- CN207295701U CN207295701U CN201721223229.7U CN201721223229U CN207295701U CN 207295701 U CN207295701 U CN 207295701U CN 201721223229 U CN201721223229 U CN 201721223229U CN 207295701 U CN207295701 U CN 207295701U
- Authority
- CN
- China
- Prior art keywords
- pile pipe
- plate
- center column
- pipe head
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model belongs to technical field of building construction, a kind of more particularly to tower pile pipe head, it includes connecting plate and top, the top tip structure includes center column plate and symmetrical two side plates, center column plate is the pyramidal structure of top isosceles triangle lower rectangular, and the side plate is right-angled trapezium, and center column plate welds together with side plate composition cross, top tip structure is fixed on connecting plate, optional welding manner;Tower is top to be equipped with I, II, III, IV between connecting plate, four mutually independent area of space;The tower pile pipe head of the utility model design has piling, and stress is small soon, in piling sinking watching, the design of structure is carried the power of the overwhelming majority by pile pipe head, pile pipe tube body stress is small, it is not easy to be damaged and bending, at the same time tower pile pipe header structure it is simple, it is easily manufactured, can be with use after any pile pipe pipe welding, cost is low, can effectively carry out large-scale promotion.
Description
Technical field
The utility model belongs to technical field of building construction, more particularly to a kind of tower pile pipe head.
Background technology
The shortcomings that pile pipe head shapes of the prior art are mostly cone, the pile pipe head of this cone is:
1st, when running into different soil properties, the geology of harder rock or solution cavity class is especially encountered during piling,
The pile pipe head of cone be easy to occur it is top be smoothed or top directly broken situation, if top be smoothed or break
Fall, will carry the resistance of bigger continuing piling, very lossy can be caused to motor of pile body and piling machine etc., and it is existing
, moreover, there is such case and just has to carry out secondary or even repeatedly beat in situations such as being burnt out there may be broken pile and motor
Stake, not only cost and time greatly increase, while have also seriously affected piling construction quality.
2nd, cone pile pipe head uses extruding form in sinking watching, and the soil or carg being squeezed out can only be from
Both sides are squeezed out, and increase resistance of the pile pipe head in sinking watching, and such a structure stress maximum point is normally at pile pipe
The junction of head and pile pipe tube body, simultaneously because the material selected as pile pipe is first is good compared with the hardness high quality of pile pipe tube body, institute
Pile pipe head often occurs without damage, the part of pile pipe tube body and pile pipe head junction is damaged deformation, or even rolls over
It is curved, cause pile pipe to scrap, so that have to drive piles again, it is time-consuming and laborious.
Utility model content
For above-mentioned the deficiencies in the prior art, the tower pile pipe head of the utility model design has that piling is fast, beats
Stake sinking watching in stress it is small, while the overwhelming majority power carried by pile pipe head, pile pipe tube body stress is small, be not easy to be damaged and
The advantages that bending, realizes disposable piling, and construction quality is good, solves the problems, such as above-mentioned.
The utility model is achieved through the following technical solutions:Tower pile pipe head includes connecting plate and top, described
Top tip structure includes center column plate and symmetrical two side plates, and the center column plate is top isosceles triangle lower rectangular
Pyramidal structure, the side plate is right-angled trapezium, and center column plate welds together with side plate composition cross, and top tip structure is fixed
On connecting plate, optional welding manner;Tower is top to be equipped with I, II, III, IV between connecting plate, four mutually independent spaces
Region.
Further, one side height a that the side plate is connected with center column plate and center column plate rectangle part height b phases
Deng i.e. a=b.
Further, the base angle e of the center column plate upper triangular is equal with side plate upper inclination angle d angles, i.e. e=
d。
Further, the connecting plate is circular steel plate, other stereotypes, cast iron materials etc. also can be selected, while shape can
Needed to choose ellipse or polygon according to site operation.
Further, the base length c of the center column plate is equal with the diameter of connecting plate.
The beneficial effects of the utility model are:
(1) tower pile pipe head described in the utility model, top top can quickly be driven underground into pyramidal structure;
Tower is top to be equipped with I, II, III, IV between connecting plate, and four mutually independent area of space, can keep in top portion extrusion
The soil or carg fallen, the resistance run into when being driven underground are greatly reduced compared to the resistance that plane is subject to, so using
Not only resistance that is fast but also being subject to is small when being driven underground for the pile pipe head of the application, and the infringement under similarity condition for pile body is small,
Avoid the occurrence of broken pile problem, at the same motor is damaged it is small, will not cause motor band it is motionless cause burning machine phenomenon, also greatly save
Electric energy, reduces cost.
(2) tower pile pipe head described in the utility model, top rectangle part length is identical with pile pipe pipe diameter, energy
Pile body end (i.e. the link position of pile pipe head and pile pipe tube body) off-load is effectively helped, compared to directly using circular cone or right angle three
Angular, pyramidal structure, which can effectively prevent, to be born excessive extruding force in practical work process pile end and deforms or damage,
Even bending, so as to avoid the situation for causing pile pipe to scrap, driving piles again, has been saved time and cost, and this tower stake
Tube head, which realizes, to be disposably driven underground, and is closely as one with underground surrounding, and construction quality is more preferable and other effects.
(3) tower pile pipe head described in the utility model, it is simple in structure, easily manufactured, can be with any pile pipe pipe welding
Or use after the fixation of other modes, cost is low, can effectively carry out large-scale promotion.
Brief description of the drawings
Fig. 1 is each design of part schematic diagram of the utility model;
Fig. 2 is the front view schematic diagram that the utility model assembles;
Fig. 3 is the top view illustration that the utility model assembles;
In figure:1st, side plate, 2, center column plate, 3, connecting plate.
Embodiment
The utility model is further illustrated, it is necessary to explanation is with embodiment below in conjunction with the accompanying drawings, present embodiment
It is descriptive, is not limited, it is impossible to thus limit the scope of protection of the utility model.
As shown in Figs. 1-3, tower pile pipe head includes connecting plate 3 and top, and top tip structure includes center column plate 2 and left and right is right
Two side plates 1 claimed, center column plate are the pyramidal structure of top isosceles triangle lower rectangular, and side plate is right-angled trapezium, center
Column plate welds together with side plate composition cross, and top tip structure is fixed on connecting plate, optional welding manner;Tower it is top with
I, II, III, IV is equipped between connecting plate, four mutually independent area of space.
By above-mentioned setting, top top can quickly be driven underground into pyramidal structure;Tower it is top with connecting plate it
Between be equipped with I, II, III, IV, four mutually independent area of space, can keep in soil or carg that top part squeezes,
The resistance run into when being driven underground is greatly reduced compared to the resistance that plane is subject to, so being squeezed into using the pile pipe head of the application
Not only resistance that is fast but also being subject to is small during underground, and the infringement under similarity condition for pile body is small, avoids the occurrence of broken pile problem, at the same time
To motor damage it is small, will not cause motor band it is motionless cause burning machine phenomenon, electric energy is also greatly saved, reduces cost.
Side plate and one side height a that center column plate connects are equal with center column plate rectangle part height b, i.e. a=b.
Realized and be seamlessly connected by above-mentioned setting side plate and center column plate, connection is smooth, close, will not be stressed
The situation of mutation.
The base angle e of center column plate upper triangular is equal with side plate upper inclination angle d angles, i.e. e=d.
It is more smooth by the top center column plate of above-mentioned setting and side plate into an angle tilt, reduce stress
Concentrate.
Connecting plate is circular steel plate, other stereotypes, cast iron materials etc. also can be selected, while shape can be according to site operation need
Choose ellipse or polygon.
The base length c of center column plate is equal with the diameter of connecting plate.
The top rectangle part length of above-mentioned setting is identical with pile pipe pipe diameter, can effectively help (the i.e. stake of pile body end
The link position of tube head and pile pipe tube body) off-load, compared to circular cone or right angled triangle is directly used, pyramidal structure can effectively be prevented
Only excessive extruding force is born in practical work process pile end and deform or damage, or even bending, so as to avoid causing
Pile pipe is scrapped, and situation about driving piles again, has been saved time and cost, and this tower pile pipe head realizes and disposably squeezes into ground
Under, it is closely as one with underground surrounding, construction quality is more preferable and other effects.
