CN207295933U - A kind of intelligence well head flood control cylinder - Google Patents

A kind of intelligence well head flood control cylinder Download PDF

Info

Publication number
CN207295933U
CN207295933U CN201721032476.9U CN201721032476U CN207295933U CN 207295933 U CN207295933 U CN 207295933U CN 201721032476 U CN201721032476 U CN 201721032476U CN 207295933 U CN207295933 U CN 207295933U
Authority
CN
China
Prior art keywords
flood control
strut
clamp
control cylinder
enclosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721032476.9U
Other languages
Chinese (zh)
Inventor
毕永伟
高琼
秦春禹
李艳
郭利明
王然
贺建国
王志锋
王运涛
李喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing North Row Equipment Industry Co Ltd
Original Assignee
Beijing North Row Equipment Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing North Row Equipment Industry Co Ltd filed Critical Beijing North Row Equipment Industry Co Ltd
Priority to CN201721032476.9U priority Critical patent/CN207295933U/en
Application granted granted Critical
Publication of CN207295933U publication Critical patent/CN207295933U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

It the utility model is related to a kind of intelligent well head flood control cylinder, including enclosing, stretching cloth, steel ring, buoy, supporting rod, ballast, water level mark;The inner ring of enclosing is fixed by stretching cloth and supporting rod forms flood control cylinder water reserve;Steel ring and ballast are placed in flood control cylinder close to pithead position, flood control cylinder further includes automatic control unit, electrical retractor is provided with supporting rod, operator can be according to the flow of water situation for treating flood control well head, by being manually entered length of telescopic bar value on automatic control unit, control motorized adjustment telescopic device adjusts the length of supporting rod to meet that enclosing highly reaches preset height.It has:It is simple in structure, design it is reasonable, easy for operation, work of flood prevention can be carried out within the shortest time should be to emergency case when, effectively increase the work efficiency of field operation, it can effectively ensure that personnel are not in contingency at the same time, in addition intelligentized design is also one spotlight, being capable of widely expanded and application.

