CN207314279U - It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city - Google Patents
It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city Download PDFInfo
- Publication number
- CN207314279U CN207314279U CN201720931154.1U CN201720931154U CN207314279U CN 207314279 U CN207314279 U CN 207314279U CN 201720931154 U CN201720931154 U CN 201720931154U CN 207314279 U CN207314279 U CN 207314279U
- Authority
- CN
- China
- Prior art keywords
- pump
- water
- gate
- city
- integration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
Abstract
The utility model offer is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city, it is characterised in that:Including integration pump brake system and its control system, the utility model be it is a kind of have that structure type is simple, it is low to save civilwork engineering quantity, construction cost, take up an area small scale, construction and installation are convenient, take into account the pump brake system of urban flood defence water drainage and moisturizing demand.This integration pump brake system can be built in river channel in city, meet that flood season controls flood and drains flooded fields, fine day, which vitalizes inland river water body, improves the requirement of inland river ecological environment.Integration pump brake lever sluice and pumping plant are combined into one, and two groups of pump lock reversed arrangements, gate opening/closing or pumping drainage are realized by electric-control system, particularly evident for river channel in the city without expropriation of land condition, advantage.
Description
Technical field
River flood control water drainage is the utility model is related to, moisturizing demand is taken into account more particularly to a kind of medium and small river flood control water drainage
Integration pump brake system.
Background technology
By way of pump brake system solution urban flood defence water drainage takes into account moisturizing demand.Stopped using closing gate to reach
Outer river water flows into inland river, realizes the purpose of flood control;The unlatching of gate at the same time is exchanged to carry out inland river and the gravity flow of outer river, is reached and is vitalized
The purpose of water body.When freshwater line is less than outer stream stage, the water pump in brake system is pumped, can be turned by the turning handle kinetic energy of impeller
The potential energy of water is turned to, is lifted so as to fulfill water from low liquid level side to high liquid level side, the water of interior korneforos is lifted to outer river water
Position, achievees the purpose that water drainage.Reversed arrangement water pump at the same time, can guide to outer river water in inland river, complete inland river moisturizing demand.
City pump brake system construction and normal operation, be China's water policy needs, and sustainable development will
Ask.But the foundation investment of river channel pump lock is big in traditional city, and occupation of land scale is big, and maintenance cost is high, prevents as foundation takes into account city
The pump brake system of flood water drainage moisturizing demand, operation expense are more prominent.The gate of river channel usually not drains flooded fields in city
And the design of water supplement function, after gate system runs a period of time, the demand of water pump water drainage and moisturizing can be increased, but by various
Conditionality, it is difficult to realize this function.Main cause is:But due to project site selection and the limitation of occupation of land, it is difficult to which expropriation of land is built again
Found new pumping plant;Or the limitation of medium and small river width, pumping plant at one is established from river, the overcurrent in river can be influenced and ship passes through and needs
Ask.Therefore, just build pump brake system, or establish in former gate system take into account control flood and drain flooded fields and moisturizing appellative function in determine skill
During art route, the characteristics of should considering to pump brake system, local river information system and development orientation are combined again, while also to meet
National relevant policies requirement, selection are adapted to work as ground pump lock construction scheme.
Utility model content
The purpose of this utility model is to provide a kind of one taken into account city middle and small river and controlled flood and drained flooded fields with moisturizing demand
Change pump brake system, to solve the problems, such as in above-mentioned background technology.
The defects of for the prior art, the utility model, which provides, takes into account small river flood control water drainage and moisturizing demand in city
Integration pump brake system, it is characterised in that:The integration pump brake system includes river upstream and downstream both sides bulkhead gate/accident
Gate, is periodically closed, for overhauling grid, main body gate, water pump in integration pump brake system;Control system is further included, institute
Stating control system includes instrument, control unit and wechat public platform platform, and the instrument is ultrasonic level gage, a set of integration
Pump brake system includes 6 ultrasonic level gages, and main body gate upstream and downstream both sides respectively set 3 ultrasonic level gages, according to setting
Value carrys out the start stop operation of regulating gate and water pump;Described control unit includes control and tele-control system on the spot, uses
SCADA softwares carry out the logic control of gate water pump unlatching;The wechat public platform platform checks integration pump lock for client
Operating status provide facilitates measure, have permission user can cell phone platform change parameter, regulate and control integration pump lock opening-closing process.
Preferably, the integration pump brake system includes the waterpower grid of river upstream or upstream and downstream;The grid is optional
Mechanical grille or tablet grid, for intercepting the dirts such as the rubbish in river, water plant, avoid obstruction water pump.
Preferably, the waterpower grid is removed contamination mode, selects swinging grid sewage-removing machine collocation screw conveyor, grab type
Grid sewage-removing machine is manually periodically removed contamination.
Preferably, the main body gate is main gate, and water pump is connected with gate, and is integrally lifted with gate, composition one
Bodyization pumps lock.
Preferably, the water pump is connected with gate connection mode for horizontal pit shaft, and water pump is placed in pit shaft, and pit shaft passes through method
Orchid is fixed with gate, the pit shaft end set flap valve of water pump water outlet side.
Preferably, for the main body gate to rise horizontal hydraulic flap gate, hoisting way is hydraulic pressure lift.
Preferably, the water pump is axial-flow pump, range of flow 100-7000L/s, lift 2-10m.
Preferably, river flood control water drainage and moisturizing demand are taken into account, integration pump brake system includes integration pump of controlling flood and draining flooded fields
Lock and moisturizing integration pump lock, control flood and drain flooded fields integration pump lock and moisturizing integration pump lock reversed arrangement, integration of controlling flood and draining flooded fields
It is interior covalency Wai He to pump water seal pump direction;Moisturizing integration pump water seal pump direction is outer covalency inland river, vitalizes inland river water body.
The purpose of this utility model is to be directed to the pump lock engineering that river channel is established in current city, meets to control flood, drain flooded fields and mend when at the same time
During water function, the occupation of land of conventional pump lock is larger, surrounding road resident is caused to significantly affect, or can not be successfully implementation.One
Change pump brake system system to establish on the basis of conventional pump lock, with reference to the engineer application experience of nearly 10 years both at home and abroad, develop and be directed to
The pump lock technology of river channel in city.Solve since structures are intensive around middle river channel, can not additionally establish asking for pumping plant
Topic.Realize, merely with former river width, integration pump brake system is established, with regard to that can meet Pluvial flood control and water drainage and fine day disk
The demand of inland river water body living, realizes the purpose that a lock uses.
Embodiment
Take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city, it is characterised in that:Including one
Bodyization pumps brake system and its control system.
Integration pump brake system requires no conventional pump lock requirement high occupation of land, can be just with river channel original river in city
Road width, and former river extra separation need not be built pumping plant.Occupation of land will not thus be increased, river overcurrent will not be influenced and broken
Face.The integration pump brake system includes river upstream and downstream both sides bulkhead gate/emergency gate, periodically closes, for overhauling one
Grid, main body gate, water pump in bodyization pump brake system.
Bulkhead gate/emergency gate can use cast iron edge copper or steel material, and screw rod opens and closes hoisting way.
The integration pump brake system includes the waterpower grid of river upstream or upstream and downstream;The optional mechanical grille of grid
Or tablet grid, for intercepting the dirts such as the rubbish in river, water plant, avoid obstruction water pump.
Tablet grid right angle setting, grizzly bar gap 50mm.
The waterpower grid is removed contamination mode, and optional swinging grid sewage-removing machine is arranged in pairs or groups screw conveyor, and grab type grid removes
Dirty machine is manually periodically removed contamination.
Grab type grid sewage-removing machine is installed on above grid, is driven a vehicle by truss and is completed crawl dirt and blowdown process.
It is characterized in that:The main body gate is main gate, and water pump is connected with gate, and is integrally lifted with gate, group
Integralization pumps lock.
Theme gate material is steel-slag sand, if any seawater, can carry out spray zinc processing.
The water pump is connected with gate connection mode for horizontal pit shaft, and water pump is placed in pit shaft, and pit shaft passes through flange and lock
Door is fixed, the pit shaft end set flap valve of water pump water outlet side.
By being connected after the center of gravity of software analysis water pump, pit shaft, flap valve and installation annex with gate.If any deviation, can lead to
The structure design for crossing gate avoids, or the influence of bias is adjusted by the position of gate lifting point.
For the main body gate to rise horizontal hydraulic flap gate, hoisting way is hydraulic pressure lift.
Hydraulic pressure lift mode accuracy is high, and hoisting capacity is big, and maturation application is reliable and stable.During lifting tilting flapgate standard-sized sheet,
Gate horizontal can crouch in the top of gate pier, be fully horizontally opened into above river, river overcurrent do not interfered with, to environment shadow
Ring smaller.
The water pump is axial-flow pump, range of flow 100-7000L/s, lift 2-10m.
Axial-flow pump is submersible axial flow pump, according to operating mode may be selected a lock one pump or a lock more pump form.Such as pumped with a lock more
Form, pump house distance are more than 1 times of mineshaft diameter.
River flood control water drainage and moisturizing demand are taken into account, integration pump brake system includes control flood and drain flooded fields integration pump lock and moisturizing
Integration pump lock, control flood and drain flooded fields integration pump lock and moisturizing integration pump lock reversed arrangement, integration pump water seal pump of controlling flood and draining flooded fields
Direction is interior covalency Wai He;Moisturizing integration pump water seal pump direction is outer covalency inland river, vitalizes inland river water body.
Two sets of pump brake systems, can select different model water pump according to duty requirements;According to operating mode may be selected a lock one pump or
One lock pumps form more.Such as pump form with a lock, pump house distance is more than 1 times of mineshaft diameter more.
The control system includes instrument, control unit and wechat public platform platform.
The instrument is ultrasonic level gage, and a set of integration pump brake system includes 6 ultrasonic level gages, main body gate
Upstream and downstream both sides respectively set 3 ultrasonic level gages.
To avoid maloperation, upstream and downstream takes 3 differences respectively to install ultrasonic level gage, according to setting value come regulating gate
And the start stop operation of water pump.
Described control unit includes control and tele-control system on the spot, and gate water pump unlatching is carried out using SCADA softwares
Logic control.
Control can realize that equipment state is had a guide look of and changes operating parameter at any time on the touchscreen on the spot.SCADA softwares are arranged
, it can be achieved that the function such as remote monitoring, real-time and history alarm, report query in the Central Control Room of user.
The wechat public platform platform checks that integration pump lock operating status provides for client and facilitates measure, has permission use
Family can cell phone platform change parameter, regulate and control integration pump lock opening-closing process.
Client voluntarily buys mobile, unicom or telecommunications SIM card, and integration pump lock station data can be uploaded to producer's cloud platform,
Producer provides corresponding account and password, and client can realize remote monitoring anywhere or anytime after paying close attention to wechat public platform.
Brief description of the drawings:
Fig. 1 takes into account small river flood control water drainage pump brake system integrated with moisturizing demand in city for the utility model
Structural plan schematic diagram.
Fig. 2 is the sectional view of the utility model.
Figure number explanation
1 bulkhead gate, 2 waterpower grids, 3 cat ladders, 4 water pumps, 5 main body gates, 6 hydraulic stems, 7 hinges, 8 buttresses, 9 liftings
Put.
Claims (8)
1. a kind of take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city, it is characterised in that:It is described
Integration pump brake system includes river upstream and downstream both sides bulkhead gate/emergency gate, periodically closes, for overhauling integration pump lock
Grid, main body gate, water pump in system;Control system is further included, the control system includes instrument, control unit and wechat
Public platform platform, the instrument are ultrasonic level gage, and a set of integration pump brake system includes 6 ultrasonic level gages, main body
Gate upstream and downstream both sides respectively set 3 ultrasonic level gages, according to setting value come regulating gate and the start stop operation of water pump;It is described
Control unit includes control and tele-control system on the spot, and the logic control of gate water pump unlatching is carried out using SCADA softwares;Institute
State wechat public platform platform and check that integration pump lock operating status provides and facilitates measure for client, have permission user can mobile phone put down
Platform changes parameter, regulates and controls integration pump lock opening-closing process.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 2. according to claim 1
System, it is characterised in that:The integration pump brake system includes the waterpower grid of river upstream or upstream and downstream;The optional machine of grid
Tool grid or tablet grid, for intercepting the rubbish in river, water plant, avoid obstruction water pump.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 3. according to claim 2
System, it is characterised in that:The waterpower grid is removed contamination mode, selects swinging grid sewage-removing machine collocation screw conveyor, grab type
Grid sewage-removing machine is manually periodically removed contamination.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 4. according to claim 1
System, it is characterised in that:The main body gate is main gate, and water pump is connected with gate, and is integrally lifted with gate, composition one
Change pump lock.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 5. according to claim 4
System, it is characterised in that:The water pump is connected with gate connection mode for horizontal pit shaft, and water pump is placed in pit shaft, and pit shaft passes through method
Orchid is fixed with gate, the pit shaft end set flap valve of water pump water outlet side.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 6. according to claim 4
System, it is characterised in that:For the main body gate to rise horizontal hydraulic flap gate, hoisting way is hydraulic pressure lift.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 7. according to claim 1
System, it is characterised in that:The water pump is axial-flow pump, range of flow 100-7000L/s, lift 2-10m.
A kind of take into account in city that the water drainage of small river flood control is integrated with moisturizing demand to pump lock system 8. according to claim 1
System, it is characterised in that:River flood control water drainage and moisturizing demand are taken into account, integration pump brake system includes integration pump lock of controlling flood and draining flooded fields
With moisturizing integration pump lock, control flood and drain flooded fields integration pump lock and moisturizing integration pump lock reversed arrangement, integration pump of controlling flood and draining flooded fields
Water seal pump direction is interior covalency Wai He;Moisturizing integration pump water seal pump direction is outer covalency inland river, vitalizes inland river water body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720931154.1U CN207314279U (en) | 2017-07-28 | 2017-07-28 | It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720931154.1U CN207314279U (en) | 2017-07-28 | 2017-07-28 | It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314279U true CN207314279U (en) | 2018-05-04 |
Family
ID=62434048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720931154.1U Active CN207314279U (en) | 2017-07-28 | 2017-07-28 | It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314279U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056990A (en) * | 2018-09-10 | 2018-12-21 | 华南泵业有限公司 | Integration pump lock station and application |
WO2021135213A1 (en) * | 2019-12-31 | 2021-07-08 | 苏州必加互联网科技有限公司 | Waterlogging management device for smart city |
-
2017
- 2017-07-28 CN CN201720931154.1U patent/CN207314279U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056990A (en) * | 2018-09-10 | 2018-12-21 | 华南泵业有限公司 | Integration pump lock station and application |
WO2021135213A1 (en) * | 2019-12-31 | 2021-07-08 | 苏州必加互联网科技有限公司 | Waterlogging management device for smart city |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208363235U (en) | A kind of overflow well controlling the pipeline flow that shuts off by floating drum and pulley | |
CN2905896Y (en) | Float box type automatic gate | |
CN205444311U (en) | City river pump station that gate combines | |
CN105780906B (en) | A kind of dirty exhaust system of fragment abandoned stream section | |
CN106759833A (en) | A kind of combined type fairing for improving urban rainwater pumping plant Inlet flow pattern | |
CN207314279U (en) | It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city | |
CN102296694A (en) | Composite material closure gate | |
CN209227716U (en) | A kind of automatic control reverse-filling rain sewage diversion device | |
CN207392409U (en) | A kind of Mobyneb Vatch basin system | |
CN209874005U (en) | Clear water and sewage flow dividing device for reducing rural non-point source pollution | |
CN208363234U (en) | A kind of floating drum flashboard controls the overflow well for the pipeline flow that shuts off | |
CN206015856U (en) | Rotating flow is from the integrated pumping plant in clear pond | |
CN110578367A (en) | Prefabricated vatch basin | |
CN208517904U (en) | A kind of hydraulic engineering drainage gate | |
CN205205789U (en) | A flood control floodgate and drainage pumping stations body structure | |
CN105369779B (en) | Anti-flood valve and drainage pumping stations integrative-structure | |
CN207295964U (en) | A kind of horizontal prefabricated pumping plant of integration | |
CN210857472U (en) | Bury formula dispersion regulation storage battery system | |
CN210369253U (en) | Integrated intelligent measurement and control sewage interception and distribution well | |
CN207436227U (en) | First rain storage pond flap type flusher and first rain storage pond | |
CN113152637A (en) | Integrated automatic intercepting well and intercepting method | |
CN206000004U (en) | A kind of water feed apparatus of underground sewage disposal system system | |
CN104276679B (en) | Dissolved oxygen aerating apparatus and apply its water treating equipment | |
CN215759479U (en) | Integrated automatic intercepting well | |
CN216586904U (en) | Integrated intelligent intercepting well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200927 Address after: Schaffhausen, Switzerland Patentee after: Xylem Europe Ltd. Address before: 200050 room 3011-3014, building A, Shanghai, Hongqiao, Zunyi Road, No. 100, Shanghai, Patentee before: XYLEM (CHINA) Co.,Ltd. |
|
TR01 | Transfer of patent right |