CN207277103U - Railway frog - Google Patents

Railway frog Download PDF

Info

Publication number
CN207277103U
CN207277103U CN201621330000.9U CN201621330000U CN207277103U CN 207277103 U CN207277103 U CN 207277103U CN 201621330000 U CN201621330000 U CN 201621330000U CN 207277103 U CN207277103 U CN 207277103U
Authority
CN
China
Prior art keywords
rail
heart
railway frog
connection
fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621330000.9U
Other languages
Chinese (zh)
Inventor
李伟
张立军
李永茂
谢明峻
尉小明
朱婷婷
闫佳
姜丽丽
王猛
钱坤
邓瑞平
潘佳音
李岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
High-New Tramcar Co Ltd In Suzhou
North Vehicle (beijing) Track Equipment Co Ltd
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Original Assignee
High-New Tramcar Co Ltd In Suzhou
North Vehicle (beijing) Track Equipment Co Ltd
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by High-New Tramcar Co Ltd In Suzhou, North Vehicle (beijing) Track Equipment Co Ltd, China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS filed Critical High-New Tramcar Co Ltd In Suzhou
Priority to CN201621330000.9U priority Critical patent/CN207277103U/en
Application granted granted Critical
Publication of CN207277103U publication Critical patent/CN207277103U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model provides a kind of railway frog, including the fork heart and connection rail, connection rail are connected with pitching the termination of the heart, and at least top for pitching the heart is made of wear-resisting alloy steel.By the fork heart of antifriction alloy steel making, its wearability is higher than existing high manganese steel frog, thus can replace high manganese steel frog, extensive use on the railroad track.

Description

Railway frog
Technical field
Tramcar track switch field of structural design is the utility model is related to, in particular to a kind of railway frog.
Background technology
Now, more and more big and medium-sized cities start Urban Rail Transit Development, as track traffic weakest link Tramcar track switch, domestic design theory by blank new transformation, and achieve certain achievement.
Most common tramcar track switch is grooved track trouble, and track switch railway frog is one of its weak link.Meanwhile railway frog The important composition component of railway track structure, be rolling stock wheel from-that stock rail goes to another strand of rail is required Special installation.Railway frog locomotive by when will be subject to huge wheel impacts load, railway frog is except being greatly increased at this time Outside dead load, will also dynamic loading maximum on rail be born, and on rail and track switch, dynamic loading is 2~5 times of dead load.
Since the operating condition of railway frog is extremely harsh, its requirement to material is very stringent naturally.At present, The railway frog used in China railways mainly has two kinds:One kind is high-carbon steel assembled frog, is processed with common high-carbon rail, passes through spiral shell Bolt fastening forms.This railway frog was both not wear-resisting, and bolt easily loosens, the defects of crackle can be usually formed at threaded hole, so that The service life is caused to be greatly shortened, maintenance work amount is big, has been rarely employed;Another kind is solid manganese steel frog, it is laid with extensively It is the main composition of China railways railway frog on China railways main line.
With the development of Chinese national economy, railway transporting amount rapidly increases.Railway construction will be towards speed-raising, high speed, heavy duty Target development, traditional solid manganese steel frog have been unable to meet China railways development needs.
Utility model content
The main purpose of the utility model is that provide a kind of wear-resisting property more preferable railway frog.
To achieve these goals, one side according to the present utility model, there is provided a kind of railway frog, including the fork heart and company Integrate with, connection rail is connected with pitching the termination of the heart, and at least top for pitching the heart is made of wear-resisting alloy steel.
Further, the heart is pitched integrally all to be made of wear-resisting alloy steel.
Further, the hardness of the heart is pitched between 370HBW~430HBW.
Further, connection rail is formed by U75V rail.
Further, pitch and welded between the termination of the heart and connection rail by flash welding.
Further, the termination for pitching the heart is four, and four terminations are relatively conllinear two-by-two respectively to be set, and is accordingly connected Rail is also four, and four terminations are connected to a connection rail, and four connection rails are also relatively conllinear two-by-two respectively to be set.
Further, pitch the heart and four connection rails form X-shaped structure.
Further, connection rail offers the first groove structure, and fork offers what is be connected with the first groove structure in the heart Second groove structure.
Further, connection rail includes the sequentially connected flange of rail, the web of the rail and rail head, and the flange of rail is used to be fixed at ground On.
Further, railway frog is arranged in pairs, and connects and mounting hole is offered on the web of the rail of rail, and mounting hole is multiple, Duo Gean Dress hole is correspondingly arranged with the mounting hole on the web of the rail for the connection rail being arranged in pairs, and the mounting hole being correspondingly arranged is used for attaching plate elements, To keep the gauge for the connection rail being arranged in pairs.
Using the technical solution of the utility model, by the fork heart of antifriction alloy steel making, its wearability is higher than existing height Manganese steel frog, thus high manganese steel frog can be replaced, extensive use on the railroad track.
In addition to objects, features and advantages described above, the utility model also has other purposes, feature and excellent Point.Below with reference to figure, the utility model is described in further detail.
Brief description of the drawings
The Figure of description for forming the part of the utility model is used to provide a further understanding of the present invention, this The schematic description and description of utility model is used to explain the utility model, does not form the improper limit to the utility model It is fixed.In the accompanying drawings:
Fig. 1 shows the structure diagram of the embodiment of railway frog according to the present utility model;And
Fig. 2 shows the schematic cross-sectional view at the A in Fig. 1.
Wherein, above-mentioned attached drawing is marked including the following drawings:
10th, the heart is pitched;20th, rail is connected.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the utility model can To be mutually combined.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
It is real below in conjunction with the utility model in order to make those skilled in the art more fully understand the utility model The attached drawing in example is applied, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described Embodiment is only the embodiment of the utility model part, instead of all the embodiments.Based on the reality in the utility model Apply example, those of ordinary skill in the art's all other embodiments obtained without making creative work, all should When the scope for belonging to the utility model protection.
It should be noted that term " first " in the specification and claims of the utility model and above-mentioned attached drawing, " second " etc. is for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so The term used can exchange in the appropriate case, so as to the embodiment of the utility model described herein.In addition, term " bag Include " and " having " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing series of steps Or process, method, system, product or the equipment of unit are not necessarily limited to those steps or the unit clearly listed, but can wrap Include not listing clearly or for the intrinsic other steps of these processes, method, product or equipment or unit.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
Unless specifically stated otherwise, the component and positioned opposite, the digital table of step otherwise illustrated in these embodiments Up to the unlimited the scope of the utility model processed of formula and numerical value.At the same time, it should be appreciated that each shown in attached drawing for the ease of description The size of a part is not to be drawn according to actual proportionate relationship.For skill known to person of ordinary skill in the relevant Art, method and apparatus may be not discussed in detail, but in the appropriate case, the technology, method and apparatus should be considered as awarding Weigh part for specification.In shown here and discussion all examples, any occurrence should be construed as merely example Property, not as limitation.Therefore, the other examples of exemplary embodiment can have different values.It should be noted that:It is similar Label and letter similar terms is represented in following attached drawing, therefore, once be defined in a certain Xiang Yi attached drawing, then with It need not be further discussed in attached drawing afterwards.
For the ease of description, spatially relative term can be used herein, as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation of sign.It should be appreciated that spatially relative term is intended to comprising the orientation except device described in figure Outside different azimuth in use or operation.For example, if the device in attached drawing is squeezed, it is described as " in other devices It will be positioned as " under other devices or construction after the device of part or construction top " or " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The device can also other different modes positioning (being rotated by 90 ° or in other orientation), and And respective explanations are made to the opposite description in space used herein above.
In the description of the utility model, it is to be understood that the noun of locality such as " forward and backward, upper and lower, left and right ", " horizontal, Vertically, vertically, it is horizontal " and " pushing up, bottom " etc. indicated by orientation or position relationship be normally based on orientation or position shown in the drawings Relation is put, description the utility model is for only for ease of and simplifies description, in the case where not making conversely explanation, these nouns of locality Do not indicate that and imply that the device of meaning or element there must be specific orientation or with specific azimuth configuration and operation, because This is it is not intended that limitation to scope of protection of the utility model;The noun of locality " inside and outside " refers to the wheel relative to each component in itself Wide is inside and outside.
Fig. 1 shows the structure of the embodiment one of the railway frog of the utility model, including the fork heart 10 and the termination with pitching the heart 10 The connection rail 20 of connection.Wherein, at least top for pitching the heart 10 is made of wear-resisting alloy steel.The fork heart of antifriction alloy steel making, its Wearability is higher than existing high manganese steel frog, thus can replace high manganese steel frog, extensive use on the railroad track.
Optionally, the hardness of the heart 10 is pitched between 370HBW~430HBW.Because pitching at least part of the heart by wear-resisting alloy steel It is made, thus, the fork heart has high intensity, high tenacity.
Optionally, rail 20 is connected by being formed for U75V rail.Railway frog used in common single turnout, uses common U75V steel Rail;When welded frog applies to diamond crossing, due to the presence of sharp fork or blunt fork idle space, it is possible to cause opposite It is another it is sharp fork or it is blunt fork connection rail play the role of guard rail, abrasion-resistant stee can be used in the connection rail at this time.
Optionally, pitch and welded between the termination of the heart 10 and connection rail 20 by flash welding.Flash welding is electric current by two The contact surface of workpiece, the resistance of its tiny contact point and its electric arc generation heat for contacting surface are docked, by butting surface Heating, in due course between after, butt joint applies pressure, makes the whole regions of the two butting surfaces electricity that gets up of strong bonded at the same time Welding resistance method.In embodiment one, by flash welding, the fork heart 10 can be connected firmly with being connected rail 20, and shape is integral.
As shown in Figure 1, in embodiment one, the termination of the fork heart 10 is four, and four terminations are relatively conllinear two-by-two respectively Set, it is also four accordingly to connect rail 20, and four terminations are connected to a connection rail 20, and four connection rails 20 also divide It is relatively not conllinear two-by-two to set.When wheel passes through railway frog, first the connection rail 20 from fork heart side passes through the fork heart, then drives to fork On the connection rail 20 of heart opposite side, so as to fulfill the lane change of locomotive.
As shown in Figure 1, in embodiment one, pitch the heart 10 and four connection rails 20 form X-shaped structure.Wheels travel is this In X-shaped structure, travel route can be varied as desired in, realizes the lane change of locomotive.
In embodiment one, as depicted in figs. 1 and 2, connect and the first groove structure is offered on rail 20, pitch and opened up on the heart 10 There is the second groove structure being connected with the first groove structure.Connected by the first groove structure and the second groove structure, guiding Wheel, again to rail 20 is connected, completes the lane change process of locomotive from connection rail 20 to the fork heart 10.
Optionally, connection rail 20 includes the sequentially connected flange of rail, the web of the rail and rail head, and the flange of rail is used to be fixed at ground On.It is fixedly connected with the ground by the flange of rail, it is ensured that locomotive driving connection rail 20 when connecting on rail 20 will not rock, it is ensured that driving Safety.Optionally, land-fill method can be also used, by flange of rail landfill and ground.
Railway frog is arranged in pairs, that is, is connected rail 20 also to be arranged in pairs, be arranged in pairs in correspondence on the web of the rail of connection rail 20 and open Equipped with mounting hole, mounting hole is multiple, and the corresponding mounting hole opened up is used for attaching plate elements, to keep the connection rail 20 being arranged in pairs Gauge.The utility model additionally provides two (not shown) of embodiment of railway frog, including the fork heart 10 and the end with pitching the heart 10 The connection rail 20 of head connection.Difference lies in the fork heart 10 in embodiment two is overall by resistance to break-in with embodiment one for embodiment two Jin Gang is made.Identical with embodiment one, by the fork heart of antifriction alloy steel making, its wearability is higher than existing high manganese steel frog, High manganese steel frog thus can be replaced, extensive use on the railroad track;And compared to the fork heart 10 in embodiment one, by wear-resisting The fork heart 10 of steel alloy monoblock cast, further increases the wear-resisting property of the fork heart 10, so as to extend the use longevity of the fork heart 10 Life.
Optionally, the hardness of the heart 10 is pitched between 370HBW~430HBW.Overall because of the fork heart is made of wear-resisting alloy steel, Thus, the fork heart has high intensity, high tenacity.
Identical with embodiment one, the connection rail 20 in embodiment two is also formed by U75V rail.It is subject to due to connection rail Impact force is smaller relative to the fork heart, thus can meet requirement using existing potassium steel rail.Optionally, embodiment two In connection rail be also U75V rail.
Optionally, pitch and welded between the termination of the heart 10 and connection rail 20 by flash welding.Flash welding is electric current by two The contact surface of workpiece, the resistance of its tiny contact point and its electric arc generation heat for contacting surface are docked, by butting surface Heating, in due course between after, butt joint applies pressure, makes the whole regions of the two butting surfaces electricity that gets up of strong bonded at the same time Welding resistance method.In embodiment one, by flash welding, the fork heart 10 can be connected firmly with being connected rail 20, and shape is integral.
Identical with embodiment one, in embodiment two, the termination of the fork heart 10 is four, and four terminations are relatively common two-by-two respectively Line is set, and it is also four accordingly to connect rail 20, and four terminations are connected to a connection rail 20, four connection rails 20 It is relatively conllinear two-by-two respectively to set.When wheel passes through railway frog, first the connection rail 20 from fork heart side passes through the fork heart, then drives to On the connection rail 20 for pitching heart opposite side, so as to fulfill the lane change of locomotive.
It is identical with embodiment one, in embodiment two, pitch the heart 10 and four connection rails 20 form X-shaped structure.Wheels travel exists In this X-shaped structure, travel route can be varied as desired in, realizes the lane change of locomotive.
Optionally, connect and the first groove structure is offered on rail 20, offer on the fork heart 10 and be connected with the first groove structure The second logical groove structure.Connected by the first groove structure and the second groove structure, guiding wheel is from connection rail 20 to the fork heart 10 arrive connection rail 20 again, complete the lane change process of locomotive.
Identical with embodiment one, the connection rail 20 in embodiment two also includes the sequentially connected flange of rail, the web of the rail and rail head, rail Bottom is used to be fixedly installed on the ground.It is fixedly connected with the ground by the flange of rail, it is ensured that locomotive driving is connected when connecting on rail 20 Rail 20 will not rock, it is ensured that traffic safety.Optionally, land-fill method can be also used, by flange of rail landfill and ground.
Railway frog is arranged in pairs, that is, is connected rail 20 also to be arranged in pairs, be arranged in pairs in correspondence on the web of the rail of connection rail 20 and open Equipped with mounting hole, mounting hole is multiple, and the corresponding mounting hole opened up is used for attaching plate elements, to keep the connection rail 20 being arranged in pairs Gauge.
It can be seen from the above description that the above embodiments of the present invention achieve the following technical effects:
At least top of the fork heart 10 is made of wear-resisting alloy steel.It is high using the fork heart of antifriction alloy steel making, its wearability In existing high manganese steel frog, the service life of the fork heart can be extended, thus high manganese steel frog can be replaced, on the railroad track Extensive use.
Alloy steel construction track switch in the mill, it is necessary to using unlike material welding, the welding skill of medium alloy steel of the present invention Art, can be successfully applied on railway steel alloy welded frog, and welding technique is ripe.The technology tramcar field is at home It is pioneering, through Mechanics Performance Testing and flaw detection, meet product quality requirement.
For tramcar due to being limited by existing highway, crossing angle and condition are different, cause diamond crossing angle and Radius is varied, such as uses potassium steel block cast form, mould species is various, with high costs, and the process-cycle is longer.Therefore in water chestnut Shape preferably uses alloy steel frog form in intersecting, to adapt to various crossing angle requirements.Steel alloy have high intensity, high tenacity, The good characteristics such as high-wearing feature, select steel alloy to be selected as tramcar track switch railway frog material for the mainstream in market.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the present invention, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on, should be included within the scope of protection of this utility model.

Claims (9)

1. a kind of railway frog, including:
Pitch the heart (10);
Rail (20) is connected, the connection rail (20) is connected with the termination of the fork heart (10);
It is characterized in that, at least top of the fork heart (10) is made of wear-resisting alloy steel, the termination of the fork heart (10) is four A, four terminations are relatively conllinear two-by-two respectively to be set, and accordingly the connection rail (20) is also four, described in four Termination is connected to a connection rail (20), and four connection rails (20) are also relatively conllinear two-by-two respectively to be set.
2. railway frog according to claim 1, it is characterised in that the fork heart (10) is integrally all made of wear-resisting alloy steel.
3. railway frog according to claim 2, it is characterised in that it is described fork the heart (10) hardness 370HBW~430HBW it Between.
4. railway frog according to claim 1, it is characterised in that the connection rail (20) is formed by U75V rail.
5. railway frog according to claim 1, it is characterised in that it is described fork the heart (10) termination with it is described connection rail (20) it Between welded by flash welding.
6. railway frog according to claim 5, it is characterised in that the fork heart (10) and four connection rails (20) are formed X-shaped structure.
7. railway frog according to claim 6, it is characterised in that the connection rail (20) offers the first groove structure, institute State and offer the second groove structure being connected with first groove structure on the fork heart (10).
8. railway frog according to claim 1, it is characterised in that the connection rail (20) includes the sequentially connected flange of rail, rail Waist and rail head, the flange of rail are used to be fixedly installed on the ground.
9. railway frog according to claim 8, it is characterised in that the railway frog is arranged in pairs, the institute of the connection rail (20) State and mounting hole is offered on the web of the rail, the mounting hole is multiple, multiple mounting holes and the connection rail being arranged in pairs (20) the mounting hole on the web of the rail is correspondingly arranged, and the mounting hole being correspondingly arranged is used for attaching plate elements, to keep The gauge for the connection rail (20) being arranged in pairs.
CN201621330000.9U 2016-12-02 2016-12-02 Railway frog Expired - Fee Related CN207277103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621330000.9U CN207277103U (en) 2016-12-02 2016-12-02 Railway frog

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621330000.9U CN207277103U (en) 2016-12-02 2016-12-02 Railway frog

Publications (1)

Publication Number Publication Date
CN207277103U true CN207277103U (en) 2018-04-27

Family

ID=61991317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621330000.9U Expired - Fee Related CN207277103U (en) 2016-12-02 2016-12-02 Railway frog

Country Status (1)

Country Link
CN (1) CN207277103U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778602A (en) * 2019-03-25 2019-05-21 中铁宝桥集团有限公司 A kind of tramcar groove profile railway frog and seamless process manufacturing method
CN113618210A (en) * 2021-08-19 2021-11-09 铁科(北京)轨道装备技术有限公司 Frog manufacturing process and frog

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778602A (en) * 2019-03-25 2019-05-21 中铁宝桥集团有限公司 A kind of tramcar groove profile railway frog and seamless process manufacturing method
CN113618210A (en) * 2021-08-19 2021-11-09 铁科(北京)轨道装备技术有限公司 Frog manufacturing process and frog

Similar Documents

Publication Publication Date Title
CN207277103U (en) Railway frog
CN108842526A (en) A kind of groove profile rail double slip swich
CN103015309A (en) Integral joint steel structure door type pier
CN102021866B (en) Alloy steel combined frog in wedge-shaped structure
CN201850506U (en) Lower chord checking mechanism for steel truss bridge
CN104499382A (en) Combined frog of forged high-manganese-steel point rail
CN218986630U (en) Derailment prevention device for railway train
CN204803690U (en) Pairing gold solid forging railway frog
CN207227871U (en) Fusion cast frog
CN212375641U (en) Reinforced alloy steel point rail combined acute frog
CN2570315Y (en) Alloyed steel composite frog
CN2765934Y (en) Gluing alloy steel frog
CN201942957U (en) Wedge-shaped alloy steel combination frog
CN200952101Y (en) Full-bainitic steel forge welding frog
CN105297615B (en) A kind of method of suppression Suo Cheng bridge expanssion joint diseases
CN208830066U (en) A kind of groove profile rail double slip swich
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN112726296A (en) Split type combination frog
CN203362913U (en) Anti-fracture composition brake shoe for metro vehicle
CN208472469U (en) A kind of pre-buried steel-rail structure of suspension type monorail traffic
CN203782497U (en) Novel freeze joint clamping plate for railway tracks
CN207159721U (en) A kind of magnetic floats support meanss between turnout junction girder
CN212357835U (en) Novel cross turnout
CN218508138U (en) Novel double-working-edge wear-resistant guard rail for railway turnout
CN202157273U (en) Hanging basket separating type walking track structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20201202