CN207294280U - A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe - Google Patents

A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe Download PDF

Info

Publication number
CN207294280U
CN207294280U CN201720266022.1U CN201720266022U CN207294280U CN 207294280 U CN207294280 U CN 207294280U CN 201720266022 U CN201720266022 U CN 201720266022U CN 207294280 U CN207294280 U CN 207294280U
Authority
CN
China
Prior art keywords
iron
gripped
magnet
magnetising
magnet assemblies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720266022.1U
Other languages
Chinese (zh)
Inventor
周保平
冯潼江
王进国
李泽江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Yingsite Dilute Magnetic Materials Ltd By Share Ltd
Original Assignee
Baotou Yingsite Dilute Magnetic Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Yingsite Dilute Magnetic Materials Ltd By Share Ltd filed Critical Baotou Yingsite Dilute Magnetic Materials Ltd By Share Ltd
Priority to CN201720266022.1U priority Critical patent/CN207294280U/en
Application granted granted Critical
Publication of CN207294280U publication Critical patent/CN207294280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of magnetising assembly, including housing, magnet assemblies, cushion block;The enclosure interior is equipped with cavity, and the magnet assemblies are arranged in the cavity, and the top of the housing side plate is equipped with arc groove, and the cushion block is arranged between magnet assemblies and the housing, for fixed magnet component.A kind of outer formula water magnetizing apptss of pipe, including even number magnetising assembly are further related to, the magnetising assembly is opposite close to the magnetism of the magnetic pole of pipeline side on pipeline center's distribution in a center of symmetry, opposite two magnetising assemblies.By the combination of the high-performance Ne-Fe-B magnet in each magnetising assembly, then some magnetising assemblies are arranged on to the outside of pipeline, so that the magnetic field intensity on magnetization water surface surface is improved, so that the generation of fouling in pipeline is avoided, so as to improve the service life of pipeline.

Description

A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe
Technical field
Fluid magnetic field is the utility model is related to, especially a kind of magnetising assembly and the outer formula water magnetizing apptss of pipe.
Background technology
At present, the application of magnetic material is quite varied, manages outer formula water magnetizing apptss and also obtains preferable land productivity in no field With in pipe technology field, since pipeline easy fouling or forms floccule during use, so as to be produced to the flow of water It is raw to influence, and the service life of pipeline is reduced, the water in pipeline can be magnetized by formula water magnetizing apptss outside pipe, so that Avoid the generation of fouling in pipeline, water magnetizing apptss general structure of the prior art is complex, and formed magnetic field intensity compared with Fouling that is low, can not being effectively reduced in pipeline.
The content of the invention
To solve the above-mentioned problems, the utility model provides a kind of magnetising assembly and the outer formula water magnetizing apptss of pipe, its purpose It is to be arranged on the outer of pipeline by the combination of the high-performance Ne-Fe-B magnet in each magnetising assembly, then by some magnetising assemblies Side, so that the magnetic field intensity on magnetization water surface surface is improved, so that the generation of fouling in pipeline is avoided, so as to improve the use of pipeline Service life.
The utility model solves the technical solution that its technical problem uses:The magnetising assembly include housing, magnet assemblies, Cushion block;The enclosure interior is equipped with cavity, and the magnet assemblies are arranged in the cavity, and the top of the housing side plate is equipped with Arc groove, the cushion block are arranged between magnet assemblies and the housing, for fixed magnet component.
The utility model solves the further technical solution of its technical problem:The magnet assemblies include the first permanent magnet With two the second permanent magnets, two second permanent magnets are respectively arranged at the both sides of first permanent magnet.
The utility model solves the further technical solution of its technical problem:The housing includes U-shaped shell, the first iron Grip, the second iron is gripped, first iron grip with second iron grip it is equal be fixedly connected with the U-shaped shell, first iron is gripped, institute State the second iron and grip the cavity surrounded with the U-shaped shell for accommodating the magnet assemblies.
The utility model solves the further technical solution of its technical problem:The U-shaped shell includes front panel, bottom surface Plate and rear panel, the front panel are fixedly connected with the front end of the bottom panel, the rear end of the rear panel and the bottom panel It is fixedly connected, the front end face that the front end face and second iron that first iron is gripped are gripped is fixedly connected with the front panel, institute State the rear end face that the first iron grips and the rear end face that second iron is gripped is fixedly connected with the rear panel.
The utility model solves the further technical solution of its technical problem:First iron is gripped to be gripped with second iron It is fixedly connected with the front panel by screw, first iron, which is gripped to grip with second iron, equal passes through spiral shell with the rear panel Nail is fixedly connected.
The utility model solves the further technical solution of its technical problem:The top of the U-shaped shell, described first Top that iron is gripped, the top that second iron is gripped, first permanent magnet top and two cushion blocks the common shape in top Into the arc surface to fit with pipeline outer wall.
The utility model solves the further technical solution of its technical problem:Two sides difference of the magnet assemblies Grip to grip with second iron with first iron and fit, the front end face of the magnet assemblies and the cushion block phase by front end Fitting, the rear end face of the magnet assemblies fit with the cushion block close to rear end.
The utility model solves the further technical solution of its technical problem:First iron is gripped close to the cavity Side is equipped with the first slot, and second iron is gripped is equipped with the second slot, the magnet assemblies close to the side of the cavity Both sides be sticked in respectively in first slot and second slot.
The utility model solves the further technical solution of its technical problem:The U-shaped shell is by stainless steel material system Into the cushion block is made by brass material.
The outer formula water magnetizing apptss of pipe, including magnetising assembly described in even number, the magnetising assembly is on pipeline center into center Symmetrical, two opposite magnetising assemblies are close to the magnetic identical of the magnetic pole of pipeline side.
By using above-mentioned technical proposal, the utility model achieves following beneficial effect:By in each magnetising assembly High-performance Ne-Fe-B magnet combination, then some magnetising assemblies are arranged on to the outside of pipeline, so as to improve magnetization water-gage The magnetic field intensity in face, so that the generation of fouling in pipeline is avoided, so as to improve the service life of pipeline.Meanwhile tune can be passed through The number of magnetising assembly changes the magnetic field intensity in pipe on the outside of homogeneous tube road, easy to use.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the dimensional structure diagram of the component of the outer formula water magnetizing apptss of pipe provided by the utility model;
Fig. 2 is the top view of the component of the outer formula water magnetizing apptss of pipe provided by the utility model;
Fig. 3 is the A-A sectional views of Fig. 2;
Fig. 4 is the structure diagram of the magnet assemblies A of the outer formula water magnetizing apptss of pipe provided by the utility model;
Fig. 5 is the structure diagram of the magnet assemblies B of the outer formula water magnetizing apptss of pipe provided by the utility model;
Fig. 6 is the structure diagram of the outer formula water magnetizing apptss of pipe provided by the utility model and Pipe installing;
In figure:1st, U-shaped shell;2nd, the first iron is gripped;3rd, the second iron is gripped;4th, magnet assemblies;5th, cushion block;41st, the first permanent magnet; 42nd, the second permanent magnet;11st, front panel;12nd, bottom panel;13rd, rear panel.
Embodiment
To make the purpose of this utility model, technical solution and advantage clearer, below by the technology of the utility model Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Obtained all other embodiment is put, belongs to the scope that the utility model is protected.
A kind of magnetising assembly, referring to shown in attached drawing 1-3, which includes housing, magnet assemblies, cushion block;The shell Body is internally provided with cavity, and the magnet assemblies are arranged in the cavity, and the top of the housing side plate is equipped with arc groove, described Cushion block is arranged between magnet assemblies and the housing, for fixed magnet component.Pass through the high-performance in each magnetising assembly The combination of ndfeb magnet, then some magnetising assemblies are arranged on to the outside of pipeline, so as to improve the magnetic field on magnetization water surface surface Intensity, so that the generation of fouling in pipeline is avoided, so as to improve the service life of pipeline.
The magnet assemblies include the first permanent magnet and two the second permanent magnets, and two second permanent magnets are set respectively In the both sides of first permanent magnet.First permanent magnet and the second permanent magnet are ndfeb magnet, model N48H.
The housing include U-shaped shell, the first iron is gripped, the second iron is gripped, first iron grip with second iron grip with The U-shaped shell is fixedly connected, and first iron is gripped, second iron is gripped and the U-shaped shell is surrounded for accommodating the magnetic The cavity of iron component.
As shown in Figure 4 and Figure 5, the model of the first permanent magnet in said structure and two the second permanent magnets is N48H, The Nd-Fe-B permanent magnet of N48H models has stronger magnetism, and the first permanent magnet in one of component and two second are forever The mutual set-up mode of magnet can be:The N poles of first permanent magnet are upper, and under, two the second permanent magnets are close for S poles The side of first permanent magnet is N poles, and the side away from the first permanent magnet is S poles, and the component of above-mentioned arrangement form is denoted as magnetic Iron component A, the mutual set-up mode of the first permanent magnet and two the second permanent magnets in another component can be:The The S poles of one permanent magnet are upper, and N poles are under, and two the second permanent magnets are S poles close to the side of the first permanent magnet, away from first The side of permanent magnet is N poles, and the component of above-mentioned arrangement form is denoted as magnet assemblies B, above-mentioned magnet assemblies A and magnet assemblies B In the first permanent magnet, two the second permanent magnets and two cushion blocks 5 be gap-matched between each other, fit clearance 0.05 ~0.1mm.
In a kind of preferably embodiment, arrangement of the above-mentioned magnet assemblies 4 in cavity can be:Magnet assemblies Two sides grip to grip with the second iron with the first iron and fit respectively, and the front end face of magnet assemblies is affixed with the cushion block by front end Close, the rear end face of magnet assemblies fits with the cushion block close to rear end, and the first iron is gripped is equipped with the first engaging close to the side of cavity Groove, the side that the second iron is gripped close to cavity are equipped with the second slot, the both sides of magnet assemblies be sticked in respectively the first slot with In second slot, the first slot securely can engage one of them second permanent magnet, and similarly, the second slot can Securely to engage another second permanent magnet, so that two the second permanent magnets can be sticked in cavity securely It is interior.
In a kind of preferably embodiment, U-shaped shell includes:Front panel, bottom panel and rear panel, front panel and bottom panel Front end be fixedly connected, rear panel is fixedly connected with the rear end of bottom panel, the front end that the front end face and the second iron that the first iron is gripped are gripped Face is fixedly connected with front panel 11, and the rear end face that the rear end face and the second iron that the first iron is gripped are gripped is fixedly connected with rear panel, First iron is gripped to grip with the second iron and is fixedly connected with front panel by screw, and the first iron is gripped to grip with the second iron to be passed through with rear panel Screw is fixedly connected, and the model of above-mentioned screw can be M5 × 6, and the material of screw can be stainless steel material, so as to avoid Screw is corroded.
A kind of top that top that preferably in embodiment, the top of U-shaped shell, the first iron are gripped, the second iron are gripped, first The arc surface to fit with pipeline outer wall is collectively forming at the top of the top of permanent magnet and two cushion blocks, passes through the arc surface of formation It can fit closely with the outer wall of pipeline, pipeline can be engaged completely so as to fulfill magnet assemblies A and magnet assemblies B.
In a kind of preferably embodiment, U-shaped shell is made of stainless steel material.
In a kind of preferably embodiment, two cushion blocks are made by brass material.
The outer formula water magnetizing apptss of pipe, including magnetising assembly described in even number, the magnetising assembly is on pipeline center into center Symmetrical, two opposite magnetising assemblies are close to the magnetic identical of the magnetic pole of pipeline side.
Embodiment one
The outer formula water magnetizing apptss of pipe, including four magnetising assemblies, as shown in Figure 6, the magnetising assembly is on pipeline Center distribution in a center of symmetry, opposite two magnetising assemblies are close to the magnetic identical of the magnetic pole of pipeline side.
The magnetising assembly, referring to shown in attached drawing 1-3, which includes housing, magnet assemblies, cushion block;The shell Body is internally provided with cavity, and the magnet assemblies are arranged in the cavity, and the top of the housing side plate is equipped with arc groove, described Cushion block is arranged between magnet assemblies and the housing, for fixed magnet component.Pass through the high-performance in each magnetising assembly The combination of ndfeb magnet, then some magnetising assemblies are arranged on to the outside of pipeline, so as to improve the magnetic field on magnetization water surface surface Intensity, so that the generation of fouling in pipeline is avoided, so as to improve the service life of pipeline.
The magnet assemblies include the first permanent magnet and two the second permanent magnets, and two second permanent magnets are set respectively In the both sides of first permanent magnet.First permanent magnet and the second permanent magnet are ndfeb magnet, model N48H.
The housing include U-shaped shell, the first iron is gripped, the second iron is gripped, first iron grip with second iron grip with The U-shaped shell is fixedly connected, and first iron is gripped, second iron is gripped and the U-shaped shell is surrounded for accommodating the magnetic The cavity of iron component.
As shown in Figure 4 and Figure 5, the model of the first permanent magnet in said structure and two the second permanent magnets is N48H, The Nd-Fe-B permanent magnet of N48H models has stronger magnetism, and the first permanent magnet in one of component and two second are forever The mutual set-up mode of magnet can be:The N poles of first permanent magnet are upper, and under, two the second permanent magnets are close for S poles The side of first permanent magnet is N poles, and the side away from the first permanent magnet is S poles, and the component of above-mentioned arrangement form is denoted as magnetic Iron component A, the mutual set-up mode of the first permanent magnet and two the second permanent magnets in another component can be:The The S poles of one permanent magnet are upper, and N poles are under, and two the second permanent magnets are S poles close to the side of the first permanent magnet, away from first The side of permanent magnet is N poles, and the component of above-mentioned arrangement form is denoted as magnet assemblies B, above-mentioned magnet assemblies A and magnet assemblies B In the first permanent magnet, two the second permanent magnets and two cushion blocks be gap-matched between each other, fit clearance 0.05 ~0.1mm.
Arrangement of the above-mentioned magnet assemblies in cavity can be:Gripped respectively with the first iron two sides of magnet assemblies Grip and fit with the second iron, the front end face of magnet assemblies fits with the cushion block by front end, and the rear end face of magnet assemblies is with leaning on The cushion block of nearly rear end fits, and the first iron is gripped is equipped with the first slot close to the side of cavity, and the second iron grips one close to cavity Side is equipped with the second slot, and the both sides of magnet assemblies are sticked in the first slot and the second slot respectively, the first slot One of them second permanent magnet can be engaged securely, similarly, the second slot can securely by another second forever Magnet engages, so that two the second permanent magnets can be sticked in cavity securely.
U-shaped shell includes:Front panel, bottom panel and rear panel, front panel are fixedly connected with the front end of bottom panel, rear panel It is fixedly connected with the rear end of bottom panel, the front end face that the front end face and the second iron that the first iron is gripped are gripped is fixedly connected with front panel, The rear end face that the rear end face and the second iron that first iron is gripped are gripped is fixedly connected with rear panel, and the first iron is gripped to be gripped with before with the second iron Panel is fixedly connected by screw, and the first iron is gripped to grip with the second iron and is fixedly connected with rear panel by screw, above-mentioned screw Model can be M5 × 6, and the material of screw can be stainless steel material, so as to avoid screw from being corroded.
Top, the top that the second iron is gripped, the top of the first permanent magnet and two pads that the top of U-shaped shell, the first iron are gripped The arc surface to fit with pipeline outer wall is collectively forming at the top of block, can be close with the outer wall of pipeline by the arc surface of formation Fitting, can engage pipeline completely so as to fulfill magnet assemblies A and magnet assemblies B.
U-shaped shell is made of stainless steel material.Two cushion blocks are made by brass material.
The utility model is simple in structure, easy to make, is the stronger magneto water magnetizing apptss of a practicality.
The above, is only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model discloses Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power Subject to the protection domain that profit requires.

Claims (10)

  1. A kind of 1. magnetising assembly, it is characterised in that:Including housing, magnet assemblies, cushion block;The enclosure interior is equipped with cavity, institute State magnet assemblies to be arranged in the cavity, the top of the housing side plate is equipped with arc groove, and the cushion block is arranged at group of magnets Between part and the housing, for fixed magnet component.
  2. 2. magnetising assembly according to claim 1, it is characterised in that:The magnet assemblies include the first permanent magnet and two Second permanent magnet, two second permanent magnets are respectively arranged at the both sides of first permanent magnet.
  3. 3. magnetising assembly according to claim 2, it is characterised in that:The housing include U-shaped shell, the first iron grip, the Two iron are gripped, first iron grip with second iron grip it is equal be fixedly connected with the U-shaped shell, first iron is gripped, described Two iron grip the cavity surrounded with the U-shaped shell for accommodating the magnet assemblies.
  4. 4. magnetising assembly according to claim 3, it is characterised in that:The U-shaped shell include front panel, bottom panel and after Panel, the front panel are fixedly connected with the front end of the bottom panel, and the rear end of the rear panel and the bottom panel, which is fixed, to be connected Connecing, the front end face that the front end face and second iron that first iron is gripped are gripped is fixedly connected with the front panel, and described first The rear end face that the rear end face and second iron that iron is gripped are gripped is fixedly connected with the rear panel.
  5. 5. magnetising assembly according to claim 4, it is characterised in that:First iron is gripped to be gripped and institute with second iron State front panel to be fixedly connected by screw, first iron is gripped to grip with second iron and equal fixed by screw with the rear panel Connection.
  6. 6. magnetising assembly according to claim 3, it is characterised in that:The top of the U-shaped shell, first iron are gripped It is collectively forming and manages at the top of top, the top of first permanent magnet and two cushion block that top, second iron are gripped The arc surface that pipeline outer wall fits.
  7. 7. magnetising assembly according to claim 3, it is characterised in that:Two sides of the magnet assemblies respectively with it is described First iron is gripped to grip with second iron and fitted, and the front end face of the magnet assemblies fits with the cushion block by front end, The rear end face of the magnet assemblies fits with the cushion block close to rear end.
  8. 8. magnetising assembly according to claim 7, it is characterised in that:First iron is gripped to be set close to the side of the cavity There is the first slot, second iron is gripped is equipped with the second slot, the both sides of the magnet assemblies close to the side of the cavity It is sticked in respectively in first slot and second slot.
  9. 9. magnetising assembly according to claim 3, it is characterised in that:The U-shaped shell is made of stainless steel material, described Cushion block is made by brass material.
  10. 10. the outer formula water magnetizing apptss of pipe, it is characterised in that:Including even number magnetising assembly, the magnetising assembly is on pipeline center Distribution in a center of symmetry, opposite two magnetising assemblies are close to the magnetic identical of the magnetic pole of pipeline side;The magnetization group Part includes housing, magnet assemblies, cushion block;The enclosure interior is equipped with cavity, and the magnet assemblies are arranged in the cavity, institute The top for stating housing side plate is equipped with arc groove, and the cushion block is arranged between magnet assemblies and the housing, for fixed magnet Component.
CN201720266022.1U 2017-03-17 2017-03-17 A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe Active CN207294280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720266022.1U CN207294280U (en) 2017-03-17 2017-03-17 A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720266022.1U CN207294280U (en) 2017-03-17 2017-03-17 A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe

Publications (1)

Publication Number Publication Date
CN207294280U true CN207294280U (en) 2018-05-01

Family

ID=62270841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720266022.1U Active CN207294280U (en) 2017-03-17 2017-03-17 A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe

Country Status (1)

Country Link
CN (1) CN207294280U (en)

Similar Documents

Publication Publication Date Title
CN206616049U (en) A kind of Halbach water magnetizing apptss
CN205943636U (en) High -intensity magnetic field subassembly
CN207294280U (en) A kind of magnetising assembly and the outer formula water magnetizing apptss of pipe
CN206556705U (en) A kind of low power consumption electromagnetic flowmeter
CN105871257B (en) A kind of torque current distribution method of moving-coil type magnetic suspension permanent magnet planar motor
CN203258882U (en) Magnetic water type solar water heater
CN209328642U (en) The neodymium iron boron of square wave magnet ring is orientated device
KR200412414Y1 (en) Apparatus for generating water that form hexagon ring structure
KR20080013277A (en) Device for producing magnetization hexagonal water
CN206955723U (en) Formula fluid magnetizer in a kind of pipe
KR100779269B1 (en) Apparatus for generating water that form hexagon ring structure
CN203700042U (en) Halbach magnetic scale inhibiting and removing device
CN104319060A (en) Sinusoidal magnetizing method and device for permanent magnet rotor
CN206981907U (en) A kind of double-side chamfering machine of magnet processing
CN216957624U (en) Single magnetic pole rotating magnetic mechanism
CN201297356Y (en) Magnetic flywheel
CN103426609A (en) Transformer with mixed iron cores of amorphous alloy and silicon steel sheets
CN202657991U (en) Strong-penetrating environment-friendly magnetizer for thick iron wall
JP3055498U (en) Water magnetic treatment equipment
CN206148204U (en) Permanent magnet subassembly with anti - misalignment function that leads
CN2905769Y (en) Magnetized device for fluid pipe and water tap
CN207819584U (en) A kind of rotor permanent magnet mounting structure
CN216528274U (en) Fluid magnetizer
CN203617060U (en) Strong magnetic device used for fluid magnetization
CN201625348U (en) Magnetic assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Magnetization component and outside of tubes formula magnetization hydrophone

Effective date of registration: 20190117

Granted publication date: 20180501

Pledgee: China Postal Savings Bank Limited by Share Ltd. Baotou branch

Pledgor: BAOTOU INST MAGNETIC NEW MATERIAL CO.,LTD.

Registration number: 2019150000001

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220214

Granted publication date: 20180501

Pledgee: China Postal Savings Bank Limited by Share Ltd. Baotou branch

Pledgor: BAOTOU INST MAGNETIC NEW MATERIAL CO.,LTD.

Registration number: 2019150000001

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A magnetizing component and an out-of-tube magnetizing water device

Effective date of registration: 20230209

Granted publication date: 20180501

Pledgee: Baotou Branch of Bank of Communications Co.,Ltd.

Pledgor: BAOTOU INST MAGNETIC NEW MATERIAL CO.,LTD.

Registration number: Y2023150000022

PE01 Entry into force of the registration of the contract for pledge of patent right