler plate with positioning pin and be positioned at small lappet positioning branch In support component, middle part lappet positioning support component and Astilbo idestabularis (Hemsl.) Engler plate positioning support component, finally by ring flange, the small leaf in termination Plate, middle part lappet and termination Astilbo idestabularis (Hemsl.) Engler plate are respectively welded on supporting steel pipe, and whole assembly process is simple and convenient and imitates Rate is high.
In such scheme, the small lappet positioning support component includes the leaflet one piece along the base lateral arrangement Daughter board installs support plate and two pieces of small lappet positioning plates being longitudinally arranged along the base, the shape of the small lappet positioning plate Shape and structure are engaged with the shape and structure of the small lappet in the termination, opposite between two pieces of small lappet positioning plates Relative position between position and two pieces of small lappets in termination is engaged, and the top surface of the small lappet installation support plate is The cambered surface of the steel pipe is used to support, the bottom of the small lappet installation support plate is installed on the base, described in two pieces Small lappet positioning plate is separately mounted to the small lappet installation branch backwards to one end of the corresponding ring flange positioning plate On fagging, two pieces of small lappet positioning plates are suspended towards one end of the corresponding ring flange positioning plate.
By the way that the shape of small lappet positioning plate and structure are designed to match with the shape of the small lappet in termination and structure Close, so using the hole position on small lappet positioning plate, insert positioning pin wherein and carry out the small lappet in location and installation termination, from And realize the accurate positionin between the small lappet in termination and steel pipe;Meanwhile small lappet installation support plate can also play steel pipe Support the effect of positioning.
In such scheme, the middle part lappet positioning support component is arranged laterally at a spacing including two pieces along the base Middle part lappet installation support plate and two pieces of middle part lappet positioning plates being longitudinally arranged along the base, the middle part leaf The shape and structure of plate positioning plate are engaged with the shape and structure of the middle part lappet, two pieces of middle part lappet positioning Relative position between plate is engaged with the relative position between two pieces of paired middle part lappets, two pieces of middle leaves The top surface of daughter board installation support plate is the cambered surface for being used to support the steel pipe, and two pieces of middle part lappets install the bottom of support plate Portion is installed on the base, the middle part lappet positioning plate be installed on two pieces of middle part lappets installation support plates it Between.
By the way that the shape of middle part lappet positioning plate and structure are designed to match with the shape of middle part lappet and structure Close, so using the hole position on the lappet positioning plate of middle part, insert positioning pin wherein and carry out lappet in the middle part of location and installation, from And realize the accurate positionin between middle part lappet and steel pipe;Meanwhile middle part lappet installation support plate can also play steel pipe Support the effect of positioning.
In such scheme, what the Astilbo idestabularis (Hemsl.) Engler plate positioning support component was arranged laterally at a spacing including two pieces along the base Astilbo idestabularis (Hemsl.) Engler plate installs support plate and two pieces of Astilbo idestabularis (Hemsl.) Engler plate positioning plates being longitudinally arranged along the base, the Astilbo idestabularis (Hemsl.) Engler plate positioning plate Shape and structure be engaged with the shape and structure of the termination Astilbo idestabularis (Hemsl.) Engler plate, between two pieces of Astilbo idestabularis (Hemsl.) Engler plate positioning plates Relative position between relative position and two blocks of termination Astilbo idestabularis (Hemsl.) Engler plates is engaged, two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plates Top surface be the cambered surface for being used to support the steel pipe, the bottom of two pieces of Astilbo idestabularis (Hemsl.) Engler plates installation support plates is installed on the base On, the Astilbo idestabularis (Hemsl.) Engler plate positioning plate is installed between two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plates.
