CN207296944U - A kind of pressure control device of docking style geothermal well - Google Patents

A kind of pressure control device of docking style geothermal well Download PDF

Info

Publication number
CN207296944U
CN207296944U CN201721053740.7U CN201721053740U CN207296944U CN 207296944 U CN207296944 U CN 207296944U CN 201721053740 U CN201721053740 U CN 201721053740U CN 207296944 U CN207296944 U CN 207296944U
Authority
CN
China
Prior art keywords
port
well
control device
valve
pressure control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721053740.7U
Other languages
Chinese (zh)
Inventor
张晓宏
郭文祥
樊占龙
陈粤强
浦静怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Coalfield Geology Group Co Ltd
Original Assignee
Shaanxi Coalfield Geology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Coalfield Geology Group Co Ltd filed Critical Shaanxi Coalfield Geology Group Co Ltd
Priority to CN201721053740.7U priority Critical patent/CN207296944U/en
Application granted granted Critical
Publication of CN207296944U publication Critical patent/CN207296944U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of pressure control device of docking style geothermal well provided by the utility model, including four-way housing, four-way housing includes four ports, is respectively first port, second port, the 3rd port and the 4th port, wherein, first port is connected with being arranged on the casing of straight well well head;Second port is connected with pressure gauge and shut-off valve in turn;3rd port is connected with semilune bias flashboard valve;4th port is connected with mud line interface, meanwhile, the 4th port on the pipeline of mud line interface with being provided with flashboard valve.The utility model realizes the pressure balance in straight well and horizontal engineering well shaft bottom, ensure that the safety of straight well shaft mouth operation personnel, protects well site environment.

Description

A kind of pressure control device of docking style geothermal well
Technical field
The utility model belongs to geothermal energy development technical field, is related in a kind of docking style geothermal well implementation process supporting The pressure control device that straight well uses.
Background technology
For a kind of new docking style geothermal well of 1500~3000m mid-deep stratas geothermal resource of hydrothermal type exploitation, by flatly Straight well and the horizontal engineering well of a bite are composed.This new docking style geothermal well is related to horizontal engineering well in implementation process Be docked and connected shop problem of the straight well in purpose heat reservori.Due to:1. connectivity points position is usually relatively deep, bottom pressure is big; 2. horizontal engineering well is big in connectivity points both sides bottom hole pressure difference with straight well, in the moment that horizontal engineering well is connected with straight well, Liang Jingjing Bottom pressure disequilibrium, the mud of horizontal engineering well are scurried into straight well, are caused in a short time:Horizontal engineering well bottom pressure is rapid Drop, occurs hole collapse, sand card and underground drilling accident;Straight well bottom pressure rises sharply, and is altered on mud, jeopardizes and is used in straight well pit shaft pair Lead to the signal measurement instrument safety of operation in succession;3. straight well well head sprays mud, jeopardize personnel safety, cause environmental pollution etc. to ask Topic.To solve the problems, such as this, it is necessary to be designed in straight well well head and install a kind of pressure control device additional, to control bottom pressure to become Change, it is ensured that the operation that is docked and connected smoothly is implemented.
The content of the invention
A kind of pressure control device of docking style geothermal well provided by the utility model, solves existing level engineering Well and straight well being docked and connected in operation process in purpose heat reservori, due to connectivity points both sides bottom hole pressure difference is big, in water The moment that flat engineering well is connected with straight well, two well bottom pressure disequilibrium, the mud of horizontal engineering well are scurried into a short time Straight well, causes horizontal engineering well bottom pressure rapid drawdown, and hole collapse, sand card and underground drilling accident occurs;Straight well bottom pressure rises sharply, Altered on mud, jeopardize the defects of interior signal measurement instrument for the operation that is docked and connected of straight well pit shaft is safe.
In order to achieve the above object, the technical solution adopted in the utility model is:
A kind of pressure control device of docking style geothermal well provided by the utility model, including four-way housing, four-way Housing includes four ports, respectively first port, second port, the 3rd port and the 4th port, wherein, first port is with setting Put the casing connection in straight well well head;Second port is connected with pressure gauge and shut-off valve in turn;3rd port is connected with semilune Eccentric flashboard valve;4th port is connected with mud line interface, meanwhile, the 4th port on the pipeline of mud line interface with setting It is equipped with flashboard valve.
Preferably, four ports of four-way housing are arranged in cross-shaped configuration.
Preferably, first port is connected by screw thread with the casing of straight well well head.
Preferably, second port is connected with pressure gauge and shut-off valve successively by reducer union.
Preferably, the 3rd port is connected by flange with semilune bias flashboard valve.
Preferably, the 4th port is connected by one end of the first clip and flashboard valve, and the other end of flashboard valve passes through Second clip is connected with mud line interface.
Preferably, cable aperture is offered on the moon shape center of semilune bias flashboard valve.
Compared with prior art, the beneficial effects of the utility model are:
The pressure control device of a kind of docking style geothermal well provided by the utility model, first by the four-way housing A port is connected with the casing of straight well well head, meanwhile, a port of four-way housing is connected with mud line interface, passes through mud Slurry pipeline interface injects mud into straight well, and the balance of two well bottom pressures is realized by mud;In horizontal engineering well and straight well During connection, matched by valve and pressure gauge, precisely adjust straight well shaft bottom mud pressure, realize that bottom pressure is put down Weighing apparatus;Each valve state is kept, until horizontal engineering well completes drilling well task.The utility model realizes horizontal engineering well and straight well The pressure balance in shaft bottom, ensure that the safety of straight well shaft mouth operation personnel, protect well site environment.
Further, it is connected by screw thread with the casing of straight well well head so that the structure convenient disassembly, and it is adapted to different rulers Very little well head uses.
Further, it is connected by flashboard valve with mud line interface, effectively controls mud flowing in straight well pit shaft, protect The safety for the signal measurement instrument for being used for being docked and connected in straight well pit shaft is demonstrate,proved.
Further, the moon shape center on semilune bias flashboard valve opens up cable aperture, does not influence measuring instrument electricity Cable passes through convenient working.
Brief description of the drawings
Fig. 1 is pressure control device structure diagram;
Fig. 2 is semilune bias flashboard valve structure diagram;
Wherein, 1, four-way housing 2, screw thread 3, reducer union 4, the first clip 5, flange 6, flashboard valve 7, pressure Table 8, shut-off valve 9, the second clip 10, mud line interface 11, semilune bias flashboard valve 101, first port 102nd, second port 103, the 3rd port 104, the 4th port 1101, moon shape center 1102, cable aperture.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings.
A kind of pressure control device of docking style geothermal well provided by the utility model, including it is arranged on straight well well head Four-way housing 1, four-way housing 1 include in cross arrangement four ports, be respectively first port 101, second port 102nd, the 3rd port 103 and the 4th port 104, wherein, 101 and the 3rd port 103 of first port is placed on same vertical line, the 102 and the 4th port 104 of Two-port netwerk is placed in same horizontal line.
The first port 101 of four-way housing 1 is installed on by screw thread 2 on the casing of straight well well head;The second of four-way housing 1 Port 102 is connected with pressure gauge 7 and shut-off valve 8 in turn by reducer union 3;3rd port 103 of four-way housing 1 passes through flange 5 connection semilune bias flashboard valves 11;4th port 104 of four-way housing 1 connects flashboard valve 6 by the first clip 4 One end, the other end of flashboard valve 6 connect mud line interface 10 by the second clip 9.
As shown in Fig. 2, the both ends of semilune bias flashboard valve 11 are flange arrangement, semilune bias flashboard valve 11 Moon shape center 1101 offer cable aperture 1102.
During work:
First, carried out in docking style geothermal well before two wells are docked and connected, by screw thread 2 by the first end of four-way housing 1 Mouthfuls 101 with the female thread on straight well wellhead casing pipe immediately, meanwhile, mud line interface 10 is connected with mud channel;
Then, semilune bias flashboard valve 11 is opened, is put into and is used for from the inlet of semilune bias flashboard valve 11 Be docked and connected the signal measurement instrument of operation, and instrument keeps semilune bias flashboard valve 11 to open behind precalculated position State;
Then, open flashboard valve 6, from mud line interface 10 into straight well mud grouting, pass through semilune bias flashboard The aperture observation of valve 11, when mud is filled to well head, closes flashboard valve 6, while the cable tight of signal measurement instrument is leaned on Cable aperture 1102, closes semilune bias flashboard valve 11;
Then, shut-off valve 8 is opened, is being docked and connected in operation process, the pressure change of close observation pressure gauge 7, works as pressure The reading of power table 7 from it is above freezing rise to no longer change when, illustrate that bottom pressure reaches balance, two wells connect successfully.Keep each valve State, until horizontal engineering well completes drilling well task.
Finally, after horizontal engineering well finishing drilling, semilune bias flashboard valve 11 is opened, acts measuring instrument, horizontal engineering In well trip-out process, flashboard valve 6 is opened, by mud line interface 10 toward mud is supplemented in straight well, maintains two well shaft bottoms pressure Dynamic balance.

