Utility model content
The purpose of this utility model is to provide environmental protection greening corridor, can realize easily in the lighting operation at night, just
In the current of people and have a rest, it is overall beautiful, while use energy-saving and environmental protection.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of environmental protection greening corridor, including corridor, the corridor include erecting in both sides interval along the length direction of corridor
The support column that directly sets, be fixedly connected on fixed link at the top of support column in both sides, interval is fixed in that both sides are opposite to support capital
Top beam bar between portion, the support column are provided with the illumination for illumination towards the side wall on the inside of corridor along short transverse
Lamp, is fixedly mounted the solar cell module that oriented headlamp is powered between fixed link described in both sides, and the corridor is along long
Degree direction is installed with the mounting assembly for planting Hanging Plants below fixed link.
Using the above scheme, by the way that solar cell module is fixedly mounted with to being arranged at support column in the top of top beam bar
The headlamp of madial wall carries out the offer of electric energy, and use is more environmentally friendly, pollution-free, while reduces the waste to municipal electric power,
Can smoothly it be illuminated at night, what is be convenient for people to passes through, has a rest and view and admire, and the mounting assembly set can hang down
Hang the plantation of plant so that overall corridor is beautiful, environmental protection, while daytime is carried out in the lower section of solar cell module
The absorption of thermal energy, reduces the damage to solar cell module, and use is more economical, environmentally friendly, energy saving.
Preferably, the solar cell module includes the sun that some length direction spaced horizontals along corridor are installed
Energy solar panel and the solar panel are connected to the upper surface of top beam bar one by one.
Using the above scheme, some solar panels that solar cell module includes can realize single progress
Opto-electronic conversion carries out the supply of electric energy, reduces wherein a certain solar panel damage and causes the headlamp of overall corridor all can not
Situation about being illuminated occurs, and use is more flexible;And solar panel corresponds and carries out abutting support in top beam bar
Installation, is fixed by support of the top beam bar below solar panel, and then strengthens the mechanical strength of solar panel, is kept away
Exempt from solar panel to be easily damaged, prolong the service life.
It is useful for preferably, the fixed link is fixedly mounted between adjacent solar battery plate along its length
The glass plate of optical illumination, the fixed mechanism for fastening glass panels is additionally provided with the fixed link.
Using the above scheme, the glass plate that fixed link is fixedly mounted between adjacent solar panels along its length can be
Normal illumination on corridor so that the Hanging Plants planted in mounting assembly can contact sunlight and carry out normal photosynthesis,
The setting of glass plate at the same time enables the upper surface rain cover of corridor, can Sometimes When It Rains avoid plant directly by rain
Water washes away, and the setting of fixed mechanism can realize that the fixed installation to glass plate causes corridor overall structure to stablize.
Preferably, the side wall that the fixed mechanism includes being opened in fixed link is used for the card slot of inlay card glass plate, Tenon
In fixture block of the both sides of fixed link to be fixed in the upper end of glass plate.
Using the above scheme, the card slot that fixed mechanism is opened on the side wall of fixed link can carry out inlay card to glass plate,
Spacing to glass plate progress to avoid glass plate moving horizontally on corridor, fixture block Tenon realizes fixture block in the both sides of fixed link
Fixed and fixture block can be fixed in the upper end of glass plate, so that glass plate in the vertical direction can also keep stable
Firmly, and then fixed mechanism realizes that the overall of glass plate is firmly installed, simple installation and stabilization.
Preferably, the fixture block is L-shaped and edge along glass plate is connected to the upper surface of glass plate everywhere.
Using the above scheme, fixture block is L-shaped can realize that one end Tenon is connected to glass in another part in fixed link
The upper surface on edges of boards edge, and then setting that is spacing, and being abutted everywhere along the edge of glass plate is realized in the upper surface of glass plate
Part encapsulation process can be formed between glass plate and fixed link by fixture block, is formed when reducing glass plate installation big
The situation of infiltration inside Sometimes When It Rains corridor is caused to occur in gap.
Preferably, the mounting assembly includes along the length direction of corridor is fixed in support column below fixed link
Between mounting rod, horizontal be fixedly connected between the mounting rod of both sides for planting the mounting box of Hanging Plants.
Using the above scheme, mounting assembly coordinates along the length direction of corridor in the affixed mounting rod in the lower section of fixed link
In mounting box, the fixed installation to mounting box is realized by mounting rod, and mounting box level is fixedly connected on the mounting rod of both sides
Between to realize plantation to Hanging Plants.
Preferably, the mounting box is right against the junction of solar cell module and glass plate, the glass vertically
Just shifted to install between plate and solar cell module and the upper surface of the glass plate is less than under solar cell module
Surface supplies rain penetration to the permeable groove of mounting box to be formed in both junctions.
Using the above scheme, mounting box is right against the junction of solar cell module and glass plate, and glass plate vertically
High infraversion malposition forms permeable groove between solar cell module, so that Sometimes When It Rains rainwater can be partly from permeable groove
Permeated in the interior mounting box to underface, and then realize and the moisture of Hanging Plants is supplied, save the energy.
It is communicated in the external world to discharge moisture unnecessary in mounting box preferably, the both ends of the mounting box offer
Osculum.
Using the above scheme, the osculum that the both ends of mounting box open up can carry out drain operation in the both sides of mounting box,
Drain operation can be naturally carried out out of osculum when excess moisture in mounting box, keeps moisture in mounting box to close
It is suitable, so that plant preferably grows.
In conclusion the utility model has the advantages that:
The utilization to nature luminous energy is realized in setting by installing solar cell module above corridor, can be corridor
Interior headlamp provides electric energy, is well at night, easily lighting operation, using more environment-protecting clean, and in corridor
The mounting assembly of interior setting can realize the plantation of Hanging Plants, so that in corridor under the decoration of Hanging Plants more
Beauty, afforest, be refrigerant, while can realize the absorbing operation below solar cell module, reduces solar cell module
Damage.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Environmental protection greening corridor disclosed in the present embodiment, as shown in Figure 1, including corridor 1, corridor 1 includes along length
The support column 11 that direction is supported in both sides, is connected to the fixed link 12 of the upper end of column 11 supported on both sides and is erected at
The top of column 11 supported on both sides and the top beam bar 13 for the fixed link 12 for being fixedly connected on both sides.Support column 11 is set along vertical direction
Put, the gallery to pass through for people is formed between both sides, installation, and top beam bar 13 are fixed in the top of support column 11 for fixed link 12
Realize being fixedly connected for both sides.It is additionally provided with the top of corridor 1 for receiving illumination and carrying out the solar-electricity of opto-electronic conversion
Pond component 2, is then provided with headlamp 111 in the madial wall of support column 11, corridor is realized by the power supply of solar cell module 2
Illumination beautification in 1.
As shown in Fig. 2, solar cell module 2 includes some spaced solar panels, solar cell
Plate is fixedly installed between the fixed link 12 of both sides, and is corresponded and set in top beam bar 13, is fixedly installed in top beam bar 13
Realize that support is fixed by top beam bar 13 in top so that solar panel installation is more firm.The fixed link 12 of both sides exists
Glass plate 3 is then installed between adjacent solar battery plate, blocking for the top of corridor 1 is realized by glass plate 3, while
Realize printing opacity.The both sides of glass plate 3 are connected in fixed link 12, and are additionally provided with the fixation that fixed mechanism 4 realizes team's glass plate 3
Operation.
As shown in figure 3, fixed mechanism 4, which includes along the length direction of fixed link 12, is opened in 12 upper surface of fixed link
The fixture block 42 of card slot 41 and inlay card in card slot 41, fixture block 42 is L-shaped and is mortgaged everywhere along the edge of glass plate 3, with
The upper surface of glass plate 3 is fixed, 42 Tenon of fixture block is fixed in the card slot 41 of fixed link 12.The side of fixed link 12
Along depression so that glass plate 3 is installed inlay card and stablized, and mutual dislocation between glass plate 3 and solar panel, form high-low-position
Put difference and in both junctions formed with permeable groove 6.Mounting assembly 5 is additionally provided between the fixed link 12 of both sides for kind
Plant Hanging Plants and cause the overall more beautiful environmental protection of corridor 1.
As shown in figure 4, mounting assembly 5, which includes along the length direction of corridor 1, is fixedly installed in the lower section of fixed link 12
Mounting rod 51, formed with gap between mounting rod 51 and fixed link 12, mounting assembly 5, which has further included, is connected to both sides mounting rod 51
Between mounting box 52,52 both ends of mounting box are installed between mounting rod 51 and fixed link 12, and mounting box 52 is right against glass
The junction of plate 3 and solar cell module 2 is set, so that mounting box 52 can be directed at permeable groove 6, when rainy so that permeable
In groove 6 when infiltration, mounting box 52 can realize automatic water recharging, reduce the number of operations at manually addition water source, and
The setting of the permeable groove 6 of 52 face of mounting box can also avoid the water of circulation in permeable groove 6 from being directly dropped in corridor 1.Mounting box
52 both sides are communicated in the outside of corridor 1, and both sides offer osculum 521, when excess moisture in mounting box 52,
The exclusion of excessive moisture can be realized by the osculum 521 of both sides.
Operating procedure:
1st, Hanging Plants are planted in the mounting box 52 of mounting assembly 5, mounting box 52 is installed on fixed link 12 in peace
Realization is fixed between filling bar 51;
The 2nd, solar panel is realized to fixed installation one by one, and glass plate 3 is realized into inlay card and by fixture block 42 one by one
Realize and fix;
3rd, solar panel carries out opto-electronic conversion when daytime, to provide the electric energy of headlamp 111;Sometimes When It Rains
Seeped water by permeable groove 6 into mounting box 52 and realize the natural pouring of Hanging Plants.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability
Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but
As long as all protected in the right of the utility model be subject to Patent Law.