CN207313403U - Intelligent environment protection septic tank system - Google Patents
Intelligent environment protection septic tank system Download PDFInfo
- Publication number
- CN207313403U CN207313403U CN201721333901.8U CN201721333901U CN207313403U CN 207313403 U CN207313403 U CN 207313403U CN 201721333901 U CN201721333901 U CN 201721333901U CN 207313403 U CN207313403 U CN 207313403U
- Authority
- CN
- China
- Prior art keywords
- septic tank
- water inlet
- grid
- inspection well
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 127
- 238000007689 inspection Methods 0.000 claims abstract description 58
- 239000010802 sludge Substances 0.000 claims abstract description 32
- 239000010865 sewage Substances 0.000 claims abstract description 31
- 230000001877 deodorizing effect Effects 0.000 claims abstract description 28
- 239000000523 sample Substances 0.000 claims abstract description 21
- 238000007789 sealing Methods 0.000 claims description 18
- 238000009434 installation Methods 0.000 claims description 17
- 238000002360 preparation method Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- 238000012856 packing Methods 0.000 claims description 2
- 238000010298 pulverizing process Methods 0.000 claims description 2
- 230000007613 environmental effect Effects 0.000 claims 1
- 238000004332 deodorization Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 7
- 239000011150 reinforced concrete Substances 0.000 description 7
- 239000002689 soil Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 239000000945 filler Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000011152 fibreglass Substances 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 239000002781 deodorant agent Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000008239 natural water Substances 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000004065 wastewater treatment Methods 0.000 description 1
Landscapes
- Treatment Of Sludge (AREA)
- Treating Waste Gases (AREA)
- Bidet-Like Cleaning Device And Other Flush Toilet Accessories (AREA)
Abstract
本实用新型公开了一种智能环保化粪池系统,包括原水管网、格栅粉碎单元、化粪池、除臭装置、污泥探头、拍门防倒流单元、排污管网和控制系统;其中,原水管网与格栅粉碎单元的进水口连通,格栅粉碎单元的出水口与化粪池的进水口连接,化粪池的出水口与拍门防倒流单元的进水口连接,拍门防倒流单元的出水口与排污管网连接;化粪池的顶部井盖处设置有第一检查井,所述除臭装置与第一检查井的内部相通;化粪池的进水口和出水口均设置在化粪池的上端,且出水口的位置低于进水口的位置;所述污泥探头固定在化粪池内;所述格栅粉碎单元包括格栅粉碎机,格栅粉碎机和污泥探头均与所述控制系统连接。
The utility model discloses an intelligent environment-friendly septic tank system, which comprises a raw water pipe network, a grid crushing unit, a septic tank, a deodorizing device, a sludge probe, a flap door anti-backflow unit, a sewage pipe network and a control system; , the raw water pipe network is connected to the water inlet of the grid crushing unit, the water outlet of the grill crushing unit is connected to the water inlet of the septic tank, the water outlet of the septic tank is connected to the water inlet of the flap door anti-backflow unit, and the flap door anti-backflow The water outlet of the backflow unit is connected to the sewage pipe network; the top manhole cover of the septic tank is provided with a first inspection well, and the deodorization device communicates with the inside of the first inspection well; the water inlet and outlet of the septic tank are both set On the upper end of the septic tank, and the position of the water outlet is lower than that of the water inlet; the sludge probe is fixed in the septic tank; the grid crushing unit includes a grid grinder, a grid grinder and a sludge probe are connected with the control system.
Description
技术领域technical field
本实用新型属于水处理技术领域,具体涉及智能环保化粪池系统。The utility model belongs to the technical field of water treatment, in particular to an intelligent environment-friendly septic tank system.
背景技术Background technique
随着我国经济快速发展和人民生活水平的不断提高,生活用水和排污总量不断增加,但由于乡镇农村污水处理率不高,加重了自然水体污染,水体自净功能已经无法恢复水质,局部水循环系统平衡遭到破坏,许多城市和地区出现了水源型缺水或水质型缺水问题,生活污水末端处理已迫在眉睫。With the rapid development of my country's economy and the continuous improvement of people's living standards, the total amount of domestic water and sewage continues to increase. However, due to the low treatment rate of sewage in towns and villages, the pollution of natural water bodies has been aggravated, and the self-purification function of water bodies has been unable to restore water quality. Local water circulation systems The balance has been destroyed, and many cities and regions have water shortages of water sources or water quality, and the terminal treatment of domestic sewage is imminent.
目前,居住小区的废水处理模式仍然为集中处理方式:综合污水+化粪池+市政管网+污水处理厂相比较的分布式处理方式:将几个家庭、楼宇的生活污水直接排入化粪池进行处理,处理后就地排放或者排入管网。现有的化粪池种类主要有砖混结构化粪池、水泥预制化粪池、钢筋混凝土结构化粪池、玻璃钢化粪池等。而这些化粪池主要存在以下问题:1、存在泄漏的问题,钢混化粪池存在造价高、工期长的问题。2、化粪池及后续官网存在堵塞的风险,官网疏通麻烦;3、化粪池内污泥不能及时清瘀,污泥流入后续管网,造成污染;4、化粪池使用1年以后,臭味外溢,影响居户的生活环境;5、部分化粪池,由于雨污混排,存在雨水倒灌的风险。At present, the wastewater treatment mode in residential quarters is still a centralized treatment method: comprehensive sewage + septic tank + municipal pipe network + sewage treatment plant compared with the distributed treatment method: the domestic sewage of several families and buildings is directly discharged into septic After treatment, it is discharged on-site or into the pipe network. The existing types of septic tanks mainly include brick-concrete structure septic tanks, cement prefabricated septic tanks, reinforced concrete structure septic tanks, and glass fiber reinforced plastic septic tanks. And these septic tanks mainly have the following problems: 1. There is the problem of leakage, and the steel-mixed septic tanks have the problems of high cost and long construction period. 2. There is a risk of blockage in the septic tank and the subsequent pipeline, and it is troublesome to dredge the pipeline; 3. The sludge in the septic tank cannot be cleared in time, and the sludge flows into the subsequent pipe network, causing pollution; 4. After one year of use of the septic tank, the smelly Odor overflow, affecting the living environment of residents; 5. Some septic tanks, due to the mixed drainage of rain and sewage, there is a risk of rainwater backflow.
实用新型内容Utility model content
针对上述现有技术中存在的技术问题,本实用新型的目的是提供一种智能环保化粪池系统。用以解决化粪池存在的容易泄露、容易造成堵塞、污染、容易产生臭味外溢以及容易产生雨水倒灌的问题。Aiming at the technical problems existing in the above-mentioned prior art, the purpose of this utility model is to provide an intelligent environment-friendly septic tank system. It is used to solve the problems of septic tanks that are easy to leak, easy to cause blockage, pollution, easy to produce odor overflow and easy to produce rainwater backflow.
为了解决以上技术问题,本实用新型的技术方案为:In order to solve the above technical problems, the technical solution of the utility model is:
一种智能环保化粪池系统,包括格栅粉碎单元、化粪池、除臭装置、污泥探头、拍门防倒流单元和控制显示单元,其中,An intelligent environment-friendly septic tank system, including a grid crushing unit, a septic tank, a deodorizing device, a sludge probe, a flap door anti-backflow unit and a control display unit, wherein,
格栅粉碎单元包括第一进水口和第一出水口,化粪池包括第二进水口和第二出水口,拍门防倒流单元包括第三进水口和第三出水口;第一进水口与原水管网连接,第一出水口与所述第二进水口连接,第二出水口与第三进水口连接,第三出水口与排污管网连接;The grid crushing unit includes a first water inlet and a first water outlet, the septic tank includes a second water inlet and a second water outlet, and the flap door anti-backflow unit includes a third water inlet and a third water outlet; the first water inlet and The raw water pipe network is connected, the first water outlet is connected to the second water inlet, the second water outlet is connected to the third water inlet, and the third water outlet is connected to the sewage pipe network;
在化粪池的顶部且环绕化粪池的顶部井盖设置有第一检查井,第一检查井的顶部盖合有第一密封盖体,所述除臭装置与第一检查井的内部连通,以去除自化粪池逸出至第一检查井内的气体的臭味;A first inspection well is arranged on the top of the septic tank and around the top well cover of the septic tank, and the top of the first inspection well is covered with a first sealing cover, and the deodorizing device communicates with the inside of the first inspection well, to remove the odor of gas escaping from the septic tank into the first manhole;
所述第二进水口和第二出水口均设置在化粪池的上端,且第二出水口的位置低于第二进水口的位置;Both the second water inlet and the second water outlet are arranged at the upper end of the septic tank, and the position of the second water outlet is lower than that of the second water inlet;
所述污泥探头固定在化粪池内,且污泥探头的位置在第二进水口和第二出水口的连线的下方;The sludge probe is fixed in the septic tank, and the position of the sludge probe is below the connection line between the second water inlet and the second water outlet;
所述格栅粉碎单元还包括格栅粉碎机,格栅粉碎机和污泥探头均与所述控制显示单元连接;所述拍门防倒流单元包括用于防外水倒灌的拍门。The grid pulverizing unit also includes a grid pulverizer, and the grid pulverizer and the sludge probe are both connected to the control and display unit; the flap door anti-backflow unit includes a flap door for preventing external water backflow.
化粪池前端增设格栅粉碎机,可以将污水中体积较大的漂浮物粉碎,解决管网容易堵塞的问题;在化粪池内安装污泥探头,实时监测池内污泥层厚度,高泥位时,可以通知管理人员及时清理,可以解决污泥不能及时清瘀,污泥流入后续管网,容易造成污染的问题;A grid pulverizer is added to the front of the septic tank, which can crush the larger floating objects in the sewage, and solve the problem of easy blockage of the pipe network; a sludge probe is installed in the septic tank to monitor the thickness of the sludge layer in the tank in real time, and the high mud level When it happens, the management personnel can be notified to clean up in time, which can solve the problem that the sludge cannot be cleaned in time, and the sludge flows into the follow-up pipe network, which is easy to cause pollution;
在化粪池的顶部,且环绕化粪池的顶部井盖设置第一检查井,可以通过第一检查井检查化粪池内的情况。化粪池的顶部井盖可以实现对化粪池的一次密封;在第一检查井的顶部盖合密封盖体,对第一检查井进行密封设置,实现了对化粪池的二次密封;将第一检查井与除臭装置连通,可以将化粪池的顶部井盖处泄露的臭气进行除臭处理,避免了由于第一检查井密封不严导致的臭气泄露,彻底解决臭气外溢。A first inspection well is arranged on the top of the septic tank and around the top manhole cover of the septic tank, and the situation in the septic tank can be checked through the first inspection well. The top manhole cover of the septic tank can realize the primary sealing of the septic tank; the sealing cover is covered on the top of the first inspection well, and the first inspection well is sealed to realize the secondary sealing of the septic tank; The first inspection well is connected to the deodorization device, which can deodorize the odor leaked from the top manhole cover of the septic tank, avoiding the leakage of the odor caused by the poor sealing of the first inspection well, and completely solving the odor overflow.
化粪池的第二进水口和第二出水口都设置于化粪池的上端,且第二出水口的高度低于第二进水口的高度,两者之间形成液位差,这样便于化粪池中水的流动。The second water inlet and the second water outlet of the septic tank are both arranged on the upper end of the septic tank, and the height of the second water outlet is lower than the height of the second water inlet, and a liquid level difference is formed between the two, which is convenient for septic tanks. The flow of water in a septic tank.
污泥探头的位置低于出水口的高度,使污泥探头完全浸入污水中,更容易准确检测化粪池中的污泥厚度。当检测化粪池内的泥位较高时,工作人员可以将管道通过化粪池顶部开口顺入化粪池内,用泵将化粪池内的污泥抽出。The position of the sludge probe is lower than the height of the water outlet, so that the sludge probe is completely immersed in the sewage, and it is easier to accurately detect the thickness of the sludge in the septic tank. When detecting that the mud level in the septic tank is high, the staff can put the pipe through the top opening of the septic tank into the septic tank, and use a pump to pump out the sludge in the septic tank.
优选的,所述格栅粉碎单元包括第二检查井、格栅粉碎机和安装导轨,所述安装导轨固定安装在第二检查井内,格栅粉碎机安装在安装导轨上,在控制系统的控制下可沿安装导轨上下移动。便于根据具体的水质调节合适的高度,以达到最佳的粉碎效果。Preferably, the grid crushing unit includes a second inspection well, a grid grinder, and an installation guide rail, the installation guide rail is fixedly installed in the second inspection well, the grid grinder is installed on the installation guide rail, and controlled by the control system It can move up and down along the installation guide rail. It is convenient to adjust the appropriate height according to the specific water quality to achieve the best crushing effect.
进一步优选的,所述格栅粉碎单元还包括导流通道,导流通道的两端分别与所述第一进水口和第一出水口连通,导流通道和第二检查井的内壁围成密封的污水流动腔室;Further preferably, the grid crushing unit further includes a diversion channel, the two ends of the diversion channel communicate with the first water inlet and the first water outlet respectively, and the inner wall of the diversion channel and the second inspection well forms a sealed sewage flow chamber;
所述格栅粉碎机包括格栅破碎部位和电机,电机带动格栅破碎部位运转,格栅破碎部位位于导流通道内,电机位于导流通道外。The grid crusher includes a grid crushing part and a motor, the motor drives the grid crushing part to run, the grid crushing part is located in the diversion channel, and the motor is located outside the diversion channel.
格栅粉碎机可以用于粉碎导流通道内的污水中的体积较大的固体污染物。The grid pulverizer can be used to pulverize the larger solid pollutants in the sewage in the diversion channel.
更进一步优选的,所述导流通道的底部的两端分别与第一进水口和第一出水口的最低端平齐。可以将导流通道内的所有污水排出。Still further preferably, both ends of the bottom of the flow guiding channel are respectively flush with the lowest ends of the first water inlet and the first water outlet. All sewage in the diversion channel can be discharged.
进一步优选的,所述第一出水口的高度低于第一进水口的高度。第一进水口和第一出水口之间的导流通道形成一定的坡度,便于将粉碎后的污水导流至第一出水口处流出。Further preferably, the height of the first water outlet is lower than that of the first water inlet. The diversion channel between the first water inlet and the first water outlet forms a certain slope, which is convenient for diverting the pulverized sewage to the first water outlet to flow out.
进一步优选的,所述安装导轨通过固定支撑架固定在第二检查井内。Further preferably, the installation guide rail is fixed in the second inspection well through a fixed support frame.
进一步优选的,所述第二检查井的顶部密封。Further preferably, the top of the second inspection well is sealed.
优选的,所述除臭装置为干燥化学制剂除臭机,包括若干层叠加设置的填料层和位于除臭装置顶端的防雨帽。Preferably, the deodorizing device is a dry chemical preparation deodorizing machine, which includes several layers of filler layers superimposed and a rainproof cap on the top of the deodorizing device.
优选的,所述拍门防倒流单元包括第三检查井、进水管和拍门,所述进水管的一端与第二出水口连通,进水管的另一端通过第三进水口延伸第三检查井内,拍门设置于所述进水管的末端。Preferably, the flap door anti-backflow unit includes a third inspection well, a water inlet pipe and a flap door, one end of the water inlet pipe communicates with the second water outlet, and the other end of the water inlet pipe extends into the third inspection well through the third water inlet , the flapper is arranged at the end of the water inlet pipe.
进一步优选的,所述拍门的轴线相对于水平线倾斜向上设置。Further preferably, the axis of the flapper door is set obliquely upward relative to the horizontal line.
更进一步优选的,所述拍门上连接有一个用于人工开启拍门的链条,链条的一端固定在拍门上,另一端连接在第三检查井的内壁的上端。More preferably, a chain for manually opening the flap door is connected to the flap door, one end of the chain is fixed on the flap door, and the other end is connected to the upper end of the inner wall of the third inspection well.
拍门倾斜向上设置时,操作人员可以通过链条将拍门打开,便于检修。When the flap door is set upwards, the operator can open the flap door through the chain for easy maintenance.
进一步优选的,出水管的高度低于进水管的高度。便于水的流通。Further preferably, the height of the water outlet pipe is lower than that of the water inlet pipe. Facilitate the circulation of water.
进一步优选的,所述第三检查井的顶端盖合有第二密封盖体。Further preferably, the top end of the third inspection well is covered with a second sealing cover.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1)在化粪池前端增设格栅粉碎机,可以将污水中体积较大的漂浮物粉碎,解决管网容易堵塞的问题;1) Add a grid crusher at the front end of the septic tank, which can crush the larger floating objects in the sewage and solve the problem of easy blockage of the pipe network;
2)在化粪池内安装污泥探头,实时监测池内污泥层厚度,高泥位时,可以通知管理人员及时清理,可以解决污泥不能及时清瘀,污泥流入后续管网,容易造成污染的问题;2) Install a sludge probe in the septic tank to monitor the thickness of the sludge layer in the tank in real time. When the mud level is high, the management personnel can be notified to clean it up in time, which can solve the problem that the sludge cannot be cleaned in time, and the sludge flows into the subsequent pipe network, which is easy to cause pollution The problem;
3)对化粪池井盖实行密封处理,并增加除臭装置,可以去除臭味,避免臭味外溢;3) Seal the manhole cover of the septic tank and add a deodorizing device to remove the odor and prevent the odor from overflowing;
4)在化粪池的出口处设置拍门装置,可以防止雨水的倒灌。4) A flapping device is installed at the outlet of the septic tank to prevent the backflow of rainwater.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。The accompanying drawings constituting a part of the present application are used to provide further understanding of the present application, and the schematic embodiments and descriptions of the present application are used to explain the present application, and do not constitute improper limitations to the present application.
图1是整体式化粪池安装示意图;Figure 1 is a schematic diagram of the installation of an integral septic tank;
图2是整体式化粪池的A-A剖面图;Fig. 2 is the A-A sectional view of integral septic tank;
图3是除臭装置的主视图结构示意图;Fig. 3 is the front view structural representation of deodorizing device;
图4是除臭装置的仰视图结构示意图;Fig. 4 is the bottom view structural representation of deodorizing device;
图5是拍门的主视图结构示意图;Fig. 5 is a schematic diagram of the structure of the front view of the flap door;
图6是拍门的侧视图结构示意图;Fig. 6 is a side view structural schematic diagram of the flap door;
图7是拍门的俯视图结构示意图;Fig. 7 is a top view structural schematic diagram of the flap door;
图8是格栅粉碎机的主视图结构示意图;Fig. 8 is a schematic diagram of the structure of the front view of the grill grinder;
图9是格栅粉碎机的侧视图结构示意图;Fig. 9 is a schematic diagram of a side view of a grill grinder;
图10是格栅粉碎机的俯视图结构示意图;Fig. 10 is a top view structural schematic diagram of a grill grinder;
图11是本实用新型的完整处理流程。Fig. 11 is a complete processing flow of the utility model.
其中,1、原始地坪,2、格栅粉碎单元,3、排水管,4、室外电控柜,5、第一检查井,6、第一盖板,7、第一防臭密封垫,8、除臭装置,9、进水管,10、C25钢筋混凝土路面,11、砂石垫层,12、上素土夯实层,13、排污管网,14、拍门防倒流单元,15、污泥探头,16、化粪池,17、砂垫层,18、C20钢筋混凝土层,19、卵石垫层,20、下素土夯实层,21、原水管网,22、防雨帽,23、填料层,24、进风管,25、C20钢筋混凝土基础,26、第二盖板,27、第二防臭密封垫,28、拍门,29、链条,30、第二检查井,31、钢格板检修孔,32、第三防臭密封垫,33、安装导轨,34、格栅粉碎机,35、第三检查井,36、导流通道,37、固定支撑架。Among them, 1. Original floor, 2. Grate crushing unit, 3. Drainage pipe, 4. Outdoor electric control cabinet, 5. The first inspection well, 6. The first cover plate, 7. The first deodorant gasket, 8 , deodorizing device, 9, water inlet pipe, 10, C25 reinforced concrete pavement, 11, sand and gravel cushion, 12, compacted layer of upper plain soil, 13, sewage pipe network, 14, flap door anti-backflow unit, 15, sludge Probe, 16, septic tank, 17, sand cushion, 18, C20 reinforced concrete layer, 19, pebble cushion, 20, plain soil tamping layer, 21, raw water pipe network, 22, rainproof cap, 23, filler Layer, 24, air inlet pipe, 25, C20 reinforced concrete foundation, 26, second cover plate, 27, second deodorizing gasket, 28, flap door, 29, chain, 30, second inspection well, 31, steel grid Plate inspection hole, 32, the third anti-odor sealing gasket, 33, installation guide rail, 34, grid grinder, 35, the third inspection well, 36, diversion channel, 37, fixed support frame.
具体实施方式Detailed ways
应该指出,以下详细说明都是例示性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and/or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and/or combinations thereof.
拍门,安装于排水管道的尾端,具有防止外水倒灌功能的逆止阀。The flap door is installed at the end of the drainage pipe, and has a check valve to prevent the function of external water backflow.
如图1和图2所示,一种生活污水化粪池处理系统,包括原水管网21、格栅粉碎单元2、化粪池16、除臭装置8、污泥探头15、拍门防倒流单元14、排污管网13和控制显示单元(对应的是室外电控柜4);As shown in Figures 1 and 2, a domestic sewage septic tank treatment system includes a raw water pipe network 21, a grid crushing unit 2, a septic tank 16, a deodorizing device 8, a sludge probe 15, and a flap door to prevent backflow Unit 14, sewage pipe network 13 and control display unit (corresponding to the outdoor electric control cabinet 4);
格栅粉碎单元2包括第一进水口和第一出水口,化粪池16包括第二进水口和第二出水口,拍门防倒流单元14包括第三进水口和第三出水口;第一进水口与原水管网21连接,第一出水口通过排水管3与所述第二进水口连接,第二出水口与第三进水口连接,第三出水口与排污管网13连接;The grid crushing unit 2 includes a first water inlet and a first water outlet, the septic tank 16 includes a second water inlet and a second water outlet, and the flap door anti-backflow unit 14 includes a third water inlet and a third water outlet; The water inlet is connected to the raw water pipe network 21, the first water outlet is connected to the second water inlet through the drain pipe 3, the second water outlet is connected to the third water inlet, and the third water outlet is connected to the sewage pipe network 13;
在化粪池16的顶部,且环绕化粪池16的顶部井盖设置有第一检查井5,第一检查井5和化粪池16的顶部开口盖合有密封盖体,第一检查井5为了实现密封,在第一检查井5的顶部设置第一防臭密封垫7,并在第一防臭密封垫7的上端盖上第一盖板6,所述除臭装置8与第一检查井5的内部相通,用于对自化粪池16内逸出至第一检查井5中的臭气进行除臭;化粪池16的第二进水口和第二出水口均设置在化粪池16的上端,且第二出水口的位置低于第二进水口的位置;污泥探头15固定在化粪池16内,且污泥探头15的位置在化粪池15的第二进水口和第二出水口的连线的下方;所述格栅粉碎单元2包括格栅粉碎机34,格栅粉碎机34和污泥探头15均与室外电控柜4连接。At the top of the septic tank 16, and the top well cover around the septic tank 16 is provided with a first inspection well 5, the top opening of the first inspection well 5 and the septic tank 16 is covered with a sealing cover, the first inspection well 5 In order to realize sealing, the first deodorizing sealing pad 7 is set on the top of the first inspection well 5, and the first cover plate 6 is covered on the upper end of the first deodorizing sealing pad 7, and the deodorizing device 8 is connected with the first inspection well 5. The inside of the septic tank 16 is used to deodorize the odor that escapes from the septic tank 16 to the first inspection well 5; the second water inlet and the second water outlet of the septic tank 16 are all arranged in the septic tank 16 and the position of the second water outlet is lower than that of the second water inlet; the sludge probe 15 is fixed in the septic tank 16, and the position of the sludge probe 15 is between the second water inlet and the second water inlet of the septic tank 15 Below the line connecting the two water outlets; the grid crushing unit 2 includes a grid grinder 34 , and the grid grinder 34 and the sludge probe 15 are both connected to the outdoor electric control cabinet 4 .
为了提高化粪池16的耐腐蚀性,其材质为BSHC玻璃钢。In order to improve the corrosion resistance of the septic tank 16, its material is BSHC fiberglass.
在该实施例中,将格栅粉碎单元2、化粪池16和拍门防倒流单元14埋入地下,首先需要对原始地坪1进行开外,为了保证地表对各个单元足够的支撑作用,对地表进行处理,如格栅粉碎单元2和拍门防倒流单元14所埋入的地表的结构从上到下依次包括C25钢筋混凝土路面(200mm)10、砂石垫层(100mm)11和上素土夯实层12。此处上素土夯实层12中的“上”仅起到位置上的区分作用,与化粪池16下端的素土夯实层区别开。In this embodiment, the grid crushing unit 2, the septic tank 16 and the flap gate anti-backflow unit 14 are buried underground. First, the original floor 1 needs to be removed. The ground surface is treated, such as the structure of the ground surface buried by the grid crushing unit 2 and the flap door anti-backflow unit 14 includes C25 reinforced concrete pavement (200mm) 10, sand and gravel cushion (100mm) 11 and upper prime from top to bottom. Soil compaction layer12. Here, the "upper" in the upper plain soil compacted layer 12 only serves to distinguish the position, and is distinguished from the plain soil compacted layer at the lower end of the septic tank 16 .
化粪池16下端的地面的结构从上到下依次包括:砂垫层(100mm)17、C20钢筋混凝土层(100mm)18、卵石垫层(100mm)19和下素土夯实层(密度大于95%)20。The structure of the ground at the lower end of the septic tank 16 includes from top to bottom: sand cushion (100mm) 17, C20 reinforced concrete layer (100mm) 18, pebble cushion (100mm) 19 and lower plain soil compacted layer (density greater than 95 %)20.
如图3和图4所示,除臭装置8为干燥化学制剂除臭机,包括若干层叠加设置的填料层23和位于除臭装置8顶端的防雨帽22,第一检查井5中的臭气通过进风管24进入除臭装置8中进行除臭。进风管与填料层23之间的连接处采用C20钢筋混凝土基础25进行加固支撑,保证除臭装置8的牢固性。As shown in Fig. 3 and Fig. 4, the deodorizing device 8 is a dry chemical preparation deodorizing machine, comprising several layers of superimposed filler layers 23 and a rainproof cap 22 positioned at the top of the deodorizing device 8, the first inspection well 5 Smell enters the deodorizing device 8 through the air inlet pipe 24 for deodorization. The connection between the air inlet pipe and the packing layer 23 is reinforced and supported by a C20 reinforced concrete foundation 25 to ensure the firmness of the deodorizing device 8 .
如图5、图6和图7所示,拍门防倒流单元14包括第三检查井35、进水管9和拍门28,进水管9的末端延伸进入第三检查井35的内部,拍门28设置于进水管9的末端。拍门28的轴线相对于水平线倾斜向上设置,用于人工开启的链条29的一端与拍门28固定连接,另一端固定在第三检查井35的内壁上,最好是栓在第三检查井35内壁的顶端,维修人员方便操作。第三检查井35的第三出水口的高度低于第三进水口的高度,便于水的流通。在第三检查井35的顶部盖合有密封装置,密封装置包括第二盖板31和位于第二盖板31下端的第二防臭密封垫27。As shown in Fig. 5, Fig. 6 and Fig. 7, the flap door anti-backflow unit 14 includes a third inspection well 35, a water inlet pipe 9 and a flap door 28, and the end of the water inlet pipe 9 extends into the inside of the third inspection well 35, and the flap door 28 is arranged on the end of water inlet pipe 9. The axis of the flap door 28 is arranged upwardly relative to the horizontal line, one end of the chain 29 for manual opening is fixedly connected with the flap door 28, and the other end is fixed on the inner wall of the third inspection well 35, preferably bolted to the third inspection well. The top of the 35 inner wall is convenient for maintenance personnel to operate. The height of the third water outlet of the third inspection well 35 is lower than that of the third water inlet, which facilitates the circulation of water. A sealing device is covered on the top of the third inspection well 35 , and the sealing device includes a second cover plate 31 and a second deodorizing gasket 27 located at the lower end of the second cover plate 31 .
如图8和图9所示,格栅粉碎单元2包括第二检查井30、格栅粉碎机34和安装导轨33,所述安装导轨33固定安装在第二检查井30内,格栅粉碎机34安装在安装导轨33上,在控制显示单元(室外电控柜4)的控制下可沿安装导轨33上下移动。便于根据具体的水质调节合适的高度,以达到最佳的粉碎效果。格栅粉碎单元2还包括导流通道36,导流通道36的两端分别与第一进水口和第一出水口连通,导流通道36和第二检查井30的内壁围成密封的污水流动腔室;格栅粉碎机34包括格栅破碎部位和电机,电机带动格栅破碎部位运转,格栅破碎部位位于导流通道36内,电机位于导流通道36外。As shown in Figures 8 and 9, the grid crushing unit 2 includes a second inspection well 30, a grid grinder 34 and an installation guide rail 33, and the installation guide rail 33 is fixedly installed in the second inspection well 30, and the grid grinder 34 is installed on the installation guide rail 33, and can move up and down along the installation guide rail 33 under the control of the control display unit (outdoor electric control cabinet 4). It is convenient to adjust the appropriate height according to the specific water quality to achieve the best crushing effect. The grid crushing unit 2 also includes a diversion channel 36, the two ends of the diversion channel 36 communicate with the first water inlet and the first water outlet respectively, and the inner wall of the diversion channel 36 and the second inspection well 30 encloses a sealed sewage flow Chamber; the grill crushing machine 34 includes a grill crushing part and a motor, the motor drives the grill crushing part to run, the grill crushing part is located in the diversion channel 36 , and the motor is located outside the diversion channel 36 .
导流通道36的底部的两端分别与第二检查井30的进口和出口的最低端平齐。第二检查井30的出口的高度低于进口的高度。第二检查井30的进口和出口之间的导流通道36形成一定的坡度,便于将粉碎后的污水导流至出口处流出。安装导轨33通过固定支撑架37固定在第二检查井30内。第二检查井30的顶部盖合有密封部件,密封部件包括第三防臭密封垫32和位于第三防臭密封垫32上端的钢格板检修孔31。Both ends of the bottom of the diversion channel 36 are respectively flush with the lowest ends of the inlet and the outlet of the second inspection well 30 . The height of the outlet of the second inspection well 30 is lower than that of the inlet. The diversion channel 36 between the inlet and the outlet of the second inspection well 30 forms a certain slope, which is convenient for diverting the pulverized sewage to the outlet to flow out. The installation guide rail 33 is fixed in the second inspection well 30 through a fixed support frame 37 . The top of the second inspection well 30 is covered with a sealing component, and the sealing component includes a third deodorizing sealing gasket 32 and a steel grating inspection hole 31 located at the upper end of the third deodorizing sealing gasket 32 .
利用本实用新型处理污水的流程如图10所示,污水通过原水管网输送至格栅粉碎机,将污水中的较大的块状物和缠绕物等粉碎,防止后续管网的堵塞,粉碎后的污水输送至化粪池中,利用污泥探头实现在线监测泥位,并利用除臭装置解决臭气外逸的问题。处理后的污水通过拍门防倒流单元输送至排污管网,用以解决雨水倒灌的问题。The process of using the utility model to treat sewage is shown in Figure 10. The sewage is transported to the grid pulverizer through the raw water pipe network, and the larger lumps and entanglements in the sewage are crushed to prevent the blockage of the subsequent pipe network. The final sewage is transported to the septic tank, the sludge level is monitored online by the sludge probe, and the problem of odor escape is solved by the deodorization device. The treated sewage is transported to the sewage pipe network through the flap door anti-backflow unit to solve the problem of rainwater backflow.
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, there may be various modifications and changes in the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721333901.8U CN207313403U (en) | 2017-10-17 | 2017-10-17 | Intelligent environment protection septic tank system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721333901.8U CN207313403U (en) | 2017-10-17 | 2017-10-17 | Intelligent environment protection septic tank system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207313403U true CN207313403U (en) | 2018-05-04 |
Family
ID=62380991
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721333901.8U Active CN207313403U (en) | 2017-10-17 | 2017-10-17 | Intelligent environment protection septic tank system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207313403U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109879562A (en) * | 2019-03-27 | 2019-06-14 | 中节能城市节能研究院有限公司 | A new type of septic tank device without cleaning |
| CN110698019A (en) * | 2019-11-13 | 2020-01-17 | 嘉兴汇昌塑业有限公司 | Anti-blocking mechanism and anti-blocking control system for integral plastic septic tank |
| CN113057103A (en) * | 2021-03-25 | 2021-07-02 | 山东大学 | fabricated manure trough |
| CN118289848A (en) * | 2024-04-03 | 2024-07-05 | 天宏建设有限公司 | A rural septic tank structure |
-
2017
- 2017-10-17 CN CN201721333901.8U patent/CN207313403U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109879562A (en) * | 2019-03-27 | 2019-06-14 | 中节能城市节能研究院有限公司 | A new type of septic tank device without cleaning |
| CN110698019A (en) * | 2019-11-13 | 2020-01-17 | 嘉兴汇昌塑业有限公司 | Anti-blocking mechanism and anti-blocking control system for integral plastic septic tank |
| CN113057103A (en) * | 2021-03-25 | 2021-07-02 | 山东大学 | fabricated manure trough |
| CN113057103B (en) * | 2021-03-25 | 2022-04-19 | 山东大学 | fabricated manure trough |
| CN118289848A (en) * | 2024-04-03 | 2024-07-05 | 天宏建设有限公司 | A rural septic tank structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207313403U (en) | Intelligent environment protection septic tank system | |
| CN201695439U (en) | Rainwater collection automatic treatment device | |
| CN102531282B (en) | Device and method for quality-based rainwater collection, treatment and utilization | |
| CN206737105U (en) | A kind of integrated prefabricated pumping station system of fiber reinforced plastic barrel | |
| CN109944313B (en) | A rural outdoor vacuum drainage system | |
| CN207392409U (en) | A kind of Mobyneb Vatch basin system | |
| CN208899603U (en) | A kind of useless three pipes unification drainage system of the dirt that sponge urban construction mode is rainy | |
| CN202227456U (en) | Rainwater collection and recycling system for environment-friendly transformer station | |
| CN113529874A (en) | Rural domestic sewage collecting and treating system and method | |
| CN215855702U (en) | Glass fiber reinforced plastic septic tank | |
| CN105822092B (en) | Assembled self-loopa bio-toilet | |
| CN201952879U (en) | Cutoff apparatus used in municipal rainwater pipe network for cutting off the rainwater flow of the initial period | |
| CN104193100B (en) | A kind of greening wall device and using method thereof with sewage treatment function | |
| CN204401778U (en) | Integrated sewage water Boosting pumping station | |
| CN208633259U (en) | A prefabricated interception well | |
| CN210066942U (en) | Rural outdoor vacuum drainage system | |
| CN217232043U (en) | Coal dust pollution place initial stage rainwater collection distribution well | |
| CN205777667U (en) | Assembled self-loopa bio-toilet | |
| CN204079705U (en) | A kind of greening wall device with sewage treatment function | |
| CN110578367A (en) | Prefabricated vatch basin | |
| CN207597574U (en) | A kind of prefabricated pumping plant of constant temperature for severe cold area | |
| CN207295964U (en) | A kind of horizontal prefabricated pumping plant of integration | |
| CN209163262U (en) | A kind of rain leader downspout rain sewage diversion device | |
| CN218204787U (en) | A lifting interception well | |
| CN221889396U (en) | Above-ground integrated rainwater collection and treatment pool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |