A kind of construction site is with tubing drilling device
Technical field
Construction site technical field is the utility model is related to, is specially a kind of construction site with tubing drilling device.
Background technology
Construction site is to develop construction project at one, carries out the place of civil engineering, its scope often has coaming plate, iron wire
Net or enclosure wall are closed, and limit the disengaging of personnel and material, machinery and vehicle, have estate management administrator to guard, discrepancy can
Identity can be registered, and to dress safety cap etc..
Traditional building pipe drilling device, when perforating, every dozen of eyes are required for manually pulling downward on drawing
Hand carry out jewel hole, when need beat multiple eyes on a tubing if, using traditional drilling device excessively waste manpower
Material resources, reduce work task efficiency indirectly, can not meet the using effect of user.
Utility model content
(One)The technical problem of solution
In view of the deficiencies of the prior art, the utility model provides a kind of construction site tubing drilling device, solves
Traditional construction site tubing drilling device wasting manpower and material resources excessive when multiple holes are beaten on a tubing
The problem of with work task efficiency is reduced.
(Two)Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of construction site tubing
With drilling device, including base, fixed plate is fixedly connected with the top of the base, the top on the right side of the fixed plate, which is fixed, to be connected
Transmission device is connected to, through there is supporting rod, the bottom of the supporting rod is fixedly connected with motor housing for the bottom of the transmission device,
The inner cavity of the motor housing is fixedly connected with the first motor, and the output shaft of first motor is through the bottom of motor housing and fixation
Drill bit is connected with, workbench is fixedly connected with the top of the base, and the both sides of bench-top have been fixedly connected with admittedly
Determine frame.
The transmission device includes shell, and the side at the top of the shell inner cavity is fixedly connected with the second motor, and described
The output shaft of two motors is fixedly connected with rotation axis by shaft coupling, and the surface of the rotation axis is arranged with first gear, described
The bottom of first gear is engaged with second gear, and the side of the second gear is fixedly connected with sliding shoe, and sliding shoe
Surface slidably connects the endless glide being adapted with sliding shoe, and the both sides of the endless glide are respectively at the both sides of shell inner cavity
It is fixedly connected, the opposite side of the second gear is rotatably connected to connecting rod, and the bottom of the connecting rod is rotatably connected to connecting rod, institute
The bottom for stating connecting rod is fixedly connected with sliding block, and the surface of the sliding block slidably connects the track being adapted with sliding block, and
The bottom of track is fixedly connected with the bottom of shell inner cavity, and the bottom of the sliding block is fixedly connected with the top of supporting rod.
Preferably, the bottom of the shell is fixedly connected with limiting plate, and the side of limiting plate is fixedly connected with slide,
The inner wall of the slide slidably connects the gag lever post being adapted with slide, and the side of the other end of gag lever post and motor housing
It is fixedly connected.
Preferably, the position on the workbench and between two fixed frames offers drill trough.
Preferably, the surface of the motor is arranged with motor rack, and the top of motor rack and the top of shell inner cavity are consolidated
Fixed connection.
Preferably, the both sides of the track have been fixedly connected with limited post, and one end of limited post and shell inner cavity
Side is fixedly connected.
(Three)Beneficial effect
The utility model provides a kind of construction site with tubing drilling device.Possesses following beneficial effect:The building
Building site tubing drilling device, by motor, rotation axis, first gear, second gear, sliding shoe, endless glide, connecting rod,
Connecting rod, sliding block and track are used cooperatively, and solve traditional construction site tubing drilling device on a tubing
The problem of beating multiple needs manually to pull knob to carry out jewel hole, saves manpower and materials, improves work task efficiency, full
The foot using effect of user.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the side view of the utility model;
Fig. 3 is the structure diagram of the utility model transmission device;
Fig. 4 is the side view of the utility model transmission device.
In figure:1st, base;2nd, fixed plate;3rd, transmission device;301st, shell;302nd, motor;303rd, rotation axis;304th, first
Gear;305th, second gear;306th, sliding shoe;307th, endless glide;308th, connecting rod;309th, connecting rod;310th, sliding block;311st, rail
Road;312nd, motor rack;313rd, limited post;4th, supporting rod;5th, motor housing;6th, the first motor;7th, drill bit;8th, workbench;9th, it is fixed
Frame;10th, limiting plate;11st, slide;12nd, gag lever post;13rd, drill trough.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction site tubing drilling device,
Including base 1, the top of base 1 is fixedly connected with fixed plate 2, and the top on the right side of fixed plate 2 is fixedly connected with transmission device 3,
The bottom of transmission device 3 is through there is supporting rod 4, and the bottom of supporting rod 4 is fixedly connected with motor housing 5, and the inner cavity of motor housing 5 is fixed
The first motor 6 is connected with, the output shaft of the first motor 6 through the bottom of motor housing 5 and is fixedly connected with drill bit 7, the top of base 1
Portion is fixedly connected with workbench 8, and the position on workbench 8 and between two fixed frames 9 offers drill trough 13, drill trough
13 are used to protect drill bit 7, and the both sides at the top of workbench 8 have been fixedly connected with fixed frame 9.
Transmission device 3 includes shell 301, and the bottom of shell 301 is fixedly connected with limiting plate 10, and the one of limiting plate 10
Side is fixedly connected with slide 11, and the inner wall of slide 11 slidably connects the gag lever post 12 being adapted with slide 11, and gag lever post
12 other end is fixedly connected with the side of motor housing 5, and limiting plate 10, slide 11 and being used cooperatively for gag lever post 12 are used to limit
The movement locus of motor housing 5, the side of 301 inner cavity top of shell are fixedly connected with the second motor 302, the surface set of motor 302
Equipped with motor rack 312, and the top of motor rack 312, with being fixedly connected at the top of 301 inner cavity of shell, motor rack 312 is used for solid
The position of fixed second motor 302, the output shaft of the second motor 302 are fixedly connected with rotation axis 303, rotation axis by shaft coupling
303 surface is arranged with first gear 304, and the bottom of first gear 304 is engaged with second gear 305, and the one of second gear 305
Side is fixedly connected with sliding shoe 306, and the surface of sliding shoe 306 slidably connects the annular being adapted with sliding shoe 306 and slides
Rail 307, the both sides of endless glide 307 are fixedly connected respectively at the both sides of 301 inner cavity of shell, and the opposite side of second gear 305 turns
Dynamic to be connected with connecting rod 308, the bottom of connecting rod 308 is rotatably connected to connecting rod 309, and the bottom of connecting rod 309 is fixedly connected with cunning
Block 310, the surface of sliding block 310 slidably connect the track 311 being adapted with sliding block 310, and the both sides of track 311 are fixedly connected with
There is limited post 313, and one end of limited post 313 is fixedly connected with the side of 301 inner cavity of shell, and limited post 313 is used to fix
The position of track 311, and the bottom of track 311 is fixedly connected with the bottom of 301 inner cavity of shell, the bottom of sliding block 310 and branch
The top of strut 4 is fixedly connected.
During work, it would be desirable to which the tubing of punching is positioned on fixed frame 9, opens the first motor 6, the rotation of the first motor 6
Drive drill bit 7 to rotate, open motor 302, the movement of motor 302 drives rotation axis 303 to rotate, and the rotation of rotation axis 303 drives
First gear 304 rotates, and the rotation of first gear 304 drives the sliding shoe 306 of 305 side of second gear in endless glide 307
Slided on inner wall, the movement of second gear 305 drives the top of connecting rod 308 to pump, and the movement of connecting rod 308, which drives, to be connected
The top of extension bar 309 pumps, and the movement band movable slider 310 of connecting rod 309 carries out up and down in 311 inner wall of track
Move back and forth, sliding block 310 drives supporting rod 4 to move up and down, and the movement of supporting rod 4 drives the first motor 6 and drill bit 7 to carry out interval
The boring action of formula, manually not pull knob to drill.
In conclusion the construction site tubing drilling device, passes through motor 302, rotation axis 303, first gear
304th, the component such as second gear 305, sliding shoe 306 and endless glide 307 is used cooperatively, and is solved traditional construction site and is used
Tubing is beating the problem of multiple needs manually pull knob to carry out jewel hole with drilling device on a piece tubing, save manpower thing
Power, improves work task efficiency, meets the using effect of user.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those
Element, but also including other elements that are not explicitly listed, or further include as this process, method, article or equipment
Intrinsic key element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.