- CN207280537U CN207280537U CN201721391296.XU CN201721391296U CN207280537U CN 207280537 U CN207280537 U CN 207280537U CN 201721391296 U CN201721391296 U CN 201721391296U CN 207280537 U CN207280537 U CN 207280537U
- Authority
- CN
- China
- Prior art keywords
- gas relay
- detection
- gas
- pipeline
- binding clasp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
The embodiment of the present application discloses a kind of three pipeline gas relay test tables.The three pipeline gas relay test tables of the utility model include two racks, fuel tank, basic pipeline, the first detection bypass, the second detection bypass and the 3rd detection bypass being oppositely arranged;By way of basic pipeline and three detection bypass combinations, make oil stream sectional area consistent with tested gas relay bore sectional area respectively, eliminate the discrete of the oil stream impact that oil stream is subject to gas relay internal actions element, so as to meet the demand that different bores, different manufacturers, the domestic and international gas relay heavy gas flow speed value of different model detect, have the characteristics that easy to operate, reliability is high, labor intensity is low, work efficiency is high, accuracy of detection is high.
Description
Technical field
This application involves gas relay detection technique field, more particularly to a kind of three pipeline gas relay test tables.
Background technology
Gas relay is for a kind of main protective device in oil-immersed transformer.When in oil-immersed transformer
There is turn-to-turn and layer short circuit, iron core failure, inside pipe casing failure, winding inside broken string and insulation degradation in portion and pasta declines
When failure, gas relay can be acted delicately in generation, sent fault alarm in time or cut off event from power grid rapidly
Hinder equipment, so as to reduce the generation of accident, the safe operation to equipment provides a strong guarantee.Gas relay monitor station is to be directed to
Gas relay detection special equipment used in electric system.
Domestic production gas-actuated relay calibration stand is again relatively backward in terms of detection method and accuracy of detection at present, similar
Product mainly uses following methods in terms of flow rate detection:Flow velocity scaling method:This method is to use single-chip microcomputer control technology,
Different bores, different model, the domestic and international gas relay flow velocity scaled data mould of different manufacturers are suitable for by Erecting and improving
The mode of formula.On the basis of flow velocity quantitative measurement is demarcated based on one kind, realize and completed not with the signal piping of same caliber
Same bore, the Buchholz relay school of different model, different manufacturers the heavy gas flow speed value detection of various gas relays both at home and abroad
Test platform.Its method is that a little signal piping is small, small, establishes single benchmark pipeline, when detection and benchmark pipe diameter
Detected value is accurate during consistent gas relay.
Its maximum deficiency be it is following some:Detection and the inconsistent gas relay of non-referenced pipe diameter sectional area
When, the oil stream impact area discreteness that gas relay internal actions element is subject to is larger, at this time by gathering benchmark pipeline stream
Amount flow rate detection value carries out contrast amendment with by the consistent detected value of gas relay bore oil stream sectional area.Such a amendment side
Method is smaller there are error after amendment in gas relay bore and inside consistent into an actor's rendering of an operatic tune physical characteristic structure;As gas after
It is larger there are error after amendment when electric appliance bore and internal an actor's rendering of an operatic tune physical characteristic structure change;Because producing gas both at home and abroad
Relay producer and model are more, cause gas relay internal rows cavity configuration different.At this time, oil stream passes through in gas relay
During portion's an actor's rendering of an operatic tune, caused oil stream property difference is larger.So needed to establish corresponding non-referenced pipe diameter according to These characteristics
The correction factor database of different manufacturers, model, bore in addition, thus cause the method to gas relay detection adaptability compared with
Difference.
Utility model content
The application provides a kind of three pipeline gas relay test tables, to solve the detection of existing gas relay monitor station
The oil stream of pipeline section pasta product is inconsistent with being detected gas relay bore, can not eliminate oil stream to gas relay internal actions
The oil stream that element is subject to is impacted discrete, so that the problem of causing big error detection value, gas relay detection bad adaptability
Problem.