By the way that the shape of Astilbo idestabularis (Hemsl.) Engler plate positioning plate and structure are designed to match with the shape of termination Astilbo idestabularis (Hemsl.) Engler plate and structure Close, so using the hole position on Astilbo idestabularis (Hemsl.) Engler plate positioning plate, insert positioning pin wherein and carry out location and installation termination Astilbo idestabularis (Hemsl.) Engler plate, from And realize the accurate positionin between termination Astilbo idestabularis (Hemsl.) Engler plate and steel pipe;Meanwhile Astilbo idestabularis (Hemsl.) Engler plate installation support plate can also play steel pipe Support the effect of positioning.
In such scheme, supporting item is equipped between the back side of the ring flange positioning plate and the top surface of the base.Add If supporting item can improve the intensity of ring flange positioning plate, prevent it from dislocation, deformation occurring during assembly.
In such scheme, the both sides of any ring flange positioning plate are installed with one block of stripper plate respectively.What is added is de- The tower body welding section tubing connecting assembly that template can conveniently splice successfully is deviate from from this splicing frock, accordingly, two Spacing between ring flange positioning plate should be just engaged with the sum of the thickness of the length of steel pipe and stripper plate.
The utility model is compared with the prior art, and fully shows that it is advantageous in that:
1st, by separately designing the ring flange positioning plate for location and installation ring flange on base top surface, pacifying for positioning Fill the small lappet positioning support component of the small lappet in termination and supporting steel pipe, for lappet in the middle part of location and installation and supporting steel The middle part lappet positioning support component of pipe and the Astilbo idestabularis (Hemsl.) Engler plate for location and installation termination Astilbo idestabularis (Hemsl.) Engler plate and supporting steel pipe are determined Two ring flanges in this way, during assembled tower body welding section tubing connecting assembly, only first need to be set in steel pipe by position support component Both ends on and be placed in this splicing frock, then ring flange is fixed on ring flange positioning plate with positioning pin and bolt, Then the small lappet in termination, middle part lappet and termination Astilbo idestabularis (Hemsl.) Engler plate are corresponded to respectively with positioning pin and is positioned at small lappet positioning In support component, middle part lappet positioning support component and Astilbo idestabularis (Hemsl.) Engler plate positioning support component, finally by ring flange, termination leaflet Daughter board, middle part lappet and termination Astilbo idestabularis (Hemsl.) Engler plate are respectively welded on supporting steel pipe, whole assembly process it is simple and convenient and It is efficient;
2nd, by the way that the shape of small lappet positioning plate and structure to be designed to shape and structure phase with the small lappet in termination Coordinate, so using the hole position on small lappet positioning plate, insert positioning pin wherein and carry out the small lappet in location and installation termination, So as to fulfill the accurate positionin between the small lappet in termination and steel pipe;Meanwhile small lappet installation support plate can also play steel pipe To the effect of support positioning;
3rd, by the way that the shape of middle part lappet positioning plate and structure are designed to and the shape of middle part lappet and structure phase Coordinate, so using the hole position on the lappet positioning plate of middle part, insert positioning pin wherein and carry out lappet in the middle part of location and installation, So as to fulfill the accurate positionin between middle part lappet and steel pipe;Meanwhile middle part lappet installation support plate can also play steel pipe To the effect of support positioning;
4th, by the way that the shape of Astilbo idestabularis (Hemsl.) Engler plate positioning plate and structure to be designed to shape and structure phase with termination Astilbo idestabularis (Hemsl.) Engler plate Coordinate, so using the hole position on Astilbo idestabularis (Hemsl.) Engler plate positioning plate, insert positioning pin wherein and carry out location and installation termination Astilbo idestabularis (Hemsl.) Engler plate, So as to fulfill the accurate positionin between termination Astilbo idestabularis (Hemsl.) Engler plate and steel pipe;Meanwhile Astilbo idestabularis (Hemsl.) Engler plate installation support plate can also play steel pipe To the effect of support positioning;
5th, the supporting item added can improve the intensity of ring flange positioning plate, prevent it from dislocation occurring during assembly, becomes Shape;
6th, the tower body welding section tubing connecting assembly that the stripper plate added can conveniently splice is successfully from this splicing frock Upper abjection.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is another viewing angle constructions schematic diagram of Fig. 1;
Fig. 3 is the main structure diagram of Fig. 1;
Fig. 4 is the overlooking the structure diagram of Fig. 1;
Fig. 5 is the side structure schematic view of Fig. 1;
Fig. 6 is structure diagram when being placed on after ring flange is sleeved on steel pipe in this splicing frock;
Fig. 7 is the structure diagram after the installation of all position components;
Fig. 8 is the structure diagram of tower body welding section tubing connecting assembly.
