CN207277907U - Environmental protection greening corridor - Google Patents

Environmental protection greening corridor Download PDF

Info

Publication number
CN207277907U
CN207277907U CN201721120626.1U CN201721120626U CN207277907U CN 207277907 U CN207277907 U CN 207277907U CN 201721120626 U CN201721120626 U CN 201721120626U CN 207277907 U CN207277907 U CN 207277907U
Authority
CN
China
Prior art keywords
corridor
environmental protection
fixed link
glass plate
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721120626.1U
Other languages
Chinese (zh)
Inventor
张建国
朱君其
王林
李秀丽
梁伙明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxin Eco Environment Technology Co ltd
TONGXIN ECOLOGICAL ENVIRONMENT TECHNOLOGY Co.,Ltd.
Original Assignee
Zhejiang Letter Garden Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Letter Garden Construction Ltd By Share Ltd filed Critical Zhejiang Letter Garden Construction Ltd By Share Ltd
Priority to CN201721120626.1U priority Critical patent/CN207277907U/en
Application granted granted Critical
Publication of CN207277907U publication Critical patent/CN207277907U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of environmental protection greening corridor,Solve the illumination of current corridor and do not popularize and cause night to influence current and view and admire,The drawbacks of then energy waste being caused using municipal electric power again,Its key points of the technical solution are that including corridor,Corridor includes the support column being vertically arranged along the length direction of corridor in both sides interval,The fixed link being fixedly connected at the top of support column,Top beam bar between being fixed at the top of two support columns,Support column is provided with the headlamp for illumination towards the side wall on the inside of corridor along short transverse,The solar cell module that oriented headlamp is powered is fixedly mounted between the fixed link of both sides,Corridor is installed with the mounting assembly for planting Hanging Plants below fixed link along its length,The environmental protection greening corridor of the utility model,It can realize easily in the lighting operation at night,Easy to the current of people and have a rest,It is overall beautiful,At the same time using energy saving,Environmental protection.

Description

Environmental protection greening corridor
Technical field
Gardens construction device is the utility model is related to, more particularly to environmental protection greening corridor.
Background technology
Various corridors can be set in some gardens of municipal for people's leisure respite, with the hair of municipal Urban Greening Exhibition, is also constantly improved, the combination of green plants and corridor is also more and more for the requirement afforested and beautified.
As the corridor of leisure respite, it is difficult to when night and insufficient light it is clear that inconvenient walking, to people's Viewing and admiring respite makes troubles, while also influences the leisure mood of people, if carrying out the powered lighting of municipal power equipment, then can Certain energy waste is caused, uses then not environmentally friendly enough, energy saving, the space that could be improved.
Utility model content
The purpose of this utility model is to provide environmental protection greening corridor, can realize easily in the lighting operation at night, just In the current of people and have a rest, it is overall beautiful, while use energy-saving and environmental protection.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of environmental protection greening corridor, including corridor, the corridor include erecting in both sides interval along the length direction of corridor The support column that directly sets, be fixedly connected on fixed link at the top of support column in both sides, interval is fixed in that both sides are opposite to support capital Top beam bar between portion, the support column are provided with the illumination for illumination towards the side wall on the inside of corridor along short transverse Lamp, is fixedly mounted the solar cell module that oriented headlamp is powered between fixed link described in both sides, and the corridor is along long Degree direction is installed with the mounting assembly for planting Hanging Plants below fixed link.
Using the above scheme, by the way that solar cell module is fixedly mounted with to being arranged at support column in the top of top beam bar The headlamp of madial wall carries out the offer of electric energy, and use is more environmentally friendly, pollution-free, while reduces the waste to municipal electric power, Can smoothly it be illuminated at night, what is be convenient for people to passes through, has a rest and view and admire, and the mounting assembly set can hang down Hang the plantation of plant so that overall corridor is beautiful, environmental protection, while daytime is carried out in the lower section of solar cell module The absorption of thermal energy, reduces the damage to solar cell module, and use is more economical, environmentally friendly, energy saving.
Preferably, the solar cell module includes the sun that some length direction spaced horizontals along corridor are installed Energy solar panel and the solar panel are connected to the upper surface of top beam bar one by one.
Using the above scheme, some solar panels that solar cell module includes can realize single progress Opto-electronic conversion carries out the supply of electric energy, reduces wherein a certain solar panel damage and causes the headlamp of overall corridor all can not Situation about being illuminated occurs, and use is more flexible;And solar panel corresponds and carries out abutting support in top beam bar Installation, is fixed by support of the top beam bar below solar panel, and then strengthens the mechanical strength of solar panel, is kept away Exempt from solar panel to be easily damaged, prolong the service life.
It is useful for preferably, the fixed link is fixedly mounted between adjacent solar battery plate along its length The glass plate of optical illumination, the fixed mechanism for fastening glass panels is additionally provided with the fixed link.
Using the above scheme, the glass plate that fixed link is fixedly mounted between adjacent solar panels along its length can be Normal illumination on corridor so that the Hanging Plants planted in mounting assembly can contact sunlight and carry out normal photosynthesis, The setting of glass plate at the same time enables the upper surface rain cover of corridor, can Sometimes When It Rains avoid plant directly by rain Water washes away, and the setting of fixed mechanism can realize that the fixed installation to glass plate causes corridor overall structure to stablize.
Preferably, the side wall that the fixed mechanism includes being opened in fixed link is used for the card slot of inlay card glass plate, Tenon In fixture block of the both sides of fixed link to be fixed in the upper end of glass plate.
Using the above scheme, the card slot that fixed mechanism is opened on the side wall of fixed link can carry out inlay card to glass plate, Spacing to glass plate progress to avoid glass plate moving horizontally on corridor, fixture block Tenon realizes fixture block in the both sides of fixed link Fixed and fixture block can be fixed in the upper end of glass plate, so that glass plate in the vertical direction can also keep stable Firmly, and then fixed mechanism realizes that the overall of glass plate is firmly installed, simple installation and stabilization.
Preferably, the fixture block is L-shaped and edge along glass plate is connected to the upper surface of glass plate everywhere.
Using the above scheme, fixture block is L-shaped can realize that one end Tenon is connected to glass in another part in fixed link The upper surface on edges of boards edge, and then setting that is spacing, and being abutted everywhere along the edge of glass plate is realized in the upper surface of glass plate Part encapsulation process can be formed between glass plate and fixed link by fixture block, is formed when reducing glass plate installation big The situation of infiltration inside Sometimes When It Rains corridor is caused to occur in gap.
Preferably, the mounting assembly includes along the length direction of corridor is fixed in support column below fixed link Between mounting rod, horizontal be fixedly connected between the mounting rod of both sides for planting the mounting box of Hanging Plants.
Using the above scheme, mounting assembly coordinates along the length direction of corridor in the affixed mounting rod in the lower section of fixed link In mounting box, the fixed installation to mounting box is realized by mounting rod, and mounting box level is fixedly connected on the mounting rod of both sides Between to realize plantation to Hanging Plants.
Preferably, the mounting box is right against the junction of solar cell module and glass plate, the glass vertically Just shifted to install between plate and solar cell module and the upper surface of the glass plate is less than under solar cell module Surface supplies rain penetration to the permeable groove of mounting box to be formed in both junctions.
Using the above scheme, mounting box is right against the junction of solar cell module and glass plate, and glass plate vertically High infraversion malposition forms permeable groove between solar cell module, so that Sometimes When It Rains rainwater can be partly from permeable groove Permeated in the interior mounting box to underface, and then realize and the moisture of Hanging Plants is supplied, save the energy.
It is communicated in the external world to discharge moisture unnecessary in mounting box preferably, the both ends of the mounting box offer Osculum.
Using the above scheme, the osculum that the both ends of mounting box open up can carry out drain operation in the both sides of mounting box, Drain operation can be naturally carried out out of osculum when excess moisture in mounting box, keeps moisture in mounting box to close It is suitable, so that plant preferably grows.
In conclusion the utility model has the advantages that:
The utilization to nature luminous energy is realized in setting by installing solar cell module above corridor, can be corridor Interior headlamp provides electric energy, is well at night, easily lighting operation, using more environment-protecting clean, and in corridor The mounting assembly of interior setting can realize the plantation of Hanging Plants, so that in corridor under the decoration of Hanging Plants more Beauty, afforest, be refrigerant, while can realize the absorbing operation below solar cell module, reduces solar cell module Damage.
Brief description of the drawings
Fig. 1 is the structure diagram in greening corridor;
Fig. 2 is the exploded perspective view in greening corridor;
Fig. 3 is the enlarged drawing in A portions in Fig. 2;
Fig. 4 is the enlarged drawing in B portions in Fig. 2.
In figure:1st, corridor;11st, support column;111st, headlamp;12nd, fixed link;13rd, top beam bar;2nd, solar battery group Part;3rd, glass plate;4th, fixed mechanism;41st, card slot;42nd, fixture block;5th, mounting assembly;51st, mounting rod;52nd, mounting box;521st, arrange Water hole;6th, permeable groove.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Environmental protection greening corridor disclosed in the present embodiment, as shown in Figure 1, including corridor 1, corridor 1 includes along length The support column 11 that direction is supported in both sides, is connected to the fixed link 12 of the upper end of column 11 supported on both sides and is erected at The top of column 11 supported on both sides and the top beam bar 13 for the fixed link 12 for being fixedly connected on both sides.Support column 11 is set along vertical direction Put, the gallery to pass through for people is formed between both sides, installation, and top beam bar 13 are fixed in the top of support column 11 for fixed link 12 Realize being fixedly connected for both sides.It is additionally provided with the top of corridor 1 for receiving illumination and carrying out the solar-electricity of opto-electronic conversion Pond component 2, is then provided with headlamp 111 in the madial wall of support column 11, corridor is realized by the power supply of solar cell module 2 Illumination beautification in 1.
As shown in Fig. 2, solar cell module 2 includes some spaced solar panels, solar cell Plate is fixedly installed between the fixed link 12 of both sides, and is corresponded and set in top beam bar 13, is fixedly installed in top beam bar 13 Realize that support is fixed by top beam bar 13 in top so that solar panel installation is more firm.The fixed link 12 of both sides exists Glass plate 3 is then installed between adjacent solar battery plate, blocking for the top of corridor 1 is realized by glass plate 3, while Realize printing opacity.The both sides of glass plate 3 are connected in fixed link 12, and are additionally provided with the fixation that fixed mechanism 4 realizes team's glass plate 3 Operation.
As shown in figure 3, fixed mechanism 4, which includes along the length direction of fixed link 12, is opened in 12 upper surface of fixed link The fixture block 42 of card slot 41 and inlay card in card slot 41, fixture block 42 is L-shaped and is mortgaged everywhere along the edge of glass plate 3, with The upper surface of glass plate 3 is fixed, 42 Tenon of fixture block is fixed in the card slot 41 of fixed link 12.The side of fixed link 12 Along depression so that glass plate 3 is installed inlay card and stablized, and mutual dislocation between glass plate 3 and solar panel, form high-low-position Put difference and in both junctions formed with permeable groove 6.Mounting assembly 5 is additionally provided between the fixed link 12 of both sides for kind Plant Hanging Plants and cause the overall more beautiful environmental protection of corridor 1.
As shown in figure 4, mounting assembly 5, which includes along the length direction of corridor 1, is fixedly installed in the lower section of fixed link 12 Mounting rod 51, formed with gap between mounting rod 51 and fixed link 12, mounting assembly 5, which has further included, is connected to both sides mounting rod 51 Between mounting box 52,52 both ends of mounting box are installed between mounting rod 51 and fixed link 12, and mounting box 52 is right against glass The junction of plate 3 and solar cell module 2 is set, so that mounting box 52 can be directed at permeable groove 6, when rainy so that permeable In groove 6 when infiltration, mounting box 52 can realize automatic water recharging, reduce the number of operations at manually addition water source, and The setting of the permeable groove 6 of 52 face of mounting box can also avoid the water of circulation in permeable groove 6 from being directly dropped in corridor 1.Mounting box 52 both sides are communicated in the outside of corridor 1, and both sides offer osculum 521, when excess moisture in mounting box 52, The exclusion of excessive moisture can be realized by the osculum 521 of both sides.
Operating procedure:
1st, Hanging Plants are planted in the mounting box 52 of mounting assembly 5, mounting box 52 is installed on fixed link 12 in peace Realization is fixed between filling bar 51;
The 2nd, solar panel is realized to fixed installation one by one, and glass plate 3 is realized into inlay card and by fixture block 42 one by one Realize and fix;
3rd, solar panel carries out opto-electronic conversion when daytime, to provide the electric energy of headlamp 111;Sometimes When It Rains Seeped water by permeable groove 6 into mounting box 52 and realize the natural pouring of Hanging Plants.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but As long as all protected in the right of the utility model be subject to Patent Law.

Claims (8)

1. a kind of environmental protection greening corridor, including corridor (1), the corridor (1) include the length direction along corridor (1) in both sides It is spaced the support column (11) being vertically arranged, in both sides to be fixedly connected on fixed link (12) at the top of support column (11), interval affixed In both sides with respect to the top beam bar (13) between support column (11) top, it is characterized in that:The support column (11) is towards on the inside of corridor Side wall headlamp (111) for illumination is installed along short transverse, be fixedly mounted between fixed link (12) described in both sides The solar cell module (2) that oriented headlamp (111) is powered, the corridor (1) is along its length in fixed link (12) Lower section be installed with mounting assembly (5) for planting Hanging Plants.
2. environmental protection greening corridor according to claim 1, it is characterized in that:The solar cell module (2) includes some The solar panel and the solar panel installed along the length direction spaced horizontal of corridor (1) are connected to top one by one The upper surface of beam column (13).
3. environmental protection greening corridor according to claim 2, it is characterized in that:The fixed link (12) is along its length in phase The glass plate (3) for being useful for illumination light transmission is fixedly mounted between adjacent solar panel, use is additionally provided with the fixed link (12) Fixed mechanism (4) in fastening glass panels (3).
4. environmental protection greening corridor according to claim 3, it is characterized in that:The fixed mechanism (4) includes being opened in fixation The side wall of bar (12) is used for the card slot (41) of inlay card glass plate (3), Tenon in the both sides of fixed link (12) with glass plate (3) The fixture block (42) that upper end fixes.
5. environmental protection greening corridor according to claim 4, it is characterized in that:The fixture block (42) is L-shaped and along glass The edge of plate (3) is connected to the upper surface of glass plate (3) everywhere.
6. environmental protection greening corridor according to claim 3, it is characterized in that:The mounting assembly (5) includes along corridor (1) Length direction mounting rod (51) between support column (11) is fixed in below fixed link (12), level is fixedly connected on two For the mounting box (52) of plantation Hanging Plants between side mounting rod (51).
7. environmental protection greening corridor according to claim 6, it is characterized in that:The mounting box (52) is right against solar energy vertically The junction of battery component (2) and glass plate (3), high infraversion malposition is set between the glass plate (3) and solar cell module (2) Put and the upper surface of the glass plate (3) supplies rain less than the lower surface of solar cell module (2) to be formed in both junctions Water penetration to mounting box (52) permeable groove (6).
8. environmental protection greening corridor according to claim 7, it is characterized in that:The both ends of the mounting box (52) offer connection In osculum (521) of the external world moisture unnecessary in mounting box (52) to be discharged.
CN201721120626.1U 2017-09-04 2017-09-04 Environmental protection greening corridor Active CN207277907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721120626.1U CN207277907U (en) 2017-09-04 2017-09-04 Environmental protection greening corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721120626.1U CN207277907U (en) 2017-09-04 2017-09-04 Environmental protection greening corridor

Publications (1)

Publication Number Publication Date
CN207277907U true CN207277907U (en) 2018-04-27

Family

ID=61989588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721120626.1U Active CN207277907U (en) 2017-09-04 2017-09-04 Environmental protection greening corridor

Country Status (1)

Country Link
CN (1) CN207277907U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111149557A (en) * 2020-01-07 2020-05-15 深圳市现代城市建筑设计有限公司 Green gallery
CN111802135A (en) * 2020-07-20 2020-10-23 黄得永 Vine plant shed frame for ecological corridor construction
CN114215392A (en) * 2021-11-30 2022-03-22 上海阿特贝尔景观规划设计有限公司 Landscape corridor frame structure based on garden design

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111149557A (en) * 2020-01-07 2020-05-15 深圳市现代城市建筑设计有限公司 Green gallery
CN111802135A (en) * 2020-07-20 2020-10-23 黄得永 Vine plant shed frame for ecological corridor construction
CN114215392A (en) * 2021-11-30 2022-03-22 上海阿特贝尔景观规划设计有限公司 Landscape corridor frame structure based on garden design

Similar Documents

Publication Publication Date Title
CN207277907U (en) Environmental protection greening corridor
CN204806229U (en) New forms of energy street lamp
KR101001341B1 (en) Lighting pole within solar module
CN206593007U (en) A kind of solar LED street lamp with spraying function
CN206101085U (en) Intelligence photovoltaic green house
CN202787110U (en) Multifunctional road surface indicating board
KR101269473B1 (en) The L which has a hemisphere style solar battery module the D street lamp
CN208354162U (en) A kind of water-saving environmental-protection planting greenhouse
CN207094469U (en) A kind of novel and multifunctional solar street light
CN201909268U (en) Solar garden lamp
CN102165902A (en) Ecological greening device
CN201228901Y (en) Double-energy source multifunctional street lamp
CN209458834U (en) A kind of garden landscape street lamp facilitating adjusting
CN107386162A (en) A kind of solar energy afforests municipal guardrail
CN209672206U (en) A kind of built-in type hidden-form Landscape Lamp
CN203628479U (en) Sunshade street lamp
CN106031355A (en) Forestry transplanted tree protection support
CN212671314U (en) Landscape architecture wayside pavilion
CN210241417U (en) Three-dimensional greening formula landscape environmental protection lamp
CN206310414U (en) A kind of solar energy geography lamp with light control functionality
CN214038202U (en) Lamp post of garden lamp
CN212987050U (en) Integrative fence of environmental protection and energy saving solar lamp post
CN217470835U (en) Greening frame for municipal works
CN212507578U (en) Energy-saving bus stop with rainwater collection function
CN201448733U (en) Solar flowerpot lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 315507 Third Floor of Huangxian Village Committee, Qiucun Town, Fenghua District, Ningbo City, Zhejiang Province

Patentee after: Tongxin Eco-environment Technology Co.,Ltd.

Address before: 315507 Third Floor of Huangxian Village Committee, Qiucun Town, Fenghua District, Ningbo City, Zhejiang Province

Patentee before: TONGXIN ECOLOGICAL ENVIRONMENT TECHNOLOGY Co.,Ltd.

Address after: 315507 Third Floor of Huangxian Village Committee, Qiucun Town, Fenghua District, Ningbo City, Zhejiang Province

Patentee after: TONGXIN ECOLOGICAL ENVIRONMENT TECHNOLOGY Co.,Ltd.

Address before: 315507 Third Floor of Huangxian Village Committee, Qiucun Town, Fenghua District, Ningbo City, Zhejiang Province

Patentee before: ZHEJIANG TONGXIN LANDSCAPE CONSTRUCTION CO.,LTD.