CN207280288U - A kind of cooling tower filler apparatus for eliminating sludge - Google Patents

A kind of cooling tower filler apparatus for eliminating sludge Download PDF

Info

Publication number
CN207280288U
CN207280288U CN201721323139.5U CN201721323139U CN207280288U CN 207280288 U CN207280288 U CN 207280288U CN 201721323139 U CN201721323139 U CN 201721323139U CN 207280288 U CN207280288 U CN 207280288U
Authority
CN
China
Prior art keywords
cooling tower
medicine
introducing pipe
cleaning
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721323139.5U
Other languages
Chinese (zh)
Inventor
周富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianda Jinkang (Tianjin) Science and Technology Co., Ltd.
Original Assignee
TIANJIN TIANDAJINKANG CHEMICAL EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TIANDAJINKANG CHEMICAL EQUIPMENT Co Ltd filed Critical TIANJIN TIANDAJINKANG CHEMICAL EQUIPMENT Co Ltd
Priority to CN201721323139.5U priority Critical patent/CN207280288U/en
Application granted granted Critical
Publication of CN207280288U publication Critical patent/CN207280288U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a kind of cooling tower filler apparatus for eliminating sludge, including cooling tower main body, include filler in the cooling tower main body, the cooling tower main body upper end offers opening, and opening is provided with fixed cover board, medicine-introducing pipe is fixedly installed on the fixed cover board, and one end of medicine-introducing pipe is stretched into cooling tower main body from the centre position of fixed cover board, the one end stretched on the medicine-introducing pipe in cooling tower main body is fixedly connected on the bottom of filler by bearing, and is that the one end stretched into cooling tower main body offers opening on medicine-introducing pipe.In the utility model, by setting the cleaning device using medicine-introducing pipe as main shaft, it can make when being cleaned to filler, herbal sprinkling first can be carried out to filler inner wall, the later stage is facilitated to clean with water, the cooling tower of solution runs without interruption for a long time, along with the generation for situations such as surrounding enviroment are severe, industry water water quality inferiority, weather reason cause the easy fouling of cooling tower filler and freezed in winter, increases the service life of cooling tower.

Description

A kind of cooling tower filler apparatus for eliminating sludge
Technical field
It the utility model is related to the technical field of cooling tower, more particularly to a kind of cooling tower filler apparatus for eliminating sludge.
Background technology
Cooling tower is by the use of water as circulating coolant, heat dissipation is absorbed from a system into air, to reduce water temperature Device;It is to carry out cold and hot exchange after contacting with air flow using water to produce steam that its is cold, and steam volatilization is taken away heat and reached The principles such as evaporative heat loss, convection current heat transfer and radiant heat transfer reduce water temperature to disperse the waste heat produced in industrial or refrigeration air-conditioner Evaporating radiator, to ensure the normal operation of system, device is generally tubbiness, and therefore named is cooling tower.
Circulating water tower apparatus is widely used in the cooling of enterprises and institutions' industry aqueous medium, is reached by industrial water cooling To the purpose of recycling, avoid supplementing substantial amounts of industry water, play the role of it is water-saving, but during practice, Since circulating water tower apparatus runs without interruption for a long time, along with surrounding enviroment are severe, industry water water quality inferiority, weather reason are made Into the easy fouling of cooling tower filler and freezed in winter, so as to influence circulating water column efficiency, cause not reaching and save industry water Purpose, for this reason, we are badly in need of designing a kind of cooling tower filler apparatus for eliminating sludge, to solve the above problems.
Utility model content
The purpose of this utility model is and a kind of cooling tower filler proposed in order to solve shortcoming existing in the prior art Use apparatus for eliminating sludge.
To achieve these goals, the utility model employs following technical solution:
A kind of cooling tower filler apparatus for eliminating sludge, including cooling tower main body, include filler in the cooling tower main body, institute State cooling tower main body upper end and offer opening, and opening is provided with fixed cover board, is fixedly installed and leads on the fixed cover board Pencil, and one end of medicine-introducing pipe is stretched into cooling tower main body from the centre position of fixed cover board, and cooling is stretched on the medicine-introducing pipe One end in tower main body is fixedly connected on the bottom of filler by bearing, and is to stretch into one end in cooling tower main body on medicine-introducing pipe Opening is offered, the both sides of the medicine-introducing pipe are provided with two groups of cleaning slideways, and the one end for cleaning slideway passes through fixed cover board, even It is connected on bearing, sliding slot is provided with the cleaning slideway, and sliding slot is arranged on the side away from medicine-introducing pipe on cleaning slideway, institute State and position limiting slide block is movably set with sliding slot, and one end of position limiting slide block passes through sliding slot, extends to the side of cleaning slideway, it is described Cleaning slide bar is fixedly connected with through one end of sliding slot on position limiting slide block, and cleans slide bar and is vertically arranged with cleaning slideway, it is described Push rod is fixedly connected with cleaning slide bar, and one end of push rod passes through fixed cover board to be connected with push-rod electric machine.
Preferably, opening is offered on the medicine-introducing pipe, and opening is arranged on one of remote cleaning slideway on medicine-introducing pipe Side, the opening on the medicine-introducing pipe is equidistantly positioned along the length direction of medicine-introducing pipe, and opening is connected with high pressure and sprays head.
Preferably, the side away from cleaning slide bar is fixedly connected on the outside of medicine-introducing pipe on the cleaning slideway, and cleans The length of slideway is identical with the length of medicine-introducing pipe.
Preferably, the push rod is fixedly connected on cleaning slide bar close to one end of cleaning slideway, and push-rod electric machine is fixed It is arranged on fixed cover board.
Preferably, one end away from cleaning slideway is fixedly connected with brush head on the cleaning slide bar.
Compared with prior art, the beneficial effects of the utility model are:In the utility model, by set using medicine-introducing pipe as The cleaning device of main shaft, can make when being cleaned to filler, first can carry out herbal sprinkling to filler inner wall, facilitate the later stage Clean with water, the cooling tower of solution runs without interruption for a long time, along with surrounding enviroment are severe, industry water water quality inferiority, weather reason cause The generation of situations such as easy fouling of cooling tower filler and freezed in winter, increases the service life of cooling tower.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of cooling tower filler apparatus for eliminating sludge structure diagram;
Fig. 2 be the utility model proposes a kind of cooling tower filler apparatus for eliminating sludge medicine-introducing pipe plan structure signal Figure.
In figure:1 cooling tower main body, 2 fillers, 3 medicine-introducing pipes, 4 cleaning slideways, 5 cleaning brush holder supports, 6 push-rod electric machines, 7 fixed covers Plate, 8 high pressures spray head, 9 push rods, 10 sliding slots, 11 position limiting slide blocks.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
With reference to Fig. 1-2, a kind of cooling tower filler apparatus for eliminating sludge, including cooling tower main body 1, includes in cooling tower main body 1 There is filler 2,1 upper end of cooling tower main body offers opening, and opening is provided with fixed cover board 7, is fixedly installed on fixed cover board 7 There is medicine-introducing pipe 3, and one end of medicine-introducing pipe 3 is stretched into cooling tower main body 1 from the centre position of fixed cover board 7, is stretched on medicine-introducing pipe 3 One end in cooling tower main body 1 is fixedly connected on the bottom of filler 2 by bearing, and is to stretch into cooling tower main body 1 on medicine-introducing pipe 3 Interior one end offers opening, and the both sides of medicine-introducing pipe 3 are provided with two groups of cleaning slideways 4, and the one end for cleaning slideway 4 passes through and fixes Cover board 7, is connected on bearing, opening is offered on medicine-introducing pipe 3, and opening is arranged on medicine-introducing pipe 3 away from cleaning slideway 4 Side, the opening on medicine-introducing pipe 3 is equidistantly positioned along the length direction of medicine-introducing pipe 3, and opening is connected with high pressure and sprays head 8, clean in slideway 4 and be provided with sliding slot 10, and sliding slot 10 is arranged on and cleans the side away from medicine-introducing pipe 3 on slideway 4, in sliding slot 10 Position limiting slide block 11 is movably set with, and one end of position limiting slide block 11 passes through sliding slot 10, extends to the side of cleaning slideway 4, it is spacing Cleaning slide bar 5 is fixedly connected with through one end of sliding slot 10 on sliding block 11, and cleans slide bar 5 and is vertically arranged with cleaning slideway 4, clearly Wash the side away from cleaning slide bar 5 on slideway 4 and be fixedly connected on the outside of medicine-introducing pipe 3, and clean the length and medicine-introducing pipe of slideway 4 3 length is identical, cleans one end away from cleaning slideway 4 on slide bar 5 and is fixedly connected with brush head, cleans on slide bar 5 and be fixedly connected There is push rod 9, and one end of push rod 9 passes through fixed cover board 7 to be connected with push-rod electric machine 6, push rod 9 is fixedly connected on cleaning slide bar 5 Close to one end of cleaning slideway 4, and push-rod electric machine 6 is fixed on fixed cover board 7.
Operation principle:, can be by the opening in the outside of medicine-introducing pipe 3 during using the present apparatus, the perfusion into medicine-introducing pipe 3, so Afterwards by high pressure spray first 8 to filler 2 inner wall spray, then by rotating medicine-introducing pipe 3 so that herbal sprinkling it is more equal It is even, after standing a period of time, then by cleaning the brush head on brush holder support 5, the inner wall of filler is cleaned, it is quiet medicine will to be passed through The dirt on 2 inner wall of filler put is brushed, and achievees the purpose that scale removal.
The above, is only the preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (5)

1. a kind of cooling tower filler apparatus for eliminating sludge, including cooling tower main body (1), it is characterised in that the cooling tower main body (1) Inside include filler (2), cooling tower main body (1) upper end offers opening, and opening is provided with fixed cover board (7), institute State and medicine-introducing pipe (3) is fixedly installed on fixed cover board (7), and one end of medicine-introducing pipe (3) is stretched from the centre position of fixed cover board (7) Enter in cooling tower main body (1), the one end stretched on the medicine-introducing pipe (3) in cooling tower main body (1) is fixedly connected on by bearing The bottom of filler (2), and be that the one end stretched into cooling tower main body (1) offers opening, the medicine-introducing pipe on medicine-introducing pipe (3) (3) both sides are provided with two groups of cleaning slideways (4), and the one end for cleaning slideway (4) passes through fixed cover board (7), is connected to bearing On, sliding slot (10) is provided with the cleaning slideway (4), and sliding slot (10) is arranged on cleaning slideway (4) away from medicine-introducing pipe (3) Side, is movably set with position limiting slide block (11) in the sliding slot (10), and one end of position limiting slide block (11) passes through sliding slot (10), The side of cleaning slideway (4) is extended to, being fixedly connected with cleaning through one end of sliding slot (10) on the position limiting slide block (11) slides Bar (5), and clean slide bar (5) and be vertically arranged with cleaning slideway (4), push rod (9) is fixedly connected with the cleaning slide bar (5), And one end of push rod (9) passes through fixed cover board (7) to be connected with push-rod electric machine (6).
2. a kind of cooling tower filler apparatus for eliminating sludge according to claim 1, it is characterised in that on the medicine-introducing pipe (3) Offer opening, and opening is arranged on the side away from cleaning slideway (4) on medicine-introducing pipe (3), opening on the medicine-introducing pipe (3) It is equidistantly positioned at mouthful along the length direction of medicine-introducing pipe (3), and opening is connected with high pressure and sprays head (8).
A kind of 3. cooling tower filler apparatus for eliminating sludge according to claim 1, it is characterised in that the cleaning slideway (4) The upper side away from cleaning slide bar (5) is fixedly connected on the outside of medicine-introducing pipe (3), and cleans the length and medicine-introducing pipe of slideway (4) (3) length is identical.
4. a kind of cooling tower filler apparatus for eliminating sludge according to claim 1, it is characterised in that the push rod (9) is fixed It is connected to close to one end of cleaning slideway (4) on cleaning slide bar (5), and push-rod electric machine (6) is fixed at fixed cover board (7) On.
A kind of 5. cooling tower filler apparatus for eliminating sludge according to claim 1, it is characterised in that the cleaning slide bar (5) Upper one end away from cleaning slideway (4) is fixedly connected with brush head.
CN201721323139.5U 2017-10-12 2017-10-12 A kind of cooling tower filler apparatus for eliminating sludge Active CN207280288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721323139.5U CN207280288U (en) 2017-10-12 2017-10-12 A kind of cooling tower filler apparatus for eliminating sludge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721323139.5U CN207280288U (en) 2017-10-12 2017-10-12 A kind of cooling tower filler apparatus for eliminating sludge

Publications (1)

Publication Number Publication Date
CN207280288U true CN207280288U (en) 2018-04-27

Family

ID=61980215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721323139.5U Active CN207280288U (en) 2017-10-12 2017-10-12 A kind of cooling tower filler apparatus for eliminating sludge

Country Status (1)

Country Link
CN (1) CN207280288U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108645241A (en) * 2018-05-23 2018-10-12 江苏双辉环境科技有限公司 A kind of cooling tower convenient for scale removal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108645241A (en) * 2018-05-23 2018-10-12 江苏双辉环境科技有限公司 A kind of cooling tower convenient for scale removal

Similar Documents

Publication Publication Date Title
CN103673661B (en) Waist type cross section coil pipe closed cooling tower
CN103743258A (en) Water-saving dry closed cooling tower
CN207280288U (en) A kind of cooling tower filler apparatus for eliminating sludge
CN108645241A (en) A kind of cooling tower convenient for scale removal
CN203506662U (en) Dishwasher for recovering waste heat by heat pipes
CN204757738U (en) Circulative cooling tower
CN104315885A (en) Water cooling heat exchanger
CN205580290U (en) Hydrogen -cooled ware online cleaning device
CN204255124U (en) A kind of evaporative condenser being applicable to power plant
CN204268927U (en) With the volumetric heat exchanger of floating coiled pipe
CN207395514U (en) A kind of high effect forced water-saving interior cooling back installation of heat dissipation
CN204678917U (en) The removable cooler bin of a kind of full automatic high efficiency
CN205317018U (en) Countercurrent type filler cooling tower
CN215003017U (en) Cooling tower for foam production
CN208349631U (en) A kind of environmental protection type cold condenser
CN201246999Y (en) Column tube type condenser operation synchronous cleaner
CN209355760U (en) A kind of sealed cooling tower has the spray nozzle device of Telescopic
CN208476024U (en) A kind of water wheel type automatically cleaning central air-conditioning cooling tower
CN204026847U (en) A kind of purification air-cooler with the wet curtain paper of waveform
CN104457324A (en) Solar air cooler
CN205228213U (en) Improve radiating cooling tower of cooling tower
CN206094958U (en) High -efficient low noise cooling tower
CN206019463U (en) A kind of rectilinear movement, the targeting positioning ball-throwing apparatus of region overlay
CN205690923U (en) A kind of wet type air chiller
CN203672185U (en) Efficient combined-flow pre-cooling type closed cooling tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300 000 Area A, Shengda Five Branches Road, Saida Industrial Park, Xiqing Economic and Technological Development Zone, Xiqing District, Tianjin

Patentee after: Tianda Jinkang (Tianjin) Science and Technology Co., Ltd.

Address before: 300 000 Area A, Shengda Five Branches Road, Saida Industrial Park, Xiqing Economic and Technological Development Zone, Xiqing District, Tianjin

Patentee before: TIANJIN TIANDAJINKANG CHEMICAL EQUIPMENT CO., LTD.

CP01 Change in the name or title of a patent holder