In figure:Base 1, ring flange positioning plate 2, small lappet position support component 3, and small lappet installs support plate 3a, Small lappet positioning plate 3b, middle part lappet positioning support component 4, middle part lappet installation support plate 4a, middle part lappet are determined Position plate 4b, Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5, Astilbo idestabularis (Hemsl.) Engler plate installation support plate 5a, Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b, supporting item 6, takes off Template 7, steel pipe a, ring flange b, the small lappet c in termination, middle part lappet d, termination Astilbo idestabularis (Hemsl.) Engler plate e.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and embodiments, but the embodiment should not be understood For the limitation to the utility model.
The present embodiment provides a kind of splicing frock for communication iron tower, include the base 1 of strip structure, the base 1 is H profile steel, and the top surface both ends of the base 1 are respectively perpendicular the ring flange positioning plate 2 being provided with for location and installation ring flange b, The both sides of any ring flange positioning plate 2 are installed with one block of stripper plate 7 respectively, the spacing between two ring flange positioning plates 2 It is engaged with the sum of the thickness of the length of steel pipe a and stripper plate 7, is corresponded on 1 top surface of base on the steel pipe a and termination is installed The position of small lappet c is equipped with the small lappet positioning for being used for the small lappet c in termination described in location and installation and supporting the steel pipe a Support component 3, the position that installation middle part lappet d on the steel pipe a is corresponded on 1 top surface of base are equipped with and are used for location and installation The middle part lappet of the middle part lappet d and the support steel pipe a position support component 4, and institute is corresponded on 1 top surface of base The position that termination Astilbo idestabularis (Hemsl.) Engler plate e is installed on steel pipe a is stated equipped with for termination Astilbo idestabularis (Hemsl.) Engler plate e described in location and installation and the support steel The Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5 of pipe a.
By separately designing the ring flange positioning plate 2 for location and installation ring flange b on 1 top surface of base, for positioning The small lappet positioning support component 3 of termination leaflet daughter board c and supporting steel pipe a are installed, for lappet d in the middle part of location and installation and The middle part lappet of supporting steel pipe a positions support component 4 and for location and installation termination Astilbo idestabularis (Hemsl.) Engler plate e and supporting steel pipe a Astilbo idestabularis (Hemsl.) Engler plate positions support component 5, in this way, during assembled tower body welding section tubing connecting assembly, only need to be first by two b points of ring flanges It is not sleeved on the both ends of steel pipe a and is placed in this splicing frock, ring flange b is then fixed on method with positioning pin and bolt On blue disk positioning plate 2, then the small lappet c in termination, middle part lappet d and termination Astilbo idestabularis (Hemsl.) Engler plate e are corresponded to respectively with positioning pin It is positioned in small lappet positioning support component 3, middle part lappet positioning support component 4 and Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5, Finally ring flange b, the small lappet c in termination, middle part lappet d and termination Astilbo idestabularis (Hemsl.) Engler plate e are respectively welded on supporting steel pipe a i.e. Can, whole assembly process is simple and convenient and efficient.
Above-mentioned small lappet positioning support component 3 includes one piece of small lappet along 1 lateral arrangement of base and installs branch Fagging 3a and two pieces of small lappet positioning plate 3b being longitudinally arranged along the base 1, the shape of the small lappet positioning plate 3b It is engaged with structure with the shape and structure of the small lappet c in the termination, the phase between two pieces of small lappet positioning plate 3b Relative position between position and two pieces of small lappet c in termination is engaged, the small lappet installation support plate 3a's Top surface is the cambered surface for being used to support the steel pipe a, and the bottom of the small lappet installation support plate 3a is installed on the base 1 On, two pieces of small lappet positioning plate 3b are separately mounted to described backwards to one end of the corresponding ring flange positioning plate 2 On small lappet installation support plate 3a, two pieces of small lappet positioning plate 3b are towards the corresponding ring flange positioning plate 2 One end suspension.By the way that the shape of small lappet positioning plate 3b and structure to be designed to shape and knot with the small lappet c in termination Structure is engaged, and so using the hole position on small lappet positioning plate 3b, inserting positioning pin wherein, to come location and installation termination small Lappet c, so as to fulfill the accurate positionin between the small lappet c and steel pipe a of termination;Meanwhile small lappet installation support plate 3a It can also play the role of support positioning to steel pipe a.
Above-mentioned middle part lappet positioning support component 4 includes two pieces of middle part leaves being arranged laterally at a spacing along the base 1 Plate installs support plate 4a and two pieces of middle part lappet positioning plate 4b being longitudinally arranged along the base 1, the middle part lappet are determined The shape and structure of position plate 4b is engaged with the shape and structure of the middle part lappet d, two pieces of middle part lappet positioning Relative position between plate 4b is engaged with the relative position between two pieces of paired middle part lappet d, during two pieces described The top surface of portion lappet installation support plate 4a is the cambered surface for being used to support the steel pipe a, and two pieces of middle part lappets install branch The bottom of fagging 4a is installed on the base 1, and the middle part lappet positioning plate 4b is installed on two pieces of middle part lappets Between installation support plate 4a.By the way that the shape of middle part lappet positioning plate 4b and structure to be designed to the shape with middle part lappet d Shape and structure are engaged, and so using the hole position on the lappet positioning plate 4b of middle part, insert positioning pin wherein to position peace Dress middle part lappet d, so as to fulfill the accurate positionin between middle part lappet d and steel pipe a;Meanwhile middle part lappet installation branch Fagging 4a can also play the role of steel pipe a support positioning.
Above-mentioned Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5 includes two blocks of Astilbo idestabularis (Hemsl.) Engler plates being arranged laterally at a spacing along the base 1 and pacifies Support plate 5a and two pieces of Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b being longitudinally arranged along the base 1 is filled, the Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b's Shape and structure are engaged with the shape and structure of the termination Astilbo idestabularis (Hemsl.) Engler plate e, between two pieces of Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b Relative position be engaged with the relative position between two pieces of termination Astilbo idestabularis (Hemsl.) Engler plate e, two pieces of Astilbo idestabularis (Hemsl.) Engler plates installation branch The top surface of fagging 5a is the cambered surface for being used to support the steel pipe a, and the bottom of two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plate 5a is installed On the base 1, the Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b is installed between two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plate 5a.Pass through The shape of Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b and structure are designed to be engaged with the shape of termination Astilbo idestabularis (Hemsl.) Engler plate e and structure, so may be used Using the hole position on Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b, positioning pin is inserted wherein and carrys out location and installation termination Astilbo idestabularis (Hemsl.) Engler plate e, so as to fulfill Accurate positionin between termination Astilbo idestabularis (Hemsl.) Engler plate e and steel pipe a;Meanwhile Astilbo idestabularis (Hemsl.) Engler plate installation support plate 5a can also play steel pipe a branch Support the effect of positioning.
Supporting item 6 is equipped between the back side of above-mentioned ring flange positioning plate 2 and the top surface of the base 1.The supporting item 6 added The intensity of ring flange positioning plate 2 can be improved, prevents it from dislocation, deformation occurring during assembly.