The application provides a kind of three pipeline gas relay test tables, including two racks, fuel tank, bases being oppositely arranged
Pipeline, the first detection bypass, the second detection bypass and the 3rd detection bypass;The oil outlet of the basis pipeline and the fuel tank
Connection, one end of the first detection bypass, the second detection bypass and the 3rd detection bypass connect with the basic pipeline respectively
Connect, the other end is connected with the rack respectively;
Ventilation solenoid valve is provided with the fuel tank, the port of export of the ventilation solenoid valve is turned on air, the ventilation
The input end of solenoid valve is used to be connected with the gas nozzle under test gas relay;The basis pipeline includes and the fuel tank
The sequentially connected manual ball valve of oil outlet, oil pump, gas-removing filter and main meter;
The first detection bypass is disposed with level-one electrical ball valve, first flowmeter, first gas relay and clamps
Device and the first regulating valve;It is described second detection bypass be disposed with second-stage electric ball valve, second flowmeter, second gas after
Electric appliance binding clasp and the second regulating valve;The 3rd detection bypass is disposed with three-grade electric ball valve, the 3rd flowmeter, the
Three gas relay binding clasps and the 3rd regulating valve;The first gas relay binding clasp, the second gas relay
Binding clasp and the third gas relay binding clasp are fixed on the rack;
The first gas relay binding clasp, the second gas relay binding clasp and the third gas relay
Device binding clasp is adapted with the under test gas relay that bore is 25mm, 50mm and 80mm respectively.
Optionally, the length of first flowmeter front end pipeline is 8 times of the described first detection bypass inside nominal diameter, institute
The length for stating first flowmeter rear end pipeline bypasses 5 times of inside nominal diameter for the described first detection;
The length of second flowmeter front end pipeline bypasses 8 times of inside nominal diameter for the described second detection, and described second
The length of flowmeter rear end pipeline bypasses 5 times of inside nominal diameter for the described second detection;
The length of 3rd flowmeter front end pipeline bypasses 8 times of inside nominal diameter for the described 3rd detection, and the described 3rd
The length of flowmeter rear end pipeline bypasses 5 times of inside nominal diameter for the described 3rd detection.
Optionally, the first gas relay binding clasp, the second gas relay binding clasp and the described 3rd
Gas relay binding clasp is respectively hydraulic clamping device;
The first gas relay binding clasp, the second gas relay binding clasp and the third gas relay
Device binding clasp includes the oil cylinder being arranged on the rack respectively, and piston rod is provided with the oil cylinder.
Optionally, the internal diameter of the oil cylinder two end portions is less than the internal diameter of the oil cylinder center section, outside the piston rod
Side face is provided with lug boss, and the outside diameter of the piston rod is adapted with the internal diameter of the oil cylinder two end portions, the boss
Inside the oil cylinder center section;
The inner space of the oil cylinder is separated into front chamber and rear chamber by the piston rod, it is corresponding on the oil cylinder described in
The first oil inlet and outlet is provided with above front chamber, is corresponded on the oil cylinder and second is provided with above the rear chamber into fuel-displaced
Mouthful.
Optionally, the three pipeline gas relay test table includes heavy gas flow speed test oil circuit, the grave gas stream
Speed test oil circuit includes the manual ball valve, the oil pump, the gas-removing filter, the first detection bypass, described second
Detection bypass, it is described 3rd detection bypass, the level-one electrical ball valve, the second-stage electric ball valve, the three-grade electric ball valve,
The first flowmeter, the second flowmeter, the 3rd flowmeter, the first gas relay binding clasp, described
Two gas relay binding clasps, the third gas relay binding clasp, first regulating valve, second regulating valve, institute
State the 3rd regulating valve and the ventilation solenoid valve.
Optionally, the three pipeline gas relay test table include light gas volume test oil circuit, described light watt
This gas volume test oil circuit includes the ventilation solenoid valve, the first detection bypass, the second detection bypass, described the
Three detection bypasses and described first detect the first volume solenoid valve for bypassing connection and the first metering pump, are detected with described second
Bypass connection the second volume solenoid valve and the second metering pump, with the described 3rd detection bypass connection the 3rd volume solenoid valve and
3rd metering pump, first oil inlet and outlet and second oil inlet and outlet, the first gas relay binding clasp, described
Two gas relay binding clasps, the third gas relay binding clasp, first regulating valve, second regulating valve and
3rd regulating valve.
Optionally, the three pipeline gas relay test table includes sealing performance test pipeline, and the sealing performance is surveyed
Bypass is detected in test tube road including the ventilation solenoid valve, described first, second detection bypasses, the 3rd detection bypasses,
With described first detection bypass connection the first accumulator, with described second detection bypass connect the second accumulator, with it is described
The 3rd accumulator, the first gas relay binding clasp, the second gas relay of 3rd detection bypass connection clamp
Device, the third gas relay binding clasp, the first pressure sensor for being arranged at the first detection bypass, be arranged at it is described
The second pressure sensor of second detection bypass, the 3rd pressure sensor for being arranged at the 3rd detection bypass, described first
Regulating valve, second regulating valve and the 3rd regulating valve.
Optionally, the three pipeline gas relay test table includes liquid level test oil circuit, and the liquid level is surveyed
Bypass is detected in formation testing road including the ventilation solenoid valve, described first, second detection bypasses, the 3rd detection bypasses,
Respectively with described first detection bypass, it is described second detection bypass and it is described 3rd detection bypass connection liquid level solenoid valve,
Liquid level gauge, the first volume solenoid valve, the second volume solenoid valve, the 3rd volume solenoid valve, first metering
Pump, second metering pump, the 3rd metering pump, first oil inlet and outlet and second oil inlet and outlet, described first
Gas relay binding clasp, the second gas relay binding clasp, the third gas relay binding clasp, described first are adjusted
Save valve, second regulating valve and the 3rd regulating valve.
Optionally, oil temperature heating controller is provided with the fuel tank.
Optionally, the oil pump is electrically connected with frequency converter.
From above technical scheme, a kind of three pipeline gas relay test table provided by the embodiments of the present application, passes through
Basic pipeline and the mode of three detection bypass combinations, make oil stream sectional area and tested gas relay bore sectional area respectively
Unanimously, the discrete of the oil stream impact that oil stream is subject to gas relay internal actions element is eliminated, so as to meet different bores, no
The demand that same producer, the domestic and international gas relay heavy gas flow speed value of different model detect, has easy to operate, reliability
High, the features such as labor intensity is low, work efficiency is high, accuracy of detection is high, it can reach more bores and correspond to gas with various relay bore
The gas relay monitor station accuracy of detection requirement of test format.There is no correct data for detecting system in the utility model
Storehouse, to gas relay grave gas flow velocity value, using detection mode is directly measured, applicability is high, so as to meet different public affairs
Claim the detection of latus rectum gas relay grave gas flow velocity value.
Brief description of the drawings
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor,
Other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is a kind of top view of three pipeline gas relay test table provided by the embodiments of the present application.
Fig. 2 is a kind of bottom view of three pipeline gas relay test table provided by the embodiments of the present application.
Fig. 3 is a kind of sectional view of the oil cylinder of three pipeline gas relay test table provided by the embodiments of the present application.
Fig. 4 is a kind of front view of three pipeline gas relay test table provided by the embodiments of the present application.
Fig. 5 is a kind of side view of three pipeline gas relay test table provided by the embodiments of the present application.
Illustrate:The detection bypasses of 1- first, the detection bypasses of 2- second, the detection bypasses of 3- the 3rd, 4- fuel tanks, 5- are fuel-displaced
Mouthful, 6- oil pumps, 7- bases pipeline, 8- gas-removing filters, 9- manual ball valves, 10- tank gauges, 11- oil temperature heating controllers,
12- frequency converters, 20- ventilation solenoid valves, 21- flowmeters, 22- liquid level solenoid valves, 23- liquid level gauges, 101- level-one electrical ball valves,
201- second-stage electric ball valves, 301- three-grade electric ball valves, 102- first flowmeters, 202- second flowmeters, the 3rd flows of 302-
Meter, 103- first gas relay binding clasps, 203- second gas relay binding clasps, 303- third gas relay clamp
Device, the first regulating valves of 104-, the second regulating valves of 204-, the 3rd regulating valves of 304-, 105- the first volume solenoid valves, 205- second hold
Product solenoid valve, the 3rd volume solenoid valves of 305-, the first metering pumps of 106-, the second metering pumps of 206-, the 3rd metering pumps of 306-, 107-
First accumulator, the second accumulators of 207-, the 3rd accumulators of 307-, 108- first pressure sensors, 208- second pressures sensing
Device, the 3rd pressure sensors of 308-.
Embodiment
Please refer to Fig.1 to Fig. 5, the utility model embodiment provides a kind of three pipeline gas relay test tables, including phase
It is other to two racks 13 of setting, fuel tank 4, the 1, second detection of the basic detection of pipeline 7, first bypass bypass 2 and the 3rd detection
Road 3;It is described basis pipeline 7 be connected with the oil outlet 5 of the fuel tank 4, it is described first detection bypass 1, second detection bypass 2 and
One end of 3rd detection bypass 3 is connected with the basic pipeline 7 respectively, and the other end is connected with the rack 13 respectively.
Wherein, ventilation solenoid valve 20, the port of export of the ventilation solenoid valve 20 and big conductance are provided with the fuel tank 4
Logical, the input end of the ventilation solenoid valve 20 is used to be connected with the gas nozzle under test gas relay;The basis pipeline 7 wraps
Include manual ball valve 9 sequentially connected with the oil outlet 5 of the fuel tank 4, oil pump 6, gas-removing filter 8 and main meter 21.
Specifically, the first detection bypass 1 is disposed with level-one electrical ball valve 101, first flowmeter 102, first
103 and first regulating valve 104 of gas relay binding clasp;The second detection bypass 2 is disposed with second-stage electric ball valve
201st, second flowmeter 202, second gas relay binding clasp 203 and the second regulating valve 204;The 3rd detection bypass 3
It is disposed with three-grade electric ball valve 301, the 3rd flowmeter 302, third gas relay binding clasp 303 and the 3rd regulating valve
304;The first gas relay binding clasp 103, the second gas relay binding clasp 203 and the third gas after
Electric appliance binding clasp 303 is fixed on the rack 13;
Specifically, the first gas relay binding clasp 103, the second gas relay binding clasp 203 and institute
Third gas relay binding clasp 303 is stated to be adapted with the under test gas relay that bore is 25mm, 50mm and 80mm respectively.
Specifically, the length of the 102 front end pipeline of first flowmeter bypasses the 8 of 1 inside nominal diameter for the described first detection
Times, the length of the 102 rear end pipeline of first flowmeter bypasses 5 times of 1 inside nominal diameter for the described first detection;
Specifically, the length of the 202 front end pipeline of second flowmeter bypasses the 8 of 2 inside nominal diameters for the described second detection
Times, the length of the 202 rear end pipeline of second flowmeter bypasses 5 times of 2 inside nominal diameters for the described second detection;
Specifically, the length of the 302 front end pipeline of the 3rd flowmeter bypasses the 8 of 3 inside nominal diameters for the described 3rd detection
Times, the length of the 302 rear end pipeline of the 3rd flowmeter bypasses 5 times of 3 inside nominal diameters for the described 3rd detection.
Specifically, the first gas relay binding clasp 103, the second gas relay binding clasp 203 and institute
It is respectively hydraulic clamping device to state third gas relay binding clasp 303;
Specifically, the first gas relay binding clasp 103, the second gas relay binding clasp 203 and institute
The oil cylinder 14 that third gas relay binding clasp 303 includes being arranged on the rack 13 respectively is stated, is set in the oil cylinder 14
There is piston rod 15.
Specifically, the internal diameter of 14 two end portions of oil cylinder is less than the internal diameter of 14 center section of oil cylinder, the piston
15 outer circumferential surface of bar is provided with lug boss, and the outside diameter of the piston rod 15 is adapted with the internal diameter of 14 two end portions of oil cylinder, institute
Boss is stated inside 14 center section of oil cylinder;
Specifically, the inner space of the oil cylinder 14 is separated into front chamber 16 and rear chamber 17, institute by the piston rod 15
State and the top of the front chamber 16 is corresponded on oil cylinder 14 be provided with the first oil inlet and outlet 18, the back cavity is corresponded on the oil cylinder 14
The top of room 17 is provided with the second oil inlet and outlet 19.
Specifically, the three pipeline gas relay test table includes heavy gas flow speed test oil circuit, the grave gas stream
Speed test oil circuit include the manual ball valve 9, the oil pump 6, the gas-removing filter 8, it is described first detection bypass 1, it is described
It is second detection bypass 2, the 3rd detection bypass 3, the level-one electrical ball valve 101, the second-stage electric ball valve 201, described
Three-grade electric ball valve 301, the first flowmeter 102, the second flowmeter 202, the 3rd flowmeter 302, described
One gas relay binding clasp 103, the second gas relay binding clasp 203, the third gas relay binding clasp
303rd, first regulating valve 104, second regulating valve 204, the 3rd regulating valve 304 and the ventilation solenoid valve
20。
Specifically, the three pipeline gas relay test table include light gas volume test oil circuit, described light watt
This gas volume test oil circuit includes the ventilation solenoid valve 20, the first detection bypass 1, the second detection bypass 2, institute
State the 3rd detection bypass 3,1 the first volume solenoid valve 105 for being connected and the first metering pump 106 are bypassed with the described first detection and
The the second volume solenoid valve 205 and the second metering pump 206 of second detection bypass, 2 connection and the described 3rd detection bypass 3 and connect
The 3rd volume solenoid valve 305 connect and the 3rd metering pump 306, first oil inlet and outlet 18 and second oil inlet and outlet 19,
The first gas relay binding clasp 103, the second gas relay binding clasp 203, third gas relay folder
Tight device 303, first regulating valve 104, second regulating valve 204 and the 3rd regulating valve 304.
Specifically, the three pipeline gas relay test table includes sealing performance test pipeline, and the sealing performance is surveyed
Test tube road includes the ventilation solenoid valve 20, the first detection bypass 1, described second detects bypass 2, the 3rd detection is other
Road 3, the first accumulator 107 being connected with the described first detection bypass 1, the second accumulation of energy being connected with the described second detection bypass 2
It is device 207, the 3rd accumulators 307 being connected with the described 3rd detection bypass 3, the first gas relay binding clasp 103, described
Second gas relay binding clasp 203, the third gas relay binding clasp 303, be arranged at the first detection bypass 1
First pressure sensor 108, the second pressure sensor 208 for being arranged at the second detection bypass 2, be arranged at the 3rd inspection
Survey the 3rd pressure sensor 308, first regulating valve 104, second regulating valve 204 and the 3rd tune of bypass 3
Save valve 304.
Specifically, the three pipeline gas relay test table includes liquid level test oil circuit, and the liquid level is surveyed
Formation testing road includes the ventilation solenoid valve 20, the first detection bypass 1, described second detects bypass 2, the 3rd detection is other
Road 3, the liquid level being connected respectively with the described first detection bypass 1, the second detection bypass 2 and the 3rd detection bypass 3
Solenoid valve 22, liquid level gauge 23, the first volume solenoid valve 105, the second volume solenoid valve 205, the 3rd volume electricity
Magnet valve 305, first metering pump 106, second metering pump 206, the 3rd metering pump 306, described first are into fuel-displaced
Mouth 18 and second oil inlet and outlet 19, the first gas relay binding clasp 103, the second gas relay binding clasp
203rd, the third gas relay binding clasp 303, first regulating valve 104, second regulating valve 204 and described
Three regulating valves 304.
Specifically, oil temperature heating controller 11 and tank gauge 10 are provided with the fuel tank 4.
Specifically, the oil pump 6 is electrically connected with frequency converter 12.
There is three test pipelines, the under test gas relay available for three kinds of bores of test in such scheme;Pass through work
Control machine opens level-one electrical ball valve 101, closes second-stage electric ball valve 201 and three-grade electric ball valve 301, is bypassed by the first detection
First flowmeter 102 on 1, the flow velocity value of the under test gas relay for the 80mm that can calibrate.Beaten by industrial personal computer
Second-stage electric ball valve 201 is opened, closes level-one electrical ball valve 101 and three-grade electric ball valve 301, is bypassed by the second detection on 2
Second flowmeter 202, the flow velocity value of the under test gas relay for the 25mm that can calibrate.Three-level is opened by industrial personal computer
Electrical ball valve 301, closes level-one electrical ball valve 101 and second-stage electric ball valve 201, and the 3rd stream on 3 is bypassed by the 3rd detection
Gauge 302, the flow velocity value of the under test gas relay for the 50mm that can calibrate.
From above technical scheme, a kind of three pipeline gas relay test table provided by the embodiments of the present application, passes through
Basic pipeline and the mode of three detection bypass combinations, make oil stream sectional area and tested gas relay bore sectional area respectively
Unanimously, the discrete of the oil stream impact that oil stream is subject to gas relay internal actions element is eliminated, so as to meet different bores, no
The demand that same producer, the domestic and international gas relay heavy gas flow speed value of different model detect, has easy to operate, reliability
High, the features such as labor intensity is low, work efficiency is high, accuracy of detection is high, it can reach more bores and correspond to gas with various relay bore
The gas relay monitor station accuracy of detection requirement of test format.There is no correct data for detecting system in the utility model
Storehouse, to gas relay grave gas flow velocity value, using detection mode is directly measured, applicability is high, so as to meet different public affairs
Claim the detection of latus rectum gas relay grave gas flow velocity value.
The application embodiment above does not form the restriction to the application protection domain.
Claims (10)
1. a kind of three pipeline gas relay test tables, it is characterised in that including two racks (13), fuel tanks being oppositely arranged
(4), basic pipeline (7), the first detection bypass (1), the second detection bypass (2) and the 3rd detection bypass (3);The base pipe
Road (7) is connected with the oil outlet (5) of the fuel tank (4), the first detection bypass (1), the second detection bypass (2) and the 3rd
One end of detection bypass (3) is connected with the basic pipeline (7) respectively, and the other end is connected with the rack (13) respectively;
Ventilation solenoid valve (20) is provided with the fuel tank (4), the port of export of the ventilation solenoid valve (20) is turned on air, institute
The input end for stating ventilation solenoid valve (20) is used to be connected with the gas nozzle under test gas relay;Basis pipeline (7) bag
Include and the oil outlet of the fuel tank (4) (5) sequentially connected manual ball valve (9), oil pump (6), gas-removing filter (8) and mainstream
Gauge (21);
It is described first detection bypass (1) be disposed with level-one electrical ball valve (101), first flowmeter (102), first gas after
Electric appliance binding clasp (103) and the first regulating valve (104);The second detection bypass (2) is disposed with second-stage electric ball valve
(201), second flowmeter (202), second gas relay binding clasp (203) and the second regulating valve (204);3rd inspection
Survey bypass (3) and be disposed with three-grade electric ball valve (301), the 3rd flowmeter (302), third gas relay binding clasp
(303) and the 3rd regulating valve (304);The first gas relay binding clasp (103), the second gas relay clamp
Device (203) and the third gas relay binding clasp (303) are fixed on the rack (13);
The first gas relay binding clasp (103), the second gas relay binding clasp (203) and the 3rd gas
Body relay binding clasp (303) is adapted with the under test gas relay that bore is 25mm, 50mm and 80mm respectively.
A kind of 2. three pipeline gas relay test table according to claim 1, it is characterised in that the first flowmeter
(102) length of front end pipeline is 8 times of described first detection bypass (1) inside nominal diameter, first flowmeter (102) rear end
The length of pipeline bypasses 5 times of (1) inside nominal diameter for the described first detection;
The length of second flowmeter (202) front end pipeline bypasses 8 times of (2) inside nominal diameter for the described second detection, described
The length of second flowmeter (202) rear end pipeline bypasses 5 times of (2) inside nominal diameter for the described second detection;
The length of 3rd flowmeter (302) front end pipeline bypasses 8 times of (3) inside nominal diameter for the described 3rd detection, described
The length of 3rd flowmeter (302) rear end pipeline bypasses 5 times of (3) inside nominal diameter for the described 3rd detection.
A kind of 3. three pipeline gas relay test table according to claim 2, it is characterised in that the first gas after
Electric appliance binding clasp (103), the second gas relay binding clasp (203) and the third gas relay binding clasp
(303) it is respectively hydraulic clamping device;
The first gas relay binding clasp (103), the second gas relay binding clasp (203) and the 3rd gas
Body relay binding clasp (303) includes the oil cylinder (14) being arranged on the rack (13) respectively, is set in the oil cylinder (14)
There is piston rod (15).
A kind of 4. three pipeline gas relay test table according to claim 3, it is characterised in that the oil cylinder (14) two
The internal diameter of part is held to be less than the internal diameter of the oil cylinder (14) center section, piston rod (15) outer circumferential surface is provided with lug boss,
The outside diameter of the piston rod (15) is adapted with the internal diameter of the oil cylinder (14) two end portions, and the boss is in the oil cylinder
(14) inside center section;
The inner space of the oil cylinder (14) is separated into front chamber (16) and rear chamber (17), the oil by the piston rod (15)
Corresponded on cylinder (14) and the first oil inlet and outlet (18) is provided with above the front chamber (16), on the oil cylinder (14) described in correspondence
The second oil inlet and outlet (19) is provided with above rear chamber (17).
A kind of 5. three pipeline gas relay test table according to claim 4, it is characterised in that three pipeline gas
Relay test table includes heavy gas flow speed test oil circuit, heavy gas flow speed test oil circuit include the manual ball valve (9),
The oil pump (6), the gas-removing filter (8), the first detection bypass (1), the second detection bypass (2), described the
Three detection bypasses (3), the level-one electrical ball valve (101), the second-stage electric ball valve (201), the three-grade electric ball valve
(301), the first flowmeter (102), the second flowmeter (202), the 3rd flowmeter (302), first gas
Body relay binding clasp (103), the second gas relay binding clasp (203), the third gas relay binding clasp
(303), first regulating valve (104), second regulating valve (204), the 3rd regulating valve (304) and the ventilation
Solenoid valve (20).
A kind of 6. three pipeline gas relay test table according to claim 5, it is characterised in that three pipeline gas
Relay test table includes light gas volume test oil circuit, and the light gas volume test oil circuit includes the ventilation
Solenoid valve (20), it is described first detection bypass (1), it is described second detection bypass (2), it is described 3rd detection bypass (3), with it is described
The the first volume solenoid valve (105) and the first metering pump (106) of first detection bypass (1) connection and the described second detection bypass
(2) connection the second volume solenoid valve (205) and the second metering pump (206), with the described 3rd detect bypass (3) be connected the 3rd
Volume solenoid valve (305) and the 3rd metering pump (306), first oil inlet and outlet (18) and second oil inlet and outlet (19),
The first gas relay binding clasp (103), the second gas relay binding clasp (203), the third gas relay
Device binding clasp (303), first regulating valve (104), second regulating valve (204) and the 3rd regulating valve (304).
A kind of 7. three pipeline gas relay test table according to claim 6, it is characterised in that three pipeline gas
Relay test table includes sealing performance test pipeline, sealing performance test pipeline include the ventilation solenoid valve (20),
It is other that first detection bypasses (1), the second detection bypass (2), the 3rd detection bypass (3) and the described first detection
Road (1) connection the first accumulator (107), with described second detection bypass (2) be connected the second accumulator (207), with it is described
The 3rd accumulator (307), the first gas relay binding clasp (103), second gas of 3rd detection bypass (3) connection
Body relay binding clasp (203), the third gas relay binding clasp (303), be arranged at the first detection bypass (1)
First pressure sensor (108), the second pressure sensor (208) for being arranged at the second detection bypass (2), be arranged at it is described
3rd pressure sensor (308) of the 3rd detection bypass (3), first regulating valve (104), second regulating valve (204)
And the 3rd regulating valve (304).
A kind of 8. three pipeline gas relay test table according to claim 7, it is characterised in that three pipeline gas
Relay test table includes liquid level test oil circuit, liquid level test oil circuit include the ventilation solenoid valve (20),
It is described first detection bypass (1), it is described second detection bypass (2), it is described 3rd detection bypass (3), respectively with described first inspection
Survey bypass (1), the liquid level solenoid valve (22) of the second detection bypass (2) and the 3rd detection bypass (3) connection, liquid level
Count (23), the first volume solenoid valve (105), the second volume solenoid valve (205), the 3rd volume solenoid valve
(305), first metering pump (106), second metering pump (206), the 3rd metering pump (306), described first into
Oil outlet (18) and second oil inlet and outlet (19), the first gas relay binding clasp (103), the second gas after
Electric appliance binding clasp (203), the third gas relay binding clasp (303), first regulating valve (104), described second are adjusted
Save valve (204) and the 3rd regulating valve (304).
9. a kind of three pipeline gas relay test table according to claim 8, it is characterised in that on the fuel tank (4)
It is provided with oil temperature heating controller (11) and tank gauge (10).
A kind of 10. three pipeline gas relay test table according to claim 9, it is characterised in that the oil pump (6) with
Frequency converter (12) is electrically connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721391296.XU CN207280537U (en) | 2017-10-25 | 2017-10-25 | A kind of three pipeline gas relay test tables |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721391296.XU CN207280537U (en) | 2017-10-25 | 2017-10-25 | A kind of three pipeline gas relay test tables |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207280537U true CN207280537U (en) | 2018-04-27 |
Family
ID=61978512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721391296.XU Active CN207280537U (en) | 2017-10-25 | 2017-10-25 | A kind of three pipeline gas relay test tables |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207280537U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107621295A (en) * | 2017-10-25 | 2018-01-23 | 云南电网有限责任公司电力科学研究院 | A kind of three pipeline gas relay test tables |
-
2017
- 2017-10-25 CN CN201721391296.XU patent/CN207280537U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107621295A (en) * | 2017-10-25 | 2018-01-23 | 云南电网有限责任公司电力科学研究院 | A kind of three pipeline gas relay test tables |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103308293B (en) | A kind of high temperature valve detection experiment system | |
CN201083590Y (en) | High-temperature high pressure helium-leakage detecting apparatus | |
CN207280537U (en) | A kind of three pipeline gas relay test tables | |
CN105181271B (en) | Bleeder and test method for line leakage system performance testing | |
CN108267199B (en) | Gas field mobile type wet gas two-phase flowmeter calibration method and device | |
CN203823448U (en) | Device for automatically adding deodorant to fuel gas | |
CN203259337U (en) | High-temperature valve detection test system | |
CN208588498U (en) | Gas gauge electric contact automatic check device | |
CN107621295A (en) | A kind of three pipeline gas relay test tables | |
CN204301821U (en) | A kind of mass method/method of standard table tiny flow quantity water flow standard apparatus | |
CN201724775U (en) | Test bed for testing differential pressure of filter | |
CN111043105A (en) | High-power hydraulic comprehensive test bed and test method thereof | |
CN207131561U (en) | A kind of colliery Pneumatic water pump performance testing device and system | |
CN207741837U (en) | A kind of calibration device for water meters in series connection | |
CN103091027A (en) | Liquid pipeline equipment flowing pressure loss tester and testing method | |
CN104142269B (en) | Packing barrel water pressure tester | |
CN109374064A (en) | A kind of metal hose discharge characteristic test equipment and method | |
CN216207362U (en) | Oxygen concentration and air tightness detection gas circuit of molecular sieve oxygen generator | |
CN208579154U (en) | A kind of experimental provision measuring fuel gas pipeline leakage characteristic | |
CN203731083U (en) | Valve detecting device for liquefied natural gas cylinder | |
CN211148489U (en) | Rock soil thermophysical property tester | |
CN203011442U (en) | Differential pressure type flowmeter and pressure measuring device capable of intelligently measuring steam flow | |
CN106568588A (en) | Excess flow cut-off valve reliability automatic detection device | |
CN209280239U (en) | A kind of air-tightness detection device | |
CN201826997U (en) | Pump and liquid level meter integration device in methanol fuel tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190128 Address after: 650217 No. 105 Yunda West Road, Kunming Economic and Technological Development Zone, Yunnan Province Patentee after: Electric Power Research Institute of Yunnan Power System Ltd Address before: 650217 No. 105 Yunda West Road, Kunming Economic and Technological Development Zone, Yunnan Province Co-patentee before: Kunming super electric equipment Co., Ltd. Patentee before: Electric Power Research Institute of Yunnan Power System Ltd |
|
TR01 | Transfer of patent right |