CN207314313U - A kind of transmission line tower foundation collapse monitoring device - Google Patents

A kind of transmission line tower foundation collapse monitoring device Download PDF

Info

Publication number
CN207314313U
CN207314313U CN201721338187.1U CN201721338187U CN207314313U CN 207314313 U CN207314313 U CN 207314313U CN 201721338187 U CN201721338187 U CN 201721338187U CN 207314313 U CN207314313 U CN 207314313U
Authority
CN
China
Prior art keywords
installing plate
piston
transmission line
displacement
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721338187.1U
Other languages
Chinese (zh)
Inventor
赵长春
吴尚阳
杨守东
王宇
王一宇
韩科
赵亮
王志钢
李睿
尹维崴
郭继辉
吕延召
谢蓓敏
江齐全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Mei Chang Electric Co Ltd
State Grid Corp of China SGCC
State Grid Jilin Electric Power Corp
Original Assignee
Hangzhou Mei Chang Electric Co Ltd
State Grid Corp of China SGCC
State Grid Jilin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Mei Chang Electric Co Ltd, State Grid Corp of China SGCC, State Grid Jilin Electric Power Corp filed Critical Hangzhou Mei Chang Electric Co Ltd
Priority to CN201721338187.1U priority Critical patent/CN207314313U/en
Application granted granted Critical
Publication of CN207314313U publication Critical patent/CN207314313U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model provides a kind of transmission line tower foundation collapse monitoring device, the second installing plate is fixed with first installing plate, humidity measurement instrument mounting base periphery is fixed with humidity measurement instrument, axle sleeve is installed in humidity measurement instrument mounting base, second installing plate upper end is also equipped with information collection module, first displacement sensor is installed between the first installing plate and the second installing plate, the periphery of second installing plate is disposed with elastic ring, second displacement inductor is installed, sleeve lining is provided with triple motion inductor between the second installing plate and elastic ring.The utility model is simple in structure, it is easy for installation, can be to humidity, gas porosity and the top layer water flow of the soil in site where electric power line pole tower, and the gradient of shaft tower carries out real time data inspecting, monitoring data is complete, accurately, data before can caving in electric power line pole tower installation place are integrated, data are analyzed by ppu, landslide is monitored in advance, improves the efficiency of monitoring.

Description

A kind of transmission line tower foundation collapse monitoring device
Technical field
It the utility model is related to landslide monitoring field, more particularly to a kind of transmission line tower foundation collapse monitoring device.
Background technology
For a long time, China causes basis failure or the inclined consequence of shaft tower in the destruction of transmission line of electricity external force with landslide It is the most serious, need to occupy longer power off time during telegram in reply of speedily carrying out rescue work, while need to spend substantial amounts of manpower and thing Power, often brings huge economic loss.
At present, transmission line of electricity landslide rely primarily on manual patrol just, it can be seen that landslide after monitoring rely primarily on manually into Row monitoring, can cause spy to waste substantial amounts of man power and material during patrolling, and will not bring preferable effect.Still further aspect, Manually after basis landslide is found, the loss brought of caving at this time is irreversible, can not manually realize ground after landslide The continuity observation of matter disaster monitoring, lacks the technological means for finding or monitoring landslide in advance.
There is ripe Geological Hazards Monitoring early warning technology in architectural engineering at present, but equipment is excessively numerous and diverse and not exclusively suitable Cave in and monitor for transmission line tower foundation.Therefore in the market geo-hazard early-warning data monitoring technology can be used for reference, researched and developed Go out a set of transmission tower foundation landslide on-Line Monitor Device for meeting transmission line of electricity characteristic.
Utility model content
It is simple in structure the purpose of this utility model is to provide a kind of transmission line tower foundation collapse monitoring device, peace Dress is convenient, and monitoring data are accurate, can be to humidity, gas porosity and the top layer current of the soil in site where electric power line pole tower Amount, and the gradient of shaft tower carry out real time data inspecting, and monitoring data is complete, and accurately, electric power line pole tower can be installed Data before place's landslide are integrated, and data are analyzed by ppu, and landslide is monitored in advance, is improved The efficiency of monitoring.
In order to achieve the above object, the utility model adopts the following technical solution:A kind of transmission line tower foundation landslide Monitoring device, including installing plate, humidity measurement instrument mounting base, humidity measurement instrument, displacement sensor, information collection module and transmission of electricity Line, is provided with humidity measurement instrument mounting base on the installing plate, humidity measurement instrument is provided with the humidity measurement instrument mounting base, Displacement sensor is installed on the installing plate, information collection module is also equipped with the installing plate, described information collects mould Block is connected by power transmission line with external power supply, and the installing plate includes the first installing plate and the second installing plate, first installation The second installing plate is fixed with plate, the side of the second installing plate upper end away from the first installing plate is provided with humidity measurement instrument peace Seat is filled, the humidity measurement instrument mounting base periphery is fixed with humidity measurement instrument, and the humidity measurement instrument mounting base is away from the second peace Loading board side is provided with axle sleeve, and the second installing plate upper end is also equipped with information collection module, and described information collection module leads to Cross power transmission line to be connected with external power supply, first through hole is equipped with first installing plate, second installing plate is interior through wet Degree detector mounting base is equipped with the second through hole, the displacement sensor including the first displacement sensor, second displacement inductor and Triple motion inductor, is provided with the first displacement sensor, second peace between first installing plate and the second installing plate The periphery of loading board is disposed with elastic ring, and second displacement inductor, the axis are provided between second installing plate and elastic ring Set inner wall is provided with triple motion inductor.
Further first displacement sensor includes the first displacement induction strip, first piston axis, the first displacement sensing Device and first piston, are connected between first installing plate and the second installing plate by first piston and first piston axis piston, First displacement sensor is installed on first piston, and the first displacement induction strip is installed on the outer wall of first piston axis On.
The further second displacement inductor includes second piston, second piston axis, second displacement sensor and the Two displacement induction strips, are connected between second installing plate and elastic ring by second piston and second piston axis piston, described Second displacement induction strip is installed on the outer wall of second piston axis, and the second displacement sensor is installed in second piston.
The further first installing plate lower end is provided with multiple fixing axles.
The internal diameter of the further first through hole and the internal diameter of the second through hole are identical.
The further second installing plate upper end is provided with water level detection gauge, and the water level detection gauge is away from the second installation The side of plate is provided with water level detecting column.
The outside diameter of the further elastic ring is more than the outside diameter of the first installing plate, and the outside diameter of the elastic ring is more than second The outside diameter of installing plate, the outside diameter of the elastic ring are more than the outside diameter of axle sleeve.
The outside diameter of further first installing plate is more than the outside diameter of the second installing plate, the outside diameter of second installing plate More than the outside diameter of axle sleeve.
The further triple motion inductor includes the 3rd piston, the 3rd piston shaft, triple motion sensor, the 3rd Displacement induction strip and elastic spacing plate, the 3rd piston are fixed on sleeve lining, the 3rd piston away from axle sleeve one Side is provided with the 3rd piston shaft, and the described one end of 3rd piston shaft away from the 3rd piston is provided with elastic spacing plate, and the described 3rd Displacement sensor is installed on the 3rd piston, and the triple motion induction strip is installed on the outer wall of the 3rd piston shaft.
The further opposite face of the elastic spacing plate is cambered surface, and the radius justified where cambered surface and the half of first through hole Footpath is identical.
After adopting the above technical scheme, the utility model has the following advantages that:
1st, the utility model is simple in structure, easy for installation, by horizontal direction soil tension force, vertical direction soil tension force and The collection of inclination of transmission line tower degree information, obtain it is comprehensive, accurately cave in before information collection, before improving landslide The high efficiency of early warning before the accuracy of information gathering and landslide, monitoring data are accurate, can be in place to electric power line pole tower institute The gradient of the humidity of soil of point, gas porosity and shaft tower carries out real time data inspecting, and monitoring data is complete, can be to transmission of electricity Overhead line structures installation place landslide before data integrated, data are analyzed by ppu, in advance to cave in into Row monitoring, improves the efficiency of monitoring.
2nd, when soil in the vertical direction loosens, to the generation extruding of the second installing plate, the second installing plate extrudes first piston, Then displacement detecting is carried out to the first displacement induction strip on first piston axis by the first displacement sensor on first piston, so The displacement data on vertical direction is transferred to information collection module afterwards, is loosened the soil of vertical direction by information collection module Data transfer gives extraneous processor to analyze, to obtain the soil data before accurately landslide.
3rd, when soil loosens in the horizontal direction, the tension force that soil produces squeezes the elastic ring of the second installing plate periphery Pressure, then this extruding force is transferred to second piston by elastic ring so that second piston axis moves in second piston, Ran Houyou Second displacement sensor and second displacement induction strip coordinate, and realize and reflect soil tension force by displacement monitoring data, Information collection module is then passed to, passing to extraneous processor by information collection module analyzes, to obtain soil in level The loosening data in direction, realize the Real Time Monitoring to the emotionally condition of loose soil before landslide, improve landslide early warning efficiency and Accuracy.
4th, fixing axle is used for the firmness for strengthening the first installing plate, realizes that the first installing plate is stable and firm and is installed on soil In, improve the stability of whole transmission line tower foundation collapse monitoring device.
5th, pass through first through hole and the second through hole to coordinate, it is ensured that whole electric power line pole tower can pass through first through hole and the Two through holes are fixed in basic collapse monitoring device, improve the stability of electric power line pole tower installation.
6th, water level detecting column is used for the height for detecting water level on ground, realizes and water level is monitored in real time, water level inspection Survey instrument and the information of water level detecting is passed into signal collection module, realize the real time data detection to earth's surface water level, raising is collapsed Early warning efficiency and accuracy before side.
7th, elastic ring is used to absorb the tension force in soil in horizontal direction, and the outside diameter of elastic ring is outside whole monitoring device The maximum in footpath, so it can receive the accurate soil tension force in horizontal direction, improves the inspection of second displacement inductor Survey the accuracy of data.
8th, in the soil on vertical direction, whole transmission line tower foundation collapse monitoring device from bottom to top, main part Part outside diameter is gradually reduced, and improves the stability of whole device, reduces the center of gravity of device, improves transmission line tower foundation The stability and reliability of collapse monitoring device installation, improve the accuracy of data acquisition.
9th, when the power given birth to by loose soil movable property to electric power line pole tower produce extruding and caused by inclination of transmission line tower, it is defeated Electric wire line pole tower generates elastic spacing plate extruding force when tilting, and extruding force is passed to the 3rd piston shaft by elastic spacing plate, So that the 3rd piston shaft moves in the 3rd piston, detection the 3rd is coordinated by triple motion sensor and triple motion induction strip The displacement of piston shaft, then passes to information collection module by displacement information, and extraneous processing is passed to by information collection module Device is analyzed, and real-time data acquisition analysis is carried out so as to fulfill to the gradient of electric power line pole tower, before obtaining accurately landslide Data, so as to improve the efficiency and accuracy of landslide early warning.
10th, elastic spacing plate is arranged to cambered surface, it is ensured that transmission line of electricity tower bar can be installed in elastic spacing plate, and energy It is enough to be surrounded by elastic spacing plate, improve the accuracy of detection, moreover it is possible to transmission line of electricity tower bar is reinforced, improves tower bar peace The stability of dress.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 be the utility model proposes a kind of transmission line tower foundation collapse monitoring device front view structure signal Figure;
Fig. 2 be the utility model proposes a kind of transmission line tower foundation collapse monitoring device plan structure signal Figure;
It is as follows that the names of the parts is marked in figure:
1st, installing plate;2nd, humidity measurement instrument mounting base;3rd, humidity measurement instrument;4th, displacement sensor;5th, information collection module; 6th, power transmission line;7th, axle sleeve;8th, first through hole;9th, the second through hole;10th, elastic ring;11st, fixing axle;12nd, water level detection gauge;13rd, water Position detection column;101st, the first installing plate;102nd, the second installing plate;41st, the first displacement sensor;42nd, second displacement inductor; 43rd, triple motion inductor;411st, the first displacement induction strip;412nd, first piston axis;413rd, the first displacement sensor;414th, One piston;421st, second piston;422nd, second piston axis;423rd, second displacement sensor;424th, second displacement induction strip;431、 3rd piston;432nd, the 3rd piston shaft;433rd, triple motion sensor;434th, triple motion induction strip;435th, elastic spacing plate.
Embodiment
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.
As depicted in figs. 1 and 2, the utility model provides a kind of transmission line tower foundation collapse monitoring device, including peace Loading board 1, humidity measurement instrument mounting base 2, humidity measurement instrument 3, displacement sensor 4, information collection module 5 and power transmission line 6, the peace Humidity measurement instrument mounting base 2 is installed in loading board 1, humidity measurement instrument 3 is installed in the humidity measurement instrument mounting base 2, it is described Displacement sensor 4 is installed on installing plate 1, information collection module 5 is also equipped with the installing plate 1, described information collects mould Block 5 is connected by power transmission line 6 with external power supply, and the installing plate 1 includes the first installing plate 101 and the second installing plate 102, described Be fixed with the second installing plate 102 on first installing plate 101,102 upper end of the second installing plate away from the first installing plate 101 one Side is provided with humidity measurement instrument mounting base 2, and 2 periphery of humidity measurement instrument mounting base is fixed with humidity measurement instrument 3, the humidity Detector mounting base 2 is provided with axle sleeve 7 away from 102 side of the second installing plate, and 102 upper end of the second installing plate is also equipped with letter Collection module 5 is ceased, described information collection module 5 is connected with external power supply by power transmission line 6, is set in first installing plate 101 There is first through hole 8, second installing plate 102 is interior to be equipped with the second through hole 9, the displacement through humidity measurement instrument mounting base 2 Inductor 4 includes the first displacement sensor 41, second displacement inductor 42 and triple motion inductor 43, first installing plate 101 and second are provided with the first displacement sensor 41 between installing plate 102, and the periphery of second installing plate 102 is disposed with bullet Property circle 10, second displacement inductor 42 is installed, 7 inner wall of the axle sleeve peace between second installing plate 102 and elastic ring 10 Equipped with triple motion inductor 43.By installing multiple displacement sensors 4, it can monitor that soil is in the horizontal direction and vertical square Upward extruding force, wherein the first displacement sensor 41 is used to monitor the soil tension force on vertical direction, second displacement inductor 42 are used for the soil tension force on level monitoring direction, by detecting extruding force of the soil in horizontally and vertically direction, realize to soil Earth loosens the monitoring of motion process, realizes and carries out real-time strain analysis to soil, effectively increases and relax to soil before landslide The real-time monitoring of power, improves the efficiency and accuracy of monitoring, is realized by installing humidity measurement instrument 3 and humidity in soil is carried out Monitoring, in real time to Humidity Detection, obtains the humidity data of high accuracy, to improve early warning efficiency and accuracy before caving in.The One through hole 8 and the second through hole 9 are used for the installation of electric power line pole tower, the corresponding collapse monitoring device of each electric power line pole tower Through hole, is stably mounted in soil, and under the detection of collapse monitoring device, effective detection has been carried out to its gradient, real Effective monitoring now is carried out to inclination of transmission line tower degree.
Preferable first displacement sensor 41 of the present embodiment includes the first displacement induction strip 411, first piston axis 412nd, the first displacement sensor 413 and first piston 414, pass through between 101 and second installing plate 102 of the first installing plate One piston shaft 412 is connected with 414 piston of first piston, and first displacement sensor 413 is installed on first piston 414, institute The first displacement induction strip 411 is stated on the outer wall of first piston axis 412.First displacement sensor 41 utilizes first piston axis 412 and first piston 414 between the first installing plate 101 and the second installing plate 102 piston connection, the first installing plate 101 In the bottommost of whole collapse monitoring device, it installs bottommost in the soil, and the second installing plate 102 passes through first piston axis 412 and first piston 414 be fixed on 102 upper end of the first installing plate, and fill in the soil, when the second installing plate 102 is arrived From between upper end soil or the first installing plate and the second installing plate during the extruding of soil, the second installing plate 102 extruding at this time the One piston shaft 412 so that the first displacement sensor 413 on first piston 414 is by sensing the first displacement induction strip Inductive signal on 411, obtains the displacement information of first piston axis 412, then passes the displacement data of first piston axis 412 It is defeated into information collection module 5, realize on vertical direction soil loosen data carry out in real time monitoring collect.
Preferably the second displacement inductor 42 includes second piston 421, second piston axis 422, second to the present embodiment Displacement sensor 423 and second displacement induction strip 424, pass through second piston between second installing plate 102 and elastic ring 10 421 connect with 422 piston of second piston axis, and the second displacement induction strip 424 is installed on the outer wall of second piston axis 422, The second displacement sensor 423 is installed in second piston 421.Second displacement inductor 42 utilizes second piston 421 and the Two piston shafts 422 piston between the second installing plate 102 and elastic ring 10 connects, and elastic ring 10 is being received in horizontal direction Soil extruding when, its elastic ring 10 extruding second piston axis 422, and the second displacement sensing in second piston 421 Device 423 is detected reception to the displacement inductive signal in the second displacement induction strip 424 on second piston axis 422, So as to which the displacement information of second piston axis 422 is transferred to signal collection module 5 after second displacement sensor 423 is collected In, realize and data progress monitoring collection in real time is loosened to soil in horizontal direction.
Preferable first installing plate, 101 lower end of the present embodiment is provided with multiple fixing axles 11.Fixing axle 11 is used to add The firmness of strong first installing plate 101, realizes the 101 stable and firm installation of the first installing plate in the soil, improves whole transmission of electricity The stability of overhead line structures basis collapse monitoring device.
Preferably the internal diameter of the internal diameter of the first through hole 8 and the second through hole 9 is identical for the present embodiment.Ensure whole power transmission line Line pole tower can be fixed in basic collapse monitoring device by 8 and second through hole 9 of first through hole, improve electric power line pole tower The stability of installation.
Preferable second installing plate, 102 upper end of the present embodiment is provided with water level detection gauge 12, the water level detection gauge 12 sides away from the second installing plate 102 are provided with water level detecting column 13.Water level detection gauge 12 is installed on the second installing plate 102 Upper end, and the water level detecting column 13 installed in water level detection gauge 12 bassets, and for detecting the height of water level on ground, realizes Water level monitored in real time, the information of water level detecting is passed to signal collection module 5 by water level detection gauge 12, is realized pair The real time data detection of earth's surface water level, improves the early warning efficiency and accuracy before landslide.
The present embodiment preferably the elastic ring 10 outside diameter be more than the first installing plate 101 outside diameter, the elastic ring 10 Outside diameter be more than the outside diameter of the second installing plate 101, the outside diameter of the elastic ring 10 is more than the outside diameter of axle sleeve 7.Elastic ring 10 is used for The tension force in horizontal direction in soil is absorbed, the outside diameter of elastic ring 10 is the maximum of whole monitoring device outside diameter, so its The accurate soil tension force in horizontal direction can be received, improves the accuracy that second displacement inductor 42 detects data.
The outside diameter of preferable first installing plate 101 of the present embodiment is more than the outside diameter of the second installing plate 102, and described second The outside diameter of installing plate 102 is more than the outside diameter of axle sleeve 7.In the soil on vertical direction, whole transmission line tower foundation landslide prison Survey device from bottom to top, main element outside diameter is gradually reduced, and improves the stability of whole device, reduces the center of gravity of device, The stability and reliability of transmission line tower foundation collapse monitoring device installation are improved, improves the accurate of data acquisition Property.
The preferable triple motion inductor 43 of the present embodiment includes the 3rd piston 431, the 3rd piston shaft the 432, the 3rd Displacement sensor 433, triple motion induction strip 434 and elastic spacing plate 435, the 3rd piston 431 are fixed on 7 inner wall of axle sleeve On, the side of the 3rd piston 431 away from axle sleeve 7 is provided with the 3rd piston shaft 432, and the 3rd piston shaft 432 is away from One end of three pistons 431 is provided with elastic spacing plate 435, and the triple motion sensor 433 is installed on the 3rd piston 431, The triple motion induction strip 434 is installed on the outer wall of the 3rd piston shaft 432.The 3rd piston in triple motion inductor 43 432 and the 3rd piston 431 of axis is used to connect between elastic spacing plate 435 and axle sleeve 7, and elastic spacing plate 435 is used for power transmission line Line pole tower progress is spacing, and when transmission line of electricity bar is there occurs tilting, elastic spacing plate 435 will be subject to electric power line pole tower at this time Extruding, so that the power that extruding is subject to is transferred to the 3rd piston shaft 432, when the 3rd piston shaft 432 moves, installed in the 3rd piston Triple motion induction strip 434 on axis 432 moves, and the triple motion sensor 433 on the 3rd piston shaft 432 is to the 3rd The mobile data of displacement induction strip 434 is monitored in real time, and the data detected then are transferred to signal collection module 5, by 5 real-time recorded data of signal collection module, monitors in real time so as to fulfill to inclination of transmission line tower degree, improves landslide The efficiency and accuracy of early warning.
Preferably the opposite face of the elastic spacing plate 435 is cambered surface to the present embodiment, and the radius of circle where cambered surface and the The radius of one through hole 8 is identical.It ensure that transmission line of electricity tower bar can be installed in elastic spacing plate 435, and can be limited by elasticity Position plate 435 surrounds.
When the transmission line tower foundation collapse monitoring device in the present embodiment comes into operation, first by whole power transmission line In the collapse monitoring device embedment electric power line pole tower installation cave of line pole tower basis, pass through the fixation of 101 lower end of the first installing plate Axis 11 carries out reinforcing installation, and power transmission line shaft tower then is inserted through first through hole 8 by the second through hole 9 is passed through installation cave bottom Portion, in the second through hole 9, the periphery of electric power line pole tower is surrounded by elastic spacing plate 435, then fill soil, the soil made The gap section of transmission line tower foundation collapse monitoring device in the present embodiment is sufficient filling with, then fills and leads up soil, is compacted, dew Go out power transmission line to be connected with extraneous processor, monitored in real time with obtaining transmission line tower foundation collapse monitoring device in the present embodiment The data of acquisition.In use, when soil in the vertical direction loosens, the tension force that soil produces is to the second installing plate 102 Produce extruding, the second installing plate 102 extruding first piston 414, then by the first displacement sensor 413 on first piston 414 Displacement detecting is carried out to the first displacement induction strip 411 on first piston axis 412, then passes the displacement data on vertical direction Information collection module 5 is defeated by, the soil of vertical direction is loosened into data transfer to extraneous processor point by information collection module 5 Analysis, to obtain the soil data before accurately landslide.When soil loosens in the horizontal direction, the tension force that soil produces is pacified to second The elastic ring 10 of 102 periphery of loading board is extruded, and then this extruding force is transferred to second piston 421 by elastic ring 10 so that Second piston axis 422 moves in second piston 421, is then matched somebody with somebody by second displacement sensor 423 and second displacement induction strip 424 Close, realize and reflect soil tension force by displacement monitoring data, be then passed to information collection module 5, received by information Collection module 5 passes to extraneous processor analysis, to obtain soil loosening data in the horizontal direction, realizes to native before landslide Earth loosens the Real Time Monitoring of situation, improves landslide early warning efficiency and accuracy.When the power given birth to by loose soil movable property is to defeated Electric wire line pole tower produces extruding and causes inclination of transmission line tower, and when inclination of transmission line tower produces elastic spacing plate 435 Extruding force is given birth to, extruding force is passed to the 3rd piston shaft 432 by elastic spacing plate 435 so that the 3rd piston shaft 432 is lived the 3rd Movement in plug 431, the position of the 3rd piston shaft 432 of detection is coordinated by triple motion sensor 433 and triple motion induction strip 434 Shifting amount, then passes to information collection module 5 by displacement information, and passing to extraneous processor by information collection module 5 analyzes, from And realize and real-time data acquisition analysis is carried out to the gradient of electric power line pole tower, to obtain data before accurately landslide, so that Improve the efficiency and accuracy of landslide early warning.Bottom surface water level information is obtained by water level detecting column 13, will by water level detection gauge 12 Ground water level information passes to information collection module 5, and water level information is passed to extraneous processor by information collection module 5 carries out Analysis, to obtain accurately extraneous water level information, improves the efficiency and accuracy of early warning before landslide.Power transmission line in the present embodiment Line pole tower basis collapse monitoring device passes through horizontal direction soil tension force, vertical direction soil tension force, inclination of transmission line tower Degree and ground water level information summation gather, obtain it is comprehensive, accurately cave in before information collection, improve landslide before letter The high efficiency of early warning before the accuracy of breath collection and landslide.
In addition to above preferred embodiment, the utility model also has other embodiments, and those skilled in the art can root Made various changes and modifications according to the utility model, without departing from the spirit of the utility model, the utility model should all be belonged to Scope defined in appended claims.

