CN207280066U - A kind of steel construction cooling-water machine system - Google Patents

A kind of steel construction cooling-water machine system Download PDF

Info

Publication number
CN207280066U
CN207280066U CN201721050322.2U CN201721050322U CN207280066U CN 207280066 U CN207280066 U CN 207280066U CN 201721050322 U CN201721050322 U CN 201721050322U CN 207280066 U CN207280066 U CN 207280066U
Authority
CN
China
Prior art keywords
water
stay tube
valve
fixed
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721050322.2U
Other languages
Chinese (zh)
Inventor
马和平
史广博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kelong New Material Co Ltd
Original Assignee
Jiangsu Kelong New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Kelong New Material Co Ltd filed Critical Jiangsu Kelong New Material Co Ltd
Priority to CN201721050322.2U priority Critical patent/CN207280066U/en
Application granted granted Critical
Publication of CN207280066U publication Critical patent/CN207280066U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

It the utility model is related to a kind of steel construction cooling-water machine system, including frame assembly, water tank, the first water pump, the second water pump, conduit assembly, the first bottom plate, the second bottom plate, the 3rd bottom plate, the first compressor, the second compressor, the first condensation babinet, the second condensation babinet, the first radiator and the second radiator;The utility model is compact-sized rationally, conveniently moving and anti-pressure ability is stronger, pipeline arrangement is orderly, refrigeration effect and efficient, the setting of second radiator and the first radiator, the heat that first compressor and the second compressor produce is discharged in time, refrigerating efficiency and effect is further increased and extends the service life of compressor.

Description

A kind of steel construction cooling-water machine system
Technical field
It the utility model is related to a kind of steel construction cooling-water machine system.
Background technology
Cooling-water machine is a kind of water cooling equipment, and cooling-water machine is a kind of to provide constant temperature, constant current, the cooling water equipment of constant pressure; Conventional cooling-water machine is loosely organized, anti-pressure ability deficiency;Pipeline arrangement is not compact enough so that refrigeration effect and efficiency is not good enough, has Treat to improve in further.
Utility model content
In view of the above-mentioned state of the art, the technical problem to be solved by the utility model is to provide a kind of structure is tight Reason is gathered together, conveniently moving and anti-pressure ability is stronger, pipeline arrangement is orderly, refrigeration effect and efficient, and good heat dissipation effect, extends The steel construction cooling-water machine system of the service life of compressor.
Technical solution is used by the utility model solves above-mentioned technical problem:A kind of steel construction cooling-water machine system, bag Include frame assembly, water tank, the first water pump, the second water pump, conduit assembly, the first bottom plate, the second bottom plate, the 3rd bottom plate, the first pressure Contracting machine, the second compressor, the first condensation babinet, the second condensation babinet, the first radiator and the second radiator, it is characterised in that The frame assembly includes crossbeam, short beam, vertical tube, top frame, transverse tube, down tube, the first stay tube, the second stay tube, the 3rd stay tube, the Four stay tubes, the 5th stay tube, the 6th stay tube, stent and the 7th stay tube;The conduit assembly includes the first water pipe, the first connector, the One valve, the second water pipe, the second connector, the first frost prevention switch, the second valve, the 3rd water pipe, the 3rd connector, the 3rd valve, Four water pipes, first pressure gauge, the 5th water pipe, the 4th valve, second pressure gauge, the 6th water pipe, the second frost prevention switch, the 5th valve Door, the first condensation module, the first copper pipe, the second copper pipe, the first expansion valve, the second expansion valve, the first device for drying and filtering, first are steamed Send out device, the second condensation module, the 3rd copper pipe, the 4th copper pipe, the second device for drying and filtering and the second evaporator;The lower of the top frame is put down Four, face corner is respectively and fixedly provided with a vertical tube, is fixed with two symmetrical crossbeams between four vertical tubes and two right Claim the short beam of distribution, be further fixed on three transverse tubes being equally spaced on the inside of the top frame, be fixed between described two crossbeams First stay tube, the second stay tube, the 3rd stay tube, the 4th stay tube, the 5th stay tube and the 6th stay tube, first stay tube and one of them Water tank is fixed with the upper plane of short beam, the first bottom plate is fixed with the upper plane of second stay tube and the 3rd stay tube, it is described The first condenser and the second condenser are fixed with the upper plane of 4th stay tube and the 5th stay tube;6th stay tube and another The second bottom plate is fixed with the upper plane of short beam.
Preferably, stent, the inner side surface of the two of which vertical tube are further fixed in the upper plane of described two crossbeams Between be fixed with the 7th stay tube, the upper plane of the 7th stay tube and stent is fixed with the 3rd bottom plate;First bottom plate it is upper The first water pump and the second water pump are fixed with plane.
Preferably, one end of first water pipe and insertion be fixed on the first condensation babinet side lower end and with it is first cold Solidifying box house is connected, and the other end of first water pipe is connected with the water inlet end of the first water pump, on first water pipe The first connector and the first valve are equiped with, first valve is between the first connector and the first water pump.
Preferably, one end of second water pipe is connected with the water outlet of the first water pump, second water pipe it is another End insertion is fixed on the side upper end of the first condensation babinet and is connected with the first condensation box house;Filled on second water pipe Equipped with the second connector, the first frost prevention switch and the second valve;Second connector be located at the first water pump and the first frost prevention switch it Between;First frost prevention switch is between the second connector and the second valve.
Preferably, one end insertion of the 3rd water pipe is fixed on the side side lower end of the second condensation babinet and with second The inside of condensation babinet is connected, and the other end of the 3rd water pipe is connected with the water inlet end of the second water pump, second water The water outlet of pump is connected with one end of the 4th water pipe, and the other end insertion of the 4th water pipe is fixed on the side side of water tank Lower end and with being connected inside water tank, first pressure gauge is equiped with the 4th water pipe;Is equiped with 3rd water pipe Three connectors and the 3rd valve, the 3rd valve is between the second water pump and the 3rd connector.
Preferably, the one end for being fixed with the 5th water pipe, the 5th water pipe are also inserted into the side side lower end of the water tank It is connected with the inside of water tank;The 4th valve is equiped with 5th water pipe, is also connected with and is communicated with second water pipe 6th water pipe, the 6th water pipe are equiped with second between the second connector and the first frost prevention switch on the 6th water pipe Frost prevention switch, the 5th valve and second pressure gauge, second frost prevention switch is between second pressure gauge and the 5th valve.
Preferably, one end of first condensation module is connected with one end of the first copper pipe, first copper pipe it is another One end is connected with the bottom of the first compressor, and the other end of first condensation module is connected with one end of the second copper pipe, The other end of second copper pipe is connected with the first evaporator, and the second device for drying and filtering and are equiped with second copper pipe One expansion valve.
Preferably, one end of second condensation module is connected with one end of the 3rd copper pipe, the 3rd copper pipe it is another One end is connected with the bottom of the second compressor, and the other end of second condensation module is connected with one end of the 4th copper pipe, The other end of 4th copper pipe is connected with the second evaporator, and the second expansion valve and first dry is equiped with the 4th copper pipe Dry filter, first expansion valve is between the first evaporator and the first condensation module.
Preferably, second radiator is fixed in the upper plane of the 3rd bottom plate, and first radiator is fixed on In the upper plane of two bottom plates;Second expansion valve is between the second condensation module and the first device for drying and filtering.
Compared with prior art, the utility model has the advantage of:Cooling-water machine is a kind of water cooling equipment, and cooling-water machine is one Kind can provide constant temperature, constant current, the cooling water equipment of constant pressure;Conventional cooling-water machine is loosely organized, anti-pressure ability deficiency;Pipeline is arranged It is not compact enough so that refrigeration effect and efficiency is not good enough;The utility model is compact-sized rationally, conveniently moving and anti-pressure ability compared with By force, pipeline arrangement is orderly, refrigeration effect and efficient, the setting of the second radiator and the first radiator so that the first compressor The heat produced with the second compressor can be discharged in time, is further increased refrigerating efficiency and effect and is extended making for compressor Use the service life.
Brief description of the drawings
Fig. 1 is the structure chart of the utility model;
Fig. 2 is the structure chart of the conduit assembly of the utility model;
Fig. 3 is the side structure figure of bowing of the utility model;
Fig. 4 is the chart at the bottom of of the utility model.
Embodiment
As shown in figures 1-4, a kind of steel construction cooling-water machine system, including frame assembly, water tank 30, the first water pump 14, second Water pump 28, conduit assembly, the first bottom plate 13, the second bottom plate 55, the 3rd bottom plate 56, the first compressor 52, the second compressor 45, One condensation babinet 22, second condenses babinet 36, the first radiator 49 and the second radiator 51;Frame assembly includes crossbeam 1, short beam 2nd, vertical tube 3, top frame 4, transverse tube 5, down tube 6, the first stay tube 7, the second stay tube 8, the 3rd stay tube 9, the 4th stay tube 10, the 5th stay tube 11st, the 6th stay tube 12,48 and the 7th stay tube 50 of stent;Conduit assembly includes the first water pipe 15, the first connector 16, the first valve 17th, the second water pipe 18, the second connector 19, the first frost prevention switch 20, the second valve 21, the 3rd water pipe 33, the 3rd connector the 34, the 3rd Valve 35, the 4th water pipe 29, first pressure gauge 57, the 5th water pipe 31, the 4th valve 32, second pressure gauge 25, the 6th water pipe 24, Second frost prevention switch 26, the 5th valve 27, the first condensation module 40, the first copper pipe 41, the second copper pipe 42, the first expansion valve 44, Second expansion valve 43, the first device for drying and filtering 46, the first evaporator 53, the second condensation module 37, the 3rd copper pipe 38, the 4th copper pipe 39th, the second device for drying and filtering 54 and the second evaporator 47;Four corners of lower plane of top frame 4 are respectively and fixedly provided with a vertical tube 3, and four Two symmetrical crossbeams 1 and two symmetrical short beams 2 are fixed between a vertical tube 3, the inner side of top frame 4 is further fixed on Three transverse tubes 5 being equally spaced, are respectively and fixedly provided with a down tube 6 below the front and rear sides of top frame 4, four down tubes 6 it is another End is separately fixed on the inner side surface of four vertical tubes 3;The first stay tube 7, the second stay tube 8, are further fixed between two crossbeams 1 In the upper plane of three stay tubes 9, the 4th stay tube 10, the 5th stay tube 11 and the 6th stay tube 12, the first stay tube 7 and one of short beam 2 It is fixed with water tank 30, the first bottom plate 13, the 4th stay tube 10 and the 5th is fixed with the upper plane of the second stay tube 8 and the 3rd stay tube 9 The first condenser 2 and the second condenser 36 are fixed with the upper plane of stay tube 11;6th stay tube 12 and the upper of another short beam 2 are put down The second bottom plate 55 is fixed with face;Stent 48, the inner side side of two of which vertical tube 3 are further fixed in the upper plane of two crossbeams 1 It is fixed with the 7th stay tube 50 between face, the upper plane of the 7th stay tube 50 and stent 48 is fixed with the 3rd bottom plate 56;First bottom plate 13 Upper plane on be fixed with the first water pump 14 and the second water pump 28;One end of first water pipe 15 is fixed on the first cooling cylinder with insertion The side lower end of body 22 and with being connected inside the first condensation babinet 22, the other end of the first water pipe 15 and the first water pump 14 into Water end (W.E.) is connected, and the first connector 16 and the first valve 17 are equiped with the first water pipe 15, and the first valve 17 is located at the first connector 16 Between the first water pump 14, one end of the second water pipe 18 is connected with the water outlet of the first water pump 14, the second water pipe 18 it is another End insertion is fixed on the side upper end of the first condensation babinet 22 and with being connected inside the first condensation babinet 22;On second water pipe 18 It is equiped with the second connector 19, the first frost prevention switch 20 and the second valve 21;Second connector 19 is anti-positioned at the first water pump 14 and first Freeze between switch 20;First frost prevention switch 20 is between the second connector 19 and the second valve 21;Insert one end of 3rd water pipe 33 Enter the side side lower end for being fixed on the second condensation babinet 36 and be connected with the inside of the second condensation babinet 36, the 3rd water pipe 33 The other end be connected with the water inlet end of the second water pump 28, the water outlet of the second water pump 28 is connected with one end of the 4th water pipe 29 Logical, the other end insertion of the 4th water pipe 29 is fixed on the side side lower end of water tank 30 and with being connected inside water tank 30, and the 4th First pressure gauge 57 is equiped with water pipe 29;The 3rd connector 34 and the 3rd valve 35, the 3rd valve are equiped with 3rd water pipe 33 35 between the second water pump 28 and the 3rd connector 34;The side side lower end of water tank 30, which is also inserted into, is fixed with the 5th water pipe 31 One end, the 5th water pipe 31 are connected with the inside of water tank 30;The 4th valve 32 is equiped with 5th water pipe 31, on the second water pipe 18 It is also connected with and is communicated with the 6th water pipe 24, the 6th water pipe 24 is between the second connector 19 and the first frost prevention switch 20, the 6th water The second frost prevention switch 26, the 5th valve 27 and second pressure gauge 25 are equiped with pipe 24, the second frost prevention switch 26 is positioned at the second pressure Between 25 and the 5th valve 27 of power table;One end of first condensation module 40 is connected with one end of the first copper pipe 41, the first copper pipe 41 other end is connected with the bottom of the first compressor 52, one end of the other end of the first condensation module 40 and the second copper pipe 42 It is connected, the other end of the second copper pipe 42 is connected with the first evaporator 53, and the second dry filter is equiped with the second copper pipe 42 Device 54;The first expansion valve 44 is equiped with second copper pipe 42, plays the role of controller perturbation keying;First expansion valve 44 is located at Between first evaporator 53 and the first condensation module 40;One end of second condensation module 37 is connected with one end of the 3rd copper pipe 38 Logical, the other end of the 3rd copper pipe 38 is connected with the bottom of the second compressor 52, the other end of the second condensation module 37 and the One end of four copper pipes 39 is connected, and the other end of the 4th copper pipe 39 is connected with the second evaporator 47, is installed on the 4th copper pipe 39 There is the second expansion valve 43, the first device for drying and filtering 46 is equiped with the 4th copper pipe 39;Second expansion valve 43 is positioned at the second condensation mould Between 37 and first device for drying and filtering 46 of block;Second radiator 51 is fixed in the upper plane of the 3rd bottom plate 56, the first radiator 49 are fixed in the upper plane of the second bottom plate 55;In use, by refrigeration working medium(That is refrigerant)In the first evaporator 53 and second The heat of cooled object is absorbed in evaporator 47 and is vaporized into steam, the first compressor 52 and the second compressor 45 constantly will productions Raw steam is extracted out from the first evaporator 53 and the second evaporator 47, and is compressed, high temperature, high steam after compression It is sent to after the first condensation module 40 and the second condensation module 37 to cooling medium(Such as water, air)Exothermic condensation is into high pressure liquid Body, is entering the first evaporator 53 and the second evaporator 47, again vapour after the first expansion valve 44 and the decompression of the second expansion valve 43 Change, absorb the heat of object to be cooled, so circulate again and again.
Cooling-water machine is a kind of water cooling equipment, and cooling-water machine is a kind of to provide constant temperature, constant current, the cooling water equipment of constant pressure; Conventional cooling-water machine is loosely organized, anti-pressure ability deficiency;Pipeline arrangement is not compact enough so that refrigeration effect and efficiency is not good enough;This Utility model is compact-sized rationally, conveniently moving and anti-pressure ability is stronger, and pipeline arrangement is orderly, refrigeration effect and efficient, the The setting of 51 and first radiator 49 of second radiator so that the heat that the first compressor 52 and the second compressor 45 produce can be in time Discharge, further increases refrigerating efficiency and effect and extends the service life of compressor.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of skill in the art that its according to It can so modify to the technical solution described in foregoing embodiments, or which part technical characteristic is replaced on an equal basis Change;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the utility model technical solution Spirit and scope.

Claims (9)

1. a kind of steel construction cooling-water machine system, including frame assembly, water tank, the first water pump, the second water pump, conduit assembly, first Bottom plate, the second bottom plate, the 3rd bottom plate, the first compressor, the second compressor, the first condensation babinet, the second condensation babinet, first dissipate Hot device and the second radiator, it is characterised in that the frame assembly include crossbeam, short beam, vertical tube, top frame, transverse tube, down tube, First stay tube, the second stay tube, the 3rd stay tube, the 4th stay tube, the 5th stay tube, the 6th stay tube, stent and the 7th stay tube;The pipeline Component includes the first water pipe, the first connector, the first valve, the second water pipe, the second connector, the first frost prevention switch, the second valve, the Three water pipes, the 3rd connector, the 3rd valve, the 4th water pipe, first pressure gauge, the 5th water pipe, the 4th valve, second pressure gauge, It is six water pipes, the second frost prevention switch, the 5th valve, the first condensation module, the first copper pipe, the second copper pipe, the first expansion valve, second swollen Swollen valve, the first device for drying and filtering, the first evaporator, the second condensation module, the 3rd copper pipe, the 4th copper pipe, the second device for drying and filtering With the second evaporator;Four corners of lower plane of the top frame are respectively and fixedly provided with a vertical tube, are fixed between four vertical tubes There are a two symmetrical crossbeams and two symmetrical short beams, three are further fixed on the inside of the top frame and is equally spaced Transverse tube, is fixed with the first stay tube, the second stay tube, the 3rd stay tube, the 4th stay tube, the 5th stay tube and the 6th between described two crossbeams Water tank is fixed with the upper plane of stay tube, first stay tube and one of short beam, second stay tube and the 3rd stay tube The first bottom plate is fixed with upper plane, the first condenser and second are fixed with the upper plane of the 4th stay tube and the 5th stay tube Condenser;The second bottom plate is fixed with the upper plane of 6th stay tube and another short beam.
A kind of 2. steel construction cooling-water machine system according to claim 1, it is characterised in that the upper plane of described two crossbeams On be further fixed on stent, the 7th stay tube, the 7th stay tube and branch are fixed between the inner side surface of the two of which vertical tube The upper plane of frame is fixed with the 3rd bottom plate;The first water pump and the second water pump are fixed with the upper plane of first bottom plate.
A kind of 3. steel construction cooling-water machine system according to claim 1, it is characterised in that one end of first water pipe with Insertion be fixed on the first condensation babinet side lower end and with first condensation box house is connected, first water pipe it is another End is connected with the water inlet end of the first water pump, and the first connector and the first valve, first valve are equiped with first water pipe Door is between the first connector and the first water pump.
A kind of 4. steel construction cooling-water machine system according to claim 1, it is characterised in that one end of second water pipe with The water outlet of first water pump is connected, and the other end insertion of second water pipe is fixed on the side upper end of the first condensation babinet simultaneously It is connected with the first condensation box house;The second connector, the first frost prevention switch and the second valve are equiped with second water pipe; Second connector is between the first water pump and the first frost prevention switch;First frost prevention switch is located at the second connector and second Between valve.
5. a kind of steel construction cooling-water machine system according to claim 1, it is characterised in that insert one end of the 3rd water pipe Enter the side side lower end for being fixed on the second condensation babinet and be connected with the inside of the second condensation babinet, the 3rd water pipe The other end is connected with the water inlet end of the second water pump, and the water outlet of second water pump is connected with one end of the 4th water pipe, institute The other end insertion for stating the 4th water pipe is fixed on the side side lower end of water tank and with being connected inside water tank, the 4th water pipe On be equiped with first pressure gauge;It is equiped with the 3rd connector and the 3rd valve on 3rd water pipe, the 3rd valve is positioned at the Between two water pumps and the 3rd connector.
6. a kind of steel construction cooling-water machine system according to claim 1, it is characterised in that under the side side of the water tank End also insertion is fixed with one end of the 5th water pipe, and the 5th water pipe is connected with the inside of water tank;Filled on 5th water pipe Equipped with the 4th valve, be also connected with second water pipe and be communicated with the 6th water pipe, the 6th water pipe be located at the second connector and Between first frost prevention switch, the second frost prevention switch, the 5th valve and second pressure gauge are equiped with the 6th water pipe, described Two frost prevention switchs are between second pressure gauge and the 5th valve.
A kind of 7. steel construction cooling-water machine system according to claim 1, it is characterised in that the one of first condensation module End is connected with one end of the first copper pipe, and the other end of first copper pipe is connected with the bottom of the first compressor, and described the The other end of one condensation module is connected with one end of the second copper pipe, and the other end of second copper pipe is connected with the first evaporator It is logical, it is equiped with the second device for drying and filtering and the first expansion valve on second copper pipe.
A kind of 8. steel construction cooling-water machine system according to claim 1, it is characterised in that the one of second condensation module End is connected with one end of the 3rd copper pipe, and the other end of the 3rd copper pipe is connected with the bottom of the second compressor, and described the The other end of two condensation modules is connected with one end of the 4th copper pipe, and the other end of the 4th copper pipe is connected with the second evaporator It is logical, the second expansion valve and the first device for drying and filtering are equiped with the 4th copper pipe, first expansion valve is positioned at the first evaporation Between device and the first condensation module.
9. a kind of steel construction cooling-water machine system according to claim 1, it is characterised in that second radiator is fixed on In the upper plane of 3rd bottom plate, first radiator is fixed in the upper plane of the second bottom plate;Second expansion valve is located at Between second condensation module and the first device for drying and filtering.
CN201721050322.2U 2017-08-22 2017-08-22 A kind of steel construction cooling-water machine system Expired - Fee Related CN207280066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721050322.2U CN207280066U (en) 2017-08-22 2017-08-22 A kind of steel construction cooling-water machine system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721050322.2U CN207280066U (en) 2017-08-22 2017-08-22 A kind of steel construction cooling-water machine system

Publications (1)

Publication Number Publication Date
CN207280066U true CN207280066U (en) 2018-04-27

Family

ID=61984559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721050322.2U Expired - Fee Related CN207280066U (en) 2017-08-22 2017-08-22 A kind of steel construction cooling-water machine system

Country Status (1)

Country Link
CN (1) CN207280066U (en)

Similar Documents

Publication Publication Date Title
CN207149977U (en) A kind of power distribution cabinet with heat sinking function
CN104456786B (en) Evaporation cooling and mechanical refrigeration combined integrated air conditioning unit
CN103225855B (en) The solution dehumidification air processor that a kind of multi-stage heat pump circulation drives
CN208124686U (en) A kind of refrigeration equipment high temperature air-cooled condensing group
CN201371022Y (en) High-efficiency compact energy-saving refrigerated type dryer
CN207280066U (en) A kind of steel construction cooling-water machine system
CN105698427B (en) Workshop section's lithium bromide refrigerating cooling and the hot ammonia I mother liquors cleaning device of Outer Cooler and method are crystallized in procedure of producing soda under joint alkaline process
CN1888743A (en) Air conditioner
CN206073492U (en) Cold storage refrigerating system
CN210123208U (en) Water-cooling screw type water chiller
CN2611840Y (en) Cool storage compressed air freezing dryer
CN203798195U (en) Cooling tower system device for processing defoaming circulating water
CN206566716U (en) A kind of gas compression cool drying all-in-one
CN106823704A (en) Semiconductor refrigerating drying machine
CN108499327B (en) High-pressure solution dehumidification and waste heat recovery device and method with adjustable pressure dew point
CN208688021U (en) A kind of agricultural machinery refrigerating circulatory device
CN106482263A (en) Evaporating air conditioner
CN207123109U (en) A kind of energy-saving mobile ice machine
CN207123107U (en) A kind of Novel movable ice machine
CN205991602U (en) A kind of air conditioner condensing device
CN218166500U (en) Air-cooled freeze dryer
CN218407738U (en) Compressor housing convenient to heat dissipation
CN110220343A (en) A kind of transparent block ice machine of ice sculpture
CN211706368U (en) Circulating freeze drier
CN204911177U (en) Compressed air refrigeration dryer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20200822

CF01 Termination of patent right due to non-payment of annual fee