Description

A kind of intelligence well head flood control cylinder
Technical field
It the utility model is related to flood protection device technical field, more particularly to a kind of intelligent well head flood control cylinder.
Background technology
Flood is a kind of common natural calamity, and the life production to people brings very big harm, in recent years, city Rain flood also often occurs, it has severely impacted the life of city people, or even causes heavy losses to civic lives and properties. Preventing Urban Storm Flood becomes a vital task in current life.Existing sewage, rainwater well head are when facing big yield, often Appearance is sprayed and spoiled over phenomenon, causes well lid to come off, and sewage outflow causes low-lying place's water largely to gather, can be caused when serious personnel and The damage of vehicle.Current main control measure is special messenger on duty in the rain, places warning sign, or using protection in well head Measure prevents personnel from dropping.But these safeguard procedures all can not fundamentally solve sewage, rainwater is sprayed and spoiled over, downstream water product Poly- phenomenon.Therefore need to propose a kind of to complete Fast Installation, quick water shutoff, the flood protection device quickly removed in various well heads.
Utility model content
For well head flood protection device above shortcomings in the prior art, the purpose of this utility model is that:There is provided one The intelligent well head flood control cylinder of kind, it has:It is simple in structure, design it is reasonable, easy for operation, can when tackling emergency case Work of flood prevention is carried out within the shortest time, effectively increases the work efficiency of field operation, while can effectively ensure personnel not Contingency occurs, in addition intelligentized design is also one spotlight, being capable of widely expanded and application.
In order to achieve the above object, the utility model adopts the following technical solution realizes:
A kind of intelligence well head flood control cylinder, the flood control cylinder are arranged on the well head of municipal sewage and/or rainwater;The flood control cylinder Including enclosing, stretching cloth, steel ring, buoy, supporting rod, ballast, water level mark;Wherein, the enclosing is by antiultraviolet polyester Fiber waterproof material is made, and the inner ring of enclosing is fixed by stretching cloth and supporting rod forms flood control cylinder water reserve, when well head has During a large amount of spilling water, the stretching cloth of flood control cylinder enclosing bottom is consolidated on the ground under the Gravitative Loads of water;The buoy is set Put and be used to float the water reserve top of flood control cylinder at the top of enclosing, water is intercepted;The base of the flood control cylinder is equipped with lanyard, It is used to hang flood control cylinder up flushing drying after use;The steel ring and ballast are placed in flood control cylinder close to well head position Put, the water level mark, which is arranged on, is used for the height for showing current level on the outer circumferential surface of enclosing;The flood control cylinder further includes certainly Dynamic control assembly, is provided with electrical retractor on the supporting rod, operator can according to the flow of water situation for treating flood control well head, By being manually entered length of telescopic bar value on automatic control unit, control motorized adjustment telescopic device adjust the length of supporting rod with Meet that enclosing highly reaches preset height.
As the further optimization of above-mentioned technical proposal, shackle member is provided with the ballast, is set on the steel ring There is the fastener to cooperate with shackle member;Or shackle member is provided with the steel ring, it is provided with and blocks on the ballast The fastener that fitting cooperates, flood control cylinder is fixed on close to well head by shackle member and fastener by steel ring and ballast interlocking Position;The shackle member uses trip, and the fastener uses card slot;Wherein, the trip includes the first clamp, the second clamp With the first clamp of connection and the guide part of the second clamp, the maximum outside diameter of first clamp is less than or equal to the maximum of the second clamp Outside diameter, the guide part are tapered portion, wherein, one first clamp of diameter smaller side of tapered portion is connected, be relatively large in diameter side with Second clamp is connected, and the diameter smaller side of tapered portion with perform larger side respectively at the first clamp end head, second The end head shape of clamp cooperates;The first clamp portion, tapered portion, the connecting portion in the second clamp portion are provided with circular arc mistake Cross, and circular arc mistake is also equipped between the position of both sides at the maximum outside diameter in the first clamp portion and the second clamp portion Cross;The second appearance that the card slot includes the first holding tank to cooperate with the second clamp portion and the second clamp portion cooperates Receive groove and with the guide part cooperate the 3rd holding tank.
As the further optimization of above-mentioned technical proposal, first clamp and the second clamp use denation portion And/or " Ω " type protrusion;First holding tank and the second holding tank the protrusion shape with the first clamp, the second clamp respectively Shape is interference fitted;The motorized adjustment telescopic device includes electric pushrod, and electric pushrod is arranged in the pipe of supporting rod, the branch First support bar and second support bar are provided with strut, electric pushrod is placed between first support bar and second support bar, is used In the bar of the stretching of driving second support bar or retraction first support bar.