Claims (10)

1. a kind of transmission line tower foundation collapse monitoring device, including installing plate (1), humidity measurement instrument mounting base (2), humidity Detector (3), displacement sensor (4), information collection module (5) and power transmission line (6), are provided with humidity on the installing plate (1) Detector mounting base (2), is provided with humidity measurement instrument (3) on the humidity measurement instrument mounting base (2), on the installing plate (1) Displacement sensor (4) is installed, information collection module (5), described information collection module are also equipped with the installing plate (1) (5) be connected by power transmission line (6) with external power supply, it is characterised in that the installing plate (1) include the first installing plate (101) and Second installing plate (102), is fixed with the second installing plate (102), second installing plate on first installing plate (101) (102) side of the upper end away from the first installing plate (101) is provided with humidity measurement instrument mounting base (2), the humidity measurement instrument peace Dress seat (2) periphery is fixed with humidity measurement instrument (3), and the humidity measurement instrument mounting base (2) is away from the second installing plate (102) side Axle sleeve (7) is installed, the second installing plate (102) upper end is also equipped with information collection module (5), described information collection module (5) it is connected by power transmission line (6) with external power supply, is equipped with first through hole (8) in first installing plate (101), described second Be equipped with the second through hole (9) through humidity measurement instrument mounting base (2) in installing plate (102), the displacement sensor (4) includes the One displacement sensor (41), second displacement inductor (42) and triple motion inductor (43), first installing plate (101) with First displacement sensor (41) is installed, the periphery of second installing plate (102) is disposed with bullet between the second installing plate (102) Property circle (10), is provided with second displacement inductor (42), the axle sleeve between second installing plate (102) and elastic ring (10) (7) inner wall is provided with triple motion inductor (43).
2. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that first displacement Inductor (41) includes the first displacement induction strip (411), first piston axis (412), the first displacement sensor (413) and first and lives Fill in (414), pass through first piston (414) and first piston axis between first installing plate (101) and the second installing plate (102) (412) piston connects, and first displacement sensor (413) is installed on first piston (414), the first displacement induction strip (411) on the outer wall of first piston axis (412).
3. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that the second displacement Inductor (42) includes second piston (421), second piston axis (422), second displacement sensor (423) and second displacement sensing Bar (424), passes through second piston (421) and second piston axis (422) between second installing plate (102) and elastic ring (10) Piston connects, and the second displacement induction strip (424) is installed on the outer wall of second piston axis (422), and the second displacement passes Sensor (423) is installed in second piston (421).
4. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that first installation Plate (101) lower end is provided with multiple fixing axles (11).
5. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that the first through hole (8) internal diameter and the internal diameter of the second through hole (9) is identical.
6. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that second installation Plate (102) upper end is provided with water level detection gauge (12), and side of the water level detection gauge (12) away from the second installing plate (102) is pacified Equipped with water level detecting column (13).
7. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that the elastic ring (10) outside diameter is more than the outside diameter of the first installing plate (101), and the outside diameter of the elastic ring (10) is more than the second installing plate (101) Outside diameter, the outside diameter of the elastic ring (10) are more than the outside diameter of axle sleeve (7).
8. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that first installation The outside diameter of plate (101) is more than the outside diameter of the second installing plate (102), and the outside diameter of second installing plate (102) is more than axle sleeve (7) Outside diameter.
9. transmission line tower foundation collapse monitoring device according to claim 1, it is characterised in that the triple motion Inductor (43) includes the 3rd piston (431), the 3rd piston shaft (432), triple motion sensor (433), triple motion sensing Bar (434) and elastic spacing plate (435), the 3rd piston (431) are fixed on axle sleeve (7) inner wall, the 3rd piston (431) side away from axle sleeve (7) is provided with the 3rd piston shaft (432), and the 3rd piston shaft (432) is away from the 3rd piston (431) one end is provided with elastic spacing plate (435), and the triple motion sensor (433) is installed on the 3rd piston (431) On, the triple motion induction strip (434) is installed on the outer wall of the 3rd piston shaft (432).
10. transmission line tower foundation collapse monitoring device according to claim 9, it is characterised in that the elasticity limit The opposite face of position plate (435) is cambered surface, and the radius of circle where cambered surface is identical with the radius of first through hole (8).
CN201721338187.1U 2017-10-17 2017-10-17 A kind of transmission line tower foundation collapse monitoring device Active CN207314313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721338187.1U CN207314313U (en) 2017-10-17 2017-10-17 A kind of transmission line tower foundation collapse monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721338187.1U CN207314313U (en) 2017-10-17 2017-10-17 A kind of transmission line tower foundation collapse monitoring device

Publications (1)

Publication Number Publication Date
CN207314313U true CN207314313U (en) 2018-05-04

Family

ID=62381624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721338187.1U Active CN207314313U (en) 2017-10-17 2017-10-17 A kind of transmission line tower foundation collapse monitoring device

Country Status (1)

Country Link
CN (1) CN207314313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761695A (en) * 2017-10-17 2018-03-06 国网吉林省电力有限公司检修公司 A kind of transmission line tower foundation collapse monitoring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761695A (en) * 2017-10-17 2018-03-06 国网吉林省电力有限公司检修公司 A kind of transmission line tower foundation collapse monitoring device

Similar Documents

Publication Publication Date Title
CN104061902B (en) Combined type underground deep disaster monitoring device
CN103727911B (en) Assembly type deep soils equipment and system based on MEMS array
CN103940394A (en) Monitoring system and method for simulating excavation device through tunnel pipe roof construction method
CN101894454B (en) Oil derrick stress measurement and data acquisition system based on wireless sensor network
CN102839693A (en) Anchor quality monitoring device for increased resistance deformation anchor bolts/ropes and application method
CN106932129A (en) Colliery depth shaft wall safety monitoring assembly and its monitoring method
CN207314313U (en) A kind of transmission line tower foundation collapse monitoring device
CN105043611B (en) A kind of swelled ground lateral swelling force in-situ testing device
CN208075790U (en) A kind of Novel tunnel convergent deformation continuous measuring device
CN204214437U (en) Profundal zone surface subsidence monitoring device
CN203148409U (en) Sliding device of deep excavation displacement real-time monitoring meter
CN202494496U (en) Intelligent underground water level meter
CN201857953U (en) Advanced abutment pressure monitoring device on coal face
CN204740024U (en) Long -range automatic monitoring devices suitable for soft ground is subsided
CN107761695A (en) A kind of transmission line tower foundation collapse monitoring device
CN208488059U (en) A kind of expansion type drilling multidirectional deformation monitoring sensor
CN217738215U (en) Deep displacement monitoring devices of waterproof type of degree of depth
CN206539340U (en) A kind of full angle mash gas pumping drilling stability dynamic monitor
CN112797929B (en) Rock-soil mass deformation monitoring device and method
CN112816024B (en) Underground water level measuring system and method
CN207863000U (en) A kind of device for detecting support disk pile hole quality
CN208282771U (en) A kind of mechanical swelling type hole wall deformation sensor for drilling
CN206648761U (en) Colliery depth shaft wall safety monitoring assembly
CN102384739B (en) Displacement sensor of infilling body
CN209296938U (en) A kind of self-propelled well geophone

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant