CN207317568U CN201721292598.1U CN201721292598U CN207317568U CN 207317568 U CN207317568 U CN 207317568U CN 201721292598 U CN201721292598 U CN 201721292598U CN 207317568 U CN207317568 U CN 207317568U
Authority
CN
China
Prior art keywords
cooling tower
pipe
spray
tower body
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721292598.1U
Other languages
Chinese (zh)
Inventor
许翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinghe System Technology Suzhou Co ltd
Original Assignee
Kunshan Jing He Electromechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Jing He Electromechanical Engineering Co Ltd filed Critical Kunshan Jing He Electromechanical Engineering Co Ltd
Priority to CN201721292598.1U priority Critical patent/CN207317568U/en
Application granted granted Critical
Publication of CN207317568U publication Critical patent/CN207317568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a kind of cooling tower, including:Cooling tower tower body, pumping source, spray assemblies and air intake assembly, spray assemblies include auxiliary water tank, spray tube and nozzle, auxiliary water tank is arranged on the external side of cooling tower, auxiliary water tank one end is connected with pumping source, the other end is connected with the spray tube being arranged on inside cooling tower body, spray tube is in continuous bending, and is provided with the nozzle for water spray;Air intake assembly includes blast pipe and heat generating component, and blast pipe is arranged at the top of cooling tower tower body, and with being connected inside cooling tower body, heat generating component includes heat conducting pipe and heating board, heating board is arranged on inside blast pipe, is in hollow structure inside heating board, heat conducting pipe connects heating board with auxiliary water tank.On the one hand the device improves cooling effectiveness, saved the energy, on the other hand can prevent air inlet from freezing to shut, reduce system failure rate, improve the reliability of system.

Description

一种冷却塔a cooling tower

技术领域technical field

本实用新型涉及冷却设备领域,尤其涉及一种冷却塔。The utility model relates to the field of cooling equipment, in particular to a cooling tower.

背景技术Background technique

冷却塔是石油、化工、制药、炼油等工业中常用的冷却设备。现有技术中,通过冷却塔体内风机、冷却填料,通过进风口进入的冷空气与进入塔内热循环水进行置换,并在冷却塔上装连有上水管和回水管。Cooling towers are commonly used cooling equipment in petroleum, chemical, pharmaceutical, oil refining and other industries. In the prior art, the cold air entering through the air inlet and the hot circulating water in the tower are replaced by the fan and cooling filler in the cooling tower, and the cooling tower is connected with an upper water pipe and a return water pipe.

但在现有技术中,冷却塔普遍存在几个方面的问题:第一方面,冷却效率普遍不高,造成了大量的能源浪费,污染环境,运行效率低;第二方面,冷却塔在北方的严寒地区,冬季运行存在有结冰问题,进风口常被结冰封死,塔外的冷空气无法与塔内热循环水进行置换,造成塔体结构的严重破坏,而现有技术解决防冻的方法通常为风机强行运转的方法,既要消耗大量的电能,又增大了风机的故障率严重影响了风机的使用寿命。However, in the prior art, cooling towers generally have several problems: first, the cooling efficiency is generally not high, causing a large amount of energy waste, polluting the environment, and low operating efficiency; second, cooling towers in the north In severe cold areas, there is a problem of icing during winter operation, and the air inlet is often blocked by icing. The cold air outside the tower cannot be replaced with the hot circulating water in the tower, causing serious damage to the tower structure. However, the existing technology solves the antifreeze method Usually, the method of forced operation of the fan consumes a large amount of electric energy, increases the failure rate of the fan and seriously affects the service life of the fan.

实用新型内容Utility model content

针对上述问题,本实用新型提出一种冷却塔,一方面提高了冷却效率,节约了能源,另一方面能够防止进风口结冰封死,降低了系统故障率,提高了系统的可靠性。In view of the above problems, the utility model proposes a cooling tower, on the one hand, it improves the cooling efficiency and saves energy, on the other hand, it can prevent the air inlet from freezing and sealing, which reduces the system failure rate and improves the reliability of the system.

本实用新型采用以下技术方案:The utility model adopts the following technical solutions:

一种冷却塔,包括:冷却塔塔体、泵源、喷淋组件和进风组件;A cooling tower, comprising: a cooling tower body, a pump source, a spray assembly and an air intake assembly;

喷淋组件包括辅助水箱、喷淋管和喷头,辅助水箱设置在冷却塔塔体外侧,辅助水箱一端与泵源连接,另一端与设置在冷却塔塔体内部的喷淋管连接,喷淋管呈连续弯折状,并设置有用于喷水的喷头;The spray assembly includes an auxiliary water tank, a spray pipe and a nozzle. The auxiliary water tank is arranged outside the cooling tower body. One end of the auxiliary water tank is connected to the pump source, and the other end is connected to the spray pipe installed inside the cooling tower body. The spray pipe It is continuously bent and equipped with a nozzle for spraying water;

进风组件包括进风管和发热组件,进风管设置在冷却塔塔体顶部,并与却塔塔体内部连通,发热组件包括导热管和发热板,发热板设置在进风管内部,发热板内部呈中空结构,导热管将发热板和辅助水箱连通。The air inlet component includes an air inlet pipe and a heating element. The air inlet pipe is set on the top of the cooling tower body and communicates with the inside of the cooling tower body. The heating element includes a heat conduction pipe and a heating plate. The inside of the board is hollow, and the heat pipe connects the heating board with the auxiliary water tank.

作为本实用新型的一种优选方案,辅助水箱的数量为两个,对称设置在冷却塔塔体上,每一辅助水箱均连通一喷淋管,两个喷淋管盘绕设置在冷却塔塔体内部。As a preferred solution of the present utility model, the number of auxiliary water tanks is two, which are arranged symmetrically on the cooling tower body. Each auxiliary water tank is connected to a spray pipe, and the two spray pipes are coiled and arranged on the cooling tower body. internal.

作为本实用新型的一种优选方案,喷淋组件上还包括有固定件,用于将喷淋管固定在冷却塔塔体上。As a preferred solution of the present invention, the spray assembly also includes a fixing piece for fixing the spray pipe on the cooling tower body.

作为本实用新型的一种优选方案,冷却塔塔体还设置有进水管、集水槽和出水管,进水管与泵源连通,集水槽设置在冷却塔塔体的底部,集水槽上还设置有第一过滤装置,出水管设置在集水槽底部。As a preferred solution of the present utility model, the cooling tower body is also provided with a water inlet pipe, a water collecting tank and a water outlet pipe, the water inlet pipe is connected with the pump source, the water collecting tank is arranged at the bottom of the cooling tower body, and the water collecting tank is also provided with For the first filtering device, the water outlet pipe is arranged at the bottom of the sump.

作为本实用新型的一种优选方案,泵源设置为一个,其一端与进水管连接,另一端与辅助水箱连接。As a preferred solution of the utility model, one pump source is provided, one end of which is connected to the water inlet pipe, and the other end is connected to the auxiliary water tank.

作为本实用新型的一种优选方案,进水管内还设置有第二过滤装置。As a preferred solution of the present utility model, a second filtering device is also arranged in the water inlet pipe.

作为本实用新型的一种优选方案,发热板的数量为多个,多个发热板在进风管的内部排布呈百叶窗结构。As a preferred solution of the present invention, there are multiple heating plates, and the multiple heating plates are arranged inside the air inlet pipe to form a louver structure.

作为本实用新型的一种优选方案,发热组件还设置有连接管,连接管沿进风管的内壁设置,将多个发热板连通。As a preferred solution of the present invention, the heating component is also provided with a connecting pipe, which is arranged along the inner wall of the air inlet pipe, and connects a plurality of heating plates.

作为本实用新型的一种优选方案,进风组件还设置有第三过滤装置,第三过滤装置设置在进风管上,并位于发热板的外侧。As a preferred solution of the utility model, the air inlet assembly is further provided with a third filtering device, and the third filtering device is arranged on the air inlet pipe and located outside the heating plate.

作为本实用新型的一种优选方案,进风组件设置有至少两组。As a preferred solution of the present invention, at least two groups of air inlet components are provided.

本实用新型的有益效果为:The beneficial effects of the utility model are:

(1)本实用新型的一种冷却塔,通过设置辅助水箱,使得喷淋管内形成一个比较稳定的水压,从而使水的流量保持均衡;通过设置连续弯折状的喷淋管,并在喷淋管上设置喷头,使得通过进风口进入的冷空气一方面可以与喷淋管进行热交换,另一方面还可以与塔内热循环水进行热交换,提高了冷却效率;通过将辅助水箱中的热水导入进风组件内的发热片,使得发热片发热,大大降低了进风口结冰造成进风口被封死的可能性,降低了系统故障率,提高了系统的可靠性。(1) In a cooling tower of the present utility model, by setting an auxiliary water tank, a relatively stable water pressure is formed in the spray pipe, so that the flow of water is kept balanced; by setting a continuously bent spray pipe, and in Spray nozzles are installed on the spray pipe, so that the cold air entering through the air inlet can exchange heat with the spray pipe on the one hand, and can also exchange heat with the hot circulating water in the tower on the other hand, which improves the cooling efficiency; The hot water is introduced into the heating sheet in the air inlet component, which makes the heating sheet heat up, which greatly reduces the possibility of the air inlet being blocked due to freezing of the air inlet, reduces the system failure rate, and improves the reliability of the system.

(2)本实用新型的一种冷却塔,通过设置两个水箱,每一辅助水箱均连通一喷淋管,两个喷淋管盘绕设置在冷却塔塔体内部,大大增加了冷却塔的散热面积,提高了散热效率。(2) In a cooling tower of the present utility model, two water tanks are provided, and each auxiliary water tank is connected to a spray pipe, and the two spray pipes are coiled and arranged inside the cooling tower body, which greatly increases the heat dissipation of the cooling tower. area, improving heat dissipation efficiency.

(3)本实用新型的一种冷却塔,通过对集水槽上设置第一过滤装置,进水管内设置第二过滤装置,以及进风组件设置第三过滤装置,对进入系统的水和风进行一定的过滤,降低了系统故障率,保证了系统的运行效率。(3) In a cooling tower of the present utility model, a first filter device is set on the sump, a second filter device is set in the water inlet pipe, and a third filter device is set in the air inlet assembly, so as to control the water and wind entering the system. Filtering reduces the system failure rate and ensures the operating efficiency of the system.

附图说明Description of drawings

图1是本实用新型提供的冷却塔的示意图。Fig. 1 is the schematic diagram of the cooling tower provided by the utility model.

图2是本实用新型提供的冷却塔的单个喷淋管的结构示意图。Fig. 2 is a schematic structural view of a single spray pipe of the cooling tower provided by the present invention.

图3是本实用新型提供的冷却塔的两个喷淋管盘绕的结构示意图。Fig. 3 is a structural schematic diagram of two coiled spray pipes of the cooling tower provided by the utility model.

图4是本实用新型提供的冷却塔的进风管处发热组件的示意图。Fig. 4 is a schematic diagram of the heat-generating components at the air inlet pipe of the cooling tower provided by the present invention.

图中:1、冷却塔塔体;11、进水管;111、第二过滤装置;12、集水槽;121、第一过滤装置;13、出水管;In the figure: 1. Cooling tower body; 11. Water inlet pipe; 111. Second filter device; 12. Water collection tank; 121. First filter device; 13. Water outlet pipe;

2、泵源;2. Pump source;

3、喷淋组件;31、辅助水箱;32、喷淋管;33、喷头;34、固定件;3. Spray assembly; 31. Auxiliary water tank; 32. Spray pipe; 33. Nozzle; 34. Fixing parts;

4、进风组件;41、进风管;42、发热组件;421、导热管;422、发热板;423、连接管;43、第三过滤装置;4. Air intake component; 41. Air intake pipe; 42. Heating component; 421. Heat conduction pipe; 422. Heating plate; 423. Connecting pipe; 43. The third filter device;

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作进一步的详细说明。可以理解的是,此处所描述的具体实施例仅仅用于解释本实用新型,而非对本实用新型的限定。另外还需要说明的是,为了便于描述,附图中仅示出了与本实用新型相关的部分而非全部结构。Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail. It can be understood that the specific embodiments described here are only used to explain the utility model, rather than limit the utility model. In addition, it should be noted that, for the convenience of description, only some structures related to the present utility model are shown in the drawings but not all structures.

如图1所示为本实用新型提供的冷却塔的示意图,主要包括:冷却塔塔体1、泵源2、喷淋组件3和进风组件4。As shown in FIG. 1 , the schematic diagram of the cooling tower provided by the utility model mainly includes: a cooling tower body 1 , a pump source 2 , a spray assembly 3 and an air intake assembly 4 .

冷却塔塔体1设置有进水管11、集水槽12和出水管13。进水管11内设置有第二过滤装置111,用于对进入冷却塔塔体1的热水进行过滤。进水管11与泵源2连通,泵源2将进水管11的热水打入辅助水箱31中。集水槽12设置在冷却塔塔体1的底部,用于收集进行热交换后的热水,集水槽12上还设置有第一过滤装置121,优选第一过滤装置121为网状结构,覆盖在集水槽12上,用于对热水以及由进风管41带入的外界异物进行过滤。出水管13设置在集水槽12底部,用于将热交换后的热水从冷却塔塔体1内导出。The cooling tower body 1 is provided with a water inlet pipe 11 , a water collection tank 12 and a water outlet pipe 13 . The water inlet pipe 11 is provided with a second filter device 111 for filtering the hot water entering the cooling tower body 1 . The water inlet pipe 11 communicates with the pump source 2 , and the pump source 2 drives the hot water in the water inlet pipe 11 into the auxiliary water tank 31 . The sump 12 is arranged at the bottom of the cooling tower body 1, and is used to collect hot water after heat exchange. The sump 12 is also provided with a first filter device 121, preferably the first filter device 121 is a mesh structure, covering the The sump 12 is used to filter the hot water and foreign objects brought in by the air inlet pipe 41 . The water outlet pipe 13 is arranged at the bottom of the water collection tank 12 and is used for leading out the hot water after heat exchange from the cooling tower body 1 .

喷淋组件3包括辅助水箱31、喷淋管32、喷头33和固定件34,辅助水箱31设置在冷却塔塔体1外侧,辅助水箱31一端与泵源2连接,另一端与设置在冷却塔塔体1内部的喷淋管32连接,辅助水箱31可以为喷淋管32提供一个较为稳定的水压,使得进入喷淋管32的水的流量保持均衡。喷淋管32呈连续弯折状,单个喷淋管的结构示意图如图2所述,其中,喷淋管32的弯折形式不限,可以设置为图2中的直角弯折形式,也可以设置成弯角弯折、圆周弯折,以及不规律弯折等结构形式,只要满足增大喷淋管32表面积的目的即可。喷淋管32上还设置有用于喷水的喷头33,喷头33均匀的布置在喷淋管32上。固定件34将喷淋管32固定在冷却塔塔体1上。作为一种优选方案,由一个泵源2作为动力源,将辅助水箱31设置有两个,对称设置在冷却塔塔体1上,这种设置方式提高了系统的散热效率,同时,每一辅助水箱31均连通一喷淋管32,两个喷淋管32盘绕设置在冷却塔塔体1内部,两个喷淋管32盘绕的结构示意图如图3所述,两个喷淋管32盘绕方式不限,可以设置为图3中的插接形式,也可以设置成类似蚊香的盘状插接等结构形式,满足两个喷淋管32共同增大表面积的目的即可。The spray assembly 3 includes an auxiliary water tank 31, a spray pipe 32, a nozzle 33 and a fixing member 34. The auxiliary water tank 31 is arranged outside the cooling tower body 1. One end of the auxiliary water tank 31 is connected to the pump source 2, and the other end is connected to the pump source 2 arranged on the cooling tower. The spray pipe 32 inside the tower body 1 is connected, and the auxiliary water tank 31 can provide a relatively stable water pressure for the spray pipe 32, so that the flow of water entering the spray pipe 32 remains balanced. The shower pipe 32 is continuously bent, and the structural diagram of a single shower pipe is as shown in Figure 2, wherein the bending form of the shower pipe 32 is not limited, it can be set as a right-angle bending form in Figure 2, or can be It can be set into structural forms such as angle bending, circumferential bending, and irregular bending, as long as the purpose of increasing the surface area of the spray pipe 32 is satisfied. The spray pipe 32 is also provided with a spray head 33 for spraying water, and the spray head 33 is evenly arranged on the spray pipe 32 . The fixing part 34 fixes the spray pipe 32 on the tower body 1 of the cooling tower. As a preferred solution, a pump source 2 is used as a power source, and two auxiliary water tanks 31 are arranged symmetrically on the cooling tower body 1. This arrangement improves the heat dissipation efficiency of the system, and at the same time, each auxiliary The water tanks 31 are all connected to a spray pipe 32, and the two spray pipes 32 are coiled and arranged inside the cooling tower body 1. The structure diagram of the two spray pipes 32 coiled is as shown in Figure 3, and the two spray pipes 32 are coiled. It is not limited, it can be set in the plug-in form shown in FIG. 3 , or it can be set in a structural form such as a disc-shaped plug-in similar to mosquito coils, so as to meet the purpose of increasing the surface area of the two spray pipes 32 together.

如图4所示,进风组件4主要包括进风管41和发热组件42和第三过滤装置43,进风管41设置在冷却塔塔体1顶部,并与却塔塔体1内部连通,发热组件42设置在进风管41内部,第三过滤装置43位于发热组件42的外侧。优选进风组件4至少设置有两组,为冷却塔提供更大的风量,提高散热效率。发热组件42包括导热管421、发热板422和连接管423,发热板422内部呈中空结构,数量为多个,在进风管41的内部排布呈百叶窗结构,连接管423沿进风管41的内壁设置,将多个发热板422连通,导热管421将发热板422和辅助水箱31连通。当系统运行时,辅助水箱31内充满由泵源2打入的待冷却的热水,其中一部分热水从导热管421进入到发热板422内,发热板422内部呈中空结构,热水充满发热板422,并从连接管423将所有的发热板422中充满热水。由于发热组件42设置在进风管41内部,当外界天气寒冷时,风从进风管41进入冷却塔时,由于需要通过具有一定热量的发热组件42,避免了进风管41结冰。发热组件42巧妙地运用了系统中待降温的热水,不需要单独加热,不需要动力源将热水打入发热组件42中,并很好的解决了进风管41结冰的问题。第三过滤装置43位于发热组件42的外侧,能够对从进风管41进入冷却塔塔体1的风夹带的杂质等进行过滤,避免了外界杂质对冷却塔塔体1的污染。As shown in Figure 4, the air inlet assembly 4 mainly includes an air inlet pipe 41, a heating assembly 42 and a third filtering device 43, the air inlet pipe 41 is arranged on the top of the cooling tower body 1, and communicates with the inside of the cooling tower body 1, The heating component 42 is arranged inside the air inlet pipe 41 , and the third filtering device 43 is located outside the heating component 42 . Preferably, there are at least two groups of air inlet components 4, so as to provide a larger air volume for the cooling tower and improve heat dissipation efficiency. The heating assembly 42 includes a heat pipe 421, a heating plate 422 and a connecting pipe 423. The heating plate 422 has a hollow structure inside, and the number is multiple. The inside of the air inlet pipe 41 is arranged in a louver structure. The inner wall is set to connect a plurality of heating plates 422 , and the heat pipe 421 communicates the heating plates 422 and the auxiliary water tank 31 . When the system is running, the auxiliary water tank 31 is filled with the hot water pumped in by the pump source 2 to be cooled, and part of the hot water enters the heating plate 422 from the heat pipe 421. The heating plate 422 has a hollow structure inside, and the hot water is full of heat. plate 422, and all heating plates 422 are filled with hot water from connecting pipe 423. Because the heating element 42 is arranged inside the air inlet pipe 41, when the outside weather is cold, when the wind enters the cooling tower from the air inlet pipe 41, it needs to pass through the heating element 42 with a certain amount of heat, so that the air inlet pipe 41 is prevented from freezing. The heating element 42 skillfully utilizes the hot water to be cooled in the system, does not need to be heated separately, and does not need a power source to inject hot water into the heating element 42, and solves the problem of freezing of the air inlet pipe 41 well. The third filtering device 43 is located outside the heating element 42, and can filter impurities and the like entrained by the wind entering the cooling tower body 1 from the air inlet pipe 41, so as to avoid contamination of the cooling tower body 1 by external impurities.

注意,上述仅为本实用新型的较佳实施例及所运用技术原理。本领域技术人员会理解,本实用新型不限于这里的特定实施例,对本领域技术人员来说能够进行各种明显的变化、重新调整和替代而不会脱离本实用新型的保护范围。因此,虽然通过以上实施例对本实用新型进行了较为详细的说明,但是本实用新型不仅仅限于以上实施例,在不脱离本实用新型构思的情况下,还可以包括更多其他等效实施例,而本实用新型的范围由所附的权利要求范围决定。Note that the above are only preferred embodiments of the present invention and the applied technical principles. Those skilled in the art will understand that the utility model is not limited to the specific embodiments here, and various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the utility model. Therefore, although the utility model has been described in detail through the above embodiments, the utility model is not limited to the above embodiments, and can also include more other equivalent embodiments without departing from the concept of the utility model. The scope of the present invention is determined by the appended claims.

Claims (10)

1.一种冷却塔,包括冷却塔塔体(1),泵源(2)设置在冷却塔塔体(1)外侧,其特征在于,还包括喷淋组件(3),所述喷淋组件(3)包括辅助水箱(31)、喷淋管(32)和喷头(33),所述辅助水箱(31)设置在所述冷却塔塔体(1)外侧,所述辅助水箱(31)一端与所述泵源(2)连接,另一端与设置在所述冷却塔塔体(1)内部的喷淋管(32)连接,所述喷淋管(32)呈连续弯折状,并设置有用于喷水的喷头(33);1. A cooling tower, comprising a cooling tower body (1), the pump source (2) is arranged on the outside of the cooling tower body (1), it is characterized in that it also includes a spray assembly (3), and the spray assembly (3) comprising an auxiliary water tank (31), a spray pipe (32) and a spray nozzle (33), the auxiliary water tank (31) is arranged on the outside of the cooling tower body (1), and one end of the auxiliary water tank (31) It is connected to the pump source (2), and the other end is connected to the spray pipe (32) arranged inside the cooling tower body (1). The spray pipe (32) is continuously bent, and is set There is a nozzle (33) for spraying water; 进风组件(4)包括进风管(41)和发热组件(42),所述进风管(41)设置在冷却塔塔体(1)顶部,并与所述冷却塔塔体(1)内部连通,所述发热组件(42)包括导热管(421)和发热板(422),所述发热板(422)设置在进风管(41)内部,所述发热板(422)内部呈中空结构,所述导热管(421)将所述发热板(422)和所述辅助水箱(31)连通。The air inlet assembly (4) includes an air inlet pipe (41) and a heating assembly (42), and the air inlet pipe (41) is arranged on the top of the cooling tower body (1) and is connected with the cooling tower body (1) Internal communication, the heating component (42) includes a heat pipe (421) and a heating plate (422), the heating plate (422) is arranged inside the air inlet pipe (41), and the inside of the heating plate (422) is hollow structure, the heat pipe (421) communicates the heating plate (422) with the auxiliary water tank (31). 2.根据权利要求1所述的冷却塔,其特征在于,所述辅助水箱(31)的数量为两个,对称设置在所述冷却塔塔体(1)上,每一所述辅助水箱(31)均连通一所述喷淋管(32),两个所述喷淋管(32)盘绕设置在所述冷却塔塔体(1)内部。2. cooling tower according to claim 1, is characterized in that, the quantity of described auxiliary water tank (31) is two, is symmetrically arranged on described cooling tower body (1), each described auxiliary water tank ( 31) are connected to one spray pipe (32), and the two spray pipes (32) are coiled and arranged inside the cooling tower body (1). 3.根据权利要求2所述的冷却塔,其特征在于,所述喷淋组件(3)上还包括有固定件(34),用于将所述喷淋管(32)固定在所述冷却塔塔体(1)上。3. The cooling tower according to claim 2, characterized in that, the spray assembly (3) also includes a fixing piece (34) for fixing the spray pipe (32) on the cooling tower. on the tower body (1). 4.根据权利要求1所述的冷却塔,其特征在于,所述冷却塔塔体(1)还设置有进水管(11)、集水槽(12)和出水管(13),所述进水管(11)与所述泵源(2)连通,所述集水槽(12)设置在所述冷却塔塔体(1)的底部,所述集水槽(12)上还设置有第一过滤装置(121),所述出水管(13)设置在所述集水槽(12)底部。4. The cooling tower according to claim 1, characterized in that, the cooling tower body (1) is also provided with a water inlet pipe (11), a sump (12) and a water outlet pipe (13), and the water inlet pipe (11) is communicated with described pump source (2), and described sump (12) is arranged on the bottom of described cooling tower tower body (1), and described sump (12) is also provided with first filtering device ( 121), the outlet pipe (13) is arranged at the bottom of the sump (12). 5.根据权利要求4所述的冷却塔,其特征在于,所述泵源(2)设置为一个,其一端与进水管(11)连接,另一端与所述辅助水箱(31)连接。5. The cooling tower according to claim 4, characterized in that, one pump source (2) is provided, one end of which is connected to the water inlet pipe (11), and the other end is connected to the auxiliary water tank (31). 6.根据权利要求5所述的冷却塔,其特征在于,所述进水管(11)内还设置有第二过滤装置(111)。6. The cooling tower according to claim 5, characterized in that, a second filtering device (111) is further arranged in the water inlet pipe (11). 7.根据权利要求1所述的冷却塔,其特征在于,所述发热板(422)的数量为多个,多个所述发热板(422)在所述进风管(41)的内部排布呈百叶窗结构。7. The cooling tower according to claim 1, characterized in that, the number of the heating plates (422) is multiple, and a plurality of the heating plates (422) are arranged inside the air inlet pipe (41). The cloth is in the form of shutters. 8.根据权利要求7所述的冷却塔,其特征在于,所述发热组件(42)还设置有连接管(423),所述连接管(423)沿所述进风管(41)的内壁设置,将多个发热板(422)连通。8. The cooling tower according to claim 7, characterized in that, the heating component (42) is also provided with a connecting pipe (423), and the connecting pipe (423) is along the inner wall of the air inlet pipe (41) Set, connect a plurality of heating boards (422). 9.根据权利要求8所述的冷却塔,其特征在于,所述进风组件(4)还设置有第三过滤装置(43),所述第三过滤装置(43)设置在所述进风管(41)上,并位于所述发热板(422)的外侧。9. The cooling tower according to claim 8, characterized in that, the air inlet assembly (4) is also provided with a third filtering device (43), and the third filtering device (43) is arranged on the air inlet on the pipe (41), and located outside the heating plate (422). 10.根据权利要求9所述的冷却塔,其特征在于,所述进风组件(4)设置有至少两组。10. The cooling tower according to claim 9, characterized in that there are at least two groups of the air inlet components (4).
CN201721292598.1U 2017-10-09 2017-10-09 A kind of cooling tower Active CN207317568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721292598.1U CN207317568U (en) 2017-10-09 2017-10-09 A kind of cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721292598.1U CN207317568U (en) 2017-10-09 2017-10-09 A kind of cooling tower

Publications (1)

Publication Number Publication Date
CN207317568U true CN207317568U (en) 2018-05-04

Family

ID=62429470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721292598.1U Active CN207317568U (en) 2017-10-09 2017-10-09 A kind of cooling tower

Country Status (1)

Country Link
CN (1) CN207317568U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117339237A (en) * 2023-12-05 2024-01-05 山西沃锦新材料股份有限公司 A crystallization device for potassium nitrate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117339237A (en) * 2023-12-05 2024-01-05 山西沃锦新材料股份有限公司 A crystallization device for potassium nitrate

Similar Documents

Publication Publication Date Title
CN104727843A (en) Gas-liquid two-media cooling device for coal face of coal mine
CN207317568U (en) A kind of cooling tower
CN209672865U (en) A kind of evaporation type oil cooler
CN211625499U (en) An air-conditioning condenser water spray energy-saving device
CN211702830U (en) A kind of cooling device of network security terminal
CN220829131U (en) Cross flow type cooling tower water diversion box
CN103424009B (en) A kind of air cooler from bearing plate pipe tilting
CN206339114U (en) A square cross-flow composite tower of hydrodynamic fan
CN205753950U (en) A kind of integrated-type cooling system on AC drive diesel locomotive current transformer
CN203216330U (en) Connected closed type cooling tower
CN205482461U (en) Range upon range of formula board is leapt high and is imitated long -life oil cooler
CN101975431B (en) Air dehumidifying and cooling device
CN205448749U (en) High -efficient closed cooling tower
CN204156352U (en) A kind of transformer station box
CN116182584A (en) A humidifying type plate air cooler
CN210523190U (en) Dust removal device for computer server
CN115183502A (en) Cleaning device for heat pump heat exchanger fins
CN208804390U (en) Heat exchanger restricting orifice structure
CN208794572U (en) A kind of condenser and its air-conditioning
CN206035767U (en) Glossy formula vacuum auxiliary system
CN208671778U (en) A secondary utilization device for mine waste heat
CN217483289U (en) Power plant cooling tower with water mist spraying temperature reducing device
CN207317572U (en) A kind of cooling tower
CN220170015U (en) Receive water machinery cooling tower
CN215176181U (en) C-shaped four-fan heat source tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Building No. 7, No. 289 Taji Road, Bacheng Town, Kunshan City, Suzhou City, Jiangsu Province, China

Patentee after: Jinghe System Technology (Suzhou) Co.,Ltd.

Address before: Room 3, 1288, Shipai Jinghan Road, Kunshan City, Suzhou City, Jiangsu Province

Patentee before: KUNSHAN FLOWTECH ELECTRO-MECHANICAL ENGINEERING CO.,LTD.