Background technology
At present, rainy season is usually formulated in city plan for flood control, the more urban area of especially southern rainwater, right
Easy accumulated water low lying areas usually require to have flood dam, in case when seashore flood tide or river flood to bank building, road surface and
Pedestrian causes to damage.
But existing flood dam is generally controlled flood using baffle, simple in structure, light-weight, is easily washed away by flood, the opposing party
Face, existing city flood dam has level altitude, once running into large-scale big flood, existing flood dam just stops incessantly flood.
Utility model content
1. technical problems to be solved
The problem of for city flood dam existing in the prior art, problem is as follows:
(1), existing flood dam is simple in structure, weight is flushed away easily.
(2), the only fixed flood control height of existing flood dam.
2. technical solution
To solve the above problems, the utility model adopts the following technical scheme.
A kind of city movable flood dam, including dam body, further include cistern, during cistern is fixedly mounted in dam body
Portion, the cistern left side are provided with inlet opening on inclined-plane, dewatering orifice, the dewatering orifice are provided with the right side of the columns base
Inside it is movably installed with valve switch;Water barrier is provided with the top of the cistern, the bottom of the cistern is provided with load-bearing
Layer, the water barrier top are installed with steel U-lag, and two notches of the steel U-lag are horizontally set on dam body
Upper surface, is movably installed with rubber baffle on the right side of the steel U-lag in notch, set on the right side of the steel U-lag in notch
Be equipped with two rubber and be buckled, the rubber baffle two bottom sides are provided with two rubber and are buckled, on the rubber buckle with
Buckle matches under rubber, and the dam body bottom is installed with pulley casing, and the pulley casing includes pulley and electric expansion fills
Put, the pulley is fixedly mounted on electrical retractor(12)Lower section, dam body bottom right is provided with controlling switch, the control
System switch left side is provided with power supply, processor is provided with the left of the power supply, the power supply is electrically connected with controlling switch, described
Controlling switch is electrically connected with processor, and the processor is electrically connected with electrical retractor.
Preferably, dam body one side is provided with convex block, and the dam body another side sets fluted, the convex block groove phase
Matching, the both sides and bottom of the dam body are both provided with rubber layer.
Preferably, dam body left bottom is installed with base, and threaded rod is movably installed with the base.
3. beneficial effect
Compared with the prior art, the utility model has the advantage of:
(1)The utility model is provided with into water by the way that cistern, cistern left side are fixedly mounted in the middle part of dam body on inclined-plane
Hole, columns base right side are provided with dewatering orifice, valve switch are movably installed with dewatering orifice;Inlet opening energy on the left of cistern
Current are made to enter cistern, with the increase of the water in cistern, the weight of dam body is consequently increased, and the increase of dam body weight is just
Flood dam is caused to be not easy to be washed away by flood, the setting on inclined-plane on the left of dam body, while impact force of the flood to dam body is decreased, protect
Dam body is protected;And the bottom of dam body is provided with rubber layer, ensure that dam body with ground with firmly contacting, so as to solve
The problem of existing flood dam is simple in structure, weight is flushed away easily;
(2)The utility model above water barrier by being fixedly mounted steel U-lag, two notch water of steel U-lag
The flat upper surface for being arranged on dam body, is movably installed with rubber baffle on the right side of steel U-lag in notch, when running into extensive big flood
When, when the current of flood are highly less than the top of dam body, current can flow into the left-hand notch of steel U-lag, at this time steel U-lag
The right pressure increase, rubber baffle are jacked up by current, are provided with two rubber and are buckled in notch on the right side of steel U-lag, rubber
Baffle bottom both sides are provided with two rubber and are buckled, and buckle matches with buckle under rubber on rubber, and such rubber baffle is just
Steel U-lag will not be gone out by current, rubber baffle has just stopped flood, so that it is only fixed anti-to solve existing flood dam
The problem of big vast height.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model inlet opening;
Fig. 3 is the functional block diagram of the utility model steel U-lag;
Fig. 4 is the structure diagram of the utility model dam body;
Fig. 5 is the structure diagram of the utility model rubber layer;
Fig. 6 is the circuit diagram of the utility model.
Figure label explanation:
1st, dam body;101st, convex block;102nd, groove;2nd, cistern;201st, inlet opening;202nd, dewatering orifice;203rd, valve switch;
3rd, water barrier;4th, bearing plate;5th, steel U-lag;501st, it is buckled on rubber;6th, power supply;7th, processor;8th, controlling switch;9th, rubber
Glue baffle;901st, it is buckled under rubber;10th, pulley casing;11st, pulley;12nd, electrical retractor;13rd, rubber layer;14th, base;15、
Threaded rod.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model;The technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe;Obviously;The described embodiments are only a part of the embodiments of the utility model;Rather than whole
Embodiment.Based on the embodiment in the utility model;Those of ordinary skill in the art are without making creative work
All other embodiments obtained;It shall fall within the protection scope of the present invention.
- 6 are please referred to Fig.1, a kind of city movable flood dam, including dam body 1, further include cistern 2, cistern 2 is fixed
Middle part in dam body 1, is provided with inlet opening 201 on 2 left side inclined-plane of cistern, 2 bottom right of cistern, which is provided with, to be put
Water hole 202, is movably installed with valve switch 203 in dewatering orifice 202;The top of cistern 2 is provided with water barrier 3, cistern 2
Bottom is provided with supporting course 4, and the top of water barrier 3 is installed with steel U-lag 5, and two notch levels of steel U-lag 5 are set
Put and rubber baffle 9 is movably installed with the upper surface of dam body 1,5 right side notch of steel U-lag, 5 right side notch of steel U-lag
Inside it is provided with two rubber and is buckled 501,9 two bottom sides of rubber baffle, which are provided with two rubber, is buckled 901, is buckled on rubber
501 901 match with buckle under rubber, and 1 bottom of dam body is installed with pulley casing 10, and pulley casing 10 includes pulley 11 and electronic
Telescopic device 12, pulley 11 are fixedly mounted on the lower section of electrical retractor 12, and 1 bottom right of dam body is provided with controlling switch 8,
The left side of controlling switch 8 is provided with power supply 6, and the left side of power supply 6 is provided with processor 7, and power supply 6 is electrically connected with controlling switch 8, control
Switch 8 is electrically connected with processor 7, and processor 7 is electrically connected with electrical retractor 12.
1 one side of dam body is provided with convex block 101,1 another side of dam body setting fluted 102, convex block 101 and groove 102
Match, the both sides and bottom of dam body 1 are both provided with rubber layer 13.
1 left bottom of dam body is installed with base 14, and threaded rod 15 is movably installed with base 14.
Operation principle:
Use using it is new when, power on 6 first, then open controlling switch 8, power supply 6 and controlling switch 8 are electrical
Connection, controlling switch 8 are electrically connected with processor 7, and processor 7 is electrically connected with electrical retractor 12, at this time electric expansion
Device 12 stretches out pulley 11, then the utility model is moved to flood hotspot by pulley 11, then controlling switch 8 is beaten
Open, pulley 11 is retracted by pulley casing 10 by electrical retractor 12,1 one side of dam body is provided with convex block 101, and dam body 1 is another
Side sets fluted 102, and convex block 101 matches with groove 102, and convex block 101 is mutually chimeric by one piece of block independence with groove 102
Dam body 1 connect to resist flood, the rubber layer 13 that the both sides and bottom of dam body 1 are all set can prevent current from spreading
Come, play the role of sealing, the bottom of dam body 1 be provided with rubber layer 13, ensure that dam body 1 with ground with firmly contacting,
It is prevented from current to spread out, 1 left bottom of dam body is installed with base 14, and threaded rod is movably installed with base 14
15, threaded rod 15 is connected by screw thread mouth with land operations, and dam body 1 is fixed on the ground, and cistern 2 is fixedly mounted on dam body
Middle part in 1, is provided with inlet opening 201 on 2 left side inclined-plane of cistern, 2 bottom right of cistern is provided with dewatering orifice 202, puts
Valve switch 203 is movably installed with water hole 202;When flood arrives, current enter cistern 2 by inlet opening 201, with
The increase of water in cistern 2, the weight of dam body 1 are consequently increased, and bearing plate 4 plays the role of bearing weight, dam body 1
Weight increase just causes dam body 1 to be not easy to be washed away by flood, the setting on 1 left side inclined-plane of dam body, while decreases flood to dam body 1
Impact force, protect dam body 1;Steel U-lag 5, two notch levels of steel U-lag 5 are fixedly mounted above water barrier 3
The upper surface of dam body 1 is arranged on, rubber baffle 9 is movably installed with 5 right side notch of steel U-lag, when running into extensive big flood
When, when the current of flood are highly less than the top of dam body 1, current can flow into the left-hand notch of steel U-lag 5, at this time steel U-shaped
5 the right pressure increase of groove, rubber baffle 9 are jacked up by water flow pressure, and two rubber are provided with 5 right side notch of steel U-lag
Upper buckle 501,9 two bottom sides of rubber baffle, which are provided with two rubber, is buckled 901, and buckle 501 under rubber with being buckled on rubber
901 match, and such rubber baffle 9 just will not be gone out steel U-lag 5 by current, and rubber baffle 9 has just stopped flood,
Flood is stepped back, and when without using the utility model, opens valve switch 203, the water in cistern 2 will be with dewatering orifice 202
Outflow, 1 weight saving of dam body, the transport after being easy to use.
It is described above;The only preferable embodiment of the utility model;But the scope of protection of the utility model is not
It is confined to this;Any one skilled in the art is in the technical scope that the utility model discloses;According to this practicality
New technical solution and its improvement design is subject to equivalent substitution or change;It should all cover in the scope of protection of the utility model
It is interior.