CN207280581U CN201721358143.5U CN201721358143U CN207280581U CN 207280581 U CN207280581 U CN 207280581U CN 201721358143 U CN201721358143 U CN 201721358143U CN 207280581 U CN207280581 U CN 207280581U
Authority
CN
China
Prior art keywords
coal
metering
module
remaining
limit switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721358143.5U
Other languages
Chinese (zh)
Inventor
张涛
常红霞
贾春晖
王荣文
黄和平
薛嘉刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201721358143.5U priority Critical patent/CN207280581U/en
Application granted granted Critical
Publication of CN207280581U publication Critical patent/CN207280581U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)

Abstract

It the utility model is related to field of measuring techniques, disclose one kind and push up coal metering device more than charging coke, the device includes raw coal coal bunker door, remaining coal coal bunker door, coal tower scale, metering PLC acquisition stations, calculating correction values machine, switching value module, analog module, ethernet module are set in the metering PLC acquisition stations, first limit switch is set at the raw coal coal bunker door, the second limit switch is set at remaining coal coal bunker door;Metering button and remaining coal metering button are set on the coal tower scale;First, second limit switch is connected with switching value module;The coal tower scale is connected with analog module;The ethernet module is connected with calculating correction values machine.The utility model has effectively measured remaining coal data, prevents cost allowance caused by measurement deviation, with reference to same day production status can carry out more than coal flexible allocation and efficiently utilize, improve production efficiency.

Description

Coal metering device more than the charging coke of one kind top
Technical field
The utility model is specifically related to field of measuring techniques, relates more specifically to coal metering dress more than a kind of top charging coke Put.
Background technology
For tradition top charging coke when coal car is coaling, pusher machine is carrying out flat coal operation at the same time, and leveling bar enters charcoal at present Change room top to move back and forth, be uniformly distributed carbonization chamber top furnace coal.The coal that leveling bar is taken out of during the work time is by leading Hopper has entered remaining coal scuttle, and when remaining coal scuttle is filled, pusher machine is run to the remaining coal recycle bin between two coke ovens, by car Remaining coal is put into recycle bin, and remaining coal is sent the recycling for coal tower, completing remaining coal by recycle bin with remaining coal monobucket lifting device again.
Measurement problem occurs when recycling in this remaining coal way of recycling:When pushing up charging car feeding, coal tower scale is utilized Weighing is carried out to coal car, the coal capacity of each coal car is measured to come, then when coal car is to coke oven coal-charging, these meterings The coal crossed is pushed into after remaining coal hopper by the leveling bar of pusher machine and is transported to coal tower, so remaining coal is repeated metering.If more than Coal is directly used as raw coal to load coal car, can cause to repeat the problem of measuring, and cost analysis will be there are error, and remaining coal Amount is bigger, and error is bigger, and uses and adjust traditional day metering method, it is impossible to ensures the accuracy of continuous data, so as to looking forward to The cost budgeting of industry and operating cost analysis bring very big influence.
Utility model content
To solve there is no effective metering method to cause cost budgeting to have error and fortune when remaining coal recycles in the prior art The problem of row cost repeats to measure, the utility model provide coal metering device more than a kind of top charging coke.
The utility model adopts the following technical solution:Coal metering device more than the charging coke of one kind top, the device include raw coal Coal bunker door, remaining coal coal bunker door, coal tower scale, metering PLC acquisition stations, calculating correction values machine, the metering PLC acquisition stations are interior to be set Switching value module, analog module, ethernet module, the first limit switch, remaining coal coal bunker are set at the raw coal coal bunker door Second limit switch is set at door;Metering button and remaining coal metering button are set on the coal tower scale;First, second limit Bit switch is connected with switching value module;The coal tower scale is connected with analog module;The ethernet module and calculating correction values machine Connection.
The utility model is sent signal to metering with remaining coal metering button by first, second limit switch, metering button PLC acquisition stations carry out coal metering more than charging coke.Can during to being recycled to top charging coke using the remaining coal of pusher machine recycling The repetition measurement problem that can be produced provides a kind of solution method, has effectively measured remaining coal data, prevent caused by measurement deviation into This loss, and can carry out the flexible allocation of remaining coal with reference to same day production status and efficiently utilize, improve production efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Symbol description
1:First limit switch;2:Second limit switch;3:Metering button;4:Push up charging car;5:3rd signal cable;6: Coal tower scale;7:4th signal cable;8:First signal cable;9:Secondary signal cable;10:Power module;11:Processor die Block;12:Ethernet module;13:Switching value module;14:Analog module;15:Calculating correction values machine;16:Cable;17:First is burnt Stove;18:Second coke oven;19:Remaining coal metering button;20:Measure PLC acquisition stations;21:Raw coal coal bunker door;22;Remaining coal coal bunker storehouse Door.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, coal metering device includes two limit switches, i.e. the first limit switch 1 more than a kind of top charging coke With the second limit switch 2, top charging car 4, metering button 3, remaining coal metering button 19, coal tower scale 6, metering PLC acquisition stations 20, meter Measure computer 15.First limit switch 1 is installed at raw coal coal bunker door 21, and the second limit switch 2 is installed on remaining coal coal bunker storehouse At door 22, for collecting bin door switch amount signal;Metering button 3 and remaining coal metering button 19 are installed at coal tower scale 6, for receiving The normal metering of collection and remaining coal metering switch amount signal;First limit switch 1 passes through the first signal cable 8 and 13 phase of switching value module Even, the second limit switch 2 be connected by secondary signal cable 9 with switching value module 13, metering button 3 and remaining coal metering button 19 It is connected by the 3rd signal cable 5 with switching value module 13.Coal tower scale 6 passes through the 4th signal cable 7 and 14 phase of analog module Even.6 current signal of coal tower scale is sent to the analog module 14 in metering PLC acquisition stations, by processing by the 4th signal cable 7 11 computing of device module, data cable 16 is sent to calculating correction values machine 15, produce continuous data finally by ethernet module 12 Report.Power module 10 is used for powering to PLC acquisition stations.
The specific method of remaining coal metering is:
When remaining coal is stored into a certain amount of, can be opened according to the production schedule and cost budgeting on the same day more than coal coal bunker door 22, the second signal that opens a position of limit switch 2 is sent to metering PLC acquisition station switching values module 13 and is recorded.Being filled under remaining coal Onto top charging car 4, and it is 6 tons to set the lower remaining coal upper limit filled.Then move at coal tower scale 6, by the coal metering button that is left Coal gross weight weighs more than 19 progress.Remaining coal gross weight signal is sent to metering PLC acquisition stations analog module 14, and top is coaling after weighing Car 4 is run to raw coal coal bunker, being run after top charging car 4 is attached under raw coal to coal tower scale 6, is pressed metering button 3 and is carried out Gross weight weighs.Gross weight signal is sent to metering PLC acquisition stations analog module 14, then pushes up charging car 4 and runs to the first coke oven 17 or the top of the second coke oven 18 unload coal, finally return to metering empty wagons tare weight at coal tower scale 6, tare weight signal is sent to metering PLC and adopts Collection station analog module 14.Tare weight, remaining coal gross weight and gross weight correspond to one group of data, and processor module 11 can calculate this accordingly The net weight of car charging, it is final to produce raw coal and remaining coal metering report.Remaining coal metering button 19 is not pressed if there is human error, Processor module 11 can be carried out the accuracy that coal more than automatic decision measures and be given with the remaining coal upper limit and average coal capacity data comparison Alarm and corrigendum.Weigh every time is all to open a position signal and metering button be engaged to ensure the accuracy of metering.Data management people Member, according to data trend curve map, can be monitored the whole weighing process of coal car, find in time different by calculating correction values machine 15 Often.
The utility model is solved when remaining coal is stored into a certain amount of, the production schedule that can be according to the same day and cost budgeting, Pushed up being attached under remaining coal on charging car, and the coal upper limit more than each coal car dress is set, there to have with normal lower dress raw coal amount to be significantly poor Not, so can be to avoid measurement error caused by human error.With coal tower scale measured more than coal gross weight, it is then former in lower dress Coal, and metering gross weight is carried out herein, scale carries out metering tare weight on empty wagons after last discharging.Three data are one group of calculating coal car Clean coal amount, each metrological operation is all with opening a position signal and metering button is engaged to ensure the accuracy of data metering.

Claims (1)

1. one kind top charging coke more than coal metering device, the device include raw coal coal bunker door, remaining coal coal bunker door, coal tower scale, PLC acquisition stations, calculating correction values machine are measured, switching value module, analog module, Ethernet are set in the metering PLC acquisition stations Module, it is characterised in that the raw coal coal bunker door(21)Place sets the first limit switch(1), remaining coal coal bunker door(22)Place Second limit switch is set(2);The coal tower scale(6)Upper setting metering button(3)With remaining coal metering button(19);Described First, the second limit switch(1、2)With switching value module(13)Connection;The coal tower scale(6)With analog module(14)Connection;Institute State ethernet module(12)With calculating correction values machine(15)Connection.
CN201721358143.5U 2017-10-20 2017-10-20 Coal metering device more than the charging coke of one kind top Expired - Fee Related CN207280581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721358143.5U CN207280581U (en) 2017-10-20 2017-10-20 Coal metering device more than the charging coke of one kind top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721358143.5U CN207280581U (en) 2017-10-20 2017-10-20 Coal metering device more than the charging coke of one kind top

Publications (1)

Publication Number Publication Date
CN207280581U true CN207280581U (en) 2018-04-27

Family

ID=61980851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721358143.5U Expired - Fee Related CN207280581U (en) 2017-10-20 2017-10-20 Coal metering device more than the charging coke of one kind top

Country Status (1)

Country Link
CN (1) CN207280581U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676567A (en) * 2018-08-01 2018-10-19 马鞍山钢铁股份有限公司 A kind of coal tower and the unmanned intelligent interlock of charging car and method and its system
CN108871523A (en) * 2018-08-01 2018-11-23 马鞍山钢铁股份有限公司 It is a kind of that nobody accurately counts device, the system and method for flat coal amount
CN113372929A (en) * 2021-06-25 2021-09-10 马鞍山钢铁股份有限公司 Process system and method for adjusting temperature of furnace top space
CN113467386A (en) * 2020-03-30 2021-10-01 上海梅山钢铁股份有限公司 Method for accurately measuring coal feeding amount of coke oven carbonization chamber

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676567A (en) * 2018-08-01 2018-10-19 马鞍山钢铁股份有限公司 A kind of coal tower and the unmanned intelligent interlock of charging car and method and its system
CN108871523A (en) * 2018-08-01 2018-11-23 马鞍山钢铁股份有限公司 It is a kind of that nobody accurately counts device, the system and method for flat coal amount
CN108871523B (en) * 2018-08-01 2024-04-05 马鞍山钢铁股份有限公司 Unmanned device, system and method for precisely counting coal leveling quantity
CN113467386A (en) * 2020-03-30 2021-10-01 上海梅山钢铁股份有限公司 Method for accurately measuring coal feeding amount of coke oven carbonization chamber
CN113467386B (en) * 2020-03-30 2023-06-09 上海梅山钢铁股份有限公司 Method for accurately measuring coal feeding amount of carbonization chamber of coke oven
CN113372929A (en) * 2021-06-25 2021-09-10 马鞍山钢铁股份有限公司 Process system and method for adjusting temperature of furnace top space

Similar Documents

Publication Publication Date Title
CN207280581U (en) Coal metering device more than the charging coke of one kind top
CN205262563U (en) Hopper scale
CN102967150B (en) Energy-saving and environment-friendly feeding control system for vertical laterite-nickel ore smelting furnace controlled by PLC
CN104984916A (en) High-precision and high-speed dynamic checkweigher of traditional Chinese medicinal pills
CN204694338U (en) A kind of electronic-weighing feed proportioning system
CN202945200U (en) Coke-oven coal loading vehicle with weighing device
CN210544869U (en) Coking is experimental with coal blending device and coking is experimental with coal blending system
CN201497567U (en) Real coal verifying unit on bridge coal unloading machine
CN204817220U (en) Heavy balance is examined to high -speed developments of well pellet high accuracy
CN204211161U (en) A kind of feed bin feed discharge system
CN103373482B (en) Weigh counting packer
CN201636888U (en) Automatic coal saving device of boiler
CN104724479A (en) System and method for blending power heat coal
CN100577539C (en) Quick and automatic entrucking method of multiple fixed volume bunker, quick and automatic entrucking station for double fixed volume bunkers
CN104423395B (en) Coke dry quenching furnace coke discharge amount method of calibration
CN205873210U (en) Quick lime dosing unit
CN204674857U (en) Powder automatic Weighing packaging facilities
CN104748826B (en) A kind of method of the accurate dispensing continuous metering of static bunker scale
CN202245237U (en) High-precision continuous feeding system
CN108871523B (en) Unmanned device, system and method for precisely counting coal leveling quantity
CN115651675A (en) Feeding and tamping system for tamping coking coal cakes
CN112258125B (en) Multi-material dynamic collaborative management system and method based on Euro bin
CN103508209A (en) Automatic sodium carbonate measuring and conveying device and method in lithium carbonate production
CN200996859Y (en) Packing weight with automatic charging function
CN208383267U (en) It is a kind of that nobody accurately counts the apparatus and system of flat coal amount

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20181020