The utility model is exemplarily described above in conjunction with attached drawing, it is clear that the utility model implement and from
The limitation of aforesaid way, if employ the utility model design and technical solution carry out various unsubstantialities improve or not
Other occasions are directly used in by the design and technical solution that improve the utility model, in the scope of protection of the utility model
Within.
Claims (5)
- A kind of 1. tower pile pipe head, it is characterised in that:Including connecting plate (3) and top, the top tip structure includes center column plate (2) and symmetrical two side plates (1), the center column plate (2) are the pyramidal structure of top isosceles triangle lower rectangular, The side plate (1) is right-angled trapezium, and center column plate (2) welds together with side plate (1) composition cross, and top tip structure is fixed on On connecting plate (3), I, II, III, IV is formed between top (3) with connecting plate of tower, four mutually independent area of space.
- 2. tower pile pipe head according to claim 1, it is characterised in that:What the side plate (1) was connected with center column plate (2) One side height a is equal with center column plate (2) rectangle part height b, i.e. a=b.
- 3. tower pile pipe head according to claim 1, it is characterised in that:The bottom of center column plate (2) upper triangular Angle e is equal with side plate (1) upper inclination angle d angles, i.e. e=d.
- 4. tower pile pipe head according to claim 1, it is characterised in that:The connecting plate (3) is circular steel plate.
- 5. the tower pile pipe head according to claim 1 or 4, it is characterised in that:The base length c of the center column plate (2) It is equal with the diameter of connecting plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721223229.7U CN207295701U (en) | 2017-09-22 | 2017-09-22 | Tower pile pipe head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721223229.7U CN207295701U (en) | 2017-09-22 | 2017-09-22 | Tower pile pipe head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207295701U true CN207295701U (en) | 2018-05-01 |
Family
ID=62443056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721223229.7U Expired - Fee Related CN207295701U (en) | 2017-09-22 | 2017-09-22 | Tower pile pipe head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207295701U (en) |
-
2017
- 2017-09-22 CN CN201721223229.7U patent/CN207295701U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103140303B (en) | The manufacture method of spiral steel and application product thereof and spiral steel | |
CN201794079U (en) | Foundation pit supporting system | |
CN204212145U (en) | A kind of precast concrete combination sheet pile | |
CN207295701U (en) | Tower pile pipe head | |
CN201924349U (en) | Anchor ear type connecting clamp for uplift pipe piles | |
CN106869167A (en) | The bowed out box shape steel structure Urban Underground pipe gallery in section | |
CN206752460U (en) | A kind of pile end board | |
CN208201865U (en) | Column hammer and rammed bulb pile equipment | |
CN205617369U (en) | Shoe of efficient hollow pile | |
CN209260708U (en) | A kind of civil engineering piling machine | |
CN206941588U (en) | A kind of simple positioning tool of steel-pipe pile spreading | |
CN105544507B (en) | A kind of steel pipe pile device with overhanging arm | |
CN202416301U (en) | Novel pipe pile joint | |
CN207538054U (en) | A kind of combined type cofferdam | |
CN201924350U (en) | Bolt-type mechanical connecting clamp for pulling-resistant pipe pile | |
CN205617361U (en) | Cast in situ concrete major diameter tubular pile | |
CN207295699U (en) | New pile pipe | |
CN203741835U (en) | Pile tip structure for prefabricated pipe pile | |
CN207295700U (en) | Cross pile pipe head | |
CN105464151A (en) | Precast pile pulling resistance testing device | |
CN207846413U (en) | A kind of soil pore-forming equipment | |
CN211368689U (en) | Novel conical tubular pile side opening pointed pile | |
CN206800380U (en) | A kind of PHC tubular pile splicings structure | |
CN204003293U (en) | The flange arrangement that a kind of anti-piling is impacted | |
CN206554596U (en) | A kind of reinforced concrete pole flange component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180501 Termination date: 20190922 |
|
CF01 | Termination of patent right due to non-payment of annual fee |