Assembled process is as follows:
First, two ring flange b are set on the both ends of steel pipe a and be placed in this splicing frock;Then, use Ring flange b is fixed on ring flange positioning plate 2 by positioning pin and bolt, wherein, for the ring flange positioning plate equipped with stripper plate 7 2, stripper plate 7 is stuck between ring flange b and ring flange positioning plate 2;Then, with positioning pin respectively by the small lappet c in termination, middle part Lappet d and termination Astilbo idestabularis (Hemsl.) Engler plate e, which is corresponded to, is positioned at small lappet positioning support component 3, middle part lappet positioning support component 4 In Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5;Followed by ring flange b, the small lappet c in termination, middle part lappet d and termination is big Lappet e is respectively welded on supporting steel pipe a;After being cooled down Deng welding position, all bolts and positioning pin are unclamped, and will be de- Template 7 is struck down from ring flange positioning plate 2;Finally, can easily by the tower body welding section tubing connecting assembly being welded from Taken out in this splicing frock.
The present embodiment by separately designed on 1 top surface of base the ring flange positioning plate 2 for location and installation ring flange b, Small lappet for location and installation termination small lappet c and supporting steel pipe a positions support component 3, in the middle part of location and installation The middle part lappet of lappet d and supporting steel pipe a positions support component 4 and for location and installation termination Astilbo idestabularis (Hemsl.) Engler plate e and branch The Astilbo idestabularis (Hemsl.) Engler plate positioning support component 5 of steel pipe a is supportted, in this way, during assembled tower body welding section tubing connecting assembly, only need to be first by two Ring flange b is set on the both ends of steel pipe a and is placed in this splicing frock, then with positioning pin and bolt by ring flange B is fixed on ring flange positioning plate 2, then with positioning pin respectively by the small lappet c in termination, middle part lappet d and termination great Ye Daughter board e, which is corresponded to, is positioned at small lappet positioning support component 3, middle part lappet positioning support component 4 and Astilbo idestabularis (Hemsl.) Engler plate positioning branch On support component 5, ring flange b, the small lappet c in termination, middle part lappet d and termination Astilbo idestabularis (Hemsl.) Engler plate e are finally respectively welded at branch Support on steel pipe a, whole assembly process is simple and convenient and efficient;By by the shape and knot of small lappet positioning plate 3b Structure is designed to be engaged with the shape of the small lappet c in termination and structure, so using on small lappet positioning plate 3b hole position, Inserting positioning pin carrys out the small lappet c in location and installation termination wherein, so as to fulfill the standard between the small lappet c and steel pipe a of termination Determine position;Meanwhile small lappet installation support plate 3a can also play the role of steel pipe a support positioning;By by middle part leaf The shape and structure of plate positioning plate 4b is designed to be engaged with the shape of middle part lappet d and structure, so using middle leaf Hole position on daughter board positioning plate 4b, inserts positioning pin and carrys out lappet d in the middle part of location and installation, so as to fulfill middle part lappet wherein Accurate positionin between d and steel pipe a;Meanwhile middle part lappet installation support plate 4a can also play steel pipe a in the work of support positioning With;By the way that the shape of Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b and structure are designed to be engaged with the shape of termination Astilbo idestabularis (Hemsl.) Engler plate e and structure, So using the hole position on Astilbo idestabularis (Hemsl.) Engler plate positioning plate 5b, positioning pin is inserted wherein and carrys out location and installation termination Astilbo idestabularis (Hemsl.) Engler plate e, from And realize the accurate positionin between termination Astilbo idestabularis (Hemsl.) Engler plate e and steel pipe a;Meanwhile Astilbo idestabularis (Hemsl.) Engler plate installation support plate 5a can also be to steel pipe a Play the role of support positioning;The supporting item 6 added can improve the intensity of ring flange positioning plate 2, prevent it during assembly Generation dislocation, deformation;The tower body welding section tubing connecting assembly that the stripper plate 7 added can conveniently splice is successfully from this splicing Deviate from frock.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality Within new spirit and principle, any modification, equivalent replacement, improvement and so on, should be included in the guarantor of the utility model Within the scope of shield.

Claims (6)

  1. A kind of 1. splicing frock for communication iron tower, it is characterised in that:Base (1) including strip structure, the base (1) top surface both ends are respectively perpendicular the ring flange positioning plate (2) being provided with for location and installation ring flange (b), two methods Spacing between blue disk positioning plate (2) is engaged with the length of steel pipe (a), and the steel pipe (a) is corresponded on base (1) top surface The position of upper installation termination leaflet daughter board (c), which is equipped with, is used for the small lappet (c) in termination described in location and installation and the support steel pipe (a) small lappet positions support component (3), and installation middle part lappet on the steel pipe (a) is corresponded on base (1) top surface (d) position is equipped with the middle part lappet positioning branch for being used for middle part lappet (d) described in location and installation and supporting the steel pipe (a) Support component (4), corresponds on base (1) top surface and the position of termination Astilbo idestabularis (Hemsl.) Engler plate (e) is installed on the steel pipe (a) is equipped with and is used for Termination Astilbo idestabularis (Hemsl.) Engler plate (e) described in location and installation and the Astilbo idestabularis (Hemsl.) Engler plate positioning support component (5) for supporting the steel pipe (a).
  2. 2. it is used for the splicing frock of communication iron tower as claimed in claim 1, it is characterised in that:The small lappet positioning support Component (3) includes one piece along the small lappet installation support plate (3a) of the base (1) lateral arrangement and two pieces along the base (1) the small lappet positioning plate (3b) being longitudinally arranged, shape and structure and the termination of the small lappet positioning plate (3b) The shape and structure of small lappet (c) are engaged, the relative position between two pieces of small lappet positioning plates (3b) with two pieces Relative position between the small lappet (c) in termination is engaged, and the top surface of the small lappet installation support plate (3a) is use In the cambered surface for supporting the steel pipe (a), the bottom of the small lappet installation support plate (3a) is installed on the base (1), Two pieces of small lappet positioning plates (3b) are separately mounted to described backwards to one end of the corresponding ring flange positioning plate (2) On small lappet installation support plate (3a), two pieces of small lappet positioning plates (3b) position towards the corresponding ring flange One end suspension of plate (2).
  3. 3. it is used for the splicing frock of communication iron tower as claimed in claim 1, it is characterised in that:The middle part lappet positioning branch Support component (4) includes two pieces of middle part lappet installation support plates (4a) being arranged laterally at a spacing along the base (1) and two pieces of edges The middle part lappet positioning plate (4b) that the base (1) is longitudinally arranged, the shape and knot of the middle part lappet positioning plate (4b) Structure is engaged with the shape and structure of the middle part lappet (d), the phase between two pieces of middle part lappet positioning plates (4b) Relative position between position and two pieces of paired middle part lappets (d) is engaged, two pieces of middle part lappet peaces The top surface of dress support plate (4a) is the cambered surface for being used to support the steel pipe (a), and two pieces of middle part lappets install support plates The bottom of (4a) is installed on the base (1), and the middle part lappet positioning plate (4b) is installed on two pieces of middle part leaves Between plate installation support plate (4a).
  4. 4. it is used for the splicing frock of communication iron tower as claimed in claim 1, it is characterised in that:The Astilbo idestabularis (Hemsl.) Engler plate positioning support Component (5) includes the two pieces of Astilbo idestabularis (Hemsl.) Engler plates being arranged laterally at a spacing along the base (1) installation support plates (5a) and two pieces along described The Astilbo idestabularis (Hemsl.) Engler plate positioning plate (5b) that base (1) is longitudinally arranged, the shape and structure of the Astilbo idestabularis (Hemsl.) Engler plate positioning plate (5b) with it is described The shape and structure of termination Astilbo idestabularis (Hemsl.) Engler plate (e) are engaged, the relative position between two pieces of Astilbo idestabularis (Hemsl.) Engler plate positioning plates (5b) with Relative position between two pieces of termination Astilbo idestabularis (Hemsl.) Engler plates (e) is engaged, and two blocks of Astilbo idestabularis (Hemsl.) Engler plates install support plate (5a) Top surface is the cambered surface for being used to support the steel pipe (a), and the bottom of two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plates (5a) is installed on institute State on base (1), the Astilbo idestabularis (Hemsl.) Engler plate positioning plate (5b) is installed between two pieces of Astilbo idestabularis (Hemsl.) Engler plate installation support plates (5a).
  5. 5. it is used for the splicing frock of communication iron tower as claimed in claim 1, it is characterised in that:The ring flange positioning plate (2) The back side and the base (1) top surface between be equipped with supporting item (6).
  6. 6. it is used for the splicing frock of communication iron tower as claimed in claim 1, it is characterised in that:Any ring flange positioning plate (2) both sides are installed with one piece of stripper plate (7) respectively.
CN201721154814.6U 2017-09-05 2017-09-05 Splicing frock for communication iron tower Expired - Fee Related CN207326288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721154814.6U CN207326288U (en) 2017-09-05 2017-09-05 Splicing frock for communication iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721154814.6U CN207326288U (en) 2017-09-05 2017-09-05 Splicing frock for communication iron tower

Publications (1)

Publication Number Publication Date
CN207326288U true CN207326288U (en) 2018-05-08

Family

ID=62371899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721154814.6U Expired - Fee Related CN207326288U (en) 2017-09-05 2017-09-05 Splicing frock for communication iron tower

Country Status (1)

Country Link
CN (1) CN207326288U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317915A (en) * 2018-10-31 2019-02-12 江苏华电铁塔制造有限公司 A kind of tower unit spliced tooling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317915A (en) * 2018-10-31 2019-02-12 江苏华电铁塔制造有限公司 A kind of tower unit spliced tooling
CN109317915B (en) * 2018-10-31 2023-06-02 江苏华电铁塔制造有限公司 Pipe tower unit concatenation frock

Similar Documents

Publication Publication Date Title
CN105155497B (en) A kind of jack up lifting platform lowering or hoisting gear and its manufacturing process
CN107985504A (en) A kind of guide rail bracket two-sided installation method under the positive tire state of container ship transverse bulkhead
CN105195947B (en) Group welding method and assembly fixture for inner barrel and outer barrel of connecting pipe with through hole support
CN105040567A (en) Interchange steel bridge and manufacture method thereof
CN205907604U (en) Steel bridge segmental hoisting counterpoint fixing device
CN113089887A (en) Assembly type wallboard with positioning device and installation method thereof
CN207326288U (en) Splicing frock for communication iron tower
CN109184225A (en) Four string prismatic bending circular tube truss structural systems of one kind and assembling method
CN103406733A (en) Method for fabricating great bridge arch rib
CN206636050U (en) Antirust H profile steel
CN206973169U (en) Equipment rack
CN207420574U (en) A kind of shield is missed the stop steelframe
CN209510324U (en) Measuring instrument placing device in a kind of measurement of shield tunnel
CN209716857U (en) A kind of junction steel plate positioning device
CN106808128B (en) The method and tooling moulding bed made for jack-up unit jetting pipeline
CN106736077B (en) Steel pipe post interface flange coordinate location device and its localization method
CN207942111U (en) One kind being convenient for site-assembled integrated-type steel moald-cavity
CN204982627U (en) Truss box member port positioner
CN105621212B (en) The rotating central hole laser locating apparatus of escalator slide rail system
CN107695488A (en) Manufacture craft in the middle part of a kind of 1600T masts arm frame
CN105881012B (en) Horizontal oil pump belt roller packaging technology
CN205363687U (en) Concrete column workshop equipment mould is managed in side
CN110315267A (en) A kind of derrick crane chip standard knot welding positioning tool
CN208847438U (en) A kind of modal test fixture constrained for simulating fixing end
CN206110364U (en) Main couple and jack truss splicing joint structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20200905

CF01 Termination of patent right due to non-payment of annual fee