A kind of SMW engineering methods stake fixed frame device
Technical field
SMW engineering method stake process equipments are the utility model is related to, more particularly to a kind of SMW engineering methods stake fixed frame device.
Background technology
The stake of SMW engineering methods is constructed using three axis deep mixers, and lifting equipment is risen using 50T tracklaying cranes and 300T
Equipment is pulled out, construction technology is beaten using set.Guide channel is excavated first, machine frame movement guide rail is set, and then SMW mixers position, and SMW is stirred
Machine stirring, lifting, whitewashing are mixed, stirring is repeated and sinks, then H profile steel welding fabrication, quality inspection, separant coating, are finally inserted H-type
Steel, construction terminate.
As shown in figure 4, in the prior art, H profile steel has a fixed frame 1 for alignment, both sides when guide channel is inserted into
Frame leg 2 is frame on guide rail, and centre is oblong openings.Some connection straps 3 are additionally provided with oblong openings both sides, are played solid
It is set for using.In the construction process, it is necessary to which artificial goes righting during H profile steel insertion guide channel, alignment oblong openings, have certain
Danger, and operate inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of SMW engineering methods stake fixed frame device, and there is guiding H profile steel correctly to insert
Among entering guide channel, while the effect that need not manually help, it is very convenient and efficient.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of SMW engineering methods stake is consolidated
Determine frame mounting, including roller and brake, including guiding wall, fixed passage, supporting rack, fixed frame;During the guiding wall is
Empty halfpace shape, the fixed passage are fixedly connected on guiding wall lower end, and the fixed passage is hollow rectangular parallelepiped structure, institute
Supporting rack connection guiding wall outer wall stage casing and fixed channel outer wall stage casing are stated, it is remote that the fixed frame is fixedly connected on fixed passage
Guiding wall one end, the fixed frame are rectangular frame structure, and the roller is arranged on side of the fixed frame away from fixed passage,
Brake is provided with the roller.
By using above-mentioned technical proposal, H profile steel can be guided and be put into fixed passage, and will not placed crooked;Will
Fixed frame is arranged to move, fixable both of which, the structure of whole device is more stablized.
Further, the height of the guiding wall is 40cm, and inclination angle is 60 °, wall thickness 3mm.
By using above-mentioned technical proposal, H profile steel can be made more to stablize when being inserted into guide channel, alignment and fixation are easier and lead to
Road.
Further, the fixed channel height is 40cm-60cm.
By using above-mentioned technical proposal, H profile steel can be made to contradict fixed passage when not being directed at position, by adjusting position
Guide channel can be properly inserted.
Further, support frame as described above has 8, per two, face.
By using above-mentioned technical proposal, there can be more supporting racks to come supporting guide wall, fixed whole device.
Further, the guiding wall, fixed passage, supporting rack, fixed frame are all made of steel.
By using above-mentioned technical proposal, SMW engineering method stake fixed frames device can be made more wear-resisting firm.
Further, the guiding wall inner wall is provided with Fluency strip.
By using above-mentioned technical proposal, sliding friction is allowed to be changed into rolling friction so that being put into for H profile steel is more smooth.
Further, the Fluency strip quantity is 6-8 bars.
By using above-mentioned technical proposal, the scope bigger that can be put into H profile steel.
In conclusion the utility model has the advantages that:
1st, SMW engineering methods stake fixed frame device can make the fixed passage of H profile steel insertion by guiding wall, it is not necessary to manually go
Help H profile steel;
2nd, SMW engineering methods stake fixed frame device ensures that H profile steel is inserted into correct position by fixed passage;
3rd, SMW engineering methods stake fixed frame device can efficiently be moved by roller;
4th, SMW engineering methods stake fixed frame device can fix SMW engineering method stake fixed frame devices by brake.
Brief description of the drawings
Fig. 1 is to be used to embody overall structure diagram in embodiment 1;
Fig. 2 is the structure diagram for being used to embody lower part in embodiment 1;
Fig. 3 is the structure diagram for being used to embody Fluency strip in embodiment 2;
Fig. 4 is the structure diagram of fixed frame in the prior art.
In figure, 1, guiding wall;11st, Fluency strip;2nd, fixed passage;21st, rubber layer;3rd, supporting rack;4th, fixed plate;5th, roll
Wheel;51st, brake.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Wherein identical parts are presented with like reference characters.It should be noted that word used in the following description
Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", " interior " and
" outer " is referred respectively to towards or away from the direction of particular elements geometric center.
Embodiment 1:A kind of SMW engineering methods stake fixed frame device, as shown in Figure 1, including guiding wall 1, fixed passage 2, branch
Support 3, fixed frame 4 and roller 5.
As shown in Figure 1,1 shape of guiding wall is hollow halfpace shape, halfpace shape is retracted downward, and material is steel, more
It is firm wear-resisting.The height of guiding wall is 40cm, and the inclination angle with vertical direction is 60 °, wall thickness 3mm.In the construction process
No longer need manually to help H profile steel to be inserted into guide channel, convenient and efficient, more mechanization.
As shown in Figure 1, fixed passage 2 is fixedly connected on 1 lower end of guiding wall, fixed passage 2 is hollow cuboid, up and down
Conducting, the size of length and width are slightly over the size of H profile steel length and width.Rubber layer 21 is provided with fixed passage 2.In the present embodiment,
The height of fixed passage 2 is 40cm-60cm.
As shown in Figure 1, supporting rack 3 is cylinder, supporting rack 3 is connected in 2 outer wall of 1 outer wall stage casing of guiding wall and fixed passage
Section, supporting rack 3 have 8, and per two, face, 3 material of supporting rack is steel, plays a supporting role in protection, prevents in tracklaying crane
When hanging H profile steel, because the self gravitation effect of H profile steel causes guiding wall 1 to be bent downwardly in guiding wall 1.
As shown in Figure 1, fixed frame 4 is fixedly connected on fixed 2 lower end of passage, fixed 2 lower end of passage is hit exactly in fixed frame 4
Between, ensure the stability of the whole device during being put into, whole device will not be caused because of pressure of the H profile steel for guiding wall
Tilt.Fixed frame 4 is rectangular frame, and material is steel, more more stable and stronger.
As shown in Fig. 2, roller 5 is arranged on four angles of fixed frame 4, brake 51 is additionally provided with roller 5, can be with
The mobile SMW engineering method stake fixed frame devices after H profile steel is inserted into guide channel, are moved to after suitable position, step on brake 51,
Brake is checked roller 5, allow whole device to stop, manually carrying SMW engineering method stake fixed frame devices can be disobeyed.
Specific implementation process:Tracklaying crane slings H profile steel, is slowly put down in SMW engineering method stake fixed frame devices upper end,
Fixed passage 2 is imported by 1 sliding friction of guiding wall.Fixed passage 2 will be contradicted if H profile steel is crooked, tracklaying crane moves
Dynamic H profile steel is completed to be put into.After completion is put into, the braking effect of brake 51 is released, mobile SMW engineering method stake fixed frames are rack-mounted
Put, need the position for being inserted into H profile steel to step on brake 51, fixed SMW engineering method stake fixed frame devices again afterwards to next.
Embodiment 2:It is with one difference of embodiment:As shown in figure 3,1 inner wall of guiding wall is set into Fluency strip 11, will
Sliding friction is changed to rolling friction, fixed passage 2 can be rolled on guiding wall 1 when H profile steel is inserted into guide channel, into
One step improves the success rate of H profile steel insertion.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability
Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but
As long as all protected in the right of the utility model be subject to Patent Law.