Claims (7)

  1. A kind of 1. pressure control device of docking style geothermal well, it is characterised in that:Including four-way housing (1), four-way housing (1) include four ports, be respectively first port (101), second port (102), the 3rd port (103) and the 4th port (104), wherein, first port (101) is connected with being arranged on the casing of straight well well head;Second port (102) is connected with pressure in turn Power table (7) and shut-off valve (8);3rd port (103) is connected with semilune bias flashboard valve (11);4th port (104) is even Mud line interface (10) is connected to, meanwhile, the 4th port (104) on the pipeline of mud line interface (10) with being provided with slide valve Door (6).
  2. A kind of 2. pressure control device of docking style geothermal well according to claim 1, it is characterised in that:Four-way shell Four ports of body (1) are arranged in cross-shaped configuration.
  3. A kind of 3. pressure control device of docking style geothermal well according to claim 1, it is characterised in that:First end Mouth (101) is connected by screw thread (2) with the casing of straight well well head.
  4. A kind of 4. pressure control device of docking style geothermal well according to claim 1, it is characterised in that:Second end Mouth (102) is connected with pressure gauge (7) and shut-off valve (8) successively by reducer union (3).
  5. A kind of 5. pressure control device of docking style geothermal well according to claim 1, it is characterised in that:3rd end Mouth (103) is connected by flange (5) with semilune bias flashboard valve (11).
  6. A kind of 6. pressure control device of docking style geothermal well according to claim 1, it is characterised in that:4th end Mouth (104) is connected by the first clip (4) with one end of flashboard valve (6), and the other end of flashboard valve (6) passes through the second clip (9) it is connected with mud line interface (10).
  7. 7. according to a kind of pressure control device of docking style geothermal well of claim 1-6 any one of them, its feature exists In:Cable aperture (1102) is offered on the moon shape center (1101) of semilune bias flashboard valve (11).
CN201721053740.7U 2017-08-22 2017-08-22 A kind of pressure control device of docking style geothermal well Expired - Fee Related CN207296944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721053740.7U CN207296944U (en) 2017-08-22 2017-08-22 A kind of pressure control device of docking style geothermal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721053740.7U CN207296944U (en) 2017-08-22 2017-08-22 A kind of pressure control device of docking style geothermal well

Publications (1)

Publication Number Publication Date
CN207296944U true CN207296944U (en) 2018-05-01

Family

ID=62443636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721053740.7U Expired - Fee Related CN207296944U (en) 2017-08-22 2017-08-22 A kind of pressure control device of docking style geothermal well

Country Status (1)

Country Link
CN (1) CN207296944U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388203A (en) * 2019-08-12 2019-10-29 北京探矿工程研究所 High-temperature geothermal well water testing and well killing system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388203A (en) * 2019-08-12 2019-10-29 北京探矿工程研究所 High-temperature geothermal well water testing and well killing system and method
CN110388203B (en) * 2019-08-12 2024-02-13 北京探矿工程研究所 High-temperature geothermal well water pressure testing well system and method

Similar Documents

Publication Publication Date Title
US11105708B2 (en) Bidirectional variable cross-section water-pressure bearer cycle test system for coal mine water inrush model test
CN203672756U (en) Indoor constant head test device for anisotropic soil bidirectional permeability coefficient
CN205000965U (en) Moisture drilling gas piezometry device
CN105806712B (en) Hole internal water pressure test device and test macro
CN104653136B (en) A kind of method of conventional oil pipe underground power drilling mill composite bridge plug
CN202900256U (en) Draining device for measuring elevation angel hole coal bed gas pressure
CN105888723B (en) Drainage arrangement from gas pressure measurement to layer-through drilling and method during a kind of lower
CN203476320U (en) Device for simultaneously determining pressure of coal bed gas through capsule grouting
CN207296944U (en) A kind of pressure control device of docking style geothermal well
Zhang et al. Application of wireline intelligent separate-layer water injection technology in Huabei Oilfield
CN103195470B (en) Drilling construction Gas gathering-device
CN205138983U (en) High temperature corrosion and erosion test device of oil well pipe bucking tubular column
CN202900175U (en) Gas storage suspending pressure meter manometry completion pipe string
CN204140060U (en) Oil well, well sleeve pipe small displacement leak finding device
CN206144523U (en) Two overhead paddle check valves
CN203490156U (en) Sectioned fixed-point device for rapidly measuring multi-branch drill hole coal seam permeability coefficients
CN206190278U (en) Bi -polar water pressure control single loop blocks up water detection instrument
CN205643745U (en) A bi -polar water pressure control single loop blocks up water detection instrument for overlying strata crack is surveyed
CN109184618B (en) Device and method for drilling, grouting, water plugging and preventing water burst, sand burst and slurry break
CN204283373U (en) A kind of hydraulic jet perforation choke manifold
CN202937264U (en) Electronically controlled single-loop water plugging and overburden rock fracture detector
CN201772975U (en) Experiment device for detecting sealing properties of expanded capsule and sealing liquid
CN205691428U (en) Hole internal water pressure test device and test system
CN102767368B (en) Simulation experiment device for polyurethane-based reinforced shaft wall
CN205483826U (en) Simple and easy experimental apparatus of water shutoff and profile control agent shutoff intensity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501