CN207314805U - A kind of scaffold wall connecting piece - Google Patents
A kind of scaffold wall connecting piece Download PDFInfo
- Publication number
- CN207314805U CN207314805U CN201721366183.4U CN201721366183U CN207314805U CN 207314805 U CN207314805 U CN 207314805U CN 201721366183 U CN201721366183 U CN 201721366183U CN 207314805 U CN207314805 U CN 207314805U
- Authority
- CN
- China
- Prior art keywords
- arc panel
- wall
- fixed
- connecting piece
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of scaffold wall connecting piece is the utility model is related to, its drip irrigation device:Including fixed link;Installing plate mutually assembled with fixed boom end, offering some mounting holes, for being fixed on the fixed link on wall;The first arc panel that end thread is connected to the fixed boom end, matching with the steel pipe on scaffold;End is movably set in the second arc panel in the fixed link, matching with the steel pipe;Arranged on first arc panel with being used to connecting both on second arc panel, so that the fixation kit that the fixed link and the steel pipe are mutually fixed, second arc panel is in the fixed link between first arc panel and the installing plate.The scaffold wall connecting piece of the utility model when in use, very easily can be fixed or dismantle with scaffold to wall-connecting piece, so as to simplify installation steps, save the time, improve efficiency.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of scaffold wall connecting piece.
Background technology
In building construction process, in order to ensure that each work progress is smoothed out, scaffold can be usually set up, meanwhile, it is
Strengthen the overall stability of scaffold, also can be connected scaffold frame body with major structure of construction by wall-connecting piece.
At present, wall-connecting piece mainly includes the connecting rod that one end is fixed on construction wall, and the other end of connecting rod passes through button
Part mutually assembles the steel pipe on scaffold with connecting rod, it is necessary to continuous turn-knob bolt during fastener is installed or removed
Or nut, whole installation and the process dismantled are comparatively laborious, can expend substantial amounts of manpower.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of scaffold wall connecting piece, can
Very easily realize the installation and dismounting between wall-connecting piece and scaffold, so as to simplify installation steps, save the time.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of scaffold wall connecting piece, including:Fixed link;Mutually being assembled with fixed boom end, offering some mounting holes,
For the installing plate being fixed on the fixed link on wall;End thread is connected to the fixed boom end and scaffold
On the first arc panel for matching of steel pipe;End be movably set in it is in the fixed link, match with the steel pipe the
Two arc panels;It is used to connect both, so that the fixed link and institute on first arc panel and second arc panel
State the fixation kit that steel pipe is mutually fixed, fixation of second arc panel between first arc panel and the installing plate
On bar.
Using above-mentioned technical proposal, when needing to use wall-connecting piece, hole can be opened up on wall in advance, installing plate is led to
Cross bolt or screw is fixed on wall, then rotate the first arc panel, make its inner side and the steel pipe on scaffold or montant phase
Fitting, slides the second arc panel and aligns with the first arc panel, recycle fixation kit can be very easily by the first arc panel
It is fixed together with the second arc panel, so that wall-connecting piece is mutually fixed with scaffold, through the above scheme, can be easily real
Existing installation and dismounting between wall-connecting piece and scaffold, so as to save the time, improves the efficiency of installation and dismounting.
The utility model is further set:The fixation kit includes:It is fixed on inserting for the second arc panel end
Bar;And the through hole to match on first arc panel with the inserted link is opened in, the plunger end outer wall offers recessed
Groove, the groove activity are equipped with fixture block, the groove bottom wall be fixed with it is that the other end is connected with the fixture block, for driving
The compression spring that the fixture block is slided along the groove.
Using above-mentioned technical proposal, after the first arc panel and the second arc panel align, fixture block is pressed, is compressed to it
In groove, the second arc panel is slided, inserted link, when inserted link passes through through hole, is compressed spring through the through hole on the first arc panel
It driving fixture block can automatically be skidded off out of groove, and be pressed on the edge of through hole, so as to very easily by the first arc
Plate is fixed together with the second arc panel.
The utility model is further set:The inserted link is threadedly coupled with second arc panel.
Using above-mentioned technical proposal, when the steel pipe on scaffold or montant have that size is inconsistent, Ke Yixuan
Turn inserted link, adjust the spacing between fixture block and the second arc panel to be adapted to the size of steel pipe or montant so that fixture block is pressed on the
When on one arc panel, very firmly steel pipe or montant can be clamped.
The utility model is further set:The fixture block is equipped with inclined plane close to the side of through hole, and the plunger end is set
There is the arcwall face touched with the through hole side edge.
Using above-mentioned technical proposal, the inclined plane of setting, after inserted link aligns with through hole, slides the second arc panel, can be with
Automatically make inserted link through through hole and be pressed on the first arc panel, so as to save this link with hand pressing fixture block;
And the arcwall face set, inserted link can be allow more quickly to be punctured into through hole, at the same time it can also reduce inserted link and through hole
Frictional force between inner wall so that when inserted link is inserted into more smoothly.
The utility model is further set:The fixed link includes the wall connecting rod being threadedly coupled with installing plate;Screw thread is arranged
Casing on the wall connecting rod;And the extension rod being threadedly coupled with described sleeve pipe.
Using above-mentioned technical proposal, when without using wall-connecting piece, very easily fixed link can be dismantled and be segmented, easy to even
The storage and carrying of wall part;At the same time it can also by rotate wall connecting rod or extension rod adjust the first arc panel and scaffold it
Between spacing so that wall-connecting piece can be adapted to the scaffold of the different distance between wall, further improve the use of wall-connecting piece
Scope.
The utility model is further set:First arc panel is with second arc panel away from the fixation kit
One end be fixed with the magnetic patch to attract each other.
Using above-mentioned technical proposal, the magnetic patch to attract each other has certain guidance quality in itself, can make the first arc panel
Quickly align between the second arc panel, meanwhile, magnetic patch can also utilize the attraction of itself, further strengthen the first arc
The stability of plate and the second arc panel.
The utility model is further set:The installing plate is connected with described for being inserted into close to the end-face helical of wall
Pre-buried bar in wall.
Using above-mentioned technical proposal, the pre-buried bar of setting, can increase the contact area between installing plate and wall so that
What installing plate was fixed more stablizes, and using being threadedly coupled between pre-buried bar and installing plate, is also convenient for the installation and dismounting of installing plate.
The utility model is further set:The pre-buried bar is at least two, and the pre-buried pole length is no more than wall
Thickness.
Using above-mentioned technical proposal, the quantity of pre-buried bar is limited, the stability of installing plate, the company of further improving can be strengthened
The overall stability of wall part, limits the length of pre-buried bar, can save material, meanwhile, and reduce the damaged condition to wall.
In conclusion the utility model has the advantages that;
By setting the first arc panel, the second arc panel and fixation kit, in the first arc panel and the second arc panel phase
After alignment, fixation kit can drive fixture block to eject automatically and scaffold and wall-connecting piece are fixed together;
Fixed link is split into wall connecting rod, casing and extension rod, can very easily realize the elongation and contraction of fixed link
Adjust, so as to be adapted to the scaffold from wall different distance, further improve the use scope of wall-connecting piece.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model embodiment;
Fig. 2 is the enlarged drawing at A in Fig. 1.
Reference numeral:1st, fixed link;11st, the first arc panel;12nd, the second arc panel;13rd, wall connecting rod;14th, casing;15th, prolong
Boom;2nd, wall;3rd, installing plate;31st, mounting hole;4th, inserted link;41st, through hole;42nd, groove;43rd, fixture block;44th, spring is compressed;5、
Arcwall face;51st, inclined plane;6th, magnetic patch;7th, pre-buried bar.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability
Field technique personnel as needed can make the present embodiment the modification for not creating contribution after this specification is read, but only
All to be protected in the right of the utility model be subject to Patent Law.
The present embodiment:A kind of scaffold wall connecting piece, as depicted in figs. 1 and 2, including be fixed on it is on wall 2, offer peace
Fill the installing plate 3 in hole 31;It is fixed on the fixed link 1 perpendicular on installing plate 3 and with installing plate 3;End thread is connected to fixation
First arc panel 11 of the bar 1 away from 3 end of installing plate;And end is movably set in fixed link 1 and 11 phase of the first arc panel
Matched second arc panel 12, and the second arc panel 12 is between the first arc panel 11 and installing plate 3.
Wherein, inserted link 4, inserted link 4 and 12 phase of the second arc panel are fixed with the second end of the arc panel 12 away from fixed link 1
Vertically, the through hole 41 to match with inserted link 4 is offered in the one or four end of the arc panel 11 away from fixed link 1;In addition, in inserted link
4 outer wall is further opened with groove 42, and the opening of groove 42 is perpendicular towards the direction extended with inserted link 4, and living in groove 42
It is visibly moved to be equipped with fixture block 43, compression spring 44 is also equipped between fixture block 43 and groove 42, compresses one end and the fixture block 43 of spring 44
The inner it is fixed, the other end is fixed on the bottom wall of groove 42.
When needing to use wall-connecting piece, the hole to match with mounting hole 31 can be opened up on wall 2 in advance, passes through bolt
Or installing plate 3 is fixed on wall 2 by screw through mounting hole 31;Then, the first arc panel 11 in fixed link 1 is rotated,
So that steel pipe vertical on the inner side of the first arc panel 11 and scaffold fits, then slide the second arc panel 12 so that second
Inserted link 4 on arc panel 12 is directed at the through hole 41 on the first arc panel 11;During the second arc panel 12 is slided, pressing card
Block 43 makes it be compressed in groove 42, and after inserted link 4 passes through through hole 41, the compression spring 44 in groove 42 can automatic driving card
The pop-up out of groove 42 of block 43, and be pressed on the edge of through hole 41 on the first arc panel 11 so that the first arc panel 11 and the
Two arc panels 12 together live steel pipe clamping, in this way, scaffold and wall 2 easily can be connected to one by wall-connecting piece
Rise, so as to save the time, reduce engineering cost.
When needing to dismantle wall-connecting piece, fixture block 43 can be extruded, it is compressed in groove 42, then slides second
Arc panel 12, makes the extraction out of through hole 41 of inserted link 4, so can separate wall-connecting piece with scaffold, then rotation installation successively
Bolt or screw in hole 31 can disassemble installing plate 3.
In addition, inserted link 4 is connected through a screw thread with the second arc panel 12, when the steel for needing to be fixedly connected wall-connecting piece on scaffold
When pipe size is different, inserted link 4 can be rotated, the length that inserted link 4 stretches out the second arc panel 12 is adjusted, so as to very easily
It is adapted to the steel pipe of different-diameter so that fixture block 43 is through the edge that through hole 41 can be still pressed on after through hole 41.
Inclined plane 51 is equipped with a side end face of the fixture block 43 close to through hole 41, in this way, aliging in inserted link 4 with through hole 41
Afterwards, the second arc panel 12 is slided, the inclined plane 51 on fixture block 43 can be inconsistent with the edge of through hole 41, and at this time, fixture block 43 is just
Can automatically it be compressed in groove 42;After fixture block 43 passes through through hole 41, compression spring 44 can automatically drive 43 bullet of fixture block
Go out groove 42 and be pressed on 41 edge of through hole of the first arc panel 11, so may dispense with and press fixture block 43 always with hand
This link.And the arcwall face 5 being in contact with 41 edge of through hole or inner wall is additionally provided with 4 end of inserted link, in inserted link 4 and through hole 41
Inner wall or during side edge touches, arcwall face 5 can reduce frictional force between the two so that inserted link 4 can be more
Quickly in insertion through hole 41.
The end that fixed link 1 is contacted with the second arc panel 12 in the first arc panel 11 is respectively and fixedly provided with the magnetic patch 6 to attract each other,
The magnetic patch 6 to attract each other itself has certain guidance quality, can cause fast between the first arc panel 11 and the second arc panel 12
The alignment of speed, meanwhile, magnetic patch 6 can also utilize the attraction of itself, further strengthen the first arc panel 11 and the second arc panel
The fastness of 12 clamping steel pipes.
Wherein, fixed link 1 includes:The wall connecting rod 13 being threadedly coupled with installing plate 3;It is connected with 13 end thread of wall connecting rod
Casing 14;And the extension rod 15 being threadedly coupled with casing 14, and casing 14 is metal material, can when without using wall-connecting piece
The dismounting of fixed link 1 very easily is divided into several sections, thus easy to the storage and carrying of wall-connecting piece and fixed link 1;Meanwhile also
The spacing between the first arc panel 11 and scaffold can be adjusted by rotating wall connecting rod 13 or extension rod 15 so that wall-connecting piece
The scaffold that different distance is spaced between wall 2 can be adapted to, so as to further improve the use scope of wall-connecting piece.
Pre-buried bar 7 is connected with close to the end-face helical of wall 2 in installing plate 3, and pre-buried bar 7 is at least two, its thickness
No more than the thickness of wall 2, when needing to use pre-buried bar 7, hole first can be opened up on wall 2, pre-buried bar 7 is inserted into hole
It is interior, then installing plate 3 is connected with the end thread of pre-buried bar 7, pre-buried bar 7 can increase the contact area with wall 2 so that
What installing plate 3 was installed more stablizes, meanwhile, it can quickly dismantle wall-connecting piece by rotating installing plate 3.
Claims (8)
- A kind of 1. scaffold wall connecting piece, it is characterised in that including:Fixed link(1);With fixed link(1)It is that end is mutually assembled, offer some mounting holes (31), for by the fixed link(1)It is fixed on Wall(2)On installing plate(3);End thread is connected to the fixed link(1)The first arc panel end and that the steel pipe on scaffold matches(11);End is movably set in the fixed link(1)On, the second arc panel for matching with the steel pipe(12);Arranged on first arc panel(11)With second arc panel(12)It is upper to be used to connect both, so that the fixed link (1)The fixation kit mutually fixed with the steel pipe, second arc panel(12)Positioned at first arc panel(11)With it is described Installing plate(3)Between fixed link (1) on.
- 2. a kind of scaffold wall connecting piece according to claim 1, it is characterised in that the fixation kit includes:It is fixed on Second arc panel(12)The inserted link of end(4);And it is opened in first arc panel(11)The upper and inserted link(4) The through hole to match(41), the inserted link(4)End outer wall opens up fluted(42), the groove(42)Activity is equipped with fixture block (43), the groove(42)Bottom wall is fixed with the other end and the fixture block(43)It is being connected, for driving the fixture block(43) Along the groove(42)The compression spring of slip(44).
- 3. a kind of scaffold wall connecting piece according to claim 2, it is characterised in that the inserted link (4) and second arc Shape plate(12)It is threadedly coupled.
- A kind of 4. scaffold wall connecting piece according to claim 3, it is characterised in that the fixture block(43)Close to through hole(41) Side be equipped with inclined plane(51), the inserted link(4)End is equipped with and the through hole(41)The arcwall face that side edge is touched(5).
- A kind of 5. scaffold wall connecting piece according to claim 1, it is characterised in that the fixed link(1)Including with installation Plate(3)The wall connecting rod of threaded connection(13);Screw thread is set in the wall connecting rod(13)On casing(14);And with the set Pipe(14)The extension rod of threaded connection(15).
- A kind of 6. scaffold wall connecting piece according to claim 1, it is characterised in that first arc panel(11)With it is described Second arc panel(12)One end away from the fixation kit is fixed with the magnetic patch to attract each other(6).
- A kind of 7. scaffold wall connecting piece according to claim 1, it is characterised in that the installing plate(3)Close to wall(2) End-face helical be connected with for being inserted into the wall(2)Interior pre-buried bar(7).
- A kind of 8. scaffold wall connecting piece according to claim 7, it is characterised in that the pre-buried bar(7)At least two, And the pre-buried bar(7)Of length no more than wall(2)Thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721366183.4U CN207314805U (en) | 2017-10-20 | 2017-10-20 | A kind of scaffold wall connecting piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721366183.4U CN207314805U (en) | 2017-10-20 | 2017-10-20 | A kind of scaffold wall connecting piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314805U true CN207314805U (en) | 2018-05-04 |
Family
ID=62381957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721366183.4U Expired - Fee Related CN207314805U (en) | 2017-10-20 | 2017-10-20 | A kind of scaffold wall connecting piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314805U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016872A (en) * | 2019-05-17 | 2019-07-16 | 中国建筑第四工程局有限公司 | A kind of wall attaching parts of bridge rectangle pier heavy type safety climbing ladder |
CN111119466A (en) * | 2020-01-19 | 2020-05-08 | 中国十七冶集团有限公司 | Mounting and dismounting type scaffold wall connecting piece and using method thereof |
CN114856159A (en) * | 2022-04-22 | 2022-08-05 | 江苏正方园建设集团有限公司 | Temporary attachment device for attached lifting scaffold |
CN114856159B (en) * | 2022-04-22 | 2024-04-30 | 江苏正方园建设集团有限公司 | Temporary attaching device for attached lifting scaffold |
-
2017
- 2017-10-20 CN CN201721366183.4U patent/CN207314805U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016872A (en) * | 2019-05-17 | 2019-07-16 | 中国建筑第四工程局有限公司 | A kind of wall attaching parts of bridge rectangle pier heavy type safety climbing ladder |
CN111119466A (en) * | 2020-01-19 | 2020-05-08 | 中国十七冶集团有限公司 | Mounting and dismounting type scaffold wall connecting piece and using method thereof |
CN111119466B (en) * | 2020-01-19 | 2024-03-29 | 中国十七冶集团有限公司 | Mounting and dismounting type scaffold wall connecting piece and application method thereof |
CN114856159A (en) * | 2022-04-22 | 2022-08-05 | 江苏正方园建设集团有限公司 | Temporary attachment device for attached lifting scaffold |
CN114856159B (en) * | 2022-04-22 | 2024-04-30 | 江苏正方园建设集团有限公司 | Temporary attaching device for attached lifting scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207314805U (en) | A kind of scaffold wall connecting piece | |
CN110805792A (en) | VR real-time monitoring equipment for education | |
CN204893850U (en) | Dismounting device of detector | |
CN209717567U (en) | A kind of pin pulling out device | |
CN206393555U (en) | A kind of core holding unit plug provision for disengagement | |
CN110778006A (en) | Assembly type easy-maintenance integrated ceiling and construction method thereof | |
CN203924622U (en) | A kind of integral installation formula baseboard assembly with head of a nail groove | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN204711957U (en) | The large-scale extracting tool to wheel, impeller | |
CN208100266U (en) | A kind of air-conditioning bearing disassembling device | |
CN206366793U (en) | A kind of flange supports drawing device | |
CN206635964U (en) | A kind of splicer of ultrathin plate built-in wall | |
CN208433653U (en) | A kind of electric power cabinet easy to maintenance | |
CN216616981U (en) | Make things convenient for adjustable formwork mounting structure of dismouting | |
CN207033332U (en) | A kind of electric power first-aid ladder | |
CN219132182U (en) | Oil seal extractor for shaft | |
CN208918094U (en) | A kind of connection structure of glass curtain wall crossbeam and column | |
CN211369138U (en) | Building interior wall structure | |
CN216398561U (en) | Stainless steel ornamental strip welded fastening frock | |
CN204381801U (en) | Intelligence screwdriver | |
CN220001475U (en) | External pressing strip for stacking door | |
CN220371942U (en) | Positioning mechanism for color steel plate production and processing | |
CN206561435U (en) | One kind drilling core sample takes out fixture | |
CN212295617U (en) | Steel structure connecting device for building | |
CN205630397U (en) | Tear open fast and trade closing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180504 Termination date: 20191020 |
|
CF01 | Termination of patent right due to non-payment of annual fee |