As the further optimization of above-mentioned technical proposal, the ballast is plated using flood control sandbag and/or portable bagged Zine plate, plating copper coin, plating steel plate or long ternes;The meter full scale of the water level mark is 0-150cm, and the interval of adjacent scale is adopted With 5cm, 10cm, 20cm or 30cm;Reflective paster is additionally provided with the outer circumferential surface of the enclosing;It is provided with the supporting rod Manual telescopic device, the manual telescopic device include the first strut, the second strut, the 3rd strut, wherein the second strut is distinguished One end, one end of the 3rd strut with the first strut are connected;The other end of first strut be arranged on the bottom of supporting rod and with The stretching cloth of bottom is connected, and the other end of the 3rd strut is connected with the stretching cloth at the top of enclosing;First strut Be both provided with the 3rd strut several mutually at equal intervals and into one row arrangement blocked hole, the upside of second strut and The elastic card bead to cooperate with above-mentioned blocked hole is both provided with downside;It is described elasticity card bead quantity be one, described one Arrange clamping hole number at least two of arrangement;The elasticity card bead includes the elastic component and bullet being fixedly connected with the second strut inner wall Property part is connected and protrudes from the steel ball of the second strut outer surface.
As the further optimization of above-mentioned technical proposal, first strut, the second strut, the length phase of the 3rd strut Deng or gradually equal difference successively decrease;First strut, the second strut, the 3rd strut use hollow taper type pipe.
As the further optimization of above-mentioned technical proposal, the automatic control unit includes integral control circuit plate, sets PLC controller on integral control circuit plate, the power supply being connected with integral control circuit plate, for accommodate integrated circuit plate, The waterproof case of power supply and PLC controller;The water level mark of the enclosing is provided with liquid level at several different graduation positions Sensor, the liquid level sensor are used to detecting the real-time level signal value at several corresponding different graduation positions, and with The PLC controller data-signal connection, the waterproof case is arranged on the top of enclosing, and the PLC controller includes Memory module, data-signal modular converter, liquid level surpass warning reminding module, and it is opposite that highest liquid level is built-in with memory module The default level threshold answered, the data-signal modular converter is connected with liquid level sensor, for liquid level sensor to be sent Real-time level signal value changed, the liquid level surpass warning reminding module be connected with light prompting device;PLC controller According to the real-time level signal value after converted compared with default level threshold, when real-time level signal value is less than default liquid During the threshold value of position, controller control light prompting device sends green passage of scintillation light;When real-time level signal value is at or above pre- If during level threshold, controller control light prompting device sends red passage of scintillation light.
As the further optimization of above-mentioned technical proposal, 5- of the level threshold higher than water level mark maximum scale 10cm。
Had the advantages that using the intelligent well head flood control cylinder and its application method of the utility model:
(1) reasonable in design, production and maintenance cost are relatively low, and on-site consolidation is quick, can be according to above-mentioned steps 1) -2) i.e. It can quickly realize flood control;
(2) design of supporting rod is in order at the height that according to the flow of water situation of actual field, can reasonably determine enclosing, Live flexible operating is stronger, can manually operate or electric operating, and when electric operating runs into inconvenience, manual operation is made For the method for auxiliary operation, operator's fast operating can be facilitated;
(3) mutual cooperation of elder sister's structure and shackle member and fastener is blocked so that site operation personnel can be according to actual needs The position of rational selection clamping is carried out, same field operation is more flexible and changeable;
(4) design of automated control component, can not effectively conveniently operate with the collapsing length that person controls supporting rod, have Effect reduces manpower, improves operating efficiency;The real-time level altitudes in enclosing are intuitively observed, and according to the face of lamp Color can easily judge whether liquid level reaches warning line, and the degree of automation is compared to other equipment performance of the same trade more It is excellent, there is preferable popularizing application prospect.
Brief description of the drawings
Attached drawing 1 is the installation front view of the utility model intelligence well head flood control cylinder.
The installation top view of 2 the utility model intelligence well head flood control cylinders of attached drawing.
Embodiment
1-2 is described in detail the utility model intelligence well head flood control cylinder below in conjunction with the accompanying drawings.
A kind of intelligence well head flood control cylinder, the flood control cylinder are arranged on the well head of municipal sewage and/or rainwater;The flood control cylinder Including enclosing 1, stretching cloth 2, steel ring 3, buoy (4), supporting rod 5, ballast 6, water level mark 7;Wherein, the enclosing is by anti-purple Outside line polyester fiber waterproof material is made, and the inner ring of enclosing is fixed by stretching cloth and supporting rod forms flood control cylinder water reserve, When well head there are a large amount of spilling water, the stretching cloth of flood control cylinder enclosing bottom is consolidated on the ground under the Gravitative Loads of water;Institute State buoy be arranged on enclosing top be used for float the water reserve top of flood control cylinder, water is intercepted;The base of the flood control cylinder Equipped with lanyard, it is used to hang flood control cylinder up flushing drying after use;The steel ring and ballast are placed in flood control cylinder and lean on Nearly 8 position of well head, the water level mark, which is arranged on, is used for the height for showing current level 9 on the outer circumferential surface of enclosing;The flood control Cylinder further includes automatic control unit, is provided with electrical retractor on the supporting rod, and operator can be according to treating flood control well head Flow of water situation, by being manually entered length of telescopic bar value on automatic control unit, control motorized adjustment telescopic device adjusts branch The length of strut is to meet that enclosing highly reaches preset height.
Shackle member is provided with the ballast, the fastener to cooperate with shackle member is provided with the steel ring;Or Shackle member is provided with described in person on steel ring, the fastener to cooperate with shackle member is provided with the ballast, passes through clamping Steel ring and ballast interlocking are fixed on flood control cylinder close to pithead position by part with fastener;The shackle member uses trip, described Fastener uses card slot;Wherein, the trip includes the first clamp, the second clamp and the first clamp of connection and second clamp is led To portion, the maximum outside diameter of first clamp is less than or equal to the maximum outside diameter of the second clamp, and the guide part is tapered portion, its In, one first clamp of diameter smaller side of tapered portion is connected, and is relatively large in diameter side and is connected with the second clamp, and tapered portion Diameter smaller side cooperates with performing larger side respectively at end head, the end head shape of the second clamp of the first clamp;Institute State the first clamp portion, tapered portion, the connecting portion in the second clamp portion are provided with arc transition, and the first clamp portion and second Arc transition is also equipped between the position of both sides at maximum outside diameter in clamp portion;The card slot includes and the second clamp portion The second holding tank and cooperate with the guide part that the first holding tank to cooperate and the second clamp portion cooperate The 3rd holding tank.
First clamp and the second clamp use denation portion and/or " Ω " type protrusion;Described first holds The protrusion shape of groove and the second holding tank respectively with the first clamp, the second clamp of receiving is interference fitted;The motorized adjustment is stretched Device includes electric pushrod, and electric pushrod is arranged in the pipe of supporting rod, and first support bar and are provided with the supporting rod Two supporting rods, electric pushrod are placed between first support bar and second support bar, for driving second support bar to stretch out or contracting Return in the bar of first support bar.
The ballast is using flood control sandbag and/or portable bagged galvanized sheet, plating copper coin, plating steel plate or long ternes; The meter full scale of the water level mark is 0-150cm, and the interval of adjacent scale uses 5cm, 10cm, 20cm or 30cm;It is described Reflective paster is additionally provided with the outer circumferential surface of enclosing;Manual telescopic device, the manual telescopic dress are provided with the supporting rod Put including the first strut, the second strut, the 3rd strut, wherein the second strut one end with the first strut, the 3rd strut respectively One end is connected;The other end of first strut is arranged on the bottom of supporting rod and is connected with the stretching cloth of bottom, and the described 3rd The other end of strut is connected with the stretching cloth at the top of enclosing;Several phases are both provided with first strut and the 3rd strut Mutually at equal intervals and into the blocked hole of a row arrangement, it is both provided with and above-mentioned blocked hole phase on the upper side and lower side of second strut The elastic card bead mutually coordinated;The quantity of the elasticity card bead is one, clamping hole number at least two of the row arrangement;Institute Elastic component that elastic card bead includes being fixedly connected with the second strut inner wall is stated, is connected with elastic component and protrudes from the second strut The steel ball of outer surface.
First strut, the second strut, the equal length of the 3rd strut or the gradual equal difference is successively decreased;First support Bar, the second strut, the 3rd strut use hollow taper type pipe.
The automatic control unit include integral control circuit plate, be arranged on integral control circuit plate PLC controller, The power supply that is connected with integral control circuit plate, for accommodating integrated circuit plate, power supply and the waterproof case of PLC controller;It is described The water level mark of enclosing is provided with liquid level sensor at several different graduation positions, and the liquid level sensor is used to detect phase The real-time level signal value at several different graduation positions is answered, and is connected with the PLC controller data-signal, it is described anti- Water shell is arranged on the top of enclosing, and the PLC controller includes memory module, data-signal modular converter, liquid level and surpasses Reminding module is guarded against, the corresponding default level threshold of highest liquid level is built-in with memory module, the data-signal turns Mold changing block is connected with liquid level sensor, and the real-time level signal value for liquid level sensor to be sent is changed, the liquid The super warning reminding module in position is connected with light prompting device;PLC controller according to the real-time level signal value after converted with Default level threshold is compared, when real-time level signal value is less than default level threshold, controller control light prompting dress Put and send green passage of scintillation light;When real-time level signal value is at or above default level threshold, controller control light carries Awake device sends red passage of scintillation light.
5-10cm of the level threshold higher than water level mark maximum scale.
The above-mentioned description to embodiment is understood that for ease of those skilled in the art and using this reality With new.Person skilled in the art obviously easily can make these embodiments various modifications, and saying herein Bright General Principle is applied in other embodiment without by performing creative labour.Therefore, the utility model is not limited to this In embodiment, those skilled in the art's announcement according to the present utility model, do not depart from that the utility model category made changes Into and modification all should be within the scope of protection of the utility model.

Claims (7)

1. a kind of intelligence well head flood control cylinder, the flood control cylinder are arranged on the well head of municipal sewage and/or rainwater;It is characterized in that: The flood control cylinder includes enclosing(1), stretching cloth(2), steel ring(3), buoy(4), supporting rod(5), ballast(6), water level mark (7);Wherein, the enclosing is made by anti-ultraviolet polyester fibers waterproof material, and the inner ring of enclosing is by stretching cloth and support Bar is fixed to form flood control cylinder water reserve, when well head has a large amount of spilling water, by flood control cylinder enclosing bottom under the Gravitative Loads of water Stretching cloth consolidate on the ground;The top that the buoy is arranged on enclosing is used to float the water reserve top of flood control cylinder, will Water intercepts;The base of the flood control cylinder is equipped with lanyard, is used to hang flood control cylinder up flushing drying after use;The steel Circle and ballast are placed in flood control cylinder close to well head(8)Position, the water level mark, which is arranged on the outer circumferential surface of enclosing, to be used to show Current level(9)Height;The flood control cylinder further includes automatic control unit, and electric expansion dress is provided with the supporting rod Put, operator can according to the flow of water situation for treating flood control well head, by being manually entered length of telescopic bar value on automatic control unit, Control motorized adjustment telescopic device adjusts the length of supporting rod to meet that enclosing highly reaches preset height.
A kind of 2. intelligent well head flood control cylinder according to claim 1, it is characterised in that:Card is provided with the ballast Fitting, the fastener to cooperate with shackle member is provided with the steel ring;Or shackle member is provided with the steel ring, it is described The fastener to cooperate with shackle member is provided with ballast, steel ring is mutually locked with ballast with fastener by shackle member Flood control cylinder is scheduled on close to pithead position;The shackle member uses trip, and the fastener uses card slot;Wherein, the trip bag The first clamp, the second clamp and the guide part of the first clamp of connection and the second clamp are included, the maximum outside diameter of first clamp is small In the maximum outside diameter equal to the second clamp, the guide part is tapered portion, wherein, one first clamp of diameter smaller side of tapered portion It is connected, is relatively large in diameter side and is connected with the second clamp, and the diameter smaller side of tapered portion is with performing larger side respectively at the The end head of one clamp, the end head shape of the second clamp cooperate;First clamp, tapered portion, the company of the second clamp Socket part is provided with arc transition, and at the maximum outside diameter on first clamp and the second clamp between the position of both sides It is provided with arc transition;The card slot includes the first holding tank to cooperate with the second clamp and the second clamp cooperates The second holding tank and with the guide part cooperate the 3rd holding tank.
A kind of 3. intelligent well head flood control cylinder according to claim 2, it is characterised in that:First clamp and the second card Head uses denation portion and/or " Ω " type protrusion;First holding tank and the second holding tank block with first respectively The protrusion shape interference fit of head, the second clamp;The motorized adjustment telescopic device includes electric pushrod, and electric pushrod is set In the pipe of supporting rod, first support bar and second support bar are provided with the supporting rod, electric pushrod is placed in the first support Between bar and second support bar, in the bar for driving second support bar stretching or retraction first support bar.
A kind of 4. intelligent well head flood control cylinder according to claim 1, it is characterised in that:The ballast is husky using flood control Bag and/or portable bagged galvanized sheet, plating copper coin, plating steel plate or long ternes;The meter full scale of the water level mark is 0- 150cm, the interval of adjacent scale use 5cm, 10cm, 20cm or 30cm;It is additionally provided with the outer circumferential surface of the enclosing reflective Paster;It is provided with manual telescopic device on the supporting rod, the manual telescopic device includes the first strut, the second strut, the Three struts, wherein one end with the first strut, one end of the 3rd strut are connected the second strut respectively;The other end of first strut It is arranged on the bottom of supporting rod and is connected with the stretching cloth of bottom, the stretching at the top of the other end and enclosing of the 3rd strut Cloth is connected;Several clampings mutually arranged at equal intervals and into a row are both provided with first strut and the 3rd strut Hole, the elastic card bead to cooperate with above-mentioned blocked hole is both provided with the upper side and lower side of second strut;The elasticity The quantity of card bead is one, clamping hole number at least two of the row arrangement;It is described elasticity card bead include with the second strut Elastic component that wall is fixedly connected, the steel ball for being connected with elastic component and protruding from the second strut outer surface.
A kind of 5. intelligent well head flood control cylinder according to claim 4, it is characterised in that:First strut, second Strut, the equal length of the 3rd strut or gradual equal difference are successively decreased;First strut, the second strut, the 3rd strut use Hollow taper type pipe.
A kind of 6. intelligent well head flood control cylinder according to claim 1, it is characterised in that:The automatic control unit includes Integral control circuit plate, the PLC controller being arranged on integral control circuit plate, the power supply being connected with integral control circuit plate, For accommodating integrated circuit plate, power supply and the waterproof case of PLC controller;The water level mark of the enclosing is carved in several differences Liquid level sensor is provided with degree position, the liquid level sensor is used to detect real-time at several corresponding different graduation positions Liquid level signal value, and be connected with the PLC controller data-signal, the waterproof case is arranged on the top of enclosing, and The PLC controller includes memory module, data-signal modular converter, liquid level surpass warning reminding module, built-in in memory module There is the corresponding default level threshold of highest liquid level, the data-signal modular converter is connected with liquid level sensor, uses Changed in the real-time level signal value for sending liquid level sensor, the liquid level surpasses warning reminding module and filled with light prompting Put and be connected;PLC controller according to the real-time level signal value after converted compared with default level threshold, when real-time liquid When position signal value is less than default level threshold, controller control light prompting device sends green passage of scintillation light;When real-time level is believed When number value is at or above default level threshold, controller control light prompting device sends red passage of scintillation light.
A kind of 7. intelligent well head flood control cylinder according to claim 6, it is characterised in that:The level threshold is higher than water level Identify the 5-10cm of maximum scale.
CN201721032476.9U 2017-08-17 2017-08-17 A kind of intelligence well head flood control cylinder Active CN207295933U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721032476.9U CN207295933U (en) 2017-08-17 2017-08-17 A kind of intelligence well head flood control cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721032476.9U CN207295933U (en) 2017-08-17 2017-08-17 A kind of intelligence well head flood control cylinder

Publications (1)

Publication Number Publication Date
CN207295933U true CN207295933U (en) 2018-05-01

Family

ID=62444672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721032476.9U Active CN207295933U (en) 2017-08-17 2017-08-17 A kind of intelligence well head flood control cylinder

Country Status (1)

Country Link
CN (1) CN207295933U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313498A (en) * 2017-08-17 2017-11-03 北京北排装备产业有限公司 A kind of intelligent well head flood control cylinder and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313498A (en) * 2017-08-17 2017-11-03 北京北排装备产业有限公司 A kind of intelligent well head flood control cylinder and its application method

Similar Documents

Publication Publication Date Title
CN205935048U (en) Chinampa is collected to fresh water
CN101864789A (en) Volume type rain early-stage split-flow device
CN207295933U (en) A kind of intelligence well head flood control cylinder
CN207314189U (en) A kind of quick-mounting formula well head flood control cylinder
CN207499116U (en) It is a kind of to be put for the quick-mounting formula flood control wound packages of municipal sewage well
CN205956964U (en) Rainwater recycle sprays street lamp
CN205642536U (en) Automatic warning flood discharge device
CN209431284U (en) Water level control street lamp with warning function
CN107313498A (en) A kind of intelligent well head flood control cylinder and its application method
CN207331652U (en) A kind of collecting refuse from open water device
CN206774136U (en) A kind of cement electric pole identifies board apparatus
CN211925583U (en) Intelligent street lamp with good warning effect
CN107299674B (en) Quick-mounting flood prevention barrel device for urban sewage well and application method of quick-mounting flood prevention barrel device
CN107313362A (en) A kind of quick-mounting formula well head flood control cylinder and its application method
CN209265665U (en) A kind of wireless leakage inductive warning device
CN208870632U (en) A kind of wisdom tunnel control device
CN207484565U (en) A kind of sponge urban green space rain recycling system
CN207897521U (en) A kind of water supply control apparatus for rice cropping
CN209084622U (en) A kind of intelligent road-lamp
CN208312207U (en) A kind of municipal administration energy-saving type vertical greening street lamp
CN206256879U (en) A kind of automatic telescopic ladder for power engineering maintenance
CN107911914A (en) A kind of reservoir is taken precautions against natural calamities warning monitoring system
CN216722502U (en) Watering lorry is used in landscape afforestation
CN213810406U (en) Intelligent street lamp capable of automatically adjusting brightness
CN208457823U (en) A kind of new type of safe waterproof lamp stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant