CN207314963U - Power line construction line bar docks levelling device - Google Patents
Power line construction line bar docks levelling device Download PDFInfo
- Publication number
- CN207314963U CN207314963U CN201721300407.1U CN201721300407U CN207314963U CN 207314963 U CN207314963 U CN 207314963U CN 201721300407 U CN201721300407 U CN 201721300407U CN 207314963 U CN207314963 U CN 207314963U
- Authority
- CN
- China
- Prior art keywords
- hanger
- line bar
- rod
- bracket
- levelling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000003032 molecular docking Methods 0.000 claims abstract description 25
- 230000001105 regulatory effect Effects 0.000 claims description 12
- 230000003750 conditioning effect Effects 0.000 claims description 5
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 6
- 230000005484 gravity Effects 0.000 description 4
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of power line construction line bar to dock levelling device, including lifter, slippage bracket is further included, the slippage bracket includes stent and the hanger being flexibly connected therewith, the stent includes base, pillar and bracket, and the bracket is flexibly connected with pillar;Hanger lower end is flexibly connected with stent, and the hanger of hanger upper end is equipped with frame wheel;The lifting seat of the lifter is equipped with transversely movable line bar hanging seat.It is mainly used for the docking when assembled of the line bar body of rod and leveling, in use, using the mode of seesaw, easily can carry out leveling to the body of rod;During docking, the docking between the body of rod can be completed by the docking pull rod on cable seat.Using the present apparatus, one not only saved labor, but also can improve work efficiency with regard to that can complete the leveling and docking of the body of rod;Moreover, moreover it is possible to improve the precision of body of rod leveling and docking, ensure construction quality.
Description
Technical field
The utility model belongs to power distribution circuit constructing device technical field, is specifically related to a kind of distribution line construction
Docking and levelling device when middle line bar is connected with line bar.
Background technology
The line bar used in existing power distribution circuit is all higher, in line construction, generally using field joint
Mode, that is, line bar are segmented after being transported to construction site, are attached and are set up on construction ground.At the construction field (site), often by
To the limitation of place, apparatus and personnel etc., along with the body of rod is very heavy, the docking and leveling when the body of rod connects are relatively difficult.
Existing docking leveling method, typically first tries to prop up body of rod segmentation, then under the body of rod adds and subtracts pad repeatedly, certain
Docked in height, heavy workload, labor intensity is high.During docking, along with construction site is usually to compare because of the body of rod slightly, again
Relatively narrower and it is uneven, the body of rod itself is difficult to leveling, also is difficult to make two sections of bodies of rod point-blank after body of rod docking, constructs
Quality is also difficult to ensure that.
The content of the invention
The technical problem to be solved by the present invention is to provide a kind of labor intensity is low, work efficiency is high, and one man operation is just
It can complete the power line construction line bar docking levelling device of body of rod leveling and the docking of bar bar.
In order to solve the above technical problems, the utility model includes lifter, it, which is structurally characterized in that, further includes slippage bracket, institute
Stating slippage bracket includes stent and the hanger that is flexibly connected therewith, and the stent includes base, pillar and bracket, the bracket and
Pillar is flexibly connected;Hanger lower end is flexibly connected with stent, and the hanger of hanger upper end is equipped with frame wheel;The lifting of the lifter
Seat is equipped with transversely movable line bar hanging seat.
The bracket includes left and right two base bodies, and base body top surface is arc-shaped, is equipped with connector between two base bodies, connector with
Pillar is flexibly connected, and pillar is connected with whorl of base, and strut height is adjustable.
The connector is equipped with level meter and side strut, and the side strut is located at the side of connector and strut attachment point
Position;Hanger lower end is flexibly connected with side strut, is being equipped with disk roller similar in the strut of side on the termination of a base body.
The hanger includes vertical connecting rod, lever arm and hanger;Lever arm is substantially in Z-shaped, its middle part and vertical connecting rod activity
Connection;Hanger is arc-shaped, it is flexibly connected with lever arm, and arc hanger is equipped with two frame wheels, and the frame wheel is universal wheel, wheel
Handle is slidably connected with hanger, and wheel shank is equipped with compression spring.
The lever arm upper end is additionally provided with regulating arm hinged therewith, and regulating arm both ends connect with lever arm and hanger respectively
Connect, the hook switch of interior receipts is equipped between regulating arm and lever arm.
The lever arm lower end is equipped with arc block plate, and when lever arm rotates, arc block plate can reach the end of bracket base body
At head.
The auxiliary conditioning unit that walks is equipped between the lifter and slippage bracket.
The auxiliary conditioning unit that walks includes two-way bracing wire and guide roller, a line and slippage bracket in two-way bracing wire
Connection, the guide roller are equipped with magnetic fixator.
The line bar hanging seat includes lashed cable and cable seat with lock, and lifting seat is equipped with horizontal slide rail, cable seat and slide
It is slidably connected, cable seat is equipped with the docking pull rod for sliding connect therewith.
With the above structure, since the utility model has lifter and a slippage bracket, slippage bracket include stent and
The hanger of flexible connection, hanger are equipped with frame wheel, and the lifting seat of lifter is equipped with transversely movable line bar hanging seat, it can be used
In the docking when assembled of the line bar body of rod and leveling.In use, being first connected the hanging seat of lifter with body of rod one end, then branch will be slid
Body of rod mounting on the inside of the hanger and lifter of frame.Start lifter, lift one end of the line bar body of rod, the body of rod just gradually inclines
Tiltedly, with the continuous increase of body of rod gradient, slippage bracket can be remote from trend(It is low)End sliding, and the branch of slippage bracket lower end
Frame is always positioned at below the body of rod.When stent reaches body of rod certain position, the upper and lower adjustment body of rod repeatedly, using stent to the body of rod
Support balance, find the center of gravity of the body of rod, and stent is fixedly supported on the body of rod center of gravity position.In this way, utilize seesaw
Mode, can easily carry out the leveling of the body of rod itself.The body of rod docked is needed, the body of rod can be completed by the docking pull rod on cable seat
Between docking.Using the present apparatus, one saves labor, work efficiency is high with regard to that can complete the leveling and docking of the body of rod;Not only such as
This, moreover it is possible to ensure the precision of leveling and docking, construction quality is good.
Brief description of the drawings
The utility model is further described with reference to the accompanying drawings and examples:
Fig. 1 is the utility model leveling schematic diagram;
Fig. 2 is that the utility model plays tune schematic diagram;
Fig. 3 is the utility model slippage bracket schematic diagram;
Fig. 4 is the utility model slippage bracket end view;
Fig. 5 is the utility model slippage bracket side schematic view;
Fig. 6 is the supporting structure schematic diagram of the utility model slippage bracket;
Fig. 7 is the utility model riser structure schematic diagram;
Fig. 8 is the utility model body of rod docking schematic diagram.
Embodiment
Referring to figs. 1 to shown in Fig. 3 and Fig. 7, the present embodiment includes:One hand lifter 1 and slippage bracket 2.Lifter 1 wraps
Pedestal 12 is included, pedestal 12 is equipped with the tooth post 14 being fastenedly connected therewith, and tooth post 14 is equipped with the lifting seat 11 being flexibly connected therewith,
Lifting seat 11 is equipped with gear set and rocking arm 13, and gear set and the rack in tooth post 14 are mutually ratcheting, and tooth can be passed through by rotating rocking arm 13
Wheel group driving lifting seat 11 makees upper and lower move along tooth post 14.The line bar hanging seat 15 that can be slid laterally is equipped with lifting seat 11.
Slippage bracket 2 includes stent 3 and the hanger 4 being flexibly connected therewith.Stent 3 includes base 31, pillar 32 and bracket
33, pillar 32 is threadedly coupled with base 31, and rotating base 31 adjusts the height of pillar 32, so that the support for adjusting stent 3 is high
Degree.Bracket 33 includes base body 39 and connector 37, and 37 arranged on left and right sides of connector is arranged with base body 39, and the top surface of base body 39 is in
Arc, connector 37 are two to be arranged in parallel, and connecting pole, connecting pole and pillar 32 are equipped between the middle part of two connectors 37
Top axis connection, makes connector 37 be flexibly connected with pillar 32, bracket 33 can the connecting shaft be fulcrum rotate.Hanger 4 includes
Vertical connecting rod 41, lever arm 42 and hanger 43;41 upper/lower terminal of vertical connecting rod is cut with scissors with the middle part of lever arm 42 and connector 37 respectively
Connect, lever arm 42 is substantially in Z-shaped, and lever arm 42 can be using its tie point as axis flexible rotating;Hanger 43 is equipped with two frame wheels
5。
In Fig. 1, the auxiliary conditioning unit 6 that walks is additionally provided between lifter 1 and slippage bracket 2, the auxiliary conditioning unit 6 that walks wraps
Two-way bracing wire 61 and guide roller 62 are included, a line in two-way bracing wire 61 is connected with slippage bracket 2, and guide roller 62 is fixed pulley,
The wheel seat of guide roller 62 is equipped with the magnetic fixator for being used for being connected with line bar 7.Lifting seat 11 is equipped with bracing wire hole.Guide roller 62
After position is fixed, two-way bracing wire 61 is pulled respectively, be can adjust and is fixed the position of slippage bracket 2.
With reference to shown in Fig. 3, Fig. 4 and Fig. 6, the present embodiment connector 37 is equipped with level meter 34 and side strut 35, level meter
34 are used for the leveling of line bar 7.The connecting shaft being connected with pillar 32 is equipped between connector 37, connecting shaft passes through bearing liner 38 and branch
32 axis connection of column.Side strut 35 is located at the side position that connector 37 connects with pillar 32;Cut with scissors with side strut 35 lower end of hanger 4
Connect.Disk roller 36 is being equipped with the termination of a base body 39 of side strut 35, the disk roller seat and base body 39 of 36 lower part of disk roller are logical
Cross and be bolted, position of the disk roller about 36 can be adjusted.42 lower end of lever arm is equipped with an arc block plate 45, and lever arm 42 rotates
When, arc block plate 45 can reach the end point of bracket base body 39, and roll and connect with disk roller 36.In actual use, line is worked as
After 7 one end of bar is raised up to certain altitude, slippage bracket 2 is just hung in line bar 7.Due to 4 lower end of hanger and connector 37
Side connects, and makes stent 3 that the inclination with 7 uniformity of line bar occur, is conducive to the downward automatic sliding of slippage bracket 2.Lever arm
During 42 rotation, the arc block plate 45 of its lower end acts on disk roller 36, can control and adjust the gradient of bracket 33, makes bracket 33 big
Body is parallel to line bar 7, in order to reduce stent 3 in body of rod lower end the space occupied, the realization cunning under as far as possible small rising height
Slide with moving 2 ultimate range of stent, be conducive to improve work efficiency.
With reference to shown in Fig. 3 and Fig. 5,42 upper end of the present embodiment lever arm is additionally provided with regulating arm 44 hinged therewith, regulating arm
44 both ends are connected with lever arm 42 and hanger 43 respectively, and the hook switch 46 of interior receipts, regulating arm are equipped between regulating arm 44 and lever arm 42
44 can elastic stretch and readjustment, after slippage bracket 2 and the body of rod mount, regulating arm 44 can be opened to certain angle, can improve extension
The adaptability of frame, is conducive to be applicable in the line bar 7 of different thicknesses;Meanwhile slippage bracket 2 is also run during downward operation
Steadily, it is not susceptible to come off.Frame wheel 5 in hanger 43 is universal wheel, and wheel shank 51 and the hanger 43 of universal wheel are slidably connected, wheel
Handle 51 is equipped with compression spring 52, it is conducive to contact of the frame wheel 5 with line bar body.
With reference to shown in Fig. 7 and Fig. 8, the present embodiment line bar hanging seat 15 is equipped with lashed cable 151 and cable seat 152, on lifting seat 11
Equipped with horizontal grooved rail 17, cable seat 152 is slidably connected with grooved rail 17, and cable seat 152 is equipped with tie rod hole, is plugged with therewith on tie rod hole
Slide the docking pull rod 16 to connect.Lashed cable 151 is used for the connection with the body of rod and plays carrying, and lashed cable 151 is equipped with lock,
Lashed cable 151 is connected with cable seat 152, and cable seat 152 can drive the movement of line bar 7 when moving.
The utility model is mainly used for circular, the field joint leveling of polyhedron shape electric line pole.In use, first with
One lifter 1 is connected with one end of line bar 7, and slippage bracket 2 is articulated in one end that the body of rod lifts.Rocking arm 13 is shaken, is risen
Seat 11 is dropped during rising, 7 one end of line bar is slowly lifted, body of rod run-off the straight, and slippage bracket 2 is just high-end certainly from the body of rod
It is dynamic to slide to body of rod low side.When slippage bracket 2 is slid onto body of rod middle part close to center of gravity position, body of rod readjustment can be carried out, declines bar
Body, makes stent 3 hold line bar 7 from bottom.Adjust lifting seat 11 and mobile 3 position of stent up and down repeatedly, after finding body of rod center of gravity accurately,
Lifting seat 11 is transferred again, the body of rod can be issued to self-balancing state in the support of stent 3, in that context it may be convenient to which leveling is carried out to line bar.
When the body of rod docks, the both ends of every line bar are respectively connected with lifter 1, after body of rod difference leveling, are drawn using the docking on lifter 1
Bar 16 draws two cable seats 152 and moves, and makes two body of rod terminations closely opposite, you can carries out docking operation.Using the utility model,
One can complete the leveling and docking of the body of rod, save manpower, be adapted to the power construction in field complexity place.
Claims (9)
1. a kind of power line construction line bar docks levelling device, including lifter(1), it is characterized in that further including slippage bracket
(2), the slippage bracket(2)Including stent(3)The hanger being flexibly connected therewith(4), the stent(3)Including base
(31), pillar(32)And bracket(33), the bracket(33)With pillar(32)It is flexibly connected;Hanger(4)Lower end and stent(3)It is living
Dynamic connection, hanger(4)The hanger of upper end(43)It is equipped with frame wheel(5);The lifter(1)Lifting seat(11)Being equipped with can be horizontal
To mobile line bar hanging seat(15).
2. levelling device is docked according to power line construction line bar described in claim 1, it is characterized in that the bracket(33)Including
Left and right two base bodies(39), base body(39)Top surface is arc-shaped, two base bodies(39)Between be equipped with connector(37), connector(37)With
Pillar(32)It is flexibly connected, pillar(32)With base(31)It is threadedly coupled.
3. levelling device is docked according to power line construction line bar described in claim 2, it is characterized in that the connector(37)On
Equipped with level meter(34)With side strut(35), the side strut(35)It is located at connector(37)With pillar(32)The side of tie point
Position;Hanger(4)Lower end and side strut(35)It is flexibly connected, in side strut(35)A similar base body(39)Termination be equipped with
Disk roller(36).
4. power line construction line bar described in accordance with the claim 1 docks levelling device, it is characterized in that the hanger(4)Including
Vertical connecting rod(41), lever arm(42)And hanger(43);Lever arm(42)Substantially it is in Z-shaped, its middle part and vertical connecting rod(41)Activity
Connection;Hanger(43)It is arc-shaped, it and lever arm(42)It is flexibly connected, arc hanger(43)It is equipped with two frame wheels(5), it is described
Frame wheel(5)For universal wheel, wheel shank(51)With hanger(43)It is slidably connected, wheel shank(51)It is equipped with compression spring(52).
5. levelling device is docked according to the power line construction line bar described in claim 4, it is characterized in that the lever arm(42)
Upper end is additionally provided with regulating arm hinged therewith(44), regulating arm(44)Both ends respectively with lever arm(42)And hanger(43)Connection,
Regulating arm(44)With lever arm(42)Between be equipped with interior receipts hook switch(46).
6. levelling device is docked according to the power line construction line bar described in claim 4 or 5, it is characterized in that the lever arm
(42)Lower end is equipped with arc block plate(45), lever arm(42)During rotation, arc block plate(45)Bracket base body can be reached(39)'s
End point.
7. power line construction line bar described in accordance with the claim 1 docks levelling device, it is characterized in that the lifter(1)With
Slippage bracket(2)Between be equipped with and walk auxiliary conditioning unit (6).
8. levelling device is docked according to the power line construction line bar described in claim 7, it is characterized in that the auxiliary that walks is adjusted
Regulating device (6) includes two-way bracing wire(61)And guide roller(62), two-way bracing wire(61)In a line and slippage bracket(2)Even
Connect, the guide roller(62)It is equipped with magnetic fixator.
9. power line construction line bar described in accordance with the claim 1 docks levelling device, it is characterized in that the line bar hanging seat
(15)Including the lashed cable with lock(151)With cable seat(152), lifting seat(11)It is equipped with horizontal slide rail(17), cable seat(152)
With slide(17)It is slidably connected, cable seat(152)It is equipped with the docking pull rod for sliding connect therewith(16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721300407.1U CN207314963U (en) | 2017-10-11 | 2017-10-11 | Power line construction line bar docks levelling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721300407.1U CN207314963U (en) | 2017-10-11 | 2017-10-11 | Power line construction line bar docks levelling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314963U true CN207314963U (en) | 2018-05-04 |
Family
ID=62429706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721300407.1U Active CN207314963U (en) | 2017-10-11 | 2017-10-11 | Power line construction line bar docks levelling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314963U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905611A (en) * | 2017-10-11 | 2018-04-13 | 国网山东省电力公司昌乐县供电公司 | Power line construction line bar docks levelling device |
-
2017
- 2017-10-11 CN CN201721300407.1U patent/CN207314963U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905611A (en) * | 2017-10-11 | 2018-04-13 | 国网山东省电力公司昌乐县供电公司 | Power line construction line bar docks levelling device |
CN107905611B (en) * | 2017-10-11 | 2024-02-27 | 国网山东省电力公司昌乐县供电公司 | Electric power line construction line pole butt joint levelling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5081662A (en) | Mobile x-ray apparatus | |
CN205367529U (en) | Balancing hanger of crane | |
CN114751258A (en) | Support frame for power transformation engineering | |
CN106891239B (en) | Iron pan outer surface polishing robot | |
CN208011206U (en) | Projecting rack | |
CN207314963U (en) | Power line construction line bar docks levelling device | |
CN209635501U (en) | Cable laying platform | |
CN108622831A (en) | A kind of architectural decoration hoistable platform | |
CN107905611A (en) | Power line construction line bar docks levelling device | |
CN209322332U (en) | A kind of adjusting center hanging apparatus | |
CN216425307U (en) | Glass placing frame | |
CN109534244A (en) | A kind of horizontal jack base | |
CN213683344U (en) | Supporting device for building engineering detection | |
CN212611829U (en) | Gravity center adjusting mechanism and leveling equipment | |
CN209816588U (en) | Portable slope | |
CN219873049U (en) | Hanging device based on transformer | |
CN215104768U (en) | Construction mounting frame for bridge | |
CN216446428U (en) | Dress casement auxiliary assembly | |
CN112320563A (en) | Truss handling installation device for bridge construction | |
CN219031575U (en) | Building support hoisting device for membrane building construction | |
CN110155887A (en) | A kind of Miniature hanging device | |
CN219854297U (en) | Simple electric torque wrench bracket | |
CN216504984U (en) | Make things convenient for angle regulation's mechanical equipment maintenance platform | |
CN220364335U (en) | Universal automatically regulated's overhead working hanging flower basket | |
CN220745088U (en) | Lifting